OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy

Similar documents
Learn more at

Offshore engineering science

The Challenge of Wave Scouring Design for the Confederation Bridge

ASSESMENT of ESTIMATION MODELS for SCOUR AROUND PIPELINES under IRREGULAR WAVES

Flexible Spools Solution at Hybrid Risers Base A. Karnikian, Total and S. Tarbadar, M. Bonnissel, S. Legeay, Technip France

Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland

LARGE-SCALE MODEL TESTS ON SCOUR AROUND SLENDER MONOPILE UNDER LIVE-BED CONDITIONS

Learn more at

Learn more at

Development of TEU Type Mega Container Carrier

Illinois State Water Survey

19.1 Problem: Maximum Discharge

STRUCTURAL STABILITY ASSESSMENT

STRIDE PROJECT Steel Risers in Deepwater Environments Achievements

Protectingpipelinesfor

FINITE ELEMENT ANALYSIS OF PIPELINE GLOBAL WALKING WITH SPANNING AND LATERAL BUCKLING

Guidance on piling, heavy loads, excavations, tunnelling and dewatering

Construction Dewatering

Pre-Trenching, Pre-Sweeping and Backfilling for the 36 Offshore Pipeline Project in Taiwan

DIRECTIONAL DRILLING

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

BEACH EROSION COUNTERMEASURE USING NEW ARTIFICIAL REEF BLOCKS

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN

IMPACTS OF COASTAL PROTECTION STRATEGIES ON THE COASTS OF CRETE: NUMERICAL EXPERIMENTS

# Post Consultation and Submissions Resource Consent Conditions for Surfing Impact Mitigation August 2016

RESIDENTIAL WATER DISTRIBUTION

Wellhead, Conductor and Casing Fatigue Causes and Mitigation Tze King Lim, Elizabeth Tellier, Hugh Howells 2H Offshore Engineering

Impact Fatigue on Suction Valve Reed: New Experimental Approach

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

THE LIGHTS GO OUT The Ultimate Protection Technology for Protecting Submarine Cables

Tube rupture in a natural gas heater

Chutes Part 2: Synthetic linings

Shoreline Response to an Offshore Wave Screen, Blairgowrie Safe Boat Harbour, Victoria, Australia

The Eighteenth (2008) International Offshore and Polar Engineering Conference Vancouver, Canada, July 6 11, 2008

CFD for Ballast Water & Bio-fouling Management

Lecture 8&9: Construction Dewatering

INFLUENCE OF DAMAGED GROINS ON NOURISHED SEASHORE

Free Surface Flow Simulation with ACUSIM in the Water Industry

RIGID RISERS FOR TANKER FPSOs

Request Number IR1-12: Flow Passage. Information Request

Subsea Wellhead and Conductor Fatigue

TECHNICAL MEMORANDUM 002 EMORANNO. 001

Steel Lazy Wave Risers A Step Change in Riser Technology for the NWS

Scour Analysis at Seawall in Salurang, Sangihe Islands Regency, North Sulawesi

THE BRIDGE COLLAPSED IN NOVEMBER 1940 AFTER 4 MONTHS OF ITS OPENING TO TRAFFIC!

ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018

JAP Additional Information Sheet

Signature redacted Signature of Author:... Department of Mechanical Engineering

ON-BOTTOM STABILITY CALCULATIONS FOR FIBRE OPTIC SUBMARINE CABLES

Aerodynamic Measures for the Vortex-induced Vibration of π-shape Composite Girder in Cable-stayed Bridge

COASTAL HAZARDS. What are Coastal Hazards?

Appendix E Cat Island Borrow Area Analysis

Nearshore Morphodynamics. Bars and Nearshore Bathymetry. Sediment packages parallel to shore, that store beach sediment

THREE DIMENSIONAL STRUCTURES OF FLOW BEHIND A

ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

Richards Bay Coal Terminal

Stability of Pipeline and details of Anchor blocks

DESIGN OF SCOUR PROTECTION FOR THE BRIDGE PIERS OF THE 0RESUND LINK

Feasibility of Steel Lazy Wave Risers in the North Sea

Low-crested offshore breakwaters: a functional tool for beach management

Fluid-Structure Interaction Analysis of a Flow Control Device

TDLP INC. The Dam & Levee Professionals. Kevin Chancey Sarah Edens. Monica Murie Jason Unruh

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

TACKLING JACK-UP RIG NO-GO LOCATIONS. Prakasha Kuppalli ABSTRACT

Dynamic Simulation of the Norne Heidrun 10 x 16 Dewatering Pig

FLOWMETERING STORAGE TANKS FROM THE INSIDE

Unsteady Wave-Driven Circulation Cells Relevant to Rip Currents and Coastal Engineering

OTC Buckle Arrestors for Deepwater Pipelines Carl G. Langner / Langner & Associates

Quantification of the Effects of Turbulence in Wind on the Flutter Stability of Suspension Bridges

STUDY ON UPWARD MOVEMENT OF FINES FROM SANDY SEABED UNDER CYCLIC WATER PRESSURE CHANGE DUE TO WAVES

OECS Regional Engineering Workshop September 29 October 3, 2014

FOR INFORMATION ONLY. Gold Coast Seaway Channel Scour and Rock Wall Stability Investigation. R.B doc December 2011

EXPERIMENTAL INVESTIGATION OF WAKE SURVEY OVER A CYLINDER WITH DIFFERENT SURFACE PROFILES

Huntington District. For More Information Contact (304)

EFFECTS ON CUTTER SUCTION DREDGE PRODUCTION WHILE DREDGING SIMULATED DEBRIS IN THE LABORATORY

page - Laboratory Exercise #5 Shoreline Processes

LABORATORY EXPERIMENTS ON WAVE OVERTOPPING OVER SMOOTH AND STEPPED GENTLE SLOPE SEAWALLS

Wake Effects from Wind Turbines

Use of Underwater Dry Welding for In Situ Repair to Offshore Structures. Sabine Powell 02/12/2016

SPE The paper gives a brief description and the experience gained with WRIPS applied to water injection wells. The main

Large-scale Field Test

Paper 2.2. Operation of Ultrasonic Flow Meters at Conditions Different Than Their Calibration

Sustainable Installation & Maintenance Methods Keith McDermott Commercial Director for Tidal Energy Mike Wilson - Managing Director Mike Wilson

Global Buckling Design for Flexible Flowlines

INTEGRITY, SAFETY AND EFFICIENCY IN LNG TRANSFER IMPACT OF EMERGENCY SHUTDOWN AND RELEASE OPERATIONS

Components of a Barrage

DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project)

The tensile capacity of suction caissons in sand under rapid loading

CONSIDERATION OF DENSITY VARIATIONS IN THE DESIGN OF A VENTILATION SYSTEM FOR ROAD TUNNELS

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS

3 CONSTRUCTION. 3.1 Construction Methods and Sequence. 3.2 Construction Sequence

FLUID FORCE ACTING ON A CYLINDRICAL PIER STANDING IN A SCOUR

Modelling of Extreme Waves Related to Stability Research

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd

SEMATECH Provisional Test Method for Pressure Cycle Testing Filter Cartridges Used in UPW Distribution Systems

Certified Professionals in Hydrographic Solutions

Experimental study of scouring process and flow behavior around a spur dike during the surge pass

Transcription:

OTC-24699-MS Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy Copyright 2014, Offshore Technology Conference This paper was prepared for presentation at the Offshore Technology Conference Asia held in Kuala Lumpur, Malaysia, 25 28 March 2014. This paper was selected for presentation by an OTC program committee following review of information contained in an abstract submitted by the author(s). Contents of the paper have not been reviewed by the Offshore Technology Conference and are subject to correction by the author(s). The material does not necessarily reflect any position of the Offshore Technology Conference, its officers, or members. Electronic reproduction, distribution, or storage of any part of this paper without the written consent of the Offshore Technology Conference is prohibited. Permission to reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of OTC copyright. Abstract Surface laid pipelines experience free spans due to various reasons such as uneven seabed, local scour or a storm event. If free span lengths are beyond acceptable limits, vortex induced vibrations (VIV) can cause the pipeline to undergo fatigue damage and severely reduce the pipeline s design life. Thus pipelines need to be periodically monitored to ensure that there are no free spans that are beyond the acceptable length. When such free spans are identified, these need to be rectified immediately to avoid fatigue damage to the pipeline. Rectifying unacceptable free spans in existing pipelines are a constant battle for operators around the world. s on existing pipelines are commonly rectified by grout bags. While this method is considered to be a standard and cheap solution, it often does not provide a long term solution to free spans. It is often the case that the pipeline whose free spans are rectified by grout bags needs further free span rectification the following year. The onset of more free spans and the need for rectification cycle often continues annually when grout bags are used to rectify free spans. This paper presents a new approach named the Pipeline lowering (PL) method for free span rectification. This unique solution will ensure the free span rectification is a long term solution compared to grout bags that may be affected by scour and wave loadings. The solution involves lowering the crests of the free spans such that the pipeline follows the natural seabed profile while ensuring the pipeline integrity is not compromised at any stage. The lowering operation is carried out solely by fluidizing the seabed soil by a mass flow excavator and the pipeline lowers under its self-weight. A laboratory demonstration and successful field implementation of PL method for free span rectification are presented in this paper. This paper provides vital technical knowledge on free span rectification by PL methodology for pipeline engineers, contractors and operators who need to ensure free spans are rectified safely and efficiently. This new methodology is a cost effective and elegant solution. Introduction s refer to the sections of underwater pipelines that are unsupported by the seabed. Surface laid pipelines can experience free spans due to various reasons such as uneven seabed or local scour. If free spans lengths are beyond acceptable limits, vortex induced vibrations (VIV) can cause the pipeline to undergo fatigue damage and severely reduce the design life of a pipeline. Thus pipelines need to be periodically monitored to ensure that there are no free spans that are beyond the acceptable limit in length. When such free spans are identified, they need to be rectified immediately to avoid fatigue damage to the pipeline. s primarily occur when the scouring action of underwater currents alters seabed topology in the vicinity of a pipeline. s have been proven to adversely affect subsea pipeline when the lengths of free spans exceed acceptable critical lengths. The objective of this paper is to propose a new method of free span rectification known as Pipeline Lowering (PL) method. This is an efficient and long term solution as the free spanning section of the pipeline is lowered and is made either to follow the natural seabed profile or buried in the seabed. s on existing pipelines are commonly rectified by grout bags. While this method is considered to be a standard and cheap solution, it often does not provide a long term solution to free spans. It is often the case that the pipeline whose free spans are rectified by grout bags needs further free span rectification the following year. The onset of more free spans and the need for rectification cycle often continues annually when grout bags are used to rectify free spans.

2 OTC-24699-MS s on pipelines are often created, A. When there is a storm event which causes a scour B. When natural waves and currents cause local scour below the pipeline (Figure 1). C. Due to seabed topology (Figure 2) If the free span is caused due to (A), then a grout bag solution is suitable, but if the free span caused due to (B) or (C), then the grout bags may not provide a permanent solution. Rectification of free spans using grout bags may not be the most cost effective solution in the long run for free spans due to (B) or (C). Past experience in projects has shown that free spans tend to reappear in pipelines that were rectified by grout bags. This is because the introduction of grout bags may induce vortex currents that in turn results in scour that lead to the onset of free span. Furthermore, grout bags are prone to settlement or can get washed away. Local scour below a pipeline is a common cause for creation of free spans. The scouring process beneath a pipeline can be categorised into five key stages; onset of scour, tunnel erosion, lee-wake erosion, equilibrium stage, and scour lateral growth. a) Onset of scour A seepage flow is created in the soil beneath the pipe due to the pressure difference between upstream and downstream side of the pipe (oscillating pressure difference in case of waves). Onset of scour occurs when this seepage rate is high and causes piping in the soil. b) Tunnel erosion At this stage, the gap between the pipe and the bed remains small. A substantial amount of water is diverted to the gap leading to very large velocities in the gap. For a gap of 5% of pipe diameter, the bed shear stress just below the pipe can be amplified by a factor of 4. This results in high rate of scour as violent jet of sand and water. As the gap grows larger, the velocity reduces and the tunnel erosion stabilises. c) Lee-wake erosion Tunnel erosion is followed by lee-wake erosion. This is caused by vortex shedding. When the gap between the pipe and the bed reaches a certain value, vortex shedding will begin to occur. Vortices sweep the downstream bed as they pass and hence increase the bed shear stressed momentarily to higher values along the lee side (up to 4 times). This will lead to higher erosion in the lee side (downstream) of the pipe. d) Equilibrium stage The scouring process finally reaches a steady state in which the bed shear stress beneath the pipe becomes constant and equal to its undisturbed value (ambient bed shear stress). It is important that the fundamental cause for onset of free spans is investigated fully before a rectification solution is chosen. Seabed mobility assessment results can provide insight into whether a free span is due to natural wave and current conditions or not. Onset of scour Tunnel erosion Lee-wake erosion Equilibrium stage U U U U Soil D e D D D S e e Figure 1: Onset of scour leading to formation of free spans. Figure 2: Illustration of a pipeline free spans due to seabed topology (pipeline shown under empty, flooded and operating conditions)

OTC 23297 3 Overview of free span rectification process An overview of current industry practice on free span identification and rectification is schematically shown in Figure 3 below. survey & span identification Engineering Assessment Rectification Planning Free Span Rectification Post Rectification Survey Figure 3: Typical rectification process a. survey & span identification A survey is performed along the length of a pipeline to identify the quantity and the parameters of the free spans. Parameters such as free span length, height of pipeline above seabed and the geography of the seabed in the vicinity of the seabed are recorded. Data gathered during this phase can be used for further engineering analysis in the next step. b. Engineering Assessment Conventionally, the free span rectification is solely based on the grout bag placement method and the engineering assessment consist of evaluating the number of grout bags required to rectify each of the identified free spans. c. Rectification Planning Using the data from the engineering assessment, the exact steps to be taken to rectify the free spans is mapped out in this phase. If there are multiple free spans, the sequence in which the free spans are to be rectified is also determined. d. Free Span Rectification The rectification of the free spans is executed in accordance to the pre-determined plan put in place during the rectification planning phase. e. Post Rectification Survey When rectification of the free span rectification is complete, a survey is performed to ensure that the final position of the pipeline is such that free span is rectified. In this phase, it is possible to install monitoring devices such as accelerometers to monitor the displacement of pipelines where free spans are expected to recur. rectification by Pipeline Lowering (PL) Method Pipeline lowering (PL) method provides a new approach for free span rectification. This unique solution will ensure the free span rectification is a long term solution compared to grout bags that may be affected by scour and wave loadings. The solution involves lowering the crests of the free spans such that the pipeline follows the natural seabed profile while ensuring the pipeline integrity is not compromised at any stage. The lowering operation is carried out solely by fluidizing the seabed soil by mass flow excavators and the pipeline lowers under its self-weight. In order to implement the PL method, the following key assessments needs to be performed. Geotechnical assessment of the seabed soil to evaluate excavation rates. Engineering assessment of allowable pipeline stresses and hence the allowable single pipeline lowering depth Pipeline survey & engineering assessment capability to ensure that the pipeline integrity is not compromised during and after pipeline lowering operations. Geotechnical properties of seabed soils need to be assessed to ensure that the seabed soil can effectively be removed by a mass flow excavator. i.e PL method may not be practical if the seabed conditions are such that mass flow excavation is ineffective. In order to identify whether the pipeline can be lowered without compromising its integrity, an engineering assessment of allowable pipeline stresses would need to be undertaken. This would be based on, 1. Pipeline properties and operating conditions 2. ECA (Engineering Critical Assessment) Under ideal conditions, the following are allowable pipeline stress limits, in accordance to ASME B31.8.

4 OTC-24699-MS Longitudinal Stress Combined Stress : 80% of the SMYS : 90% of the SMYS These limits often would be further reduced by the ECA assessment of the pipeline joints. Integrity of the pipeline throughout the lowing operation is critical for the implementation of the Pipeline Lowering (PL) method. Accurate pipeline survey and real time engineering stress assessment capability need to be in place before the pipeline lowering operation. This is to ensure that the pipeline stresses are assessed at regular intervals during the lowering stages and maintained within the acceptable levels. Figure 4 illustrates typical longitudinal stress components that need to be considered when performing pipeline stress assessment. Figure 4: Typical Pipeline Longitudinal Stress components

5 OTC 23297 rectification by Placement of grout bags A. Free Span Identification rectification by Pipeline Lowering Method A. Free Span Identification Pipeline Pipeline Seabed Seabed B. rectified by Placement of grout bags B. rectified by Pipeline Lowering (PL) method Number of grout bags are placed below the pipe such that the grout bag supports the pipeline and resulting span is within the acceptable free span length. The lowering operation is carried out solely by fluidizing the seabed soil by mass flow excavators and the pipeline lowers under its self-weight. C. Post rectification reappearance of free span & free span growth issues C. Post rectification pipeline is below natural profile thus long term solution The grout bags will tend to induce vortex sheading and that in-turn can cause further seabed scour which in-turn can lead to free span growth both sides/ or further settlement of the grout bags which will result in the original. PL method involves lowering the crests of the free spans such that the pipeline follows the natural seabed profile while ensuring the pipeline integrity is not compromised at any stage. Figure 5: Comparison of free pan rectification methods: Placement of grout bags method Vs Pipeline lowering method

6 OTC 23297 Model Demonstration of Pipeline lowering (PL) method This section demonstrates the methodology employed when lowering pipeline. The sequence of images below show a free span rectification being performed using the Pipeline Lowering (PL) methodology in a test tank. This demonstration was performed with a miniature flexible steel pipe and a purpose built small Mass Flow Excavator (MFE). (a) section of pipeline. (b) Small scale model of Mass Flow Excavator (MFE) is used to fluidize the sand at the left crest. This causes the pipe on the left crest to settle lower into the sand. (c) The Mass Flow Excavator (MFE) is used to fluidize the sand at the right crest. This causes the pipe on the right crest to settle lower into the sand. (d) Pipeline has been lowered at both the crests.

OTC 23297 7 (e) A few passes are made over the central section of the pipeline between the 2 crests. (f) Pipeline is fully supported by the sand and there is no more free span. (g) A few more passes are made over the pipeline using the Mass Flow Excavator (MFE). (h) Top surface of pipeline is now fully flush with seabed with no free span. Figure 6 (a to h): Demonstration of Pipeline Lowering (PL) in a small scale setup.

Depth (m) below LAT 8 OTC-24699-MS Field Demonstration of Pipeline Lowering (PL) method Two field examples of pipeline lowering method are provided below. 1. rectification by PL method has been successfully executed in the field (China) with silty sand seabed conditions in water depths ranging from 130m to 150m. A total of 86 free spans in a 16 pipeline were rectified in 122 operational hours while ensuring that the pipeline was stable and lying without undue stresses acting upon it. The free span height ranged from 0.5m-1.5m. Figure 7 below shows one of the locations where the mass flow excavator had been used to rectify a free span by lowering the pipeline. on this pipeline was been rectified by lowering pipeline at this crest. Figure 7: rectification by pipeline lowering method employed in the field 2. Pipeline lowering method was successfully applied to lower a 16inch live gas subsea pipeline by 6m in Indonesia. A 16 live gas pipeline was crossing a shipping channel and was buried at about 3m below seabed. In order for the port to expand and allow bigger vessels to enter the port, the shipping channel needed to be deepened. Thus the pipeline was required to be lowered further 6m for a stretch of 350m where the pipeline crosses the shipping channel. The lowering operations had to be carried out whilst the pipeline is fully operational. The pipeline lowering methodology was followed successfully to lower the pipeline in steps of less than 0.5m per single pass. The pipeline was successfully lowered by 6m using a mass flow excavator in 14 passes. This successful lowering of a live gas pipeline by 6m is considered to be world s first such lowering. The initial and final position of the pipeline is shown below. The initial top of pipe (TOP) position and final TOP position after 14 lowering passes are shown in figure below. 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 Original Seabed level Original Top of Pipeline (TOP) Target TOP Pipeline after Pass 14 350m legth of pipeline was lowered to below 21.0 35.2 35.25 35.3 35.35 35.4 35.45 35.5 35.55 35.6 35.65 35.7 35.75 35.8 35.85 35.9 35.95 36 36.05 36.1 36.15 36.2 KP (m) Thousands Figure 8: rectification by pipeline lowering method employed in the field

OTC 23297 9 Conclusion This paper presents an alternative method, known as PL method, for free span rectification compared to the traditional ground bag placement method. The paper highlighted the fact that grout bag solution may not be the best long term solution for free span rectification under certain conditions. The fundamental cause for onset of free spans should be investigated fully and the rectification solution should be based on the results of such assessment. Grout bags may be suitable solution for free span rectification where the free span was initiated due to storm event, if the seabed is stiff soils or bed rock. The Pipeline lowering (PL) method is suitable in cases where the onset of free spans is due to natural wave and currents. However, the effectiveness of free span rectification by PL method in clay seabed soils reduces with the increase of clay shear strength and in particular PL method is expected to be ineffective in cemented soil. In general, the PL method in clay seabed may not be cost effective if the seabed soil shear strength is above 40kPa. The Pipeline lowering (PL) method would be preferred and cost effective solution for free span rectification where large number of free spans needs to be rectified in sandy seabed conditions. The PL methodology can also be an effective and cost efficient solution to many other scenarios such pipeline crossing and pipeline lowering for on-bottom stability issues. Acknowledgement The author would like to thank Reef Subsea for providing insight into the operations of the mass flow excavators. References 1. ASME B31.8 Gas Transmission & Distribution Piping Systems 2012 2. Richard Whitehouse, Scour at marine structures, Thomas Telford Ltd. 3. Sumer, B. M., Truelsen, C, Sichmann, T. and Fredsoe, J., (2001), Onset of scour below pipelines and self-burial, Coastal Engineering, Elsevier, Vol 42 (4), Pages 313-335