RESOLUTION MEPC.64(36) adopted on 4 November 1994 GUIDELINES FOR APPROVAL OF ALTERNATIVE STRUCTURAL OR OPERATIONAL ARRANGEMENTS AS CALLED FOR IN

Similar documents
RESOLUTION MSC.235(82) (adopted on 1 December 2006) ADOPTION OF THE GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006

ANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

RESOLUTION MEPC.122(52) Adopted on 15 October 2004 EXPLANATORY NOTES ON MATTERS RELATED TO THE ACCIDENTAL OIL OUTFLOW PERFORMANCE UNDER REGULATION 23

The Merchant Shipping (Marine Pollution) Regulations 2004

RESOLUTION MEPC.288(71) (adopted on 7 July 2017) 2017 GUIDELINES FOR BALLAST WATER EXCHANGE (G6)

RESOLUTION MEPC.86(44) adopted on 13 March 2000 AMENDMENTS TO THE GUIDELINES FOR THE DEVELOPMENT OF SHIPBOARD OIL POLLUTION EMERGENCY PLANS

ANNEX 15. RESOLUTION MEPC.158(55) Adopted on 13 October 2006

RESOLUTION MSC.236(82) (adopted on 1 December 2006) ADOPTION OF AMENDMENTS TO THE GUIDELINES FOR THE TRANSPORT AND HANDLING OF LIMITED AMOUNTS OF

RULES PUBLICATION NO. 94/P SUBDIVISION AND DAMAGE STABILITY OF NEW OIL TANKERS, CHEMICAL TANKERS AND GAS CARRIERS January

APPENDIX 4 STANDARD FORMAT FOR THE PROCEDURES AND ARRANGEMENTS MANUAL

ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS

ANNEX 5. DRAFT RESOLUTION MSC.[ ](93) (adopted on [ ])

Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe

MSC Guidelines for Review of Stability for Sailing Catamaran Small Passenger Vessels (T)

Marine Protection Rules Part 121A Ship Design and Construction Oil Tankers

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

T. O. PHILLIPS, CDR, Tank Vessel and Offshore Division

ANNEX 5 RESOLUTION MEPC.127(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT OF BALLAST WATER MANAGEMENT PLANS (G4)

RESOLUTION MSC.365(93) (adopted on 22 May 2014) AMENDMENTS TO THE INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA, 1974, AS AMENDED

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

RESOLUTION MEPC.209(63) Adopted on 2 March GUIDELINES ON DESIGN AND CONSTRUCTION TO FACILITATE SEDIMENT CONTROL ON SHIPS (G12)

10 December 2010 GUIDANCE FOR WATERTIGHT DOORS ON PASSENGER SHIPS WHICH MAY BE OPENED DURING NAVIGATION

ANNEX 5 IMO MARINE CASULATY AND INCIDENT REPORT DAMAGE CARDS* AND INTACT STABILITY CASUALTY RECORDS

MSC Guidelines for Review of Stability for Towing Vessels (M)

ANNEX 16 RESOLUTION MEPC.232(65) Adopted on 17 May 2013

GUIDELINES ON OPERATIONAL INFORMATION FOR MASTERS IN CASE OF FLOODING FOR PASSENGER SHIPS CONSTRUCTED BEFORE 1 JANUARY 2014 *

RULES PUBLICATION NO. 86/P EXPLANATORY NOTES TO SOLAS CONVENTION AND DIRECTIVE 2003/25/EC STABILITY AND SUBDIVISION REQUIREMENTS

ANNEX 19 DRAFT ASSEMBLY RESOLUTION

RESOLUTION MSC.256(84) (adopted on 16 May 2008) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA, 1974, AS

Rules for Classification and Construction Additional Rules and Guidelines

Guide for Assessing Hull-Girder Residual Strength for Tankers. July 1995

GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS

SLOP RECEPTION AND PROCESSING FACILITIES

REPORT OF THE MARITIME SAFETY COMMITTEE ON ITS NINETY-SEVENTH SESSION

INTERNATIONAL MARITIME ORGANIZATION

RESOLUTION MEPC.190(60) Adopted on 26 March 2010 AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE

MSC Guidelines for Review of Passenger Vessel Stability (Subchapters K & H)

MSC Guidelines for Review of Cargo and Miscellaneous Vessel Stability (Subchapter I)

RESOLUTION MSC.141(76) (adopted on 5 December 2002) REVISED MODEL TEST METHOD UNDER RESOLUTION 14 OF THE 1995 SOLAS CONFERENCE

IMO ANCHORING, MOORING AND TOWING EQUIPMENT. Submitted by the Republic of Korea

ANNEX 2. RESOLUTION MSC.256(84) (adopted on 16 May 2008)

properly applied assessment in the use.1 landmarks.1 approved in-service of ECDIS is not experience The primary method of fixing required for those

Stability Information Booklet. Priority Pontoon

MSC/Circular.649 International Convention for the Safety of Life at Sea, 1974, as amended (Adopted on 8 June 1994)

RULES PUBLICATION NO. 76/P STABILITY, SUBDIVISION AND FREEBOARD OF PASSENGER SHIPS ENGAGED ON DOMESTIC VOYAGES

MSC Guidelines for Review of Inland Tank Barge Stability Procedure Number: C1-13 Revision Date: May 13, 2016

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

Done at Stockholm on 28 February Signed without reservation to ratification on 1 July 1996

INTERTANKO GAS FORUM Athens 8th of June 2016

Ship Stability. Ch. 8 Curves of Stability and Stability Criteria. Spring Myung-Il Roh

UNIFIED INTERPRETATION OF PROVISIONS OF IMO SAFETY, SECURITY AND ENVIRONMENT-RELATED CONVENTIONS

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF SHIPS IDENTIFIED BY THEIR MISSIONS CHAPTERS SCOPE

RESOLUTION MSC.137(76) (adopted on 4 December 2002) STANDARDS FOR SHIP MANOEUVRABILITY

PREDICTING THE ABILITY OF SURVIVAL AFTER DAMAGE IN TANKERS. José Poblet Martínez - SENER, (Spain) José Javier Díaz Yraola - SENER, (Spain)

SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE

IMO DEVELOPMENT OF EXPLANATORY NOTES FOR HARMONIZED SOLAS CHAPTER II-1

CHAPTER II-1 B. Construction subdivision and stability, machinery and electrical installations

Rule Change Notice For: RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS

4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0) Fax: +44 (0)

Technical Information

ClassNK Technical Information No. TEC Required minimum propulsion power In principle, the installed propulsion power (total main engine output

Minimum standard of competence in advanced training for liquefied gas tanker cargo operations (STCW Reg V/1-2)

Guideline for Scope of Damage Stability Verification on new oil tankers, chemical tankers and gas carriers *)

ST. VINCENT AND THE GRENADINES

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE

CARGO OPERATIONS (TANKER) MANUAL CH.05 BALLAST HANDLING. Rev. No: 2. Page: 1 of PURPOSE

RESOLUTION A.446(XI) adopted on 15 November 1979 REVISED SPECIFICATIONS FOR THE DESIGN, OPERATION AND CONTROL OF CRUDE OIL WASHING SYSTEMS

TECHNICAL CIRCULAR. Circular No: S-P 32/13 Revision: 1 Page: 1 of 7 Date:

Statistics of still water bending moment of damaged ships

C C S Technical Information

RULES FOR CLASSIFICATION Ships. Part 3 Hull Chapter 15 Stability. Edition October 2015 DNV GL AS

IMO REVISION OF THE INTACT STABILITY CODE. Proposal of methodology of direct assessment for stability under dead ship condition. Submitted by Japan

Resolution A.1120(30) Adopted on 6 December 2017 (Agenda item 9)

ANNEX 3 DRAFT GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS GUIDELINES FOR VERIFICATION OF STABILITY ON TANKERS PART 1

MSC Guidelines for Review of Gas Carrier/Barge Structures

MSC Guidelines for the Review of OSV Stability

RESOLUTION A.751(18) adopted on 4 November 1993 INTERIM STANDARDS FOR SHIP MANOEUVRABILITY

SUBPART C - STRUCTURE

Guideline for Scope of Damage Stability Verification on new oil tankers, chemical tankers and gas carriers

IMO REPORT OF THE MARINE ENVIRONMENT PROTECTION COMMITTEE ON ITS FORTY-NINTH SESSION

RESOLUTION MSC.32(63) adopted on 23 May 1994 ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR THE CONSTRUCTION AND EQUIPMENT OF SHIPS CARRYING

Policy for Testing of Oil Discharge Monitoring and Control System Operational Procedure : QOP (17) Revision: 0 Page 1

HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014

PASSENGER VESSEL OPERATIONS AND DAMAGED STABILITY STANDARDS

STATISTICS OF STILL WATER BENDING MOMENT OF DAMAGED SUEZMAX OIL TANKER

Have you seen a truck weighing bridge? Do you know how it works?

RESOLUTION MSC.429(98) (adopted on 9 June 2017) REVISED EXPLANATORY NOTES TO THE SOLAS CHAPTER II-1 SUBDIVISION AND DAMAGE STABILITY REGULATIONS

SJÖFS 2002:17. Bilaga 3 Sammanställning av de resolutioner och cirkulär som det refereras till i bilaga 1 och 2.

All IMO Members Contracting Governments to the International Convention for the Safety of Life at Sea, 1974

Testing Procedures of Watertight Compartments

III Code. TRACECA Maritime Safety and Security IMSAS workshop Kiev (Ukraine) III Code. Dr. Jens U. Schröder-Hinrichs

ITTC Recommended Procedures and Guidelines

This lesson will be confined to the special case of ships at rest in still water. Questions of motions resulting from waves are not considered at

Investigation of the Intact Stability Accident of the Multipurpose Vessel MS ROSEBURG

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

RULES FOR THE CLASSIFICATION OF SHIPS

ANNEX 6. RESOLUTION MSC.370(93) (adopted on 22 May 2014)

INDIAN REGISTER OF SHIPPING CLASSIFICATION NOTES

ANNEX 18. RESOLUTION MSC.362(92) (Adopted on 14 June 2013) REVISED RECOMMENDATION ON A STANDARD METHOD FOR EVALUATING CROSS-FLOODING ARRANGEMENTS

A Study on Roll Damping of Bilge Keels for New Non-Ballast Ship with Rounder Cross Section

Transcription:

MEPC 36/22 THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention of the International Maritime Organization concerning the function of the Committee, NOTING resolution MEPC.52(32) by which the Committee adopted new regulations 13F and 13G and related amendments to Annex I of MARPOL 73/78, NOTING FURTHER resolution MEPC.52(32) by which the Committee agreed to develop, as a matter of urgency, guidelines for approval of alternative structural or operational arrangements as called for in regulation 13G(7), HAVING CONSIDERED, at its thirty.;.sixth session, the guidelines developed under regulations 13G(7) of Annex I ofmarpol 73/78, 1. ADOPTS: 2. INVITES: the Guidelines for Approval of Alternative Structural or Operational Arrangements as called for in regulation 13G(7), the text of which is set out at Annex to this resolution; Governments to give due consideration to the Guidelines, set out in the Annex, when accepting structural or operational arrangements for a tanker as an alternative to the requirements prescribed in paragraph (4) of regulation 13G of Annex I ofmarpol 73/78.

MEPC 36/22 Page 2 ANNEX OR OPERATIONAL ARRANGEMENTS AS CALLED FOR IN MARPOL 73/78, ANNEX I, REGULATION 13G(7) TABLE OF CONTENTS I. Background................................. 3 2. Applicability........................................... 3 3. Perfonnance requirements....... :.................. 3 4. Damage and outflow criteria................................. 3 5. Methodology for calculation of the hypothetical oil outflow................ 4 5.1 Damage assumptions................................ 4 5.2 Calculation of outflow in case of side damage.................... 4 5.3 Calculation of outflow in case of bottom damage..................... 5 5.4 Calculation of total outflow in case of side or bottom damage.................... 7 6. Outflow reducing arrangements......................... 7 7. Operations manual..................................... 8 8 Endorsement of the IOPP Certificate/Supplement.................. 8 Page Appendix Arrangement acceptable as alternatives under regulation 13G(7) of Annex I of MARPOL 73/78.

MEPC 36/22 Page 3 Background 1 Regulation 130(4) of Annex I of MARPOL 73178 specifies the requirements applicable to existing crude oil tankers of 20,000 tons deadweight and above and product carriers of 30,000 tons deadweight and above to reduce the accidental outflow of oil in the event of a collision or stranding. Regulation 13G(7) permits other structural or operational arrangements to be accepted as alternatives, provided that such alternatives provide at least the same level of protection against oil pollution in the event of collision or stranding, and are approved by the Administration based on guidelines developed by the Organization. The guidelines contained herein specify the criteria by which the acceptability of alternative arrangements should be determined. Methods approved by the MEPC at the time of development of the guidelines are detailed in the Appendix. Other alternative arrangements may be approved by the MEPC after considering their pollution prevention and safety characteristics. A proposal for approval of a new or revised arrangement should be submitted by an Administration and contain technical and operational specifications and evaluation of any safety aspects. Applicability 2 These guidelines apply to crude oil tankers of20,000 tons deadweight and above and product carriers of 30,000 tons deadweight and above which are not required to comply with regulation 13F and do not satisfy the requirements of regulation 13G(I)(c). Performance Requirements 3 The required minimum protection against accidental oil outflow is governed by regulation 13G(4), which stipulates that tankers to which regulation 13G applies shall have wing tanks or double bottom spaces, not used for the carriage of oil and meeting the width and height requirements of regulation 13E(4), covering at least 30% of~ for the full depth of the ship on each side or at least 30% of the projected bottom shell area within the length Lt, where Lt is as defined in regulation 13E(2). Equivalent structural or operational arrangements, as permitted by regulation 13G(7), should ensure at least the same degree of protection against oil pollution in the event of collision or stranding. The equivalency should be determined by calculations in accordance with paragraphs 4 and 5 below. Damage and outflow criteria 4 The oil outflow should be calculated for the damage cases identified in subparagraph 5.1 of these guidelines. The hypothetical outflow should be calculated for the conditions specified in subparagraphs 4.1, 4.2 and 4.3 below and in accordance with the procedures defined in subparagraphs 5.2, 5.3 and 5.4. The hypothetical outflows so calculated, divided by the volume of the cargo being carried by the ship in its original configuration, and expressed as a percentage, constitute the Equivalent Oil Spill number (the EOS number) for the ship under each of the conditions detailed in subparagraphs 4.1,4.2 and 4.3. 4.1 The EOS number should be calculated for the existing ship, with the ship loaded to the maximum assigned loadline with zero trim and with cargo having a uniform density allowing all cargo tanks to be

MEPC 36/22 Page 4 loaded to 98% full. This calculation establishes the base EOS number and also the nominal cargo oil density, which should be applied in the calculations required by subparagraphs 4.2 and 4.3. 4.2 A second EOS number should be calculated for the ship arranged with non-cargo side tanks as referred to in regulation 13G(4). 4.3 A third EOS number should be calculated for the selected alternative method and should not exceed the EOS number as calculated according to subparagraph 4.2, and should furthermore not be greater than 85% of the EOS number calculated according to subparagraph 4.l. 4.4 Fuel oil tanks located within the cargo tank length should be considered as cargo oil tanks for the purpose of calculating the EOS numbers. Methodology for calculation of the hypothetical oil outflow 5 The methodology detailed in this paragraph should be used for calculating the Equivalent Oil Spill number as required by paragraph 4. 5.1 Damage assumptions The damage assumptions identified below should be applied to all oil tanks when calculating the Equivalent Oil Spill number. 5.1.1 Side damage Longitudinal extent Transverse extent Vertical extent 1I3L 2I3 or 14.5m whichever is less B/5 or 1l.5m whichever is less = from the baseline upwards without limit 5.l.2 Bottom damage Longitudinal extent Transverse extent Vertical extent from the base line 5.2 Calculation of outflow in case of side damage b. v. = O.2L "" B/6 or 10m whichever is less but not less than 5m = B/15 Calculation of the outflow from a side damage should be done as follows:

MEPC 36/22 Page 5 Length in meters between the forward and after extremities of the cargo tanks = L t Length of tank number "i" = Ii Distance from hull plating to the tank boundary = Si Cargo volume in tank number "i" = Vi (m 3 ) Length of side damage according to subpara 5.1.1 = Ie Transverse extent of damage according to subpara 5.1.1 = te Even longitudinal distribution of damage location is assumed Probability factor for breaching tank number "i" due to side damage (Ii + Ie) qei = (I-sA) (L t + Ie) (I- sa) to be,2:0 ) Total hypothetical outflow in case of a side damage Oe = E qei. Vi This calculation method gives appropriate credit for any number and size of side ballast tanks. It also takes into account the effect of the cargo tank size. The risk of breaching a longitudinal bulkhead and outflow from centre tanks is also taken into account. 5.3 Calculation of outflow in case of bottom damage Calculation of the outflow from bottom damages should be done as follows: Length in meters between the forward and after extremities of the cargo tanks Width of the cargo tank area

MEPC 36/22 ANNEXS Page 6.. Length of tank number "i" Width of tank number "i" Height of a double bottom Cargo volume in tank number "i" Length of a bottom damage according to subparagraph 5.l.2 Width of a bottom damage according to subparagraph 5.1.2 Vertical extent of a bottom damage according to subparagraph 5.1.2 = Ii = bi = hi = Vi (m 3 ) = I. = bs = vs Probability factor for breaching tank number "i" due to bottom damage (Ii + Is)(bj + b s ) qsj = (l-h/v.). (L( + Is)(Bt + Bs) (1- h/vs) to be ~O Nominal density of the cargo according to para 4 Density of the sea water (normally l.025) = Po (tlm 3 ) = Ps (tlm 3 ) Loaded condition draft d Height of cargo column above the cargo tank bottom Highest normal overpressure in the inert gas system (normally 0.05 bar) Margin for average transient loss, swell and tide effects Standard acceleration of gravity = he = ~p (bar) = 1.1 g = 9.S1rn1s2

MEPC 36/22 "' Page 7 Outflow factor due to hydrostatic overpressure in tank number "i" Qru=I- (P. (d - hj g - 100~p) 1.1. Pc. he. g <lru to be 2:0 Outflow from tank number "i" Total hypothetical outflow in case of a bottom damage In case the ship is equipped with a double bottom the calculated outflow from tanks located above such double bottom may be assumed to be reduced by 50% of the total capacity of the affected double bottom tanks but in no case by more than 50% of the calculated outflow from each tank. Calculation of total outflow in case of a side or bottom damage 5.4 The outflow calculated under subparagraphs 5.2 and 5.3 above should be combined to the total hypothetical outflow as follows: Otot = 0.4. Oc + 0.6. Os Outflow reducing arrangements 6 Alternative outflow reducing methods as permitted under regulation 130(7) may include a single method or a combination of methods giving protection in case of collision or stranding or both. Methods that have been approved by the MEPC are identified in the Appendix. Other methods may be accepted by the Organization. Such methods should, in addition to meeting the outflow criteria given in paragraphs 4 and 5, be evaluated in each individual case for acceptability from general operational and safety points of view. In particular any such method: should not expose the tanker to an unacceptable stress level in intact condition and should not cause the accidental hull damage to be exacerbated; should not create an unacceptable additional fire or explosion hazard.

MEPC 36/22 Page 8 Operations Manual 7 The Master should be supplied with operational instructions, approved by the Administration, in which the operational conditions required for compliance with these guidelines should be clearly described. These instructions may be contained in a separate manual or be incorporated into existing shipboard manuals. These instructions should identify approved loading conditions, including part load conditions and including any ballasting used for obtaining these conditions. It should also contain information on the use of inert gas system and relevant trim, stress and stability information. Endorsement of the IOPP Certificate/Supplement 8 The IOPP Certificate/Supplement should be endorsed to identify the structural or operational measures approved in accordance with regulation 13(G)(7) as well as the approved operations instructions.

MEPC 36/22 Page 9 APPENDIX Arrangements acceptable as alternatives under regulation 13G(7) of Annex I of MARPOL 73178 This appendix contains detailed requirements on arrangements accepted by the MEPC as alternatives under the provisions of regulation 13G(7) of Annex I of MARPOL 73/78. At the time of development this appendix contains only one approved alternative method. Requirements for application of hydrostatic balanced loading in cargo tanks Hydrostatic balance loading is based on the principle that the hydrostatic pressure at the cargo tank bottom of the cargo oil column plus the ullage space inert gas overpressure remains equal to or less than the hydrostatic pressure of the outside water column, thereby mitigating the outflow of oil in case of bottom damage. The maximum cargo level in each tank being loaded under this criterion should therefore satisfy the following equation: where: IS the maximum acceptable cargo level in each tank, measured from the cargo tank bottom, Pc d h I LlP P. g is the density of the current cargo, is the corresponding draught of the vessel, is the height of the tank bottom above the keel, is the highest normal overpressure in the inert gas system, expressed in bar (normally 0.05 bar), is the density of the sea water, is the standard acceleration of gravity (g = 9.81 rnis 2 ). (bar) Ballast may be carried in segregated ballast tanks to increase draught to a larger value. This may be used to allow more cargo to be taken into cargo tanks within the hydrostatic equilibrium criterion and within the limits of the assigned load line.

MEPC 36/22 Page 10 The arrangements and procedures for operation with the hydrostatic balance method should be approved by the Administration. The approval should be based on a system specification and documentation, incorporating also:.1 calculations made to confirm whether or not resonance can occur between the natural period of longitudinal cargo liquid motion and the natural period of pitching of the ship, and also between the natural period of transverse cargo liquid motion and the natural period of rolling of the ship under approved cargo loading conditions and in any cargo tanks. In this context 'resonance can occur' means that the natural period of longitudinal motion of cargo oil is within the range from 60% to 130% of the natural period of pitching of the ship and/or the natural period of transverse motion of cargo is within the range from 80% to 120% of the natural period of rolling of the ship. When resonance can occur between ship's motion and cargo liquid motion, the sloshing pressure caused by such resonance should be estimated, and it should be confirmed that the existing structure has sufficient strength to withstand the estimated sloshing pressure; and.2 calculations of intact and damage stability, including the effects of free surface. Damage stability calculations are however only required for ships defined in regulation 1(6). When the accidental outflow reduction requirement can be met by applying hydrostatic loading to a limited number of tanks, wing tanks should have priority, thereby ensuring some reduction also in outflow from a side damage and minimizing sloshing in part loaded centre tanks. When operating in a multi port loading or unloading mode using the hydrostatic balance loading method, tanks covering at least 30% of the side of the length of the cargo section should be kept empty until the last loading location or should be unloaded at the first unloading location. Copies of certified ullage measurement reports should be kept on board, clearly identified, for at least three years. *** I:\11EPC\36\22