DDAS Accident Report. Accident details. Map details. Accident Notes. Report date: 19/05/2006 Accident number: 314

Similar documents
DDAS Accident Report

DDAS Accident Report. Accident details. Map details. Accident Notes. Report date: 15/03/2004 Accident number: 323

DDAS Accident Report

DDAS Accident Report

IMAS First Edition 01 October 2001 Amendment 5, June 2013

MANUAL MINE CLEARANCE

Safe Use of Explosives in Construction. Safe to Blast. Information Sheet

Participate in a rescue operation

CIRCULAR NO. O-6. Passenger Train Handling Safety and Emergency Procedures

PASSENGER SHIP SAFETY. Review of Operational Safety Measures to Enhance the Safety of Passenger Ships. Submitted by ICS SUMMARY

Excavations and Trenches

Emergency Response Plan Supervisor Version

Using a metal-detector to locate explosive hazards

Emergency Response Plans

University Safety Policy Supplement

TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07

Your reference Your correspondence of Our reference Date VOU/RLE 13 June 2018

Countermine Operations

SG19:17 NASC. A Guide to Formulating a Rescue Plan 1. INTRODUCTION

RESPONSE TO A SUICIDE/HOMICIDE BOMBING SCENE

COWRA PISTOL CLUB INCORPORATED Range Standing Orders

Appointed person Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Swimming Pools only* b) rescue procedures

What is Part 50? The regulations also require operators and contractors to report employment data.

In Association With. City & Guilds 2013 Reproduction of this document in whole or in part is forbidden without prior consent of City & Guilds

(Health, Safety, and Welfare)

WORK HEALTH AND SAFETY

Bogo Operations Pollution Incident Response Management Plan

OP001 BUS PATROL TRAINING MANUAL

PILOTAGE DIRECTIONS REVIEWED DECEMBER 2016

CICRA EMERGENCY PROCEDURES

CHAPTER 11: MEDICAL SUPPORT AND CASEVAC

THE UNIVERSITY OF SHEFFIELD ACCIDENT AND INCIDENT REPORTING AND INVESTIGATION POLICY AND PROCEDURES

Minimum Safety Requirements for Contractors Working on Railway Property

RYA MAJOR YOUTH & JUNIOR EVENT SAFETY STANDARD OPERATING POLICY AND PROCEDURES

THE CONSTRUCTION (HEALTH, SAFETY AND WELFARE) REGULATIONS 1996

Normal Operation of the Swimming Pool

WORK HEALTH SAFETY MANAGEMENT SYSTEM First Aid Policy & Procedure WHS2200

CPCS renewal test factsheet

Emergency Response Plan

RUGBY AUSTRALIA CONCUSSION PROCEDURE (RUGBY PUBLIC STANDARD CARE PATHWAY)

Event Management Plan

EVENT OPERATIONS PLAN

TYPE OF ORDER NUMBER/SERIES ISSUE DATE EFFECTIVE DATE General Order /12/2015 6/14/2015

ECHO Walking Festival 2018 Health and Safety Plan

Incorporating the AMS Cup and Quarterdeck Trophy. The Organising Authority for this event is the Sandringham Yacht Club Inc. (SYC)


Health & Safety Plan `

Baltimore Dragon Boat Challenge 2018 Rules & Regulations

HAZARDOUS INCIDENT SITE SAFETY PLAN

Phase 1 Identification

2.This section will move into the Airway Management, Rescue Breaths & Cardiopulmonary Resuscitation (CPR).

Principles of health and safety [SAMPLE] Test duration: 45 minutes

The purpose of this document is to establish the procedures for accident prevention and investigation at (Insert Company Name) jobsites.

Chapter 27. Gaining Access. Learning Objectives. Learning Objectives 9/18/2012. Describe purpose of extrication. Discuss role of EMT in extrication

Standards ensure that SAR personnel are suitably trained and experienced and can therefore be relied on to operate efficiently and safely.

VTCA Safety Seminars Blasting Safety

COVINGTON POLICE DEPARTMENT STANDARD OPERATING PROCEDURE

HEALTH AND SAFETY POLICY

Control of Work. Introduction This procedure describes the management of Asbestos. Definitions

Safe distances when using explosives

POOL OPERATING PROCEDURES & EMERGENCY ACTION PLAN Policy Owner Bursar

Emergency Action Plan

The Marlie Farm Explosion

SOP. Working in Confined Spaces

ACCIDENT REPORT AND INVESTIGATION POLICY. Ratified by VDA Board: Review date:

Work Activity (e.g. Road Work): Work Location:.

SAFE WORK METHOD STATEMENT SWMS No Version

1 Respond to the 1.1 The situation is assessed in a manner that recognises that it

Hollow Spike Tyre Deflation System

RISK ASSESSMENT. Bobcat Excavator. Models , (Series D & G) For. Version 1.2

Safety & Health Division. INVESTIGATION INTO THE FATAL ACCIDENT TO JOHN ANTHONY MAHER AT COOK COLLIERY ON 30th AUGUST 2000

UXO Safety Training Agenda. UXO Safety

CONTRACTOR SAFETY INDUCTION HANDBOOK

Lone Working Guidance for University Departments and Functions December 2009 Safety Services Office

First Aid and Emergency Procedures Guidelines for Coaches

General Information (Cover Sheet)

Instructions: Use this format to prepare the security plans for ACP contracts. EVERY point has to be covered; if they do not apply, write N/A.

Multiple Casualty Incidents

Application of rope access methods in the construction, inspection, repair and maintenance of wind turbines

CHAPTER 7: ADDITIONAL STUDIES

VOLUNTEER RECRUIT / FIRE FIGHTER FIRE DEPARTMENT

RISK ASSESSMENT. Bobcat Skid Steer Loader. Series F & G (incl. S Models) For. SSL Version 2

Standard Operating Procedure (SOP)

IFE Level 3 Diploma in Fire Science and Fire Safety

MARIN COUNTY SHERIFF S OFFICE GENERAL ORDER WRAP RESTRAINT POLICY

Geotechnics, Face and Stockpile Operations

2.0 ROLES AND RESPONSIBILITIES

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide

Blasting soft, plastic mineral inside a silo at a copper mine

Laboratory Standard Operating Procedure: Specimen Preservatives

Baltimore Dragon Boat Challenge 2016 Rules & Regulations

To establish a guideline for the safe and effective deployment of apparatus, personnel, and resources at the scene of structural fires.

COMPETENCIES FOR SPECIFIC TASK AREAS UNDER THE SCIENTIFIC AND ARCHAEOLOGICAL DIVING ACoP

Pacific Southwest Region, LOOKOUT TOWER

CHAPTER 2 2 EMERGENCY PROCEDURES EMERGENCY PROCEDURES. Emergency Response Plan and Procedures

Incident Command System Position Manual

HYDROTHERAPY POLICY. Signature: Version: 1.0. Issue Date: March Next Review Date: March 2021

Head of the Trent Regatta

2019 J24 Australian National Championships 3 6 January 2019

Transcription:

DDAS Accident Report Accident details Report date: 19/05/2006 Accident number: 314 Accident time: 13:00 Accident Date: 07/06/2000 Where it occurred: Power lines North of Rio Ligonha, Nampula Province Primary cause: Unavoidable (?) Country: Mozambique Secondary cause: Inadequate equipment (?) Class: Excavation accident Date of main report: 09/06/2000 ID original source: GZ/AVS2001:MZ03 Name of source: HT (field): IND 132 Organisation: Name removed Mine/device: M969 AP blast Ground condition: hard metal fragments pylons and surrounds Date record created: 20/02/2004 Date last modified: 29/02/2004 No of victims: 1 No of documents: 1 Map details Longitude: 38 30' 18" E Alt. coord. system: Map east: Map scale: Map edition: Latitude: 15 30' 50" S Coordinates fixed by: Map north: Map series: Map sheet: Map name: Accident Notes inadequate medical provision (?) inadequate equipment (?) squatting/kneeling to excavate (?) 1

Accident report The demining NGO involved made available their internal investigation report during 2001. The report is reproduced below, edited for anonymity. 1. General 1.1 The electricity power lines north of the Rio Ligonha in Nampula Province were a regular target for RENAMO sabotage during the Civil War. As a result, 34 of the high tension towers on the section from Mucarre to Murrupula were protected from further attack through the laying of a small protective anti personnel minefield around the base of each pylon. These mines remain today, and are preventing EDM from carrying out essential repair and rehabilitation works. 1.2 The Niassa Survey/UXO team deployed to begin a third phase of clearance around the base of these towers on 17 th April 2000. For task site location, see map copy at Annex A [not made available]. At 13:00 on 7 th June 2000 the victim accidentally detonated an explosive device. 1.3 The internal accident investigation was conducted over 7/8th June and involved the following personnel: Mozambique Country Manager, Mozambique Chief Administrator, Mozambique Survey Officer. 1.4 As well as a detailed scrutiny of the accident site, interviews were conducted with the following personnel: Niassa Survey/UXO Team Supervisor, Trainee Supervisor, Niassa Survey/UXO Team Medic, Niassa Survey/UXO Team Deminer - victim) 1.5 Also present on the 8 th June was a representative of IND who attended all interviews as well as the accident site. 2. Events leading to the accident 2.1 The Survey/UXO team began a third phase of clearance of the task on 17 th April 2000. Each tower is suspected to be protected by up to 45 mines. These were laid in clusters of 8 to 10 around the base of each of the four legs. For this particular task, where there is the possibility of causing further damage, all mines found are moved to a demolition pit located away from the towers. By 7 th June 2000, 531 M969 Portuguese anti-personnel blast mines had been destroyed. 18 of the 34 towers had been cleared with work on-going at another five. 2.2 Tower 231 is situated 1400m west of the Rio Lalaua. The soil has a high laterite content, and so the clearance was being conducted using a combination of detector and excavation using an enxada. This is a standard method used by our group in Mozambique. By the 7 th June 2000, 21 mines had been found around the tower, with work still to be completed on the remaining South West leg. 2.3 On 7 th June 2000 the victim completed 5m of clearance which were checked by the Team Supervisor. The victim then went on to clear a further 1.3m before indicating that he had located a mine. The mine was lying on its side 30cm from the leg of the tower. The Team Supervisor examined the mine before tasking the Trainee Supervisor to move the mine to the demolition pit, during the 12:50-13:00 break period. At 13:00 the final 50 minute work period began. The Team Supervisor observed the victim restarting excavation then began walking away from the tower. When the Team Supervisor was 17m away, an unplanned explosion occurred. 3. Treatment of the victim and subsequent evacuation 3.1 On hearing the unplanned explosion, the Team Supervisor (who was only 17m away), immediately called by VHF radio for the ambulance and medic to move to tower 230. The team supervisor then moved to assist the victim who was on his feet and staggering in the cleared area under the tower. The victim was heard asking where is my enxada, where is my 2

visor?. The Team Supervisor guided him from the area of the tower to the access road some 13m away. The Team Supervisor noted during a later interview that the victim was conscious and remained quite calm throughout. 3.2 On hearing the unplanned explosion and subsequent VHF radio message the medic and Trainee Supervisor moved towards tower 230 from their positions at the medical point and demolition pit respectively. On arrival the medic performed the following actions. Confirmed the victim s level of consciousness and breathing (he was able to talk calmly). Cleaned and dressed wounds to both hands. Inserted a cannula, set up an IV giving set and began to administer 500ml of Ringers solution. Administered 10mg of Nubain (pain relief drug) via the cannula. Administered 10ml of Crystapen (liquid antibiotic) via the cannula. 3.3 At 13:03, the Country Manager and the Chief Administer arrived at the task Control Point on a scheduled visit. They were told that an unplanned explosion had taken place by the team driver, who subsequently drove 1000m to recover the victim. By 13:10, some 9 minutes after the blast, the victim was loaded on a stretcher to the rear of a Land Rover 130 covered pick up and left for Nampula Hospital. At 13:10, the Team Supervisor reported the accident in full to headquarters in Nampula. 3.4 At 13:18 headquarters informed Nampula Hospital, by phone, the details of the accident and informed them to expect the casualty. A Hospital Trauma kit was taken to the hospital by our Survey Officer who awaited the arrival of the victim. At 15:25, some 2 hours and 24 minutes after the accident, the victim was handed over to the waiting medical staff at Nampula Hospital. He was immediately examined by the duty medic. At 16:00, he was examined by a doctor. At 17:00, he was released from hospital. 4. The accident investigation 4.1 The internal accident investigation took place over Wednesday and Thursday 7/8th June 2000. This involved a detailed study of the site, almost immediately after the casualty left for the hospital, and on-site interviews and further site visit the following day. The visit on day two was also accompanied by a representative from the IND. 4.2 The study of the accident site revealed that: The nature of the victim s injuries, the damage to his visor, the physical evidence gathered around the seat of the blast and the history of the task all indicate that he had inadvertently detonated an M969 anti personnel blast mine whilst excavating ground with an enxada (hoe) at the front of his lane at pylon 231. Due to the close proximity of the steel leg of the pylon the victim had been unable to use his detector to give any pre-indication as to the presence of any suspect objects. Therefore he had been excavating using an enxada. The ground was very hard and would have required the deminer to apply greater than normal pressure in order to make any headway. The damaged head of the enxada was encountered in uncleared ground some 6m from the site of the blast. For details, see photos at annex C page C-1 [not made available]. The previous mine found was lying on its side at the base of a large spoil heap piled at the western edge of the pylon. The seat of the explosion was 30/40cm from the position of the previous mine (unusually close even for this particular task). The victim had been wearing his protective equipment (vest and visor) correctly. This is backed up by the evidence of damage to the outside of both vest and visor and to the minor injuries sustained by the deminer. 5. Conclusions in relation to the accident 3

5.1 Based on the evidence gained from interviews, consideration of the accident circumstances, and detailed assessment of the site, the following conclusions are drawn: The M969 was struck on the pressure plate causing it to detonate. The mine was lying on its side (in a similar manner to the previous mine found) probably because it had been washed down the spoil heap by rain water. No blame can be attached to the deminer or team. Our SOPs were at all times adhered to. The deminer s injuries were considerably minimised due to the correct manner in which he was wearing his protective vest and visor. Having made an assessment of the casualty the team medics applied the correct treatment before quickly moving the casualty to the hospital. The hospital were correctly notified of a casualty and one of our hospital bags was made available. A clear accident report was made to Nampula headquarters at 13:10. However, this was a full 8 minutes after the explosion had taken place. The driver should have made a short initial situation report alerting HQ and all other radio traffic that use of the radio should be minimised. 6. Summary actions 6.1 The underlying causes leading to the accident can be considered to be: a) The close proximity of the metal leg of the pylon to the mine discounting the use of a metal detector to give any advanced warnings. b) The high spoil heap lying adjacent to the pylon which has over time had rain water run off which has caused some mines laid on or around it to be displaced. 6.2 These circumstances draw into question the use of excavation around any towers surrounded with unusually high or steep slopes. An alternative method must be found. Since the immediate objective is to clear areas around the base of the towers in order to allow EDM crews access to make emergency repairs, it is suggested that the spoil heap at tower 231 is moved away from the base of the tower using our mechanical mine-clearance capability. The spoil can then be marked and cleared at a later date. 6.3 Since [the demining NGO s] well proven SOP were not by themselves the cause of the accident normal demining should continue, though all senior operational staff should be notified of the causes. Signed: Country Manager Mozambique Annexes referenced in the report were not made available. The demining NGO were operating in one-man-teams, with the enhanced levels of supervision that this entails. They routinely squat or kneel to excavate. The group always wears a full-face visor and a short frontal apron when in mined areas. An IND report was made available, but could not be copied. The accident code was 000985/Code 101. The map reference was recorded as: Lat: 15 deg 30' 50 S Long: 38deg 30'18 E The victim was born on 1st January 1964. The report included little detail, referring the reader to the internal accident report above. The only aditional infromation was that equipment worth US$50 was damaged. 4

Victim Report Victim number: 396 Age: 36 Status: deminer Compensation: not made available Protection issued: Long visor Short frontal vest Name: Name removed Gender: Male Fit for work: yes Time to hospital: 3 hours Protection used: Long visor; Short frontal vest Summary of injuries: INJURIES minor Hands COMMENT No medical report was made available. Analysis The primary cause of this accident is listed as Unavoidable because it seems that the victim was working in accordance with his SOPs at the time of the accident. The secondary cause is listed as a Inadequate equipment because the methods used and equipment available were not appropriate, and the provision of appropriate equipment from detector to ambulance is a management responsibility. The deminer was obliged to use a full excavation method in hard ground using an enxada. The use of some kind of pick-axe or hoe is not unusual when conducting area-excavation. The tool is swung in at a low angle and used to shave the face of the excavation in a slow advance. This is the second of three accidents involving this demining NGO and an enxada in Mozambique. See the accidents on 14 th April 1998 and on 7 th July 2000. A photograph of an enxada is shown above. The failure of the group s management to provide an on-site ambulance is surprising. The victim was evacuated in a Land Rover and driven over bad roads for two hours and a half hours. A full three hours elapsed before he was seen by a doctor. His injuries were very light, but had they been heavy the means of evacuation could have been life-threatening. The internal investigating team did not acknowledge that the group s failure to provide a dedicated on-site ambulance was a failing. It was unusual to the point of being almost unique amongst professional groups in Humanitarian Demining. 5