Michael D. Turpeau Jr. State Safety Program Supervisor Georgia Department of Transportation

Similar documents
What Engineering Can Do for You! Low Cost Countermeasures for Transportation Safety

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio

Now Let s Think Systemic

Designing for Pedestrians: An Engineering Symposium. Rutgers University March 21, 2013

Systemic Safety. Doug Bish Traffic Services Engineer Oregon Department of Transportation March 2016

Engineering Countermeasures for Transportation Safety. Adam Larsen Safety Engineer Federal Highway Administration

City of Grand Forks Staff Report

Road Safety Audit Report: Interstate 516

Highway Safety Improvement Program. Metro District Program Criteria

HSIP Project Selection Criteria

Table of Contents Kansas Highway Safety Improvement Program

Local Road Safety Plans

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

TEXAS TRAFFIC SAFETY TASK FORCE. Jeff Moseley Texas Transportation Commission

Road Safety Assessments. Lt. Bob McCurdy Williamson County Sheriff s s Office Marion, IL.

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Road safety design standards and the Asian Highway Network. irap Asia Pacific Workshop Greg Smith 2016/05/26

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Implementing Strategies from Missouri s Blueprint for Safer Roadways Using System-wide Safety Solutions to Save Lives

Secondary Road Program

CTDOT Pedestrian and Bicycle Safety Initiatives

Speed Management Action Plan

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Roadside Safety Proven Countermeasures. Emmett McDevitt Transportation Safety Engineer Federal Highway Administration

Lane Departure. Key Facts

Florida s Intersection Safety Implementation Plan (ISIP)

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by

INDEX. Geometric Design Guide for Canadian Roads INDEX

APPENDIX G Lane Departure Action Plan

New Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid

Institute of Transportation Engineers Safety Action Plan

APPENDIX C. Systems Performance Report C-1

Virginia s HRRR Program. Q Lim, Ph.D.

A Strategic Highway Safety Plan. a coordinated and informed approach to reducing highway fatalities and serious injuries on all public roads.

T10:2012 Site Category 1a) T10:2012 Site Category 1b) Railway Level Crossing Approach Traffic Signal Approach Event Code F Event Code E

City of Vestavia Hills Traffic Calming Policy for Residential Streets

Highway 12 Safety Coalition

Austroads National Risk Assessment Model (ANRAM) Chris Jurewicz, ARRB

ACTIVE TRANSPORTATION

Closing Plenary Session

Kentucky s Surface Transportation System

NCHRP Superelevation Criteria for Sharp Horizontal Curves on Steep Grades. Research Team: MRIGlobal Pennsylvania State University

Technical Memorandum SAFETY AND SECURITY. Prepared for: Prepared by:

Traffic Calming Policy

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

Transportation Safety Planning at DVRPC

Road Safety Audit Review Burpee Plank Road Town of Bristol. July 2, 2008

Proven Safety Countermeasures. FHWA Office of Safety January 12, :00 p.m. to 2:00 p.m. Eastern Time

Road Diets. Presented by: Cristine Gowland, P.E. LADOTD District 62 March 2, 2016

USDOT Bicycle and Pedestrian Safety Initiative: Safer People and Safer Streets. Barbara McCann, USDOT Office of Policy

11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT

Developing a Local Road Safety Plan. April 9, 2017 Presented by: Nicole Waldheim, Danena Gaines, and Hillary Isebrands

Everyone is a Pedestrian

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer

US Hwy. 64/264 Pedestrian Crossing at the Little Bridge Alternatives Analysis Public Meeting

CE576: Highway Design and Traffic Safety

Living Streets Policy

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY (MAP-21) AND ODOT FUNDING PROGRAMS

Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona

Services and Funding from WSDOT Local Programs

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

REDUCING COLLISIONS AT HIGH CRASH LOCATIONS

Telling the Story of Safety

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

How Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017

RICHMOND AREA METROPOLITAN PLANNING ORGANIZATION 2031 LONG-RANGE TRANSPORTATION PLAN PART 3 DATA COLLECTION AND ANALYSIS

Roadway Departure Focus State Initiative Roadside Safety Systems Inspection, Maintenance & Designers Mentoring Program

Where Did the Road Go? The Straight and Narrow about Curves

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

ROADSIDE DELINEATION AND SAFETY SYSTEMS

Local Rural Road Safety

Rational road safety management Practice and Theory. Bhagwant Persaud Ryerson University Toronto, Canada

Engineering Your Community Safe

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Rebecca Szymkowski, P.E., PTOE Wisconsin Department of Transportation. ITE Midwestern District Annual Meeting June 30, 2015

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

Pavement Markings (1 of 3)

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

Pedestrians safety. ROAD SAFETY SEMINAR PIARC/AGEPAR/GRSP Lome, Togo October 2006 Lise Fournier, Canada-Qu

2003 road trauma for. Wairoa District. Road casualties Estimated social cost of crashes* Major road safety issues WAIROA DISTRICT JULY 2004

6.8 Transportation Safety & Security

Safety Corridors a Synthesis. Charlie Nemmers / Derek Vap University of Missouri

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Community Transportation Plan

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

Deaths. Toward Zero. A V i s i o n f o r S a f e r R o a d s i n A m e r i c a

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

Off-road Trails. Guidance

POLICY FOR NEIGHBORHOOD TRAFFIC CALMING

CROSSING GUARD PLACEMENT CONSIDERATIONS AND GAP ASSESSMENT

High Risk Rural Road Program Road Safety Audit Report

3.1 TRAFFIC CALMING PROCESS SUMMARY

Development of the Technical Standard on the Road Safety Facility For the Asian Highway Networks

KY s s RSA Evolution. Jo Anne Tingle, PE Kentucky Transportation Cabinet (KYTC) AASHTO TIG/FHWA RSA PEER Exchange Little Rock, AR - April 29, 2008

Road Side Design: When is a Barrier Required?

Germanna Highway Route 3

Appendix 3 Roadway and Bike/Ped Design Standards

Cycle Track Design Best Practices Cycle Track Sections

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon

Transcription:

Michael D. Turpeau Jr. State Safety Program Supervisor Georgia Department of Transportation

Safety Programs Highway Safety Improvement Program (HSIP) Off-System Safety Program (OSSP) High Risk Rural Roads (HRRR) Road Safety Audits (RSA)

Highway Safety Improvement Program (HSIP) Safety projects typically fall into one of three categories: Site Specific: These improvements are made at specific locations i.e. intersection improvements based on historical crash data. These projects may be the result of a listing of high crash locations. Systematic: These improvements are made statewide at locations that meet certain criteria. These are most often associated with a specific countermeasure i.e. cable guardrail and candidate locations are selected based on a preponderance of crashes which the specific countermeasure is intended to address. Corridor : These improvements are made on an entire corridor. A high crash corridor is selected and a variety of countermeasures will be implemented throughout.

Highway Safety Improvement Program (HSIP) Georgia s Highway Safety Improvement Program systematically focuses generally on the following areas: Prevent Vehicles from Departing the Roadway or Lane Minimizing the Consequences of Leaving the Road Improve Design & Operation of Intersections Pedestrian Safety Reduce Vehicle-Train Crashes These projects are typically prioritized based on B/C Analysis

Off-System Safety Program (OSSP) Off-System Roadways are those owned and maintained by agencies other than Georgia DOT ***Represents best opportunity for local governments to secure safety funds from GDOT*** Off-System routes account for 84% of the total statewide roadway miles and 37% of the Vehicle Miles Traveled (VMT) Approximately 40% of traffic crash fatalities occur on Off- System routes each year $7,000,000 dedicated annually ($1,000,000 per District)

Off-System Safety Program (OSSP) Eligible Improvements Raised Pavement Markers Rumble Strips Edgeline Shoulder Centerline Pavement Markings Edgelines on roadways 20 in width or greater Centerlines Stop Bars

Off-System Safety Program (OSSP) Eligible Improvements(Cont d) Signing Curve Warning(Chevrons, Curve Ahead, etc.) Stop Signs Intersection Warning Signs Vegetation Removal Guardrail- excluding routine upgrades Guardrail and Object Delineation Traffic Signals(signal warrants must be satisfied and turn lanes should exist) Roundabouts High Friction Surface Treatment

Off-System Safety Program (OSSP) District Traffic Engineer Point of contact for project initiation Local Maintenance and Improvement Grant Coordinator (LMIG) Works with local officials to coordinate project development and implement improvements following Local Let procedures

District Location Title Name Phone Number E-Mail Traffic Operations Traffic 1 Gainesville 2 Tennille 3 Thomaston 4 Tifton 5 Jesup 6 Cartersville 7 Chamblee Safety Program Coordinator Safety Program Manager District Traffic Engineer LMIG Coordinator District Traffic Engineer LMIG Coordinator District Traffic Engineer LMIG Coordinator District Traffic Engineer LMIG Coordinator District Traffic Engineer LMIG Coordinator District Traffic Engineer LMIG Coordinator District Traffic Engineer LMIG Coordinator Emmanuella Myrthil (404)635-2824 emyrthil@dot.ga.gov David Adams (404)635-2850 eadams@dot.ga.gov David Olson (770)532-5533 dolson@dot.ga.gov Chris Dills (770)532-5526 cdills@dot.ga.gov Kedrick Collins (478)552-4619 kecollins@dot.ga.gov Barry Wood (478)552-4601 bwood@dot.ga.gov Michael Presley (706)646-6676 mpresley@dot.ga.gov Dane Bishop (708)646-6900 dbishop@dot.ga.gov Van Mason (229)386-3435 vmason@dot.ga.gov Jeff Bridges (229)386-3280 hbridges@dot.ga.gov Cynthia Phillips (912)427-5702 cyphillips@dot.ga.gov Brent Moseley (921)427-5711 dmosley@dot.ga.gov Harry Maddox (770)387-3628 hmaddox@dot.ga.gov Steve Sanders (770)387-3602 ssanders@dot.ga.gov Mike Lobdell (770)986-1765 mlobdell@dot.ga.gov Katie Mullins (770)986-1001 kmullins@dot.ga.gov

High Risk Rural Roads (HRRR) Approximately 60% of fatalities nationwide occur on rural roads In Georgia, rural road fatalities represent a little more than 50% of the total fatalities

High Risk Rural Roads (HRRR) Statutory Requirements: 23 U.S.C. 148(a)(1) defines a High Risk Rural Road (HRRR). States are required to identify these roadways according to the following definition: " any roadway functionally classified as a rural major or minor collector or a rural local road A. on which the crash rate for fatalities and incapacitating injuries exceeds the statewide average for those functional classes of roadway; or B. that will likely have increases in traffic volume that are likely to create an crash rate for fatalities and incapacitating injuries that exceeds the statewide average for those functional classes of roadway."

High Risk Rural Roads (HRRR) State maintained and local roads are eligible Approximately $3,000,000 has been allocated annually in Georgia GDOT Office of Traffic Operations prepares a list of eligible routes by District (Note: Analysis can be formed on specific sites as long as they meet FC criteria) District Traffic Operations Offices identify countermeasures based on the crash data and submits project requests

High Risk Rural Roads (HRRR) Sample List of Construction and Operational Improvements 23 U.S.C. Section 148(a)(3)(B) The term 'highway safety improvement project' includes a project for one or more of the following: An intersection safety improvement. Pavement and shoulder widening (including addition of a passing lane to remedy an unsafe condition). Installation of rumble strips or another warning device, if the rumble strips or other warning devices do not adversely affect the safety or mobility of bicyclists, pedestrians, and the disabled. Installation of a skid-resistant surface at an intersection or other location with a high frequency of crashes. An improvement for pedestrian or bicyclist safety or safety of the disabled.

High Risk Rural Roads (HRRR) Construction & Operational Improvements (cont d) Construction of any project for the elimination of hazards at a railway-highway crossing that is eligible for funding under section 130, including the separation or protection of grades at railway-highway crossings. Construction of a railway-highway crossing safety feature, including installation of protective devices. Construction of a traffic calming feature. Elimination of a roadside obstacle. Improvement of highway signage and pavement markings. Installation of a priority control system for emergency vehicles at signalized intersections.

High Risk Rural Roads (HRRR) Construction & Operational Improvements (cont d) Installation of a traffic control or other warning device at a location with high accident potential. Planning integrated interoperable emergency communications equipment, operational activities, or traffic enforcement activities (including police assistance) relating to workzone safety. (Only "operational activities relating to workzone safety" are eligible under HRRRP; "Planning integrated interoperable emergency communications equipment and traffic enforcement activities relating to workzone safety" are NOT eligible under HRRRP) Installation of guardrails, barriers (including barriers between construction work zones and traffic lanes for the safety of motorists and workers), and crash attenuators.

High Risk Rural Roads (HRRR) Construction & Operational Improvements (cont d) The addition or retrofitting of structures or other measures to eliminate or reduce accidents involving vehicles and wildlife. Installation and maintenance of signs (including fluorescent, yellowgreen signs) at pedestrian-bicycle crossings and in school zones. Construction and yellow-green signs at pedestrian-bicycle crossings and in school zones. Construction and operational improvements on high risk rural roads.

High Risk Rural Roads (HRRR) Many Off-System Safety Projects qualify for HRRR Funding. The primary differences include: OSSP Local Let Federal Dollars Off-System No ROW Less Complex HRRR GDOT Let Federal Dollars On/Off-System ROW Optional More Complex

Road Safety Audits (RSA s) Safety Performance Examination Existing or Future Road Independent, Multidisciplinary Team Identifies and Reports potential road safety issues Identifies opportunities for improvements Accounts for all road users Any applicable location

Road Safety Audits (RSA s) Traditional Review In-house team Review plans Reactive Standards compliance check Road Safety Audit Independent team Field review Proactive Comprehensive w/ human factors

Contact Information Reduce the number and severity of crashes May reduce costs by identifying safety issues and correcting them before projects are built Promote awareness of safe design practices Integrate multimodal safety concerns Consider human factors Low cost

Contact Information Michael D. Turpeau Jr. (404)635-2831 mturpeau@dot.ga.gov Questions