MP AUDYOGIK KENDRA VIKAS NIGAM (I) LTD., INDORE (M.P.) SMART INDUSTRIAL PARK Near NATRIP - Pithampur Project Consultant Mehta and Associates, Indore Architects & Urban Planners
Proposed site for Smart industrial park Near the existing site of National Auto Testing Track, nearly 467.7 Ha. of land identified for development of Smart Industrial Park. The land is located in district Dhar near Pithampur, the most vibrant & biggest industrial area of Madhya Pradesh.
1 NATRAX 4 6 6 1 7 2 17 2 10 11 17 11 9 11 2 7 1 1 14 16 LEGEND Mobile Tower SITE MASTER PLAN KEY PLAN
4 1 19 20 10 12 10 1 14 1 7 17 2 17 1 6 11 10 NATRAX 11 7 6 2 9 2 4 1 11 16 LEGEND 1) School 19) Hospital 20) Theater SITE MASTER PLAN KEY PLAN
PARKING SCHOOL, 1.10% HOSPITAL, POLICE & FIRE STATION 1.2% LOADING & UNLOADING 2.16% OPEN PARK and Green open spaces 12.67% AMENITIES 1.2% LAND UTILIZATION EFFICIENCY CIRCULATION 17.% INDUSTRIAL POLTTED AREA 4.6% AREA STATEMENT AREA IN AREA IN PERCENT AGE SQ.M. HECT. % TOTAL LAND AREA 467710 467.71 1 INDUSTRIAL POLTTED AREA 2614.0 2.614 4.6 2 COMMERCIAL ZONE 20620.91 20.6209 4.46 RESIDENTIAL 227211.0146 22.7211 4.6 4 AMENITIES 7096.462 7.09649 1.2 OPEN PARK and Green open spaces 9204.69 9.204 12.67 6 LOADING & UNLOADING 100.216 10.0 2.16 7 SCHOOL,HOSPITAL, POLICE & FIRE STATION 779.6.7796 1.2 RESIDENTIAL 4.6% COMMERCIAL ZONE 4.46% PARKING 164.4.1644 1.10 9 CIRCULATION 1162.607 1.1629 17. TOTAL 467710 467.71 100.00 INDUSTRIAL PLOTTING PATTERN 2% PLOT DISTRIBUTION SNO. PLOT AREA NO. 1 Less than 1.0 hect. 2 % Less than 1.0 hect. 1.0 hect to 2.0 hect. 2.0 hect. To.0 hect 2 1.0 hect to 2.0 hect. 2 2.0 hect. To.0 hect 6 10% 6% 2%.0 hect. To 4.0 hect 4.0 hect. And above 4.0 hect. To 4.0 hect 10 4.0 hect. And above TOTAL INDUSTRIAL PLOTS 100 LAND UTILIZATION DETAILS
2 1 1 19 20 6 4 7 NATRAX LEGEND Approach from NH- Mumbai- Agra Highway SITE MASTER PLAN KEY PLAN
VEHICULAR CIRCULATION NETWORK PARKING 4 MT WIDE ROAD LOGISTIC HUB/WAREHOUSE 1 CHECK POST 6 MT WIDE ROAD 4 MT WIDE ROAD ROAD JUNCTIONS Two types of intersection of the roads are planned: -WAY INTERSECTION T-Junction-The junction will cater the three road segments (arms) of the park. 4-WAY INTERSECTION Will involve crossing over of two perpendicular roads. LANES Incorporating the existing water channels and surrounding hydrological network in the layout and developing them as enjoyable green space for the park and water front development. Central Green spine divides the site, becoming the key feature and attraction of park. Vegetated buffer or filter strips will be provided, with gently sloped planted areas to pre-treat storm water runoff. 0 MT WIDE ROAD LOGISTIC HUB/WAREHOUSE 2 Approach from NH- Mumbai- Agra Highway 1 MIN. WALAKBLE DISTANCE The main arterial road of 4 meter width is 4 lane. the sub-arterial roads (internal roads) of 6 meter and 0 meter are 4 lanes 1 MIN. WALAKBLE DISTANCE Increasing biomass within the urban environment to reduce air and noise pollution, to reduce storm water runoff and soil erosion, to reduce energy usage in buildings for heating and cooling, to improve public health, and create pleasant streetscapes for the public. Efficient and eco-friendly CIRCULATION NETWORK 1 MIN. WALAKBLE DISTANCE ECO-FRIENDLY GREEN PEDESTRIAN AND NMT NETWORK
Logistic Hub /ware houses Parking NATRAX Key map 40 Mt Wide Road Section (Approach Road) (Phase 1) 4 Mt Wide Road Section (phase 1) 4 mt Wide Road Section 6mt Wide Road Section 0 Mt Wide Road Section Proposed road hierarchy of roads Efficient and eco-friendly CIRCULATION NETWORK
Logistic Hub /ware houses Parking NATRAX Key map 40 Mt Wide Road Section (Approach Road) (Phase 1) 4 Mt Wide Road Section (phase 1) 4 mt Wide Road Section 6mt Wide Road Section 0 Mt Wide Road Section Proposed road hierarchy of roads Efficient and eco-friendly CIRCULATION NETWORK
Logistic Hub /ware houses Parking NATRAX Key map 40 Mt Wide Road Section (Approach Road) (Phase 1) 4 Mt Wide Road Section (phase 1) 4 mt Wide Road Section 6mt Wide Road Section 0 Mt Wide Road Section Proposed road hierarchy of roads
Logistic Hub /ware houses Parking NATRAX Key map 40 Mt Wide Road Section (Approach Road) (Phase 1) 4 Mt Wide Road Section (phase 1) 4 mt Wide Road Section 6mt Wide Road Section 0 Mt Wide Road Section 1 MT WIDE ROAD CROSS SECTION Proposed road hierarchy of roads ENTRY 1 INDUSTRIAL PLOTS ENTRY 2 ENTRY 1 INDUSTRIAL PLOTS ENTRY 1 ENTRY 2 ENTRY 1 INDUSTRIAL PLOTS INDUSTRIAL PLOTS TYPICAL STREET LAYOUT OF INDUSTRIAL PLOTS (6 MT. WIDE ROAD)
GREEN DESIGN FEATURES &FACILITIES Maximizing the number of street trees, planting large canopy trees to provide maximum shade for side walks. Porous Concrete to be used for sidewalks, driveways, alleys, parking lots and plazas for rapid percolation of storm water. Turf areas (high water use) will be avoided. Alternative ground covers, meadow or herbaceous plants will be used. Solar Street lights to be used to minimize the operation cost. Recycled water used as a source for decorative water features. A host of common facilities to be provided for the campus users Waste Management Vermi-compost Plant (for organic waste) Handmade Paper Unit (for paper waste) Incubator facilities Business Centers Warehousing Manning access control entry/exit Canteens Micro entrepreneurships in the Green Spine Cafeteria Telephone Booth Horticulture Floriculture Space for outdoor events Services for women employees Crèche Toilets Rest rooms for extended work First aid Catering/canteens (centralized) Kiosks Transport Internal shuttle service (battery operated) External connection to public transport Security measures Secured fencing Access control Fire alarms Fighting systems
Estimate for development of Smart Industrial Park at Natrip Pithampur ABSTRACT S. No. Particulars of Items Area / Length Amount 1 4 M wide Road 1.99 KM 1.07 Crores) (in 2 Balance of 4m section 4.14 KM 12.1 6 M wide Road 9.2 KM 2.10 4 0 M wide Road 0.72 KM.62 24 M wide Road 4. KM 21. STAGE 1 ESTIMATE Total 20.67 KM 6 Parking & Logistic area Hect 26.1 7 Bridge over Major Nalla 4 m x 24 m 4.02 Box Culvert ( Culverts) m X m X 2 Cell 4.11 9 Nalla Pitching.7 Km 1. 10 Pathway 7.21 Km 7.91 11 Landscaping 200 Hect.26 12 Boundary Wall 11.0 KM 10. 1 Entrance Gate Nos. 1.99 14 Sewerage Work 20.2 KM 6.67 1 STP 1 & 1. MLD 7.42 16 Water Supply 29.0 KM 1.1 17 Storm Water Drain. KM 9.6 1 External Electrification & Street Light 6.61 19 Administrating Building 00 Sqm.00 Total 72.70 Contingencies Charges @ % 11.1 Grand Total.