with self-sealing gas valve system

Similar documents
Hot Tapping Machine. OPERATIONS MANUAL and OPERATING INSTRUCTIONS

MUELLER. Mega-Lite Drilling Machine. Reliable Connections. table of contents PAGE. Equipment 2. Operating Instructions 3-4. Parts Information 5

RG1200 Service and Repair Manual

SEries 29 Hydrant valves installation, operation & maintenance manual

APP pumps APP and APP Disassembling and assembling

PSI Mechanical Couplings

Regulators repair and maintenance. XS Compact 2nd stage. January 2014 Rev XSC /3 Ed. C /14 1

Installation, operation & maintenance manual - original version

General page Straight unions page Angle unions page Tee and L-unions page Gauge connection unions page 42

KTM 50 (DN ) Installation, maintenance and operating instructions

MUELLER GAS. No-Blo Operations Using D-5. Drilling Machine. Reliable Connections. General Information 2

Replacing the Reverse Osmosis ( RO ) Membranes

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

Installation Instructions

RST INSTRUMENTS LTD.

Operation Manual. PEGAS NovoTap, PEGAS NovoTap+

MUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.

SIMPLAIR PIPING TOOL. JXT Company

Installation, Operation, and Maintenance Manual

Introduction to Ecoseal

Disassembling and assembling APP and APP 16-22

MAINTENANCE PROCEDURE FOR X 650

COP700 / COP1400 Operating manual for comparison test pump COP700 / COP1400

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves

Engineering Data Sheet

Vessel Installation and Operating Manual

PN LINE. Technical remarks PN 11 PN 13 PN 14 PN 15 PN 17 PN 18 PN 20 PN 23 PN 25 PN 26 PN 27 PN 28 PN 29 PN 37 PN 38 PN 39 PN 40 PN 43 PN 10 8_9 10_12

HUPF Series DESCRIPTION APPLICATION INSTRUCTION SHEET GAS PRESSURE REGULATOR WITH INCORPORATED FILTER EN1C-0003NL05 R1205.

12S 1st Stage. -Maintenance Procedure-

APG001. Application Guide for Gas. T: F: E:

B-Too Drilling and Tapping Machine

AREA VALVE SERVICE UNITS

Mounting and Operating Instructions EB 8546 EN. Supply Pressure Regulator Type Fig. 1 Supply pressure regulators

Service and Repair Operative Manual MC9 1 st STAGE. MC9 1 st Stage. 1 st STAGE MC9. Jannuary Rev. MC9 /B Ed. C/13

IMPORTANT PLEASE READ BEFORE COMMENCING INSTALLATION

Booster Pump PB4-60 Replacement Kits

Team Insert Valve Sample Specification The Insert Valve shall conform to the following:

HP-104 & HP-106 Tapping Machine OPERATIONS MANUAL

Jet Swim Installation instruction

EVO Solid Downtube. Operators Manual for Downtubes fitted with zinc plated springs June 2004

Safe-T-Stopper. Gas-Free* Service Tee Renewal and Removal for CenterPoint Energy. *In a controlled gas environment

Continental Industries STEEL SERVICE TEES or FAX Visit

Final Assembly Instructions Bikes with 16 Wheel Size

Operating Procedures for GripTight 15.5 SDR & IPS Test Plugs

VK/VP SERIES : Sealless Vertical Pump. Assembling Instructions 2010

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Type BBS-03, BBS-05, BBS-06, BBS-25

Chemical Injection Technologies Installation/Service Bulletin

Pressure Dump Valve Service Kit for Series 3000 Units

Torque Specifications

Instruction Manual Updated 7/26/2011 Ver. 2.2

Mounting and Operating Instructions EB EN. Type Supply Pressure Regulator. with increased air capacity

3/8" Dr. Air Butterfly Impact Wrench

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

Operation and Maintenance Instructions

L.Ph. Bolander & Sons 1355 Evans Ave. 800/

THE HF-210 SERIES. Operating and Service Manual. Series includes all variants of HF-210/211. Issue A October 2014 *Section 6.

Float operated valve TYPE (SWDS)

Tapping Tool RT1000 WARNING! OPERATOR S MANUAL

Flashlight. Hand Lanyard. 36 Super Bright LED Bulbs. Sensor

Pressure Reducing Valve DMV 750 set range: bar

Installation and Operating Manual

OPERATING INSTRUCTIONS

Modular valve block. Operating manual Series MVB 100/200. Version BA EN Print-No TR MA DE Rev001

Final Assembly Instructions Bikes with Quill Stems

CRP INSTALLATION, OPERATING AND MAINTENANCE INFORMATION FOR INLINE SAMPLING VALVES

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

BUTTERFLY VALVES. Toll Free (877) - ICFLUID -2-

2019 MADONE ASSEMBLY MANUAL

Mounting and Operating Instructions EB 8546 EN. Type 4708 Supply Pressure Regulators. Translation of original instructions. Type Type

Ford Service Saddles and Tapping Sleeves

3" UC Ultra-Chuck Durable Lightweight Air Inflated Bladder Chuck Operation/Repair Manual. (76.2 mm) DOUBLE E COMPANY, INC.

Regulators repair and maintenance. 1st stage MC5. MC5 INT HZ MC5 DIN 300 bar HZ

5/16 MAXFLOW SPOUTS 17/64 MAXFLOW SPOUTS. 5/16 black spout with barbs $0.25 $ /64 white spout without barbs. 5/16 white spout without barbs

Installation Instructions

MUELLER. A A Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

OPERATION MANUAL Please read this Operation Manual carefully before use, and file for future reference.

1805 Series Relief Valves

INSTALLATION & MAINTENANCE INSTRUCTIONS - ORIGINAL VERSION AVK KNIFE GATE VALVES

Poollift Delphin. Version: February, 2015 MANUAL AND OPERATING INSTRUCTIONS

Operating Instructions Models and Hydrostatic Test Pumps

GAS DISTRIBUTION PRODUCTS TRANSITION FITTINGS

RARS5000 AIR BODY SAW OWNER S OPERATING MANUAL

Instruction Manual - Diaframless TM Ejector Chlorine, Sulfur Dioxide and Ammonia

Pressure Dump Valve Service Kit for Series 2300 Units

Rocky Mountain Instinct / Pipeline Alloy Frame Assembly Guide. Date: April 7, 2017

Warning: NEVER ALTER TEST EQUIPMENT

SERVICE KITS SPECIFICATIONS GENERAL DESCRIPTION. y Use only genuine ARO replacement parts to assure compatible. RM051S-XXX-XX Single Post Lift / Ram

Anderson Greenwood Series 93 Positive Pressure POSRV Installation and Maintenance Instructions

Spare parts list ( ) Spare parts list HDS 700 B

Continental Industries TRANSITION FITTINGS or FAX Visit

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

PR4 Installation, Operation & Maintenance Instructions (DOT Certification Included)

INSERT FITTINGS INSERT FITTINGS

Armatures for analytical probes

Type OS2 Slam-Shut Device

Instructions for Use. Plug connection for medical gas and vacuum acc. to DIN / 2004 DIN EN ISO

1200B2 Series Service Regulators. Instruction Manual

Paintball Marker. User s Manual. 530 South Springbrook Road Newberg, OR 97132

1. A proper preparation of the cone and other material is inevitable prior to a CPTU test.

Transcription:

with self-sealing gas valve system R

DUCTILE PVC POLSAFE GAS DISTRIBUTION SYSTEM INTRODUCTION POLSAFE is a programme of fittings for low pressure gas distribution systems. POLSAFE is designed for 25 up to 200 mbar distribution networks POLSAFE stands for: - Closed system - Self-sealing gas valve - Integral cutter - Combination of drilling and balloon entry saddles - Self-clamping lower saddle - Maintaining the original round shape of the main pipe - Simple positioning of saddle pieces - Saddle tee pieces with an end thrust connector - Saddle tee pieces for balloon entry saddles - A much simplified system for positioning or removing a balloon - Nitrile Butadiene Rubber (NBR) sealing system - Injection moulding in Ductile PVC - GIVEG-approval and Gas Quality Mark - *GASTEC-Quality Approval Self-sealing gas valve The saddle tee pieces are equipped with POLSAFE saddles or with special saddles for PE, CI or AC gas pipes. Remark: patents have been granted for the gas valve, the POLSAFE tapping set, the balloon positioning equipment and the saddle replacement set. * Gastec and GIVEG are the quality marks of the Dutch Center for Gas Technology Saddle tee pieces with end thrust coupling Upper saddle fits in both directions Cutter Main pipe maintains its round shape Self-clamping lower saddle 1 j u n e 2 0 0 0

POLSAFE GAS DISTRIBUTION SYSTEM DUCTILE PVC POLSAFE SADDLE TEE PIECE WITH SELF-SEALING GAS VALVE The POLSAFE saddle tee piece is equipped with a self-sealing gas valve. This valve prevents gas from escaping during and directly after the DRILLING/BORING a pipeline under pressure. When assembling or removing the temporary cut-off plug, the gas valve functions in the same manner. An end thrust joint with the PE service pipeline is obtained with the end thrust connector. In order to remove the pressure in the service pipeline before or after drilling, a POLSAFE testing cap or a POLSAFE testing plug respectively needs to be used. Self-sealing gas valve POLSAFE saddle tee piece The POLSAFE tapping set cuts a thread in one piece that is completely incorporated in the DRILL. No material gets into the main or service pipeline. POLSAFE cut-off plug POLSAFE testing cap POLSAFE testing plug j u n e 2 0 0 0 2

DUCTILE PVC POLSAFE GAS DISTRIBUTION SYSTEM POLSAFE SADDLE Self-clamping lower saddle The POLSAFE saddles are easy to assemble. The lower saddle is clamped on the pipe and it immediately fixes itself allowing the use of two hands for further assembly. The upper saddle fits the lower saddle in two positions. The clamping design of the POLSAFE saddle is such that it is out of the question that the pipeline is deformed. If necessary, the saddles can be temporary closed off with the help of a POLSAFE sealing plug POLSAFE BALLOON ENTRY SADDLE The POLSAFE balloon entry saddle 1 1 2" for 63, 75, 90 and 110 mm pipe diameters is identical to the gas saddle. The sizes 160 and 200 mm have a connection size of 2". The sizes 250 and 315 mm have a connection size of 21 2". The balloon entry saddle is used with POLSAFE saddle tee pieces BG. POLSAFE GAS SADDLE The POLSAFE gas saddle has a connection size of 1 1 2 ". This saddle is used in combination with a saddle tee piece with an end thrust connector. 3 j u n e 2 0 0 0

POLSAFE GAS DISTRIBUTION SYSTEM DUCTILE PVC POLSAFE SADDLE TEE PIECE BG FOR BALLOON ENTRY SADDLE WITH SELF-SEALING GAS VALVE The POLSAFE saddle tee piece BG was specially developed for the very simple and controlled positioning or removing of balloons. A POLSAFE tapping set BG must be used when boring pipes. The self-sealing gas valve prevents the escape of gas during the execution of this work. The POLSAFE balloon positioning equipment is very user-friendly. It is very simple to make a bypass with the POLSAFE system. POLSAFE saddle tee piece BG with testing cap POLSAFE balloon positioning equipment Bypass Section of the pipe to be repaired POLSAFE bypass set with spherical valve j u n e 2 0 0 0 4

DUCTILE PVC POLSAFE GAS DISTRIBUTION SYSTEM POSITIONING OF A BALLOON - Use POLSAFE balloon positioning equipment. - Check the lance and the unit hose for impurities, clean and rub on some silicone grease. - Put the correct balloon diameter on the unit hose (hand tight). - Turn the guiding piece of the balloon with the tip in the direction of the grip on the unit hose. - Push the balloon with the unit hose in the lance and turn the cap of the unit hand tight on the lance. - Vacuum-seal the balloon with the help of the filling piece and the balloon pump. - Position the unit hose in the lance - Check whether the spherical valve is turned off for degassing. - Carefully push the lance through the gas valve of the saddle tee piece BG, in such a way that the grip is in the desired direction in which the balloon needs to be positioned. - Unscrew the securing wing nut. - Push the unit hose downwards to the lowest position so that the balloon is correctly placed in the gaspipe. - Using the filling piece and the balloon pump, pump up the balloon to the right pressure, as indicated on the pressure gauge, on which the red scale division indicates the diameter of the balloon. POLSAFE ASSEMBLY INSTRUCTIONS SADDLE - Clear the main pipeline by digging to a depth of about 15 cm below the pipe. - Carefully clean that section of the main pipeline where the saddle is to be installed. - Click the lower saddle onto the main pipeline. - Place the upper saddle on the main pipeline. - Position the wedges. Tighten the wedges by steadily pushing them on simultaneously (with both hands). - Lightly tap on the wedges with a hammer to further secure them. This should be done by tapping on the one wedge and the other in turn. Continue tapping until the wedges are level with the lower and upper saddle. 5 j u n e 2 0 0 0

POLSAFE GAS DISTRIBUTION SYSTEM DUCTILE PVC POLSAFE ASSEMBLY INSTRUCTIONS SADDLE TEE PIECE - Turn the saddle tee piece into the saddle by hand until the flange of the saddle tee piece is level with the upper part of the saddle. It is not necessary to use a lubricant as the rubber ring is self-lubricating. - Check to see if the coupling and the service pipeline are of the same category. - Saw the pipe off straight and trim off the burrs. - Unscrew the coupling screw by 2 turns and push the pipe into the - Turn back the saddle tee piece to the desired position (no more than 1 turn). The underside of the flange must never be higher than the top of the saddle. connector up to the safety register (3,5 to 4 cm). - Firmly fasten the screw cap by hand. - Do not use any grease or lubricant. END TRUST CONNECTOR TESTING - Check the gas saddle and the service pipeline to see if it is closed off properly. In the case where this is done from the POLSAFE saddle tee piece a POLSAFE testing cap must be used. Right Wrong BORING A PIPE - Use a POLSAFE tapping set type AB or BG. - Remove the cap from the saddle tee piece. - Unscrew the guiding nut sufficiently, about 30 mm, between the underside of the bolt and the upper side of the jacket. - Pull back the drill chuck into the jacket completely. - Push the jacket down through the gas valve in the saddle tee piece. - Tighten the coupling nut onto the saddle tee piece. Always ensure that the drill chuck remains in the jacket during the insertion, this prevents damage to the gas valve. - Unfasten the clamp of the guiding nut en push the spindle down until the drill chuck touches the pipe. - Fasten the clamp. - Now make a hole, by turning the spindle clockwise. Continue turning until the guiding nut cannot be turned any further when it has reached the upper part of the jacket. - Unfasten the clamp of the guiding nut and pull the spindle upward to the stop. Then the drill chuck will be in the jacket. - Loosen the coupling nut and pull the jacket out of the saddle tee piece. - Fix the cap on the saddle tee piece. - Unfasten the clamp of the guiding nut, push the drill chuck out of the jacket and remove the pipe waste. - Pull back the drill chuck into the jacket (this prevents damage during transport) j u n e 2 0 0 0 6

DUCTILE PVC POLSAFE GAS DISTRIBUTION SYSTEM POLSAFE ASSEMBLY INSTRUCTIONS SADDLE TEE PIECE BG Right Wrong Screw the saddle tee piece BG in the saddle by hand until the flange of the saddle tee piece touches the upper side of the saddle. If necessary, use a wrench or a spanner in the final phase of tightening. No. 50 for saddle tee piece BG 1 1 2" No. 65 for saddle tee piece BG 2" No. 80 for saddle tee piece BG 2 1 2" POLSAFE TAPPING SET AB/BG The POLSAFE tapping set AB/BG can be used when boring plastic pipes, for saddle tee pieces type AB and BG. The tapping set consists of a universal top part, three adapters with rotating stainless steel cases and three drill chucks. After choosing the correct parts, the tapping set can be assembled very quickly. Before boring cast iron (CI) and asbest cement (AC) gas pipelines, it is necessary to put on a different upper part, an adapter (with a transition piece for AC) and special drills. The jackets AB and BG must be combined with these pieces. REMOVAL OF A BALLOON - Vacuum-seal the balloon until totally sealed with the help of the balloon pump and then close off the spherical valve on the filling piece. - Pull the unit hose upwards out of the lance, whereby the lance must be kept in place in the saddle tee piece BG (if necessary the unit hose can be turned clockwise while pulling up the unit hose, this makes the balloon coil up). - Secure the unit hose in the highest position with the wing nut. - Carefully pull the lance out of the saddle tee pipe BG. Remark: The lance of the POLSAFE balloon positioning equipment type BZA-2-P-double must be attached to the saddle tee piece BG with the fastening cap before positioning and removing balloons. Upper part for CI and AC Adapter for jackets AB and BG Transition piece for AC Upper part for plastic pipeline materials PVC, Ductile PVC, PE DRILL AB 1 1 2" jacket AB 1 1 2" drill CHUCK AB 1 1 2" DRILL BG 1 1 2" jacket BG 1 1 2" drill CHUCK BG 1 1 2" DRILL BG 2" jacket BG 2" drill CHUCK BG 2" DRILL BG 2 1 2" jacket BG 2 1 2" drill CHUCK BG 2 1 2" 7 j u n e 2 0 0 0

POLSAFE GAS DISTRIBUTION SYSTEM DUCTILE PVC PROGRAMME OF FITTINGS Polsafe gas saddle with Gastec QA-mark 63 x 1 1 2 320309 160 x 1 1 2 320331 75 x 1 1 2 320310 200 x 1 1 2 320332 90 x 1 1 2 320311 250 x 1 1 2 320333 110 x 1 1 2 320312 *315 x 1 1 2 320316 *) type M Polsafe saddle tee piece with end trust connector for PE SDR 17,6 with Gastec QA-mark 25 x 1 1 2 320300 40 x 1 1 2 320302 32 x 1 1 2 320301 63 x 2 380344 Polsafe saddle tee piece with end trust connector for PE SDR 11 with Gastec QA-mark 25 x 1 1 2 320300 *32 x 1 1 2 320303 *non standard model in colour grey j u n e 2 0 0 0 8

DUCTILE PVC POLSAFE GAS DISTRIBUTION SYSTEM PROGRAMME OF FITTINGS Polsafe balloon entry saddle 63 x 1 1 2 320309 160 x 1 1 2 320331 75 x 1 1 2 320310 200 x 1 1 2 320332 90 x 1 1 2 320311 250 x 1 1 2 320333 110 x 1 1 2 320312 *315 x 1 1 2 320316 *) different model Polsafe saddle tee piece BG for gasfree positioning of balloons and fittings 1 1 2 For balloons 63 to 110 mm 2 For balloons 160 and 200 mm 2 1 2 Polsafe cut-off plug 1 1 2 320321 2 320322 Polsafe cut-off plug for saddle tee piece (temporary disconnection) 320317 *SDR 17,6 and SDR 11 Polsafe testing plug for saddle tee piece for testing the service pipeline after drilling 320341 Polsafe testing cap for saddle tee piece 320318 Polsafe testing cap for saddle tee piece BG 1 1 2 320342 2 320343 9 j u n e 2 0 0 0

POLSAFE GAS DISTRIBUTION SYSTEM DUCTILE PVC PROGRAMME OF FITTINGS Polsafe tapping set AB (for drilling) drill1 1 2 320323 Reserve drill chuck 1 1 2 320330 Polsafe tapping set AB/BG with exchange parts Upper part jacket AB 1 1 2 Drill chuck AB 1 1 2 jacket BG 1 1 2 Drill chuck AB 1 1 2 jacket BG 2 Drill chuck BG 2 Polsafe Bypassing set consisting of 2 fittings 1 1 2 with GK 1 1 2 connection 2 with GK 2 connection Remark: the polsafe bypassing set must be used in combination with spherical valves to prevent the escape of gas Polsafe balloon position equipment Type BZA-1-P standard (St), Single balloon ø 63 thru 110 Polsafe balloon position equipment Type BZA-2-P pressure gauging (PG), Single balloon ø 63 thru 110 Polsafe balloon position equipment Type BZA-1-P double (Do), Double balloon ø 110 Polsafe balloon position equipment Type BZA-1-P double (Do), Double balloon ø 110 j u n e 2 0 0 0 1 0

Pipelife Nederland B.V. P.O. Box 380, 1600 AJ Enkhuizen, The Netherlands Flevolaan 7, 1601 MA Enkhuizen, The Netherlands Tel.: +31.(0)228.355555 Fax: +31.(0)228.355666 info@pipelife.nl http://www.pipelife.nl