Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

Similar documents
Side-of-Pole Mount for 1 Module (SPM1) For Module Type C

Side-of-Pole Mount for 1 Modules (SPM1) For Module Types E, F, G, & H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

Tripod Setup Guide (M-TPx)

U.S. Patent No. 7,922,246. Patents Pending

Troyer s Gourd Rack 8 unit F R H O P

Marine 6-Boat Free-Standing Racks SKU: Updated November 2011

RBI Solar One-Piece Ground Mount Solution GM-GS

BICYCLE ACCESS RAMP INSTALLATION INSTRUCTIONS. Customer Service all4cycling.com.au

Installation Guide RHT-380. This Manual Must Be Read Before Operating The Equipment CUSTOMER COPY

HoldUp Plus2. Safety Kit included: See additional instructions for installation. REAR WHEEL TRAY. BASE (1x) lock WASHER (1x) KEY (2x) SAFETY CLIP (1x)

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

Backboard and Rim Owners Manual

ROCKSOLID DUAL POST ANCHOR

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

Low Wind High Yields Series

GENUINE PARTS INSTALLATION INSTRUCTIONS

Disassembling and assembling APP and APP 16-22

Gurney Flap for WRX and STI w/low Profile Trunk Spoiler

PRO1030 Bi-Directional Assembly Replacement

APP pumps APP and APP Disassembling and assembling

INSTALLING THE BOLT-IN-PLACE FOOTPLATE KIT (FIGURE 1)

INSTALLATION INSTRUCTIONS

Big Ride ASSEMBLY AND INSTALLATION INSTRUCTIONS * * C A U T I O N * *

BALL STOP INSTALLTION GUIDE

Import Bike Rack OEM INSTALLATION MANUAL

Only. Gives You the TechLock. System Advantage ASSEMBLY, DISASSEMBLY AND TROUBLESHOOTING INSTRUCTIONS FOR 3000 SERIES FONTAINE

VERTICAL SURFBOARD CARRIER READ ME! IMPORTANT WARNING!

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

A A A

C - SERIES. Height Adjustable Portable Goal Supports. Installation & Owner s Instructions C1000 C2000. Made in the USA

Important Note: Tighten lock nuts so the support tubes still swing freely see figure 2. There must be 1 2 threads of bolt past end of lock nuts.

Nautique Triton Clamping Board Rack V2

INSTALLATION INSTRUCTIONS

Soccer Goal. Model: SG20 Series. Installation, Operation and Maintenance Instructions

E-trike Li Assembly Guide

222 Schwinn Recumbent Exercise Bike Parts List Full Size Hardware Chart Product Illustration Assembly Instructions

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

Steel Spring Driven Reel Instruction Manual

A A A

ROCKSOLID SINGLE POST ANCHOR

PRISMA. Installation, Operation, & Maintenance Manual. Climbing Panel + FREEMount System. NOTE TO INSTALLERS Always Read Instructions Before Use

engineered products Foldable Topside Creeper Safety First VIDEO INSTRUCTIONS ARE AVAILABLE ON OUR WEBSITE AT:

INSTALLATION INSTRUCTIONS

VERSA BIKE RACK INSTRUCTIONS

Assembly Guide ST200 FUNCTIONAL TRAINER

1500 Follow Spot Yoke

Wellhead Mast. Installation and Operation Guide. Nanometrics Inc. Kanata, Ontario Canada

BRONZE BUSHING REPLACEMENT PROCEDURE DN345 & NL450C

SKYBIRD TRAP OWNER S / OPERATOR S MANUAL PARTS AND ASSEMBLY INSTRUCTIONS

How To: Install a 1 Body Lift using Hockey Pucks A CFans Members Mod Project by grandmastrblastr

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

Booster Pump PB4-60 Replacement Kits

SPINNER RIDE GETTING STARTED GUIDE. Welcome to a personalized fitness experience for your members

Supplementary instructions. Rod and cable components. for VEGAFLEX series 80. Document ID: 44968

HP10168 & HP10169 KITS HP10152 / HP10154 / HP10156

Series RT Spring Driven Hose Reels Operating Instructions

SHEET 2: VERTICAL INSTALLATION

Assembly Instructions

TOYOTA TACOMA 2005 TOW HITCH Preparation. Part Number: PT

First Team Sports, Inc. Blast Recreational Volleyball System

First Team Sports, Inc. Stellar Recreational Volleyball System

310 SERIES TILT-TO-LOAD ROTATOR. The Specialist In Drum Handling Equipment

Pressure Dump Valve Service Kit for Series 3000 Units

GATE INSTALLATION INSTRUCTIONS

MUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.

Retractable Hose Reel with 3/8" x 50' PVC Hose

Road Chain Catcher Installation Instructions (K13-001, K13-006, K SL1, K SL2)

! CAUTION! ! WARNING! General Information

CHAINLESS ANCHORING SYSTEM USER MANUAL

MUELLER A A Non-Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

LITERIDER 2&3 IMPORTANT WARNING. 2Bike (1x) Bolt (1x) Nut (1x) Small Hex Wrench (1x)

S Surge Arresters

Parts: Included in the parts box: Inner Rear Tire Tray. Inner Front Tire Tray. Trail Doc Clamp. Pivot Assembly. Trail Doc Post.

Pressure Dump Valve Service Kit for Series 2300 Units

MUELLER. A A Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

MODEL SWH10 1,000 LB CAPACITY SWIVEL HOIST

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

H4802, H4802-1, H , and Pole Tampers

SASK-A-POLE OWNERS AND USERS MANUAL

BP48-1 AND SSP48-1 IN-GROUND POST INSTALLATION INSTRUCTIONS

VALVES & MEASUREMENT

Paddle Bar Replacement

USER S MANUAL QUESTIONS? CAUTION. Model No. FMEX Serial No. Write the serial number in the space above for reference. Serial Number Decal

BUTTERFLY VALVES Series 800

Caliber Sled Wheels Assembly Instructions for PN and 13579

SPM INDOOR TRAINING CYCLE ASSEMBLY MANUAL MODEL: SPM

SPOOLER INSTRUCTIONS. STEP 12 If you are going to paint your posts, that should be done at this time.

Air Intake Snorkel Kit

INSTRUCTION GUIDE S-WORKS ROAD CARBON CRANKSET (Carbon and Alloy OSBB cups)

INSTRUCTION GUIDE S-WORKS ROAD CARBON CRANKSET (Carbon and Alloy OSBB cups)

Installation, Operation & Maintenance Manual

KERSPLASH POOL CLIMBING WALL INSTALLATION INSTRUCTIONS

OUTDOOR BACKSTOP WITH 5'-0" EXTENSION

Tidland Air Chuck Installation, Operation and Maintenance

To save this document, scroll up and select the download icon

RADROVER REAR RACK INSTALLATION MANUAL

NEXT GENERATION FLEX FENCE

Transcription:

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 1, Rev A PCN 080311-2 SP3363-1

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B A few words about the product The SPM1 for module types A & B is designed to mount on 2-3.5 O.D. pipe (installer supplied). Options are available for mounting to larger diameter poles. Pipe size and foundation requirements are based on several factors including the array surface area, maximum design wind speed, exposure category, soil type, steepest expected tilt angle, and above-ground clearance. For foundation and pipe size recommendations on a specific installation please contact us at: Phone: 800-260-3792 Email: info@plpsolar.com WARNING: Follow the procedures and precautions in these instructions carefully. About these Assembly Instructions These instructions... Ÿ Are intended to be used by individuals with sufficient technical skills for the task. Knowledge and use of hand tools, measuring devices and torque values is also required. Ÿ Include various precautions in the forms of Notes, Cautions, and Warnings. These are to assist in the assembly process and/or to draw attention to the fact that certain assembly steps may be dangerous and could cause serious personal injury and/or damage to components. Following the step-by-step procedures and these precautions should minimize the risk of any personal injury or damage to components while making the installation not only safe but an efficient process. Required Tools 7/16 inch wrench or socket for 1/4 inch module hardware 1/2 inch wrench or socket for 5/16 inch hardware 9/16 inch wrench or socket for 3/8 inch hardware Torque wrench (not absolutely necessary) Ratchet wrench Ratchet extension bar 3 to 6 foot level Tape Measure Square 1 of 6

4 1 3 2 4 6 Side-of-Pole Mount for 1 Module for Module Types A & B Parts Identification 5 1 2 of 6

CAUTION: Use care while working around the structure during assembly. There could be components that create hazards or obstruct free movement, causing serious bodily injury. Many of these are at head/eye level. Move slowly and with care around the work area. Step 1: Attach Pole Channel to Mounting Pole Before installing the Pole Channel, verify that the Mounting Pole is plumb to the ground and hasn't shifted or leaned while the concrete footing has cured. There are two methods to attaching the Pole Channel to the Mounting Pole. The only difference between the two methods is the hardware. One uses Hose Clamps while the other uses U-Bolts. These racks are supplied with hose clamps. U-Bolts are available at extra cost and the pole diameter must be specified. Using Hose Clamps Hose Clamps pass through the two sets of vertical slotted holes of the Pole Channel, securing it to the Mounting Pole. See site specific drawings for vertical placement of the Pole Channel on the Mounting Pole. A. Unscrew the two Hose Clamps and pass the loose ends through the two vertical slots of the Pole Channel, positioning the screw housing on the backside of the Pole Channel. Secure the loose end by screwing them back into their screw housing. (See Figure 1-1) Pole Channel Hose Clamps (Screws on this side of Pole Channel) Pass Hose Clamps Through Vertical Slots Figure 1-1: Installing Hose Clamps on Pole Channel 3 of 6

B. Slip the Hose Clamps and Pole Channel over the top of Mounting Pole, sliding it down to its pre-determined vertical position on the Mounting Pole. C. Rotate the Pole Channel so it is facing south. (See Figure 1-2) D. Tighten the two Hose Clamps securing it to the Pole Channel. S W E N Tighten Hose Clamps Figure 1-2: Installing Pole Channel Using U-Bolts (option) U-Bolts pass through the two sets of horizontal slotted holes of the Pole Channel, securing it to the Mounting Pole. See site specific drawings for vertical placement of the Pole Channel on the Mounting Pole. A. Pass the two U-bolts though the two horizontal slotted holes of the Pole Channel and finger tighten. B. Rotate the Pole Channel so it is facing south. (See Figure 1-3) C. Tighten the four 3/8 flange nuts. Torque to 25-30 ft.-lbs. S W E N 3/8 Flange Nuts Pole Channel U-Bolts Vertical Pipe Figure 1-3: Installing U-Bolts 4 of 6

Step 2: Attaching Module Arms to Pole Channel The Module Arms are attached to the ends of the Pole Channel using 5/16 x 3/4 hex bolts and hardware. Module Arms are left and right hand configurations, keep this in mind during the installation. Figure 2-1 shows the installation of a right-hand Module Arm, installing a left-hand installation mirrors that shown. A. Orient and align the Module Arm as shown in Figure 2-1. Secure the Module Arm by inserting two 5/16 x 3/4 hex bolts with lock washers and flat washers, through the Module Arm and into the threaded inserts of the Pole Channel. To facilitate the module installation, position the Module Arm at 0-degrees as shown in Figure 2-1. Torque to 25-30 ft.-lbs. B. Continue in this manner and install the left Module Arm. NOTE: Although this system offers a range of elevation settings, it is recommended to set the angle at 0-degrees for ease of assembly. Optimum tilt setting of the rack will take place later in these instructions. Pole Channel Flat Washer Module Arm (Right) Lock Washer 5/16 x 3/4 Hex Bolt CAUTION: This is a two person activity. PV Modules are heavy and unstable before they are fully secured to the Module Arms. The PV Module must be held in place by one person while the second person aligns and secures them to the Module Arms. Failure to do so could lead to serious personal injury and damaged components. Figure 2-1: Attaching Module Arm to Pole Channel Step 3: Installing PV Modules to Module Rails PV Modules are secured to the Module Arms using 1/4 x 3/4 bolts and hardware. A. Place the Module on the Module Arms. While one person holds the Module in place, align the mounting holes and secure with 1/4 x 3/4 bolts and hardware. Each Module has four attachment points. Torque to 6-8 ft.-lbs. (See Figure 3-1) Flat Washer Lock Washer 1/4 Nut Module Module Arm Figure 3-1: Attaching Module to Module Arm 1/4 x 3/4 Bolt and Flat Washer 5 of 6

CAUTION: This is a two person activity. As the 5/16 hardware is loosened, the Module is heavy and unstable. It must be held in place by one person while the second person loosens and then re-tightens the hardware back in place. Failure to do so could lead to serious personal injury and damaged components. Step 4: Set the Tilt Angle Use great care as it can be dangerous if the procedure is not done as described and done with a minimum of two people. Adjust the tilt angle by loosening the four 5/16 bolts securing the Module Arms to the Pole Channel. Do not remove this hardware, simply loosen it to facilitate the movement of the Module A. While one person holds the south edge of Module, the other loosens the four 5/16 bolts. (see Figure 4-1) B. Tilt the Module to the desired elevation angle. Re-tighten the four 5/16 bolts. Torque to 14-16 ft.-lbs. Loosen 5/16 x 3/4 Bolts (on both Module Arms) Tilt Module to Desired Angle Figure 4-1: Adjusting the Tilt Angle 6 of 6

Albuquerque Office 1700 Louisiana Blvd., Suite 130 Albuquerque, NM 87110 Corporate Headquarters 660 Beta Drive Mayfield Village, OH 44143 Telephone: 800.260.3792 Fax: 505.889.3548 www.preformed.com E-mail: info@plpsolar.com 2017 Preformed Line Products PCN 080311-2 Version 1, Rev A SP3363-1