GEOTHERMAL WELL COMPLETION TESTS

Similar documents
Measurement of Velocity Profiles in Production Wells Using Spinner Surveys and Rhodamine WT Fluorescent Tracer; Geothermal Field (California)

Well Testing and Modelling of Discharging Big Bore and Super Big Bore Wells

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015

Interpretation of Parameters for Monitoring Wells during the Discharge Test of NWS-9D

Drilling Efficiency Utilizing Coriolis Flow Technology

ELECTRONIC TEMPERATURE, PRESSURE AND SPINNER LOGS IN GEOTHERMAL WELLS - PNOC-EDC APPLICATIONS

Perforating Center of Excellence TESTING SERVICES OVERVIEW

Hard or Soft Shut-in : Which is the Best Approach?

COAL SEAM METHANE - EXPLORATION AND PRODUCTION

New power in production logging

Coal Bed Methane (CBM) Permeability Testing

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

Testing Services Overview

Casing Design. Casing Design. By Dr. Khaled El-shreef

CHDT Cased Hole Dynamics Tester. Pressure testing and sampling in cased wells

2007 Gas-Lift Workshop

Contact Information. Progressive Optimization Service. We Provide: Street Bay #2. Grande Prairie, AB T8V - 4Z2

PRODUCTION I (PP 414) ANALYSIS OF MAXIMUM STABLE RATE AND CHOKES RESOLVE OF OIL WELLS JOSE RODRIGUEZ CRUZADO JOHAN CHAVEZ BERNAL

Acoustic Liquid Level Testing of Gas Wells

Journal of Applied Fluid Transients, Vol 1-1, April 2014 (3-1)

Step-Rate Formation Integrity Test Method for Geothermal Wells

High Pressure Continuous Gas Circulation: A solution for the

Next Generation Quartz Pressure Gauges

Wind Flow Validation Summary

Modern Perforating Techniques: Key to Unlocking Reservoir Potential

SPE Copyright 2012, Society of Petroleum Engineers

APPENDIX A1 - Drilling and completion work programme

Chapter 8: Reservoir Mechanics

Extended leak off testing

A LIFE OF THE WELL ARTIFICIAL LIFT STRATEGY FOR UNCONVENTIONAL WELLS

OCEAN DRILLING PROGRAM

VortexFlow DX (Downhole) Tool Installation Instructions

COPYRIGHT. Production Logging Flowmeter Survey Solution Guide

Subsea Safety Systems

Gas Gathering System Modeling The Pipeline Pressure Loss Match

TROUBLESHOOT ROD PUMPED WELLS USING TUBING FLUID LEVEL SHOTS

Worked Questions and Answers

RESIDENTIAL WATER DISTRIBUTION

Sucker Rod Pumping Workshop Technology in a Mature Industry. September 2017 John C. Patterson Consultant Retired from ConocoPhillips (2015)

Intrinsically Safe Acoustic Instrument Used in Troubleshooting Gas Lift Wells

Well Testing Plan. New York Marginal Well Study. Introduction. I. Tests to be Conducted. II. Testing Procedures

DEVELOPMENT OF AN ELECTRONIC MEMORY TOOL FOR LOGGING GEOTHERMAL TEMPERATURE AND PRESSURE PROFILES

Acid Gas Progress Report Requirements

Tool Weight Analysis An Engineering Approach to Optimize Pressure Temperature and Spinner Data Acquisition

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96)

BLOCKAGE LOCATION THE PULSE METHOD

Intermittent Gas Lift Utilizing a Pilot Valve

Development / installation of. permanent downhole capillary. injection facilities in gas wells with. sub-surface safety valves

Injector Dynamics Assumptions and their Impact on Predicting Cavitation and Performance

Flow Scanner. Production logging in multiphase horizontal wells

SOLAR 93 THE 1993 AMERICAN SOLAR ENERGY SOCIETY ANNUAL CONFERENCE. Washington, DC April 22028,1993. Editors: S. M. Burley M. E.

COMPUTER PROGRAM TO ANALYZE MULTIPASS PRESSURE-TEMPERATURE-SPINNER SURVEYS. Paul Spielman Reservoir Engineer

Along-string pressure, temperature measurements hold revolutionary promise for downhole management

North Dakota Petroleum Council Re-stimulation Initiative

W I L D W E L L C O N T R O L FLUIDS

Sarah N. S. All-Said Noor * ; Dr. Mohammed S. Al-Jawad ** ; Dr. Abdul Aali Al- Dabaj ***

GEOTHERMAL WELL DESIGN USING THE NEW 2015 NEW ZEALAND STANDARD AND 1991 STANDARD: A CASE OF MW-20A IN MENENGAI, NAKURU COUNTY, KENYA

Demystifying ESPs: A technique to make your ESP talk to you.

Casing and Cementing Requirements

Advanced Intermittent Gas Lift Utilizing a Pilot Valve

Construction Dewatering

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

Calculating Total Uncertainty of Temperature Calibration with a Dry Block. Calibration White Paper. Beamex.

5k Slickline Lightweight Pressure Control Equipment 4 ID

Numerical Simulation of Instability of Geothermal Production Well

COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

DISCHARGE OF GEOTHERYAI, WELLS

Pilgrim Hot Springs Flow Testing

Dynamic Simulation Content. be dynamic

Transient Analyses In Relief Systems

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

HYDRAULICS. H89.8D - Hydraulic Bench

WELL SUSPENSION AND ABANDONMENT GUIDELINES AND INTERPRETATION NOTES OFFICE OF THE REGULATOR OF OIL AND GAS OPERATIONS

AIAA Brush Seal Performance Evaluation. P. F. Crudgington Cross Manufacturing Co. Ltd. Devizes, ENGLAND

Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well

Gas Lift Workshop Doha Qatar 4-88 February Gas Lift Optimisation of Long Horizontal Wells. by Juan Carlos Mantecon

OCTOBER 2017 ISSUE Page 1 of 7

Autodesk Moldflow Communicator Process settings

International Journal of Technical Research and Applications e-issn: , Volume 4, Issue 3 (May-June, 2016), PP.

Situated 250km from Muscat in

PIG MOTION AND DYNAMICS IN COMPLEX GAS NETWORKS. Dr Aidan O Donoghue, Pipeline Research Limited, Glasgow

DRILLING OPERATIONS. C.Y. Chiang and Carl R.Y. Chang Taiwan Petroleum Exploration Division Chinese Petroleum Corporation Miaoli, Taiwan 360

Acoustic Techniques to Monitor and Troubleshoot Gas-lift Wells

MASSIVE GAS INJECTION SYSTEMS FOR DISRUPTION MITIGATION ON THE DIII-D TOKAMAK

WELL SCAVENGER. Versatile wellbore clean-up tool for the most demanding operations

Innovating Gas-Lift for Life of Well Artificial Lift Solution. The Unconventional Solution!

2 FUSION FITTINGS FOR USE WITH POLYETHYLENE PRESSURE PIPES DESIGN FOR DYNAMIC STRESSES

Investigations into the identification and control of outburst risk in Australian underground coal mines

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

Series Environmental Chambers

FORMATION TESTER MOBILITY. Lachlan Finlayson, Chief Petrophysicist Petrofac Engineering & Production Services Engineering Services Consultancy

PRODUCTION AND OPERATIONAL ISSUES

Acoustic Troubleshooting of Coal Bed Methane Wells

Fully coupled modelling of complex sand controlled completions. Michael Byrne

Chapter 5 Drilling and Well Testing Practices

4 RESERVOIR ENGINEERING

Practice Exam IADC WellSharp Driller and Supervisor

Accurate Measurement of Steam Flow Properties

Transcription:

GEOTHERMAL WELL COMPLETION TESTS Hagen Hole Geothermal Consultants NZ Ltd., Birkenhead, Auckland, New Zealand. ABSTRACT This paper reviews the measurements that are typically made in a well immediately after drilling is completed the Completion Tests. The objective of these tests is to determine the properties of the reservoir, and of the reservoir fluid near the well. A significant amount of information that will add to the characterisation of the reservoir and the well, can only be obtained in the period during and immediately after drilling activities are completed. INTRODUCTION Immediately after completion of the drilling of a geothermal well, a slotted or perforated liner is run into the open hole production section of the well; the blow out preventer stack is removed from the wellhead; and, if not previously fitted, the master valve is attached to the wellhead. At this point drilling operations are finished, but it is usual practice to carry out a series tests on the well, utilising the drilling rig equipment, and in particularly the rig pumps, before rigging down and removal of the rig from the wellsite. These tests, the completion tests, are designed to identify potential feed zones in the well, to provide an estimate of the total effective permeability of the well, and to establish a baseline dataset of the casing condition. OBJECTIVES For the geothermal reservoir engineer the objective of the completion tests is to determine the properties of the reservoir, and of the reservoir fluid in the proximity of the well. In addition there is generally a wide interest in the ability of the well to deliver fluid to the surface, which to a large extent will depend on the reservoir and well properties. For the geothermal production engineer the objective is to obtain a thumbprint of the well casings in their as new condition in the well, for comparison at a later date to determine if there has been corrosion or failure of any of the casing components. The suit of tests carried out that comprise the Completion Tests typically involve: a spinner test to identify the location of the permeable zones within the well and to quantify the relative permeability of each of the zones identified. In addition, the spinner tool also measures and records the downhole temperature and pressures as well. A water pumping test to obtain an injectivity and thus the gross permeability of the well. A casing condition survey, to obtain an initial graphical image of the casing in the well. IDENTIFICATION OF PERMEABLE ZONES The initial tests carried out in the well after completion are designed to identify the location and thickness of the permeable zones; and to quantify the associated permeability in relative terms. This is usually carried out using an electronic spinner (flow velocity indicator) tool, either a real time electric wireline tool, or a slick line memory tool usually temperature and pressure transducers are also incorporated into this tool. With a constant volume flowrate of water pumped to the well, the spinner instrument is lowered into the hole at a constant velocity, and then retrieved, again at a constant velocity. The spinner measures the liquid flow velocity in the well over the range of depth that the instrument is run, changes in flow velocity not associated with hole diameter changes (either passing through a casing shoe, or through an area of enlarged or washed out formation) indicates either an inflow or outflow at that point. It is usual that spinner runs are carried out at two or three different pumping rates, as well as at a zero pumping rate to identify if there any internal flows within the well that can distort the pumped volume flowrates. This data, correlated with the temperature and pressure data collected on each run, will allow reasonable characterisation of the permeability in the well. A typical set of downhole spinner data, collected from Well MK-11, Mokai geothermal Field, New Zealand, was carried out with two pumping rates, one double the flowrate of the second, and is illustrated in Figure 1 below. Data is collected only in the open hole production section of the well, below the production casing shoe, which in this case was set at 748 m depth. Fluid velocity 3 2.5 2 1.5 1.5 MK11 Downhole completion Spinner full Data flow 5 75 1 125 15 175 2 225 Depth Full flow Half flow Figure 1. Downhole Spinner Data. Well MK-11 Mokai. 1

Petroleum Engineering Summer School June 28 Workshop #26 June 9 13, 8 The down hole temperature data recorded at the same time is illustrated in Figure 2. below. Temperature 16 14 12 1 8 6 4 2 Half flow Full flow MK11 Water water Loss loss Temperatures temperatures 5 75 1 125 15 175 2 225 Depth Figure 2 Downhole Water Loss Temperatures. Well MK-11, Mokai. The interpretation of this type of data is not simple, and often not conclusive. There is considerable detail and complexity in both spinner runs, and either an enlarged wellbore down to 15m or inflow exists at around 15m. The temperatures, shown in Figure 2 argue against any inflow at 15m. They also support a major loss at 2m. The variations in fluid velocity with depth are consistent between the two runs (the larger flow has proportionately larger velocity) over 7-8m, and below 14m, but show contrasts over 8-14m that are not readily explained. The greater temperature gradient above 2m in both runs is best explained by minor inflow over this depth. This is supported by the reduction in gradient with increasing injection rate. The major loss zone is therefore at 2m, with minor fluid gain above 2m in both runs. The strong variations in velocity above 16m indicate major variations in wellbore diameter between the casing shoe at 7m and 16m. The wellbore is contracted to normal diameter at 11m and over 145-155m, but is otherwise enlarged over 7-16m. QUANTIFYING THE PERMEABILITY A simple indicator of the likely productivity of a well may be gained by evaluating the stable down hole pressures at a constant depth, against a number of injection flowrates. This stable pressure flow relationship provides the injectivity, which has been shown to be a reasonable reliable index of well performance. The pressure element must be set at some representative depth down the well, and ideally this is at the depth of the major permeable zone which of course is not always confirmed at the time this test is carried out, however, data from the previous spinner tests can provide a good indication. It is usual that water is pumped to the well at three or four different pumping rates, with the duration of each step sufficient to allow a stable downhole pressure condition to have been established typical the durations of each step is in the order of one hour. For the injectivity tests for Well MK-11, Mokai, the well as indicated above, the pressure element was set at a depth of 198 metres depth in the well. The test was commenced with water being pumped to the well at a rate of 12 litres per second for a period of 1 hour. The pumping rate was then increased to 24 l/s for one hour, 36 l/s for one hour, then 48 litres per second for one hour. The pumps were then shut off and the instrument left in place for one more hour. The stable pressures for each of the pumped rates were:- Flow Rate (l/s) Pressure at 198 m. (MPa) 12 16.168 24 16.264 36 16.36 48 16.456 16.5 16.45 INJECTIVITY Prior to the development of electric wire-line tools suitable for deployment in geothermal conditions, this test was carried out using mechanical slick-line instruments, and typically only temperature and pressure measurements were carried out. A water loss test was carried out by stopping pumping water to the well for a period to allow a mild heating in the well. With a mechanical temperature and pressure recording instrument (Kuster or Amerada) in the well, pumping of cold water was commenced at a constant rate, and by moving the temperature instrument up and down the well, the advancing cold front of fluid could be tracked down the well. Permeable zones were identified at the points where advancement of the cold front ceased (in the case of a single permeable zone) or slowed in the cased of multiple permeable zones. The method allowed only an indicative and rough characterisation of the permeability. 16.4 16.35 Pressure (Mpa) 16.3 16.25 16.2 16.15 Slope = "Injectivity"= 125 kg/mpa.s with pressure element located at 198 m depth. 1 2 3 4 5 6 Injection Rate (kg/s) Figure 3. The relation between injection flowrate and downhole pressure at the major permeable zone. The Injectivity is the slope of the plot of stable pressure versus flow. The pressure differences between the four injection rates at the depth of 198 metres gives an injectivity of 2

125. kg/mpa.s, which in this case is good to excellent. With an expected temperature of the production zone of over 3 o C as measured in nearby wells, and by comparison with previous well injectivity results, a stable flow of around 3 tonnes per hour was estimated. DOWNHOLE CASING CONDITION The production casing string in a geothermal well is the primary conductor of the geothermal production fluids from the formation to the surface and is thus subject to extreme conditions both from thermally induced stress conditions and from continuous exposure to formation fluids both internally and externally. In the past, monitoring the condition of these casing strings has been extremely difficult and limited to occasions when the well has been totally quenched with cold water to allow introduction of instrumentation such as callipers and tele-viewers. Recently an electromagnetic tool, capable of being operated in hot well conditions 3 C for several hours, has enabled the accurate measurement and periodic monitoring of both the internal and external condition of the casing string. The Hot Hole Casing Corrosion (HHCC) tool, developed by Century Drilling and Energy Services, of New Zealand provides a capability of obtaining an as new snapshot of the casing condition immediately after completion of the drilling activities, which can be compared with subsequent surveys carried out on a periodic basis throughout the well life typically annually. After the spinner - water loss tests, and the injectivity testing procedures have been completed, it is now usual practice to run a Casing Condition Survey to provide this basis for later casing corrosion and condition monitoring. The Hot Hole Casing Corrosion (HHCC) tool is an electromagnetic instrument which measures the casing wall thickness, the internal diameter, and surface roughness of both the inside and outside surfaces of the casing. Figure 4 is an example HHCC plot of a section of 9 5 / 8 casing indicating metal loss at 397 m and 45 m. Figure 4. HHCC Plot (after Stevens L, Century Drilling & Energy Services (NZ) Ltd, Monitoring of Casing Integrity in Geothermal Wells, WGC paper R253. The casing collars can be clearly identified on the phase trace. The calliper trace indicates a decrease in internal diameter at 45 m, and the roughness (RI) trace indicates that the inside surface is corroded at both the 397 m and 45 m depths. POST RIG MOVE TESTS When the spinner tests, water loss and injectivity tests have been completed, the downhole casing condition survey is optionally carried out before the rig is moved, or can be completed using the rig lifting equipment to simplify the operation. At this point the drilling rig is disassembled and moved from the wellsite, and the well is allowed to heat up. This heat-up period provides an additional opportunity to collect data that may no longer be available one the system has been altered by discharge of the well. The heat up process is not linear with time, initially heating occurs rapidly, then slows with passing time. It is usual that the series of heating temperature and pressure profiles are taken on an expanding time scale typically profiles will be run on days 1,2,4,7,15, and 28 after pumping water to the well has ceased. Pressures During Initial Heating As the well heats up, the pressure gradient in the well decreases. The pressure profiles pivot about a particular pressure point, indicating the location of a single major permeable zone, or at the mean permeability point between two or more permeable zones. Figure 5 illustrates the temperature and pressure profiles of Well MK-14, Mokai Geothermal Field, New Zealand. The pressure profiles clearly pivot about a point at around 165 m depth the major permeable zone in the well. 3

Petroleum Engineering Summer School June 28 Workshop #26 June 9 13, 8 Temperatures During Initial Heating At the completion of the spinner, water loss and injectivity tests, when pumping of cold water to the well is finally ceased, the formations surrounding the well are in a cooled state. The impermeable zones have been cooled conductively, and the permeable zones cooled by the acceptance of the drilling fluids and the completion test fluids. AS the well heats, there are four heating mechanisms that are occurring:- Conduction through the surrounding formation. Flow of fluid into the wellbore at one level and out into the formation at another interzonal flow. Convection cells within the wellbore. Flow directly across the well bore. Measured Depth (m RKB) 2 4 6 8 1 12 14 16 18 MK-14 Pressure and Temperature Recovery Profiles Temp 1st, 17/5 Pressure 1st, 17/5 Temp 2nd, 17/5 Pressure 2nd, 17.5 Temp 18/5 Pressure 18/5 Temp, 2/5 Pressure, 2/5 Temp, 24/5 Pressure, 24/5 Temp, 31/5 Pressure, 31/5 The convective processes transfer significantly greater quantities of heat than the conductive processes. The temperature profiles from a well heated with predominantly conductive heating at all depths, which is most often seen in wells with little or no permeability, will be smooth and featureless, and the heating process will be very slow. Interzonal flow, the flow of fluid from one level in a well to another through the wellbore is indicated by rapid but uniform heating of one section of the well more quickly than other sections in the wellbore. The temperature profiles of Well MK-14, presented below in Figure 5, illustrates such an interzonal flow occurring between 165 m, the major permeable zone, and 18 m depth, were a second somewhat less permeable zone exists. Cross flow within a wellbore is characterised by a single isolated temperature peak in the heating profiles this is not seen in the Well MK-14 profiles. However, the very rapid heating rate occurring from 22 metres depth to the bottom of the hole could be indicative of the cross flow phenomena. 2 22 24 26 5 1 15 2 25 3 35 Temperature ( C); Pressure (Barg) Figure 5. Mokai, Well MK-14 Well Heating Temperature and Pressure Profiles. CONCLUSION The Completion Tests carried out on a geothermal wells immediately after completion of the drilling activities provides for the collection of data which characterises the well, the formations surrounding the well, and the geothermal resource into which the well has been drilled. These tests allow for an early assessment of the likely production or injection capacity of the well, for the development of understanding of the characteristics of the geothermal resource, and benchmark information on the casing condition of the newly completed well. 4

ACKNOWLEDGMENTS: I thank Tuaropaki Power Company, owners and operators of the Mokai Geothermal field, New Zealand, for the use of field data and information. REFERENCES. Grant. M, Donaldson. I.G, Bixley. P,(1982). Geothermal Reservoir Engineering. Academic Press, New York. Steven. L, (25). Monitoring of Casing Integrity in Geothermal Wells, World Geothermal Conference 25. Paper R253. NZS 243:1991, Code of Practice for Deep Geothermal Wells Standards Association of New Zealand. 5