TEST REPORT 545 EAST ALGONQUIN RD., SUITE F ARLINGTON HEIGHTS, IL USA. Project No. G August 12, 2013 Page 1 of 9

Similar documents
Intertek Testing Services Taiwan Ltd.

DC/DC Converter. Test item description...:

IEC Test Report for mini-box.com Report No. NF September 29, Test Report

CTK Co., Ltd. (Ho-dong) 113, Yejik-ro, Cheoin-gu, Yongin-shi Gyeonggi-do KOREA, REPUBLIC OF Tel: Fax:

IP65 Test Report Issue by Design Technology Department Report No: 1605IP0667BR 8 Rugged Tablet PC : Taurus FM08 Rugged Tablet PC

TEST REPORT IEC / EN Degrees of protection provided by enclosures (Ip code)

CTK Co., Ltd. (Ho-dong) 113, Yejik-ro, Cheoin-gu, Yongin-shi Gyeonggi-do KOREA, REPUBLIC OF Tel: Fax:

FINAL VERSION VERSION FINALE

TEST REPORT EN Degrees of protection provided by enclosures (IP Code)

TEST REPORT IEC / EN Degrees of protection provided by enclosures (Ip code)

1

Introduction IP codes are used in electrical product catalogs, etc., to indicate waterproofness and so on.

Operating Instructions

QUANEX BUILDING PRODUCTS TEST REPORT

Industrial Components Preventive Maintenance, Enclosures, and Contact Ratings Specifications

IP DEFINITIONS. Technical Notes. Definitions. IPXX Code

FAS-W. Features. Applications. Automatic condensation hygrometer

Operating Instructions

Test Report Number: CRT-026 Project Number:

E2K-L. Liquid Level Sensor That Is Unaffected by the Color of the Pipe or Liquid. Liquid Level Sensor. Ordering Information

The evolution of the Ex-proof flame path

ANSI/TIA-568-C-2009: Balanced Twisted-Pair Telecommunications Cabling and Components Standard, dated August 2009

Acid- Rite ph Adjustment System 2500 by Axiall, a Westlake Company

ATEX VACUUM PUMPS AND GAUGES CHEMICALLY RESISTANT, OIL-FREE AND SAFE

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

KC Series Gas Components and Supply Design Guide

INGRESS PROTECTION RATIO IP

CLEANING, INSPECTION, AND TESTING OF SEWERS

Dip Tanks Containing Flammable or Combustible Liquids Self-Inspection Checklist

Summary of Substantive Changes between the 2004 e1 and 2017 editions of ASSE 1011, Hose Connection Vacuum Breakers

GAS SUPPLY APPLICATION GUIDE

E8AA. Pressure Sensor of Stainless Steel Construction Is Ideal for a Wide Range of Applications. Pressure Sensor (Stainless Steel Diaphragm)

WaterSense Specification for Spray Sprinkler Bodies. Version 1.0

Dual Solenoid Gas Valve Installation

Tests Completed: Test Date(s): Section Results General Requirements (All Protectors) Impact Protector Requirements (Z87+)

OPERATING AND MAINTENANCE MANUAL GOLD LINE EXTRACTION CLEANERS M14-M26

ANSI/TIA-568-C : Balanced Twisted-Pair Telecommunications Cabling and Components Standard, dated August 2009

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

Test Report Number: CRT-095 Project Number:

Rules for Classification and Construction Ship Technology

CUSTOMER ASSISTANCE GUIDE BUILDING PERMIT APPLICATION SUBMITTAL REQUIREMENTS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

Oxygen Concentrator. Installation and Operation Manual. ClearWater Tech, LLC. Integrated Ozone Systems

SECTION PRESSURE TESTING OF PIPING

TRZ 03-K Volumeter. Proven Technology. Superior Performance. TRZ 03-K Volumeter is a Turbine Gas Flowmeter for Secondary Gas Metering.

Model B-1 Pipe Line Strainer 3, 4, 6 & 8 Inch (DN80, DN100, DN150 & DN200) 175 psi (12,1 bar) General Description. Technical Data

Supplementary Operator s Manual 42/24-14 EN Rev. 3

Operating Instructions Part No

Environmental Protection of HMI Components

Further technical information is available on

Pressure Measurement Single-range transmitters for general applications

Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124

INTERNATIONAL OIML R 32 RECOMMENDATION. Rotary piston gas meters and turbine gas meters ORGANISATION INTERNATIONALE INTERNATIONAL ORGANIZATION

In Ground Buried Uplights

SPECIFICATIONS PARTICLE SENSOR KS-18F Higashimotomachi, Kokubunji, Tokyo , Japan

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS

PurgEx. X Purge Controller N Version. User s Manual

CUSTOM ENCLOSURE CUTOUTS

Technical Standard Order

MODEL 154XST INSTALLATION AND SERVICE INSTRUCTIONS FOR MODEL 154XST STROBE LIGHT FOR USE IN HARSH ENVIRONMENTS/ HAZARDOUS LOCATIONS

HYDROVEX TTT Membrane Flow Regulator

DIAPHRAGM PUMPS WITH KNF STABILIZATION SYSTEM

Smart Water Application Technologies (SWAT)

TECHNICAL SPECIFICATION

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

AIRMASTER SERIES RF AUTOMATIC DEWATERING VALVES. For the purging of water from compressed air systems WHERE DO YOU NEED AUTOMATIC DEWATERING VALVES

G96 Series BASOTROL Dual Operator Valve

ECP Series Explosionproof Enclosures for OEM Applications. Optimized design, extensive sizes, and fast lead times.

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

Simple Set. Pressure Independent Control Valves 2 Way 1/2-2

Chapter 1: Basic Concepts of Pneumatics

Electro-Pneumatic Converter YT-940 SERIES

Type 0404 / /2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation

THERMODYNAMICS, HEAT AND MASS TRANSFER TUTORIAL NO: 1 (SPECIFIC VOLUME, PRESSURE AND TEMPERATURE)

PRO-50 Instrument Supply Regulator

Accu-Tab Systems 1000 Series by Axiall Corporation

SPECIFICATIONS PARTICLE SENSOR KS-19F Higashimotomachi, Kokubunji, Tokyo , Japan

VACUUM TESTING PRECAST CONCRETE MANHOLES

INDUSTRIAL VALVES MODELS: C62-A; C62-D. INSTRUCTION MANUAL Installation Operation Parts Service DIAPHRAGM BYPASS PRESSURE REGULATING VALVES

An Urgent Bulletin from CSA Group

TotalPac X Single interlock Preaction system Electric release

Customer Responsibilities. Important Customer Information. Cary 4000/5000/6000i UV-Vis spectrophotometer Site Preparation Checklist

European Technical Standard Order (ETSO)

BRITISH STANDARD BS 341-4: Transportable gas container valves. Part 4: Pressure relief devices ICS

Pipe Thread Connection 1/2 inch NPT. Friction Loss Refer to Figure 3

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

SAR COMPLIANCE REPORT

CABLE ENTRIES IN HAZARDOUS AREAS CORRECT SELECTION, INSTALLATION AND MAINTENANCE

OSAT Series. Intrinsically Safe Infrared Temperature Sensor Operator's Guide

GAS SUPPLY DESIGN GUIDE

Code Compliance Research Report CCRR-0145

Expert Hydrostatic Level Transmitters

Purge Gas Inlet Kits

CO 2. (R744) Service Station Presentation. Contents. Goals Basic functions Specification Recovery R477 Vacuum Charge Safety Other features Prototype

Dust & Water Test Report SMA SMA-J-C-XX-ST-SB1/SMA-P-C-XX-ST-CA1

@h..p. lntertek. IECEx Certificate of Conformity

SkillGuide. User Guide. English

COATINGS SPRAY GUIDE Urethane 520

Models: C62/63/64-A/D

EMERGENCY WALL MOUNTED HAND OPERATED DELUGE SHOWER

Transcription:

TEST REPORT 545 EAST ALGONQUIN RD., SUITE F ARLINGTON HEIGHTS, IL 60005 USA Project No. G101297091 August 12, 2013 Page 1 of 9 REPORT NO. 101297091CHI-001 INGRESS PROTECTION (IP66) AND HOSEDOWN TESTING ON A EXPLOSION PROOF DIGITAL INTERCOM STATION, MODEL E1-SM RENDERED TO 2645 FEDERAL SIGNAL DRIVE UNIVERSITY PARK, IL. USA INTRODUCTION This report gives the results of the tests for protection against solid foreign objects and protection against water on an Explosion Proof Digital Intercom Station, Model E1-SM. A prototype sample in good condition was provided by the client on August 6, 2013 and tested at Intertek s Arlington Heights, IL facility. AUTHORIZATION This investigation was authorized by Signed Quotes 500472406 and 500473608, dated 08/05/13 and 08/08/13. TEST METHOD A sample of the Explosion Proof Digital Intercom Station, Model E1-SM was evaluated for conformance to the tests for protection against dust & water and also was subjected to the Hosedown test to the Standards noted below. Degrees of Protection Provided by Enclosures (IP Code) IEC 60529: Second Edition UL Standard for Safety Enclosures for Electrical Equipment, Environmental Considerations UL 50E: First Edition This report is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this report. Only the Client is authorized to permit copying or distribution of this report and then only in its entirety. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test results in this report are relevant only to the sample tested. This report by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program.

Report No. 101297091CHI-001 Page 2 August 12, 2013 GENERAL These test methods describe the degree of protection indicated by: The first character numeral The second character numeral Protection of the equipment against the ingress of dust Protection of the equipment inside the enclosure against harmful ingress of water These test methods also describe NEMA Type 4 Hosedown TEST FIRST CHARACTER NUMERAL 6 METHOD The sample was tested in a dust chamber similar to figure 2 of the standard. Talcum power was maintained in suspension by an air current. The chamber contained 2 kg of powder for every cubic meter of its volume. The talcum power used was able to pass through a square meshed sieve whose nominal wire diameter is 50 µm and whose nominal free distance between wires was 75µm. The powder was not used for more than 20 tests. The sample under test was supported inside the test chamber and the pressure inside the enclosure was maintained below the surrounding atmospheric pressure by a vacuum pump. The suction connection was made to the cable inlet hole. The other holes were treated as intended for normal use on site. The object of the test was to draw into the enclosure, by means of depression, a volume of air 80 times the volume of the sample enclosure tested without exceeding the extraction rate of 60 volumes per hour. The depression is not to exceed 2 kpa (20 mbar) on the manometer shown in figure 2. If an extraction rate of 40 to 60 volumes per hour is obtained the duration of the test is 2 h. If, with a maximum depression of 2 kpa (20 mbar), the extraction rate is less than 40 volumes per hour, the test is continued until 80 volumes have been drawn through, or a period of 8 h has elapsed. RESULTS OF TEST PASS The results comply with the requirements since there wasn t accumulation of talcum powder in a quantity or location such that it could interfere with the correct operation of the equipment or impair safety.

Report No. 101297091CHI-001 Page 3 August 12, 2013 TEST SECOND CHARACTER NUMERAL 6 METHOD During the test, the water temperature was not to differ by more than 5 K from the temperature of the sample under test. If the water temperature is more than 5 K below the temperature of the specimen, a pressure balance was to be provided for the enclosure. During the test, the moisture contained inside the enclosure may partly condense. The dew which may thus deposit is not to be mistaken for ingress of water. The surface are of the enclosure is calculated with a tolerance of 10 %. The test is made by spraying the enclosure from all practicable directions with a stream of water from a standard test nozzle as shown in figure 6. The conditions to be observed are as follows: - internal diameter of the nozzle: 12.5mm; - delivery rate: 100 I/min ± 5 %; - water pressure: to be adjusted to achieve the specified delivery rate; - core of the substantial stream: circle of approximately 120 mm diameter at 2.5 m distance from nozzle; - test duration per square meter of enclosure surface area likely to be sprayed: 1 min; - minimum test duration: 3 min; - distance from nozzle to enclosure surface: between 2.5 m and 3 m. RESULTS OF TEST - PASS The results comply with the requirements since there wasn t any water that entered the enclosure.

Report No. 101297091CHI-001 Page 4 August 12, 2013 TEST HOSEDOWN METHOD The enclosure and its external mechanisms were subjected to a stream of water from a hose that has a 25 mm inside diameter (1 inch inside diameter) nozzle that delivers at least 240 L per minute (65 gallons per minute). The water was directed at all joints from a distance of 3.0 3.5 m (10 12 feet). The nozzle was moved along each joint one time at a uniform nominal rate of 6 mm/s (1/4 inch per second). A conduit may be installed to equalize internal and external pressures, but didn t serve as a drain. RESULTS OF TEST The results comply with the requirements since there wasn t any water that entered the enclosure.

Report No. 101297091CHI-001 Page 5 August 12, 2013 DESCRIPTION The sample provided is an Explosion Proof Digital Intercom Station, Model E1-SM PHOTOS Photo 1 Model E1-SM following IP6X test. Photo 2 No sign of talc entry at microphone

Report No. 101297091CHI-001 Page 6 August 12, 2013 Photo 3 Front Subassembly free of talc. Photo 4 Main Enclosure free of talc.

Report No. 101297091CHI-001 Page 7 August 12, 2013 Photo 5 No water detected in Microphone. Photo 6 No water detected in Front Assembly

Report No. 101297091CHI-001 Page 8 August 12, 2013 Photo 7 No water detected in Main Enclosure

Report No. 101297091CHI-001 Page 9 August 12, 2013 CONCLUSION The results of the tests indicate that the Explosion Proof Digital Intercom Station, Model E1-SM, met the requirements of the degree of ingress protection rating of IP66 and also the requirements of the Type 4 Hosedown test. This Test Report completes our evaluation of this model, covered by Intertek Project No. G101297091. If there are any questions regarding the results contained in this report, or any of the other services offered by Intertek, please do not hesitate to contact the undersigned. Please note; this Test Report does not represent authorization for the use of any Intertek certification marks. Report prepared by: Report reviewed by: James Bernard Jr Engineer Syed Rizvi Engineering Manager