Page 1 of KA

Similar documents
Edge Wedge 150 lb/ft 3

Page 1 of KA

The first lift, mainline, shall be placed using a spray paver.

"Emul Asph (SS-1HP) Tack".

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1

FOR LOOP RAMPS-TAPERED DECELERATION LANE

FREEWAY AND SERVICE ROAD CONNECTIONS

FREEWAY, WEAVING LANE, AND SERVICE ROAD CONNECTIONS

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio

RE: 2007 NPA Text (Clean Version)

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE

INTERSECTION WITH RIGHT TURN TAPER

SECTION 12 ROAD MARKINGS AND DELINEATION


Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

SECTION 12 ROAD MARKINGS AND DELINEATION

Pavement Markings (1 of 3)

PERMANENT PAVEMENT MARKING PLAN

TURN ARROW. LANE-REDUCTION ARROW (RIGHT) (For Left Lane, Use Mirror Image) LANE-REDUCTION ARROW MARKING DETAIL

Minnesota Manual on Uniform Traffic Control Devices

CHAPTER 1 STANDARD PRACTICES

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

September 2008 REVISIONS (1) SYMMETRICAL VERTICAL CURVE EQUATIONS 12.5(12) VERTICAL CURVE COMPUTATIONS 12.5(14) TURNING LANE LENGTHS 15.

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

BI-DIRECTIONALS FREE-ACCESS

TRAFFIC LINE MANUAL. June 2011 TRAFFIC-ROADWAY SECTION

PERMANENT PAVEMENT MARKING PLAN

SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN.

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

General References Definitions. (1) Design Guidance. (2) Supporting Information

2009 Manual on Uniform Traffic Control Devices

TRAFFIC LINE MANUAL Edition Revision 1 June 2012 TRAFFIC-ROADWAY SECTION

PERMANENT PAVEMENT MARKING PLAN

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings

EASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO

PUBLIC WORKS DEPARTMENT SIGN AND MARKING PROCEDURES AND GUIDELINES

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway.

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

LOCATION AND DESIGN DIVISION

Illini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering

PERMANENT PAVEMENT MARKING PLAN

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park

Markings Technical Committee Chapter 3H: Roundabout Markings APPROVED IN NCUTCD COUNCIL ON JANUARY 20, 2006

CHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS. Responsible Driving (Red book) NOTES & STUDY GUIDE

CW20-1D 48" X 48" (Flags- See note 1) G " X 24" (See note 2)

Geometric Design Tables

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

Traffic Control Inspection Checklist Segment:

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

Fundamentals of Traffic Control Devices

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

KDOT Access Management Policy (AMP)

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

Tract or Parcel Project Name PCN Checked By Date

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

Attachment No. 13. National Committee on Uniform Traffic Control Devices RWSTC RECOMMENDATION FOLLOWING SPONSOR COMMENTS

TRAFFIC CONTROL DEVICES

In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park

Colored Bike Lanes Request to Experiment

CONTRACT 6 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

Pavement Markings: Past, Present, and Future. TxDOT Short Course October 2016

September Reporting on Work Plan 95-R-15 Final Report. Prepared by: Reviewed by:

Geometric designs for Safe Highways. Dr. Manoj M. Asst. Professor Department of Civil Engineering IIT Delhi

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

ADA Training Standard Plans

Identify the letter of the choice that best completes the statement or answers the question.

Traffic Control Devices

MUTCD Part 6: Temporary Traffic Control

REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M.

(This page left intentionally blank)

Implementing Strategies from Missouri s Blueprint for Safer Roadways Using System-wide Safety Solutions to Save Lives

Vermont Permit Test Flash Cards

Sign Designs and Markings Manual (TEM 295-2) Page 8-3

Legislative Update Williamsburg Residency

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

50 Year Roads: Don't Accept Anything Less

Item 585 Ride Quality for Pavement Surfaces

INDEX. Geometric Design Guide for Canadian Roads INDEX

APPENDIX G SIGNAGE AND STRIPING SUPPLEMENT

6.1.1 All paving plans and construction shall be approved by City Webster for all streets within the jurisdictional limits of City of Webster.

STANDARD SIGNS and MARKINGS MANUAL

October 30, Subject: Solicitation Number: ITB Printing of Florida Class E Driver License Handbook

Roadway Design Manual

B741 TEMPORARY CONCRETE BARRIERS - OPSS 741

ADOT Maintenance Data Collection Guide

TRAFFIC AND SAFETY NOTE 608A. Spacing for Commercial Drives and Streets. To Promote a Uniform Practice in Determining Access Spacing

ATTACHMENT NO. 18 GMI-C. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION

Pedestrian Safety at Roundabouts

Speed Control & Limits

ADA on Construction. Guidance for Section C Plan Preparers

Transcription:

Page 1 of 8 70-27 KA 4555-01

70-27 KA 4555-01 It is intended that "Wet Continuous" wet reflective pavement markings be used on all White and Yellow lines. 9 Wet continuous beads shall be used for all edge line markings, skips and gore lines. Locations including gore chevrons, diagonals or any transverse markings shall use standard glass beads with a refractive index 1.5. Page 2 of 8

2 6" DOTTED WHITE 12" SOLID WHITE CHEVRON LINE FULL LENGTH OF DECELERATION LANE EXTENSION LINE 40 6" SOLID WHITE EDGE LINE 8" SOLID WHITE GORE MARKINGS 30 12" SOLID WHITE DIAGONAL LINE 6" BROKEN WHITE LANE LINE TYPICAL DECELERATION EXIT RAMP 12" SOLID WHITE CHEVRON LINE 12" SOLID WHITE DIAGONAL LINE 40 8" SOLID WHITE GORE MARKINGS 6" DOTTED WHITE EXTENSION LINE 6" SOLID WHITE EDGE LINE 30 6" BROKEN WHITE LANE LINES TYPICAL TAPERED EXIT RAMP 6" SOLID YELLOW EDGE LINE 6" BROKEN WHITE LANE LINES 6" DOTTED WHITE EXTENSION LINE 8" SOLID WHITE GORE MARKING FULL LENGTH OF ACCELERATION LANE 6" SOLID WHITE EDGE LINE TYPICAL ACCELERATION RAMP 5/25/12 Dotted Extension Lines and Lane Drop Lines B.A.H. B.D.G. 1 7/26/05 New FHWA Approval Date J.F.F. B.D.G. NO. DATE REVISIONS BY APP D Page 3 of 8 Pg 1 of 2 KANSAS DEPARTMENT OF TRANSPORTATION TYPICAL PAVEMENT MARKING DETAILS FOR MULTI-LANE DIVIDED ROADWAYS TE307 FHWA APPROVAL 5/25/2012 APP D Brian D. Gower DESIGNED J.F.F. DETAILED J.F.F. QUANTITIES TRACED DESIGN CK. B.D.G. DETAIL CK. B.D.G. QUAN. CK. TRACE CK.

2 SHOULDER LINE EDGE OF PAVEMENT 6" SOLID WHITE EDGE LINE EDGE OF PAVEMENT 6" BROKEN WHITE LANE LINE C L EDGE OF PAVEMENT 6" SOLID WHITE EDGE LINE EDGE OF PAVEMENT SHOULDER LINE TYPICAL LANE LINE AND EDGE LINE MARKINGS FOR FOUR LANE AND SIX LANE DIVIDED HIGHWAYS 12" SOLID WHITE DIAGONAL LINE 8" SOLID WHITE GORE MARKINGS 12" SOLID WHITE CHEVRON LINE 300 8" SOLID WHITE LINE 1 2 MILE 8" LANE DROP MARKING 6" SOLID WHITE EDGE LINE 30 8" LANE DROP MARKING 6" BROKEN WHITE LANE LINES TYPICAL LANE DROP 8 24 4 9 2 2 3 3 32 TYPICAL SPACING FOR DOTTED EXTENSION LINES, UNLESS OTHERWISE NOTED ON PLANS. TYPICAL SPACING FOR BROKEN LINES UNLESS OTHERWISE NOTED ON PLANS. TYPICAL SPACING FOR LANE DROP. UNLESS OTHERWISE NOTED ON PLANS. NOTE: LONGITUDINAL PAVEMENT MARKING LINES SHALL BE OFFSET A MINIMUM OF 2" FROM LONGITUDINAL PAVEMENT JOINTS. Pg 2 of 2 NOTE: AT RAMP TERMINALS WITH CROSS-ROADS, WRAP 6" EDGE LINES AROUND RADII. NOTE: ON NON I, US, AND K ROUTES, 4" EDGE LINES MAY BE INSTALLED. 6" EDGE LINES ARE NOT REQUIRED ON NON I, US, AND K ROUTES. Page 4 of 8 5/25/12 Dotted Extension Lines and Lane Drop Lines B.A.H. B.D.G. 1 7/26/05 New FHWA Approval Date J.F.F. B.D.G. NO. DATE REVISIONS BY APP D KANSAS DEPARTMENT OF TRANSPORTATION TYPICAL PAVEMENT MARKING DETAILS FOR MULTI-LANE DIVIDED ROADWAYS TE307 FHWA APPROVAL 5/25/2012 APP D Brian D. Gower DESIGNED J.F.F. DETAILED J.F.F. QUANTITIES TRACED DESIGN CK. B.D.G. DETAIL CK. B.D.G. QUAN. CK. TRACE CK.

Page 5 of 8 TRAILING CONTRAST PAVEMENT MARKINGS 32' 8' 8' 24' 16' CONTRAST PAVEMENT MARKINGS DETAIL SHEET APP'D DESIGNED JAM DETAILED JAM DESIGN CK. DETAIL CK. CADconform Certify This File Sh. No. 6" 15-MAR-2017 09:38 Trafic Drawn By : jmadrid Ploted : File : Contrast Markings (KDOT).dgn CADconform Certify This File DOTTED EXTENSION CONTRAST PAVEMENT MARKINGS 4' 2' 2' 2' 6" LANE DROP CONTRAST PAVEMENT MARKINGS 9' 6" 3' 3' 6' * DRAWINGS NOT TO SCALE * REFER TO SECTION 806 DURABLE PAVEMENT MARKING IN THE 2015 STANDARD SPECIFICATIONS FOR ALL INFORMATION REGARDING LEGEND: WHITE PAVEMENT MARKING APPLICATION OF PAVEMENT MARKING MATERIALS. CONTRAST PAVEMENT MARKING CONCURRENTLY WHEN APPLIED TO THE ROADWAY. 5. OTHER THAN TAPE, APPLICATION OF BLACK PAVEMENT MARKING MATERIAL SHALL CONTAIN A 20-40 MIXTURE OF COAL SLAG AT THE RATE 8-10 POUNDS PER GALLON OF LIQUID PAVEMENT MARKING TO ACHIEVE A SKID RESISTANCE VALUE OF 50 BPN. 6. APPLY TRAILING PAVEMENT MARKINGS THE FOLLOW THE SAME SPACE CONFIGURATION AS BROKEN LINES, DOTTED EXTENSION AND LANE DROP MARKINGS IN THE CONTRACT DOCUMENTS. NOTES: 1. 2. 3. 4. TRAILING CONTRAST MARKINGS ARE CURRENTLY THE ONLY PREFERRED LAYOUT FOR INTERMITTENT MARKINGS ON CONCRETE AND ASPHALT SURFACES. MULTI-COMPONENT, EPOXY AND TAPE SHALL BE THE ONLY PAVEMENT MARKING MATERIAL THAT IS USED FOR CONTRAST MARKINGS. ANY OTHER MATERIAL MUST FIRST BE APPROVED BY THE TRAFFIC ENGINEERING SECTION IN THE BUREAU OF TRANSPORTATION SAFETY AND TECHNOLOGY. IF APPROVED TO USE FOR CONTRAST MARKINGS, A PROJECT WILL BE SELECTED BY KDOT'S PAVEMENT MARKING SPECIALIST IN ORDER TO TEST THE PAVEMENT MARKING MATERIAL. FOR PROPER ALIGNMENT OF CONTRAST PAVEMENT MARKINGS THE APPLICATION OF BOTH WHITE AND BLACK MATERIAL SHALL BE PLACED

70-27 KA 4555-01 X 2 4210 Page 6 of 8

Page 7 of 8 70-27 KA 4555-01

70-27 KA 4555-01 Page 8 of 8