Beyond the Highway. Tale of the Trails. Tom Beekman, P.E. Northwest Regional Planning Chief Department of Transportation

Similar documents
Beyond the Highway. Trails and trails. Tom Beekman, P.E. Northwest Regional Planning Chief Department of Transportation

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

Gary Eddy ATV/Snowmobile Administrator WI DNR

2014 Wisconsin Tribal Transportation Conference. Matt Halada Transportation Planner NE Region

CTDOT Pedestrian and Bicycle Safety Initiatives

ACTIVE TRANSPORTATION SUMMIT. Active Transportation in Small Urban and Rural Communities Bicycles

TRANSPORTATION. The intent of this chapter is to address these issues and requirements set forth by the Wisconsin Statutes.

ACTIVE TRANSPORTATION

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Brian D. Hare, P.E. Bureau of Design PennDOT PA APA Annual Conference Investing in a Sustainable Future October 5, 2009

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

El Paso County 2040 Major Transportation Corridors Plan

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

General Design Factors

The region is also served by Greyhound Bus Lines, Badger Coaches, Wisconsin Coach Lines, Lamers Bus Lines, and Amtrak Trains.

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Non-Motorized Transportation 7-1

Small Town & Rural Multimodal Networks

Perryville TOD and Greenway Plan

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS

10.0 CURB EXTENSIONS GUIDELINE

Off-road Trails. Guidance

2.0 LANE WIDTHS GUIDELINE

CHAPTER 37 BICYCLES, PLAY VEHICLES, SKATEBOARDS AND IN-LINE SKATES

Basalt Creek Transportation Refinement Plan Recommendations

APPENDIX L: COST ESTIMATING TOOLS

TxDOT Bicycle Tourism Trails Study Update. April 2017 BAC Meeting April 10, 2017

Complete Streets for Louisiana

City of Moorhead Committee of the Whole Meeting

77th OREGON LEGISLATIVE ASSEMBLY Regular Session. House Bill 2732 SUMMARY

Office of Traffic, Security and Operations 1500 West County Road B2 Tel: Mail Stop 725 Fax: Roseville, MN 55113

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Land Use Patterns. Traditional Modern

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets

MnDOT Implementation of Complete Streets Policy. January 2014

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

TABLE OF CONTENTS. Executive Summary

Active Transportation Infrastructure Investment A Business Case

BIKE ON ROAD NETWORKS: URBAN & RURAL. Non-motorized Transportation Networks. Madison County Council of Governments

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

State Road (S.R.) 61 (U.S. 319) FPID s and

Appendix 3 Roadway and Bike/Ped Design Standards

MUNICIPALITY OF ANCHORAGE TRAFFIC CODE UPDATE MASTER RECOMMENDATION REPORT: 9.14, 9.16, 9.18

The Common Council of the City of Superior, Wisconsin, does ordain as follows:

Bicycle Master Plan Goals, Strategies, and Policies

Southcote Road Improvements Class Environmental Assessment Study

City of Edinburg Department of Public Works 415 W. University Dr. Edinburg, TX (956) SPEED HUMPS INSTALLATION POLICY

South Carolina Department of Transportation. Engineering Directive

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Transportation. [Draft 12/22/2008]

Report. Typical Sections. City of Middleton, WI

RUSK COUNTY COMPREHENSIVE PLAN Chapter 3

Regional Transportation Needs Within Southeastern Wisconsin

and Rural Multimodal Networks 2017 ALTA PLANNING + DESIGN

City of Madison: 2017 Capital Budget Capital Improvement Plan

BICYCLE FACILITIES & PROGRAMS

Classification Criteria

Development of Arlington County s Marked Crosswalk Guidelines. Jon Lawler, P.E. Design Engineer Arlington County, VA

IC Chapter 3. Traffic Control Signals

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7: Bicycle And Pedestrian Investment Direction

5 CIRCULATION AND STREET DESIGN

CYCLISTS AND MOTORISTS SHARE THE ROAD SAND SPRINGS

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Engineering - Bicycle and Pedestrian

Transportation Planning Division

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

St. Francis Drive through the City of Santa Fe Corridor Study

Duwamish Way-finding and CTR Report

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Construction Specifications Manual

5. RUNNINGWAY GUIDELINES

PBIC Webinar. How to Create a Bicycle Safety Action Plan: Planning for Safety [IMAGE] Oct. 2, 2014, 2 pm

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

IC Chapter 3. Traffic Control Signals

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

Malabar Road (SR 514) PD&E. Town of Malabar Briefing (July 17, 2017)

STANLEY STREET December 19, 2017

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

Living Streets Policy

APPENDIX B1. CROSS-REFERENCE GUIDE TO THE OHIO REVISED CODE

Solana Beach Comprehensive Active Transportation Strategy (CATS)

BIKE PLAN CONTENTS GATEWAY

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

CITY OF LOMITA CITY COUNCIL REPORT

Lake to Sound Trail FEASIBILITY STUDY. February 2009

Chapter 6: Along the Street

Active Transportation Facility Glossary

Austell Road Access Management Plan Public Meeting February 17, 2009

CONNECTING PEOPLE TO PLACES

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

Transcription:

Beyond the Highway Tale of the Trails Tom Beekman, P.E. Northwest Regional Planning Chief Department of Transportation Beyond the Highway October 11, 2016 Stevens Point, WI

Wisconsin DOT and Trails TOPICS FOR TODAY Big T trails and Little t trails WisDOT funding for trails WisDOT accommodation policy for non-motorized and motorized trails within state highway right-of-way

Wisconsin DOT and Trails DEFINITION OF THE DAY Highway = The right-of-way upon which a public roadway and appurtenances are located. Roadway = The portion of highway used for vehicular travel, i.e. shoulder to shoulder.

Big T Trails Most common public perception of trail Statutorily recognized May have 4f or 6f status Many are Rails-to-Trails WisDOT interaction is typically only when a transportation project may touch them. As a rule, managed by WisDNR or local units of government.

Big T -- Rails to Trails WisDOT has right of first refusal on a rail line when rail service is officially discontinued on that line. Three options: Maintain state- sponsored rail Convert to Rails-to-Trails Abandon the rail interests on the land and convert corridor to non-rail purpose under private or public ownership. Wisconsin has been converting rails into trails since 1964 and currently has more than 300 miles of trail on rail corridors more than any other state.

Little t Trails On-Roadway STH Accommodations Bike or pedestrian lanes on the STH roadway are an accommodation, not a trail. Limited locations where this occurs on a state highway. Typically only in urban areas. On certain rural highways there may be a wider paved shoulder to accommodate identified bike or pedestrian usage. WisDOT does not sign on-roadway accommodations on STHs as trails.

Little t Trails Off-Roadway, In STH Right-of-Way Referred to as trail accommodation. It is a permitted occupation on WisDOT right-of-way. Requires local unit to be responsible for all maintenance. Potential for WisDOT cost share if done when a state highway project occurs on that highway. Can be funded at 100% local. Can be funded with certain WisDOT Local Program funds. Can be signed as a trail with appropriate WisDOT permits.

Little t Trails STAND ALONE TRAIL Red Cliff Reservation Bayfield County SIDEWALKS SHARED USE TRAIL AND CROSSINGS

Little t Trail RESULTS Linked to MORE THAN $30 Million in Additional Community Investments

WisDOT Programs Transportation Alternatives Program (TAP) Non-motorized and local maintaining authority Safe Routes to School Program, Transportation Enhancements, Bicycle & Pedestrian Facilities Program 2016-2020 Program Cycle Approximately $7 Million in Federal Funds Applications due - January 29, 2016. Awards announced - Summer 2016. Next opportunity - 2017 http://wisconsindot.gov/pages/doing-bus/local-gov/astnce-pgms/aid/tap.aspx

WisDOT Programs WisDOT allocates approximately $2 million annually to WisDNR for its Recreational Trails Program. Motorized ATV, UTV, Snowmobile Non-Motorized Bike, Pedestrian

Motorized Routes or Trails ATV Routes vs ATV Trails ATV route = On-roadway portion of a highway designated for use by ATV operators by the governmental agency having jurisdiction. ATV trail = Off-roadway portion of highway designated for use by ATV operators by the governmental agency having jurisdiction. WisDNR has jurisdiction for establishing standards, encouraging use, and supervising the rules on the WI system of ATV routes and trails.

Motorized Routes or Trails Interaction with Public Roadways IN GENERAL, ATV/UTVs are not allowed to ride on public roads or in the right-of-way next to public roads as do snowmobilers. Operation on and around public roads is restricted and in most cases illegal. There is no residential access allowance that permits riding on a roadway from a dwelling to the nearest trail or route.

Motorized Routes or Trails Crossing a Local Highway Legal if done in the most direct manner practicable, and at a place where no obstruction prevents a safe and quick crossing.

Motorized Routes or Trails Crossing a State Trunk Highway WisDOT requires a permit for any ATV to operate on a state highway or within the right of way for that state highway. However, permits are not required to operate an ATV on state highway or within state highway right of way in the following situations: Crossing the STH at a county, town or local road intersection with that STH. Crossing from a driveway on one side of STH directly to a local road or driveway on the other side.

Motorized Routes or Trails Operating ATV On-Roadway On Local Highways It is legal when: The public roadway is not being maintained for public traffic. Regardless of condition, if receiving WI General Transportation Aids, the road is being maintained. The roadway is designated as an ATV route. ATV is being used as an implement of husbandry. Operator holds a Class A or B permit under Wis. Stat. 29.193(2) and is traveling for hunting. If an ATV trail is officially routed on the roadway for a short distance.

Motorized Routes or Trails Operating ATV On-Roadway On State Highways If ATV is used as implement of husbandry. If operator holds a Class A or B permit under Wis. Stat. 29.193(2) and is traveling for hunting. If a ATV trail is officially routed on the STH for a short distance with appropriate WisDOT permits or local agreements.

Motorized Routes and Trails Requirements for Routes and Trails on State Highways Requestor must be local government Location details Memorandum of Agreement (MOA) between WisDOT and local government County and C-V-T ordinances designating route Must support DNR ATV route/trail network No short segments to only serve businesses. Signing and pavement markings paid by locals

Local Ordinances Local governments may enact ordinances to operate an ATV on the roadway or shoulder of any highway to cross a bridge 1,000 feet in length or less. Even though the statute gives local units of government this right, WisDOT may determine that due to safety and operational factors for both ATV and roadway users, an ATV trail must be built to and from the bridge instead of allowing ATVs to travel on the roadway or shoulder.

Local Ordinances

Questions? Tom Beekman, P.E. Northwest Regional Planning Chief (715) 836-4628 Thomas.beekman@dot.wi.gov http://dot.wisconsin.gov Gary Brunner, P.E. Northwest Regional Operations Chief (715) 836-2415 gary.brunner@dot.wi.gov http://dot.wisconsin.gov