Domed Ceilings and Barrel Vaults

Similar documents
Ceiling System. Installation Instructions Curvatura 2 x 2

Installation Instructions Topo Ceiling System

USG Ceiling Solutions. LOGIX Integrated Ceiling Systems INSTALLATION GUIDE

USG Ceiling Solutions USG DONN ADVANCESPAN, DXAS AND DXTAS CORRIDOR ACOUSTICAL SUSPENSION SYSTEM INSTALLATION GUIDE

USG EXTERIOR CEILING SYSTEMS

USG Ceiling Solutions USG DONN ADVANCESPAN, DXAS AND DXTAS CORRIDOR ACOUSTICAL SUSPENSION SYSTEM INSTALLATION GUIDE

CLEANROOM GEL GRID CEILING SYSTEM PRODUCT DATA Division

rondo aluminium components

INSTALLATION & OPERATION MANUAL AORCS ATLAS OPERATING ROOM CEILING SYSTEM. Redefine your comfort zone.

features and benefits:

9) BOM DOES NOT ACCOUNT FOR THE USE OF SCRAP OR EXCESS MATERIAL CUT FROM OTHER ITEMS.

Page 1 of 1 04/19/13 SBR

dividers (Converted)-1 12/2/05 10:05 AM Page 5 Donn Ceil Ceil Donn

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

Airwalker. Installation and Safety Information. Stretch Products for Dance, Therapy, Education, and Fitness

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

Tripod Setup Guide (M-TPx)

Installation of 2 Tier In Line Greeting Card Rack

GRAVITY BIKE RACK ASSEMBLY & OPERATING INSTRUCTIONS

Installation, Compensation and Maintenance Instructions for. RITCHIE Compasses. Made In U.S.A

Installation Guide, MPower Echelon Console

Installation Instructions for the AlphaDeck Staging System

This document to be used with Hurley traditional Davits

CADDY SPEED LINK MANUAL SLK LOCKING DEVICE

Plans and Instructions to build a folding reflector oven

OWNERS MANUAL. Model Shown with optional Primary Mooring Cleats. Portable Mooring System SAFETY OPERATION MAINTENANCE PARTS

L.Ph. Bolander & Sons 1355 Evans Ave. 800/

ORNAMENTAL CANTILEVER GATE INSTRUCTIONS

- Written price quotations are valid for 30 days from the date of the quote unless otherwise noted.

FireHalt TM Flexible Cavity Fire Barrier Systems

INSTALLATION INSTRUCTIONS AT-SERIES ANCHOR ASSEMBLY PART NUMBER: F-04CAJP 450 LB. [204kg] MAXIMUM CAPACITY (PRO POOL LIFT)

TO RECEIVE the most benefit from a

Chicago Metallic 4000 Tempra 9/16

Troyer s Gourd Rack 8 unit F R H O P

Owner s Manual Tourmaster Storage Cart

Bottle Rocket Launcher P4-2000

602 STRINGING MACHINE OWNER'S MANUAL

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

Installation and Training Manual

Steps for W17, W14,W07, Wing Assembly Sonex #815

Mike Hungerford's notes on building Ron Caudillo's TOS Enterprise

2012 K9100 COMPACT Worldwide Cycling Solutions Through Creative Innovations.

Made in U.S.A. Narrow-U Bike Rack Heavy Duty Submittal Sheet. Materials: Finishes: Mount Options: Setbacks:

Pre-Paint>Fuselage>Empennage>Fit vertical tail fin. Objectives of this task: Materials and equipment required: Fit the spar extender

PRODUCT SUPPORT MANUAL YACHT BEAM 6M Searchlight Remote Control System with Joystick Remote Control Panel

MODEL TRIPEX PULLEY SYSTEM

How Do I Install My Garden Master Bucket Garden?

Standard Collection Setup Manual

Rocket Activity Rocket Wind Tunnel

F-1279-R UPPER RIGHT SKIN F-1280-R RIGHT SIDE SKIN F-1281-R LOWER RIGHT SKIN F-1208-R FUSELAGE FRAME

3190A NEO-ANGLE DOOR INSTALLATION INSTRUCTIONS. Series MODEL NO

How To Measure And Mark Basketball Lines Like The Pros

SECTION 10iS: TAILCONE

BEAMGUARD SAFETY POST TM INSTRUCTIONS

INSTRUCTIONS 360 Y-DROP HAGIE STS 2015

Inflatable Stand Up Paddle Board Manual

SPOOLER INSTRUCTIONS. STEP 12 If you are going to paint your posts, that should be done at this time.

TOWER INSPECTION REPORT

NEXT GENERATION FLEX FENCE

600 / 600FC OWNER'S MANUAL

Design Guide. balloons.com

INSTALLATION INSTRUCTIONS PUSH BAR PULLMAN PANIC BOLT DEVICE TO EN 1125 : 2008

INSTRUCTION MANUAL. January 23, 2003, Revision 0

U STAND INSTALLATION INSTRUCTIONS

CamRT Sun Top Bimini Installation Instructions

USER MANUAL. DM65 Manual Flush/Tilt Combo Mount

2000 lb manual winch

CONSTRUCTOPEDIA NXT Kit 9797

Melon-Shaped Egg Basket

Assembly Instructions. -Cantilever Boat Lifts

OWNER'S MANUAL. Copyright 2003 GAMMA - All Rights Reserved

SASK-A-POLE OWNERS AND USERS MANUAL

ASSEMBLY INSTRUCTIONS

THOR 10 HAMMER CAGE INSTRUCTIONS

Preferred Instruments Danbury, CT USA

E Manual Self tacking system 30

OWNER'S MANUAL. Copyright 1999 ATS - All Rights Reserved

Moai Bike Rack Heavy Duty Submittal Sheet. Materials: 2.0 Schedule 40 Pipe (2.375 OD) Finishes: Capacity: Mount Options: Setbacks: 2 Bikes

OPERATION AND INSTRUCTION MANUAL Flat Roof Anchor Model: FRA250L-10X-CTS

GUIDE BINDING USER MANUAL

42 inch Mower for TimeCutter Z Riding Mowers. Note: Determine the left and right sides of the machine from the normal operating position.

Samurai Armor Set: Step by Step


Single and Triple Rain Barrel Setup

OWNER'S MANUAL. Turnbuckle. Stanchions. Warning

INSTALLATION INSTRUCTIONS FOR: RE4548 JK FRONT COILOVER KIT

Owner s Manual. for. Manual Reel Mower. (Model MM-1)

RATLINER Assembly Instructions.

Installation Guide RHT-380. This Manual Must Be Read Before Operating The Equipment CUSTOMER COPY

Product Identification

Installation Instructions

Hot Tapping Machine. OPERATIONS MANUAL and OPERATING INSTRUCTIONS

Standard Hangers and Adapters

CHAPTER 5 REWIND STARTERS

Read through all the steps first before working on the camera. Make sure you know what to do.

SECTION 23iS/U: SIDE SKINS

REVISIONS. Note: All revisions are highlighted in yellow within the document. 2/24/2017 TASK 2 Valve page 18

Fall Protection- Part 2

BUYING GUIDE ALGOT Storage across the home

10 DRIP NOZZLE WATERING DRIP KIT Model / Model 46095

Transcription:

Page 1 of 12 Domed Ceilings and Barrel Vaults USG Drywall Suspension System These installation instructions are divided into two parts: Part 1 applies to domed ceilings, and Part 2 applies to vaulted ceilings. Note: For installation instructions for vaulted ceilings with domed ends, follow Part I for domed ceilings to build the ends first. To ensure proper installation, read all instructions before you begin. Check the enclosed Bill of Materials to be sure that all parts and equipment are present and undamaged. Note: Parts will be permanently damaged if installed incorrectly. To generate a set of construction specifications on-line, go to www. > Resources > Online Tools. Parts Construction specifications (supplied separately) Bill of materials (BOM) Custom curved tees DGHUB Dome hub (if specified on BOM) DGSP180 Main tee splice plates (if specified on BOM) DGLW Cross tees (if specified on BOM) DGWC24 Wall attachment clips (if specified on BOM) Supplies Hanger wire Self-drilling screws 12-ga. galvanized steel wire in straight lengths #2 Philips round washerhead or similar Tools In addition to standard 16 to 32 spring clamps Locking C clamp grid installation tools, you should have:

Page 2 of 12 Step 1 Gather construction Dome construction specifications are prepared specifically for each dome, and may be provided by the architect, specifications your USG representative, or you can generate a set on-line at www. > Resources > Online Tools. These specifications include important tables, diagrams, and dimensions that you will need to install a dome successfully. For additional help, contact your USG representative. Step 2 Install the To install the dome hub, identify the correct location and elevation for the center or apex of the dome. Hang dome hub the dome hub. Tip: Form a pail handle between two opposite hanger holes so that the hub can be hung from a single wire (Figure 1). Tip: Hub detail provides connection points compatible with USG CURVATURA splice plates, access point for plumb bob, tape measure slots to aid in arc measurements, and a knockout for a standard electrical box, if needed. Figure 1- Dome hub hanger wires electrical box knockout tape measure slots center hole for plumb bob dome hub main-tee splice plate curved primary spoke Step 3 Position and install Curved grid is supplied with sets of punched holes spaced 8 apart (Figure 2) along the tee. The two round hanger wires holes are intended for hangers. Each hanger wire needs to fall in line with a pre-punched hanger hole; because the spokes are curved, the horizontal distance between hanger wires will vary (Figure 3). See Table 1.1 of the Construction Specifications for exact hanger locations (dimension B). Figure 2 Pre-punched grid Figure 3 Hanger wire spacing 12-ga. hanger wire hanger wire holes W1 W2 W3 W4 W5 cross-tee slot hub B E hanger wire spacing varies with slope of curve

Page 3 of 12 Tip: It may be easier to mark hanger locations on a tape measure or a long stick and use this as a template against the ceiling. If there are many obstructions, it may be easier to mark the locations on strips of tape along the floor (Figure 4), then use a laser to project the points to the ceiling. Tip: Extra hanger holes are provided to help work around obstructions; however, the space between any two hanger wires must not exceed 32 (every fourth hole). Eight rows of hanger wires radiate from the center of the dome. As these rows diverge by more than 4, additional rows of hanger wires need to be inserted between them (Figure 4). Figure 4 Hanger wire locations from floor strips of tape applied to floor 22 1 /2 45 hanger wire locations for secondary spokes B hanger wire locations for primary spokes secondary spokes must be inserted between primary spokes where this dimension exceeds 48"

Page 4 of 12 Step 4 Assemble and hang The first row in Table 1.2 of the Construction Specifications indicates the arc length required for each of the primary spokes primary spokes (dimension D). Prepare each spoke by measuring along the arc of the tee and trimming the end to the required length. Depending on the size of the dome, several tees may need to be connected to form the length required. Tip: The vertical slots between the hanger holes are not used in dome applications but will be useful later to gauge the correct position of headers and cross tees. The slots are exactly 8 apart along the arc of the tee. Hang the primary spokes from the hanger wires by connecting curved tees to the hub and to each other (Figure 5) using splice plates provided. Grid face elevations (measured from perimeter) are shown in Table 1.1 of the Construction Specifications to aid in the leveling of spokes (Figure 3) (dimension E). Figure 5 Connect curved tees to hub and other tees dome hub main-tee splice plate Figure 6 Connect curved tees to hub and other tees spoke arc length "D" hub dome diameter "L" primary spoke S1 distance between ends = L x 0.383 Important! The integrity and accuracy of the primary spokes will ultimately determine the quality of the completed installation. Check the integrity of the completed spokes. Extra care at this point will prevent troublesome alignment problems later. 1. Check the elevation difference between the hub and the end of each primary spoke to make sure it agrees with the construction specifications. If elevations need to be adjusted, adjust them now. 2. It is important that the main spokes are hung in the proper position relative to each other. Check for proper position by measuring the distance between the ends of the spokes. These distances should all be the same. The correct distance between the ends can be calculated by multiplying the dome diameter (ceiling opening size L ) by 0.383 (Figure 6). If hanger wires need to be relocated, move them now. 3. Examine each completed spoke from one end. Hanger wires should be in line. They should hang straight and plumb within 1:6 (about 10 degrees). The spokes should be straight with no waves. If hangers need to be relocated, move them now.

Page 5 of 12 Step 5 Add headers to Steps 5-7 are not needed for domes smaller than 10-1/2 in diameter (dimension L). If your dome is smaller expand spokes than this, headers are not required. Go to Step 8. For domes 10-1/2 in diameter or larger (dimensions L see page 4), where spokes get too far apart to support the dome (48 or more), short pieces of tees, called headers, are required to span between the spokes. Table 1.3 of the Construction Specifications indicates the length (dimension C) of the headers required. Depending on the size of the dome, several rows of headers may be required. 1. Prepare eight (8) headers. When cutting headers, they must be trimmed at both ends to avoid interference. Cut the headers to the length specified in the Construction Specifications (Figure 7A) (dimension C). Snip the bulb back about 1/4 (Figure 7B) and the face back about 3/8 (Figure 7C). It is important that the headers are all cut to the same length. Figure 7 Trim headers at both ends A arc length "C" 1 /4" grid face B 3 /8" grid face C

Page 6 of 12 Step 5 (continued) 2. Table 1.3 of the Construction Specifications indicates the correct position of each header (dimension A). Position and attach all headers and temporarily hold them in place with spring clamps (Figure 8). Use the cross-tee holes on the primary spoke as a guide for positioning. The web of the header should fall in line with a cross-tee hole on the spoke ( 1/16 ). The spring clamps will allow you to adjust the positions. Figure 8 Hold headers in place with spring clamps A header H1 Tip: If the headers seem tight and you re having difficulty lining up the slots on the spokes, double-check the lengths of the headers to make sure they re trimmed properly. All eight (8) headers must be cut to the same length. 3. Once all headers are in position, clamp the intersection and permanently attach the headers to the spokes using self-drilling screws (Figure 9). For best results, use #8 x 1/2 washer-head self-drilling screws. 4. Examine each of the spokes from one end to make sure they are not twisted or pushed out of line at the header intersections. If header adjustments are needed, make them now. Figure 9 Screw-attach headers

Page 7 of 12 Step 6 Install secondary Use the primary spokes as a model for hanger locations on the eight (8) secondary spokes. Table 1.2 of the spokes Construction Specifications indicates the length of the secondary spokes (dimension D). It is important to have the slots and hanger holes on the primary spokes line up with the ones on the secondary spokes. The only way to do this is to build the secondary spokes working inward from the perimeter of the dome. Examine the end of the primary spoke. Measure the distance from the end of the spoke to the first hole (Figure 10) (dimension X). Cut the new spoke using the same offset distance and build the new spoke working inward from the perimeter toward the header (Figure 10). Attach the secondary spoke and a hanger wire to the midpoint of the header (Figure 11). Figure 10 Trim and position secondary spoke header secondary spoke S2 primary spoke S1 distance to first cross tee slot X X distance to first cross tee slot Figure 11 Attach secondary spoke and hanger wire to midpoint of header hanger wire header secondary spoke

Page 8 of 12 Step 7 Install additional Additional headers and secondary spokes are generally needed for domes larger than 21 in diameter headers and spokes (dimension L). For construction of additional headers and spokes, refer to tables 1.2 and 1.3 of the Construction Specifications. Progression of assembly is H1, S2, H2, S3, and so on (Figure 12). Figure 12 Assembly progression of headers and spokes S1 H1 S2 H2 S3 Step 8 Install cross tees Beginning at the perimeter, cut, fit, and screw-attach cross tees into all openings so that the maximum open space is 16 inches (Figure 13). For the length of the perimeter cross tee, refer to the general data in the construction specifications. Figure 13 Cross-tee installation cross tees cut to fit 16" o.c. perimeter cross tees Tip: Exact locations of cross tees are not critical in this step since their purpose is only to provide a surface for material attachment. Step 9 Finish the dome Brace the completed dome suspension system against the surrounding structure as necessary to prevent movement. Apply lath and plaster to the exposed surface of the suspension system as indicated on the architectural plans. Use STRUCTO-BASE plaster only. Check the architectural plans for any perimeter transition treatments that may be required. Examples may be found in the USG drywall suspension system brochure (AC3152).

Part 2: Barrel Vaults Page 9 of 12 Step 1 Gather construction Vault construction specifications are prepared specifically for each vault and may be provided by the architect, specifications your USG representative, or you can generate a set on line at www. > Resources > Online Tools. The construction specifications include important tables, diagrams and dimensions that you will need to complete the vault successfully. For additional help, contact your USG representative. Step 2 Install hanger wires Curved main tees are supplied with sets of punched holes (Figure 14) spaced 8 apart along the tee. The round holes are for hangers. Each hanger wire needs to fall in line with a pre-punched hanger hole; because the spokes are curved, the horizontal distance between hanger wires will vary along the rib (Figure 15). See Table 2.1 of the Construction Specifications for hanger locations. The distances shown (dimension F) are the distance along the floor and are measured from the apex of the vault. Hanger wires should be installed symmetrically on either side of the apex. Figure 14 Pre-punched grid Figure 15 Hanger wire spacing 12-ga. hanger wire hanger wire holes W7 W5 W3 W1 W2 W4 W6 cross-tee slot apex F H hanger wire spacing varies with slope of curve Tip: It may be easiest to mark hanger locations on the floor and then use a laser to project these points to the ceiling. Tip: Extra hanger holes are provided to help work around obstructions; however, the space between any two hanger wires must not exceed the specified maximum indicated on the construction specifications. Refer to the construction specifications to determine spacing of main-tee ribs. Using Table 2.1 of the Construction Specifications as a guide, install additional rows of hangers for each main-tee rib.

Part 2: Barrel Vaults Page 10 of 12 Step 3 Install main tee ribs The construction specifications indicate the total arc length required for each main-tee rib (dimension G). Begin constructing each rib by hanging a main tee at the apex. Hang the main tee so that a cross-tee slot is at the apex (Figure 16). Work outward at both ends, connecting curved tees as needed using splice plates provided (Figure 17). Grid face elevations (measured from perimeter) are shown in Table 2.1 of the Construction Specifications to aid leveling of ribs (dimension H). If the barrel vault terminates into a wall, the perimeter hanger wire may be omitted. Instead, tie back or mechanically fasten the main-tee perimeter as required. Figure 16 Hang main tees apex Figure 17 Join curved tees H apex G Step 4 Install cross tees Install cross tees to connect main-tee ribs (Figure 18). Use spacing as indicated on the Construction Specifications. Figure 18 Cross-tee installation cross-tee spacing as specified cross tees

Part 2: Barrel Vaults Page 11 of 12 Step 5 Cut and terminate For perimeter cuts, cut in and terminate cross tees at both ends of the vault. cross tees for 1. If the vault terminates at a perpendicular wall, attach a complete main-tee rib against the wall using wall perimeter cuts attachment clips (Figure 19). Space the clips about 4 on center (every sixth slot). Use the ledge of this rib to attach cross tees. Cut cross tees to fit and permanently attach them using self-drilling screws. 2. If the barrel vault terminates at a half dome, cut cross tees to fit and mechanically fasten the cut ends to the face of the dome spokes. Figure 19 Insert clip A 1) insert tab through tee slot 3) screw-attach to wall B 2) fold against tee web Step 6 Finish the vault Apply SHEETROCK brand gypsum panels to the exposed surface of the suspension system as indicated on the architectural plans. Check the architectural plans for any additional perimeter transition treatments that may be required. Examples may be found in the USG drywall suspension system brochure (AC3152).

Literature number AC3157 Product Information See for the most up-to-date product information. Note All products described here may not be available in all geographic markets and are subject to change without notice. Consult your local sales office or representative for information. Notice We shall not be liable for incidental or consequential damages, directly or indirectly sustained, nor for any loss caused by application of these goods not in accordance with current printed instruction or for other than intended use. Our liability is expressly limited to replacement of defective goods. Any claim shall be deemed waived unless made in writing to us within thirty (30) days from date it was or reasonably should have been discovered. Safety First! Follow good safety and industrial hygiene practices during handling and installing of all products and systems. Take necessary precautions and wear appropriate personal protective equipment as needed. Read material safety data sheets and related literature on products before specification and/or installation. Manufactured by USG Interiors, Inc. 550 West Adams Street Chicago, IL 60661 The following are trademarks of USG Interiors, Inc. or a related company: CURVATURA, SHEETROCK, STRUCTO-BASE, USG. AC3157/rev. 6-06 2006, USG Interiors, Inc. Printed in U.S.A.