Operation Manual GENO Backwash Filter MX 1" MX DN 100

Similar documents
Edition October 2015 Order No inter. Operation Manual GENO Backwash Filter MX 1" MX DN 100

Operation manual Euro system separator GENO -DK 2 Euro system separator GENO -DK 2-Maxi Euro system separator GENO -DK-Maxi

Operation Manual GENO -Backwash Filter MXA 1 MXA DN 100

Operation Manual GENO-mat KF-Z / MS-Z / AK-Z Filter Systems GENO-mat TE-Z Deacidification Systems

Date September 2017 Order no inter. Operation Manual GENO-mat FE-Z Deferrisation system

Edition September 2017 Order no inter. Operation manual Filter systems GENO-mat KF-Z / MS-Z / AK-Z Deacidification systems GENO-mat TE-Z

Mounting and Operating Instructions EB 3007 EN. Self-operated Pressure Regulators. Differential Pressure Regulators (opening) Type Type 42-25

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

Mounting and Operating Instructions EB 2555 EN. Self-operated Pressure Regulators. Pressure Reducing Valves Type 50 ES Type 50 EM.

Product Manual B-Safety ClassicLine & PremiumLine Emergency Eyewash and Eye/Face Wash Equipment

Instruction manual. for. high purity gas pigtails 200 bar / 300 bar

Operating and maintenance manual Filter and reducing station Series / 1.0

OPERATING INSTRUCTIONS

Mounting and Operating Instructions EB EN. Type Supply Pressure Regulator. with increased air capacity

Innovative Vacuum for Automation. Operating Instructions Dust Filter STF P / STF-D P.

GENO -flushing compressor 1988 K operation manual

Serie ECO 3T. Threaded end back flow preventer with controllable reduced pressure zone. made in. Application fields. Protection E U R O P E

Siphon vessel / Priming aid

Steam Trap BK 15 (DN40, DN 50) Original Installation Instructions English

Operating instructions - Translation of the original -

Mounting and Operating Instructions EB 2558 EN. Self-operated Pressure Regulators. Type Pressure Build-up Regulator

Installation and operating manual. Pneumatic control station LK product no: PCS 1-10

PRAHER PLC-MP AQUASTAR MANAUL 2009

Operating Instructions. Ball valve fitting according to ZB For pressure transmitter VEGABAR 82. Document ID: 50027

Declaration of Conformity as per Directive 97/23/EC

Declaration of Conformity as per Directive 97/23/EC

Serie ECO 3F. Flanged back flow preventer with controllable reduced pressure zone. made in. Application fields. Protection

Type Pressure Regulator. for increased air capacity. Fig. 1: Type Pressure Regulator. Mounting and Operating Instructions EB EN

Declaration of Conformity as per Directive 97/23/EC

ITT RICHTER CHEMIE-TECHNIK

Operating instructions - Translation of the original -

Mounting and Operating Instructions EB 3017 EN. Self-operated Regulators

OPERATING MANUAL CHEMTRAC 840M MANUAL RETRACTABLE PROCESS HOLDER

Mounting and Operating Instructions EB 8546 EN. Supply Pressure Regulator Type Fig. 1 Supply pressure regulators

Safety Please read and keep in a safe place Operating instructions Linear flow control VFC Linear flow control with actuator IFC

Hand pump type CH. Product documentation. 300 bar 8.3 cm 3 /stroke. Operating pressure p max : Displacement volume V max stroke :

Operating instruction

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

Diaphragm relief valve

Type 3709 Pneumatic Lock-up Valve. Translation of original instructions. Mounting and Operating Instructions EB 8391 EN

GENO -Flushing Compressor Product Data Sheet F 02

Installation and Operating Instructions Bypass Flow Meter DST

Diaphragm Pressure Keeping Valve

Pressure maintenance valve SDV-P / SDV-P-E

Installation and operating instructions KEMPER Backflow Preventer BA Figure 361

WE SAY: CLEANLY SEPARATED SYSTEMS = ELKO-MAT EDER!

Mounting and operating instructions EB 2530 EN. Self-operated Pressure Regulator. Pressure Reducing Valve Type M 44-2

Flowmeter. Original operating manual DFM

Installation and Maintenance Manual. ECO Filtration Unit with 6-way-Top-Mount-Valve. Art. Nr

TITAN FLOW CONTROL, INC.

Manual Actuated Boiler Blowdown Valves

CARTRIDGE FILTERS TECHNICAL MANUAL MT 080. Installation, commissioning and maintenance instructions. 08/02 Edition

Mounting and Operating Instructions EB 3007 EN. Self-operated Pressure Regulators. Type Type Differential Pressure Regulators (opening)

Mounting and Operating Instructions EB EN. Self-operated Pressure Regulators. Type 2335 Excess Pressure Valve with pilot valve

OPERATING INSTRUCTIONS MANUAL FOR QACV PNEUMATIC DOSING PUMP

Instruction Manual SB02, SB03, SB04 All metal flow limiter

Safety Please read and keep in a safe place Operating instructions Linear flow control VFC Linear flow control with actuator IFC

Inverted Bucket Steam Trap IB 16A-7

Pressure Reducing Valve DMV 750

Measurement accessories METPOINT OCV for the measurement in systems up to 40 bar

Mounting and Operating Instructions EB 3009 EN. Self-operated Regulators. Type RS Check Valve (backflow protection)

Mounting and Operating Instructions EB 2172 EN. Series 43 Temperature Regulators. Type 43-5 and Type Type Type 43-6

Water Safety Shut-off Valve HON 790

Pressure Reducing Valve for Steam Type 2333 A

Translation of the original Operating Instructions for HKS rubber compensators

Gas plug-in hose, straight-through form. Instructions for Use. suitable for gas socket model G2019T, G2016T. G2023 from 01/1990.

Pressure Reducing Valve DMV 750 set range: bar

Installation, Operating & Maintenance Instructions. Variable leak valve with manual actuator. Series 590 DN 16 mm (I. D. ⅝") E

Filling valves AL, ALM Series Automatic filling units ALOMDIW, ALOMDNW Series

80 Litre Suction Oil Drainer

Instructions for Use. Plug connection for medical gas and vacuum acc. to DIN / 2004 DIN EN ISO

Instruction Manual Contact Pressure Vacuum Gauge

ROPV R40 E Series User Manual

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

Installation and commissioning instructions 255 series and 256 series

Operating Manual. R280 Pressure regulator made of brass. 1. Intended Use

Two-stage valve type NE

Pneumatic proportional controller Types M Types FM Function tested for use of the float in Ex-zone 0

Operating Instruction English. Revision A Date author NH This operating instruction is not subject to updating. Airgun

Pneumatic switch module 3/2-way valve (On/Off) Types P Types FP Function tested for use of the float in Ex-zone 0

Pfeiffer. Operating, assembly and maintenance instructions for discontinuous sampling valve Series 27i. 1. Design, operation and dimensions

Pressure-limiting valve and pre-load valve type MVG, MVE and MVP

Installation & Operation Manual Proven Quality since 1892

Pressure relief valve

Control Valve with ZK Radial Stage Nozzle ZK 210. Original Installation Instructions English

These operating instructions apply to: PKL 190 PKL 2100 PKL 450 PKL 5000 PKL 740 PKL 10000

Operating instructions - Translation of the original -

Steam Trap BK BK 212-ASME. Original Installation Instructions English

CARTRIDGE FILTERS. Models: CF50, CF75, CF100, CF150,

Installation, Operating & Maintenance Instructions. All-metal gate valve with extended pneumatic actuator. Series 48 DN mm (I.D.

3-port seat valves with externally threaded connection, PN 16

Operating instructions Two-way / three-way valves for drinking water plants

Non-Return Valve SRK 22A

Instruction Manual. CG16K Barometrically Compensated Capsule Dial Gauge. CG16K Capsule Dial Gauge, 0 to 25 mbar

Bermad Pressure Reducing. Model: 42T

Modular valve block. Operating manual Series MVB 100/200. Version BA EN Print-No TR MA DE Rev001

Pressure relief valve

MAINTENANCE AND OPERATING MANUAL

Eaton Filtration, LLC

OFFICINE OROBICHE S.p.A. 1/9

Transcription:

Operation Manual GENO Backwash Filter MX 1" MX DN 100 Edition 06/2013 Order No. 094 107 941-inter Grünbeck Wasseraufbereitung GmbH Josef-Grünbeck-Strasse 1 89420 Hoechstaedt/Danube GERMANY Phone +49 9074 41-0 Fax +49 9074 41-100 www.gruenbeck.com info@gruenbeck.com A company certified by TÜV SÜD in accordance with DIN EN ISO 9001, DIN EN ISO 14001, DIN EN ISO 13485 and SCC

Contents Summary A General Information 1 Preface 2 Warranty 3 General safety information 4 Transportation and Storage 5 Disposal of Used Parts and Materials B Basic Information 1 Laws, Regulations, Standards 2 Protection of Drinking Water 3 Filtration C Product Description 1 Type Designation Plate 2 Design 3 Appropriate Application 4 Principle of Operation and Functional Description of the Filter Unit 5 Technical Data/Specifications 6 Scope of Delivery D Installation 1 General Installation Instructions 2 Preparatory Work 3 Connect System E Starting up 1 Starting up the Device F Operation 1 Carry out Backwash Process G Troubleshooting H Inspection / Maintenance 1 Basic Information 2 Inspection (Functional Check) 3 Maintenance 4 Spare Parts 4 8 9 16 18 19 20 21 2

Publisher's information All rights reserved. GENO Backwash Filter Copyright by Grünbeck Wasseraufbereitung GmbH Printed in Germany Effective with the date of edition on the cover sheet. -We reserve the right to modifications, especially with regard to technical progress- Reprints, translations into foreign languages, electronic storage or copying only with explicit written approval of Grünbeck Wasseraufbereitung GmbH. Any type of duplication not authorised by Grünbeck Wasseraufbereitung is a copyright violation and subject to legal action. Responsible for contents: Grünbeck Wasseraufbereitung GmbH Josef-Grünbeck-Strasse 1 89420 Hoechstaedt/Germany Postfach 1140 89416 Hoechstaedt/Germany Phone +49 9074 41-0 Fax +49 9074 41-100 service@gruenbeck.com www.gruenbeck.de Print: Grünbeck Wasseraufbereitung GmbH Josef-Grünbeck-Strasse 1, 89420 Hoechstaedt/Germany 3

A General Information 1 Preface Thank you for opting for a Grünbeck product. Backed by decades of experience in the area of water treatment, we provide solutions for all processes. Drinking water is classified as food and requires particular care. Therefore, always ensure the required hygiene in operating and maintaining systems for drinking water treatment. This also applies to the treatment of water for industrial or domestic use if repercussions for the drinking water cannot completely be excluded. All Grünbeck systems and devices are made of high-quality materials. This ensures reliable operation over many years, provided you treat the systems with the required care. This operating manual assists you with important information. Therefore, read the complete manual before installing, operating or maintaining your system. Customer satisfaction is our prime objective and providing customers with qualified advice is crucial. If you have any questions concerning this system, possible extensions or general water and waste water treatment, our customer service staff, as well as the experts at our site in Hoechstaedt, are available to help you. Advice and assistance For advice and assistance please contact your local representative (refer to www.gruenbeck.com ) or get in touch with our service centre which can be reached during office hours: Tel.: +49 9074 41-333 Fax: +49 9074 41-120 Email: service@gruenbeck.com We can connect you with the appropriate expert more quickly if you provide the required system data. In order to have this information handy at all times, please copy the data given on the type designation plate to the table in chapter C-1. 4

2 Warranty All devices and systems supplied by Grünbeck Wasseraufbereitung GmbH are manufactured according to the most recent technical standards and subjected to a comprehensive quality assurance system. All warranty claims are subject to our General Terms and Conditions (see below): Terms and Conditions of Sale and Delivery (excerpt)........ 11. Warranty a) If goods and services are supplied which are obviously defective, the Customer must report such defects within 8 (eight) days after receipt of such goods and services in order to maintain the liability claims. b) If the defect is of such a nature that only a spare part needs to be replaced, Grünbeck shall have the right to request the Purchaser to replace the new part delivered by us if the costs for sending a technician to the Purchaser's site are unreasonably high. c) The warranty periods are: - two years: for devices for private use (natural persons) - one year: for devices for industrial or commercial use (companies) - two years: for all DVGW-certified devices, also for industrial or commercial use within the framework of the liability agreement with the ZVSHK. after delivery/acceptance. This excludes electrical parts and parts which are subject to wear and tear. The warranty period shall only apply if the operating instructions are observed meticulously, if the device is mounted, commissioned, operated and maintained properly, and/or if a maintenance contract is made within six months. If these requirements are not met, the warranty shall be void. The warranty shall be void if the purchaser uses dosing agents or chemicals supplied by other manufacturers and if the quality and composition of such dosing agents or chemicals is beyond Grünbeck's control. Grünbeck shall not be liable for defects or damage resulting from inept handling or operation. d) Grünbeck shall only be liable if the Customer performs the maintenance work as stated in the operating instructions or has the maintenance work performed in such a way and if the Customer uses spare parts supplied or recommended by Grünbeck. e) Grünbeck shall not be liable for damage resulting from frost, water or electrical over-voltage or from parts which are subject to wear and tear. This applies in particular to electrical parts. f) The claims of the Purchaser are limited to repair or replacement, as the case may be, at the discretion of Grünbeck. Grünbeck shall have the right to several attempts to repair. If Grünbeck fails to repair or re-place the defective delivery within a reasonable time, the customer shall have the right to either cancel the contract or demand an appropriate reduction of the purchase price. g) In case of complaints with regard to systems that are not installed in Germany, the warranty claim will be settled by the local technical customer service authorised by Grünbeck. If no technical customer service is designated in the specific country, the assignment of Grünbeck s technical customer service shall end at the German border. All additional cost, apart from the material required, shall be borne by the customer......... 5

3 General safety information Permitted staff Symbols and notes Only persons who have read and understood this operating manual are permitted to work with the system. The safety guidelines are to be strictly adhered to. Important notes in this operating manual are characterised by symbols. Please pay particular attention to these notes to ensure danger-free, safe and productive system operation. Danger! Failure to adhere to these notes will cause serious or lifethreatening injury, extreme damage to property or inadmissible contamination of drinking water. Warning! Failure to adhere to these notes may cause injury, damage to property or contamination of the drinking water. Attention! Failure to adhere to these notes may result in damage to the system or other objects. This symbol characterises notes and tips to make your work easier. Tasks with this symbol may only be performed by Grünbeck's technical service/authorised service company or by persons expressly authorised by Grünbeck. Tasks with this symbol may only be performed by personnel instructed in electrical engineering according to the VDE guidelines or according to the guidelines of a similar local institution. Tasks with this symbol may only be performed by the local water works or an approved installation company. Description of Special Sources of Danger Danger due to mechanical energy! System parts may be under overpressure. Danger of injuries and material damage due to leaking water and unexpected movement of system parts Check pressure pipes regularly. Depressurise system before carrying out repair and maintenance works. Health risk due to polluted drinking water! The system may only be installed by an authorised company. Strictly observe operating instructions! Ensure sufficient flow, after longer periods of standstill start up system according to instructions. Observe inspection and maintenance intervals! By signing a maintenance contract you make sure that all necessary works are carried out in due time. However, you perform the intermediate inspections yourself. 6

4 Transportation and Storage 5 Disposal of Used Parts and Materials Caution! The system may be damaged by frost or high temperatures. Avoid exposure to frost during transportation and storage! Do not install or store system close to objects with strong radiation of heat. The system may only be transported and stored in its original packing. Make sure that the system is treated carefully and placed with the right side up (if indicated on the packing). Used parts and materials must be disposed or recycled according to the regulations applicable on site. If used parts are subject to special instructions, follow the corresponding information on the packing. In case of doubt, please contact your local institution for waste disposal or the manufacturer. 7

B Basic Information 1 Laws, Regulations, Standards When handling drinking water, certain rules are unavoidable for the sake of health protection. These operating instructions take the applicable regulations into account and give you all the directions required for the safe operation of your water treatment system. Among other things the rules prescribe that only authorised specialist companies are allowed to modify water supply equipment substantially. checks, inspections and maintenance works of installed devices must be carried out regularly. 2 Protection of Drinking Water Drinking water is still the most important food which cannot be replaced by anything else. Also in trade and industry, water or drinking water is vital. For the protection of drinking water those parties who are involved directly, such as water supply companies, system mounting companies (plumbers) and users are forced to observe legal and technical regulations. Dirt getting into the drinking water supply due to construction works or damage is not only unpleasant, but may also have dangerous consequences, since deposits are a potential place especially for germs, such as viruses and bacteria, to settle and breed. Dirt, small solid particles, as e.g. small rust particles or grains of sand, may cause corrosion and malfunction of the piping and fittings. For these reasons the German standard DIN EN 806 prescribes the integration of filters in domestic water installations made of metal and copper pipes. It is recommended also in the case of plastic pipes. Grünbeck filters offer a persistently safe protection against dirt particles in drinking water. 3 Filtration The filtration principle is based on nature. When rainwater passes through the individual layers of earth into the ground water, coarse impurities are held back in the soil. While the filtration speed in nature is very slow and the retained impurities cannot be removed, technical filters can either be back-washed or dirty filter elements can be replaced. 8

C Product Description 1 Type Designation Plate The type designation plate is located at the casing of the backwash filter. Inquiries or orders can be answered more quickly if you state the data indicated on the type designation plate. Please complete the form below in order to have the necessary data always at hand. GENO Backwash Filter MX Serial Number: / Order Number: 2 Design GENO backwash filter, type MX, for inline installation into the piping. The brass materials used are low on dezincification. All parts coming into contact with the medium meet the requirements of the German Food and Feed Act (LFGB). 3 Appropriate Application GENO backwash filters MX are designed for the filtration of drinking and industrial water. They protect the water pipes and the connected water-carrying system components from malfunction and corrosion caused by undissolved impurities (particles) such as rust particles, sand, etc. They are equipped with a 100 μm filter element as standard. After consultation with Grünbeck, it is also possible to use the backwash filters with special filter elements (50 μm, 200 μm or 500 μm) for filtration of well, process and cooling water. They are not suitable for chemically treated circulation water. If used for water containing coarse dirt particles, a coarse dirt trap must always be installed upstream of the backwash filter. The filters are neither suitable for oils, fats, solvents, soaps and other greasy media nor for filtering water-soluble substances. For filter elements 50 μm, 100 μm, 200 μm, 500 μm, refer to spare parts. The GENO backwash filters MX are exclusively suited for pressurised applications. 9

4 Principle of Operation and Functional Description of the Filter Unit Unfiltered raw water reaches the filter via the connection (item 1), flows through the filter element (item 3) from the inside to the outside and is filtrated thereby. Impurities adhere to the filter element (item 2, while larger and heavier dirt particles fall down onto the sieve bottom and have to be removed during maintenance. By turning the adjusting knob (item 4) to the right, the upper suction nozzle with brush (item 5) is turned; thereby the lower suction nozzle (item 6) is lifted and the drain outlet (item 7) is opened. During the rotary movement, the brush of the suction nozzle brushes over the filter surface radially, the filter element is cleaned. The impurities that are removed from the brush and sucked off by the suction nozzle (item 5) and those having already settled in the filter funnel (item 2) during the filtration process are also washed out. If the upper suction nozzle (item 5) was moved by turning the adjusting knob (item 4) slowly until the stop, the adjusting knob (item 4) has to be turned in the opposite direction until the discharge outlet (item 7) is closed. The backwash process is completed. The backwash proceeds by a reversal of the flow direction, i.e. filtrated water passes through the filter element from the outside to the inside via the suction nozzle (item 5). Only those areas are cleaned where the suction nozzle is actually moving over. During the backwash process, the supply of filtrated water is maintained. 10

Fig. C-1: Functional diagram 11

5 Technical Data/Specifications Table C-1: Technical Data GENO Backwash Filter, Type MX 1 1¼ 1½ 2 DN 65 DN 80 DN 100 Connection data Nominal connection size [DN] 25 32 40 50 DN 65 DN 80 DN 100 Drain connection HT pipe [DN] 50 Performance data Flow rate at 0.2/0.5 bar pressure loss [m³/h] 8.5 (13) 12 (18.5) 22 (30) 27 (38.5) 33 (47) 60 (96.5) 66 (98) KV-value [m³/h] 18 25 46 56 69 124 138 Filter fineness [μm] 100 Upper filtration fineness acc. to DIN 19632 [μm] 110 Lower filtration fineness acc. to DIN 19632 [μm] 90 Nominal pressure (PN) [bar] 16 Min. flow pressure [bar] 2 Max. operat. pressure at water temp. [bar/ 10/90 C] Consumption data Quantity of backwash water at 3 bar [l] 40 water pressure and backwash time of 1.5 min., approx. Max. backwash volume flow at 9 bar, approx. [m 3 /h] 4 Dimensions and weights A: Installation length without screw [mm] 190 190 206 206 - - - connections B: Installation length with screw [mm] 276 281 342 323 - - - connections B: Installation length without counter [mm] - - - - 220 250 250 flanges, flanges PN 16 acc. to DIN C: Min. distance to wall [mm] 80 80 82 82 93 100 110 D: Overall height above connection centre [mm] 63 63 143 143 143 153 153 E: Overall height filter bottom to [mm] 194 194 212 212 212 302 302 connection centre F: Total height [mm] 257 257 355 355 355 455 455 G: Space above filter top [mm] 80 H: Space required for replacing filter element [mm] 100 100 minimum 100 optimum 215 minimum 100 optimum 315 I: Hole circle diameter of flange [mm] - - - - 145 160 180 J: Max. seal face [mm] - - - - 122 140 158 K: Number of screws M16 [St] - - - - 4 8 8 Empty weight approx. [kg] 5.6 5.7 9.7 9.7 11.8 16 17 Test mark/certification code DVGW registration number NW-9301BO0194 Environmental data Max. water temperature [ C] 90 Max. ambient temperature [ C] 40 Order no. 107 400 107 405 107 410 107 415 107 420 107 425 107 430 12

Fig. C-2: Dimensional drawing of GENO Backwash filter MX 2 1,4 Differential pressure r [bar] 1,8 1,6 1,4 1,2 1 0,8 0,6 0,4 0,2 All filters (50, 100, 200, 500) µm Differential pressure 1,2 1 0,8 0,6 0,4 0,2 All filters (50, 100, 200,500) µm 0 0 5 10 15 20 25 Flow [m ³/ h] 0 5 10 15 20 25 30 Flow [m³/h] Fig. C-3: Pressure loss curve MX/MXA DN 25 Fig. C-4: Pressure loss curve MX/MXA DN 32 0,9 0,6 Differential pressure [ba r] 0,8 0,7 0,6 0,5 0,4 0,3 0,2 0,1 Allfilters (50, 100, 200, 500) µm D ifferential pressure [ba r] 0,5 0,4 0,3 0,2 0,1 Al filters ( 50, 100, 20 0, 50 0 ) µ m 0 10 15 20 25 30 35 40 0 10 15 20 25 30 35 40 Flow [m³/h] Flow [m³/h] Fig. C-5: Pressure loss curve MX/MXA DN 40 Fig. C-6: Pressure loss curve MX/MXA DN 50 13

0,9 0,5 Differential pressure [bar] 0,8 0,7 0,6 0,5 0,4 0,3 0,2 0,1 0 0 10 20 30 40 50 60 70 Flow [m³/h] All filters (50, 100, 200, 500 μm) Differential pressure [bar] 0,4 0,3 0,2 0,1 0 30 40 50 60 70 80 90 Flow [m³/h] Al l fil ters (50, 100, 200, 500) µm Fig. C-7: Pressure loss curve MX/MXA DN 65 Fig. C-8: Pressure loss curve MX/MXA DN 80 0,45 0,4 Differential pressure [bar] 0,35 0,3 0,25 0,2 0,15 0,1 all filters (50, 100, 200, 500) µm 0,05 0 25 35 45 55 65 75 85 95 Flow [m³/h] Fig. C-9: Pressure loss curve MX/MXA DN 100 14

6 Scope of Delivery 6.1 Standard Equipment GENO backwash filter MXA for inline installation into piping, including integrated flushing water connection according to DIN EN 1717. Pressure gauge 0-16 bar on raw and pure water side. Water meter screw connections with seals up to DN 50. For DN 65 and higher, flanges according to DIN (counter flanges and necessary seals are not included in the scope of delivery). 6.2 Accessories It is possible to retrofit existing systems with optional components. Please contact your regional sales representative or the Grünbeck headquarters for further information. Differential pressure switch with electrical contactor (switch point 0.25-2.5 bar continuously adjustable) for optical or acoustic remote signal. By the application of the differential pressure switch, the pollution of the backwash filter is determined. Especially with manually operated backwash filter, a required backwash process can be transmitted to a central control station. Thus it is possible to carry out another backwash process which may become necessary according to operating conditions, in addition to the prescribed backwash interval of two months. Order no. 102 860 15

D Installation 1 General Installation Instructions The installation site must provide enough space. The required connections have to be made before starting the installation. Dimensions and connections are listed in table C-1. The installation site must be frost-proof. Protection of the system from chemicals, colorants, solvents and vapours must be ensured. 1.1 Sanitary Installation Instructions For installation of the GENO backwash filter MX, certain rules must be observed by all means. Additional recommendations facilitate the operation of the system. The installation instructions described here are shown in Fig. D-2. Mandatory rules The installation of the GENO backwash filter MX is a major modification of the drinking water installation and may therefore only be carried out by authorised specialist companies. Caution! GENO backwash filters MX are suitable for applications under pressure exclusively. When mounted on the suction side, backwashing is not possible. In the factory, the GENO backwash filters MX are preassembled with a flow direction from left to right. If the flow direction is to be from right to left, the mounted differential pressure sensor should be remounted (please observe the flow direction arrow on the differential pressure sensor casing). It should be possible to read the pressure gauges from the front. Local installation rules, general guidelines, the technical data and due application (see chapter C 3-5) of the GENO backwash filter MX must be observed. To drain the flushing water, a drain connection of minimum DN 50 is required. If used with water containing coarse dirt particles, a coarse particle filter must precede the GENO backwash filter MX. 16

2 Preparatory Work 3 Connect System 1. Unpack all components of the system. 2. Check for completeness and perfect condition. 3.1 Sanitary Connection, Connection of Water Supply Caution! According to DIN EN 806, the feeding pipe must be rinsed before start-up. The system may be damaged by impurities and corrosion particles. 1. Connect water supply according to the installation example (Fig. D-2 ) and observe the instructions and recommendations of chapter D-1 as well as the flow direction. The flushing water connection is enclosed separately in the packing. Fixing screw The flushing water connection is slid over the collar of the filter cylinder and fastened by means of the fixing screw. Pointed screw Fig. D-1: Flushing water conn. 2. Connect drain. A HT pipe DN 50 can be fastened using the two lateral pointedtop screws. 3. Install GENO backwash filters MX only horizontally and stress-free. 4. Ensure free discharge and back pressure-free drainage of the flushing water. Fig. D-2: Installation example of GENO backwash filter MX Drain funnel suitable for direct connection to HT pipe DN 50 mm. Drain connection acc. to DIN 1988. 17

E Starting up The work described here may only be carried out by trained technical personnel. We recommend having Grünbeck s technical service/authorised service company or an authorised specialist start up the system. 1 Starting up the Device The GENO backwash filters MX are supplied generally with open drain. First close the drain by turning the adjusting knob anticlockwise. 1. Open shutoff valves upstream and downstream of the device. 2. Vent pipe at the nearest connection point downstream of the device. 3. Check visually. Make sure that no water leaks at any point of the device. 4. Carry out backwash process (see chapter F): By turning the adjusting knob slowly to the right (to the stop) a backwash process is started. Close the backwash filter again by turning the button to the left. 5. The backwash filter is now ready for operation. During the backwash process, the supply of filtrated water is maintained. 18

F Operation 1 Carry out Backwash Process According to DIN EN 806 inspection and maintenance for backwash filters must be carried out every six months. Grünbeck recommends a backwash process of the backwash filter every second month. Depending on the existing operating conditions, it may be required to carry out a backwash process at an earlier date. In order to carry out this backwash, the adjusting knob must be turned slowly clockwise against the stop. Afterwards the backwash filter is to be closed again by turning the button slowly anticlockwise. Even during the backwash process, filtrated water is always available. Depending on the degree of contamination of the GENO backwash filter, several backwash processes might become necessary. In the case of heavy impurities, the standard drain outlet of 6.5 mm can be enlarged to max. 7.5 mm. This measure increases the cleaning efficiency per backwash process and at the same time the quantity of backwash water per backwash process. adusting knob Fig. F-1: Carry out backwash process 19

G Troubleshooting Even for those systems which have been designed and manufactured most carefully and are operated correctly, malfunctions cannot be excluded completely. Table G-1 lists possible disturbances during operation of the GENO backwash filter, type MX, their causes and troubleshooting measures. Grünbeck s technical service/authorised service company must be notified, if any of the disturbances cannot be eliminated by the instructions given in table G-1! State type of system, serial number and displayed error message, if possible. Table G-1: Troubleshooting Disturbance Cause Troubleshooting The differential pressure in the backwash filter is too great. Despite several backwash processes, the differential pressure in the backwash filter does not decrease. Water leakage at the lower suction nozzle, Backwash filter cannot be closed via the adjusting knob. Actuating the adjusting knob is not possible or stiff. Leakage between drive pin and casing Only little water is released during backwash Filter element contaminated! Filter element heavily contaminated, blocked! Particle is stuck between suction nozzle and funnel. Mechanical blockade in the backwash filter. Sealing at the lower suction nozzle defective or worn out. Mechanical blockade in the backwash filter. Thread in the suction nozzle worn out. O-ring seal of upper suction nozzle worn out. The sieve bottom is dirty or clogged Carry out backwash process (see chapter F-1). Open the filter, check filter element. If necessary, clean the element manually by means of a brush, if required exchange filter element. Observe hygienic aspects! Open the filter and inspect it for foreign particles and/or damage on the inner parts (see chapter H- 3). Check the sealing at the drain nozzle; if necessary replace the suction nozzle unit. Open the filter and inspect it for foreign particles and/or damage on the inner parts (see chapter H-3). Check the thread of the suction nozzle regarding wear, if necessary replace it (see chapter H-3). Dismantle upper suction nozzle, replace O-rings (see chapter H-3). Open the filter and clean the sieve bottom Caution! When opening the filter and especially when re-assembling it, the installation hints must be observed in any case, otherwise there might be the risk of damage at the backwash filter (see chapter H). 20

H Inspection / Maintenance 1 Basic Information 2 Inspection (Functional Check) To ensure a perfect long-term operation of the GENO backwash filter, some routine maintenance works are necessary. Especially in the field of drinking water supply, the required measures are defined by standards and guidelines. The local rules must be observed by all means. According to DIN EN 806, part 5, the filter must be backwashed at least every 6 months. In case of a decline in the water flow due to an increased pressure loss, a backwash process is required earlier. Grünbeck recommends a backwash process every second month. for systems with DVGW certification code, maintenance every 6 months is sufficient. Maintenance works may only be carried out by Grünbeck s technical service/authorised service company or an approved specialist company. By signing a maintenance contract, you make sure that all necessary works are carried out in due time. Routine inspections can be carried out by the user. It is recommended to check the device initially at short intervals, afterwards as required. Inspection is mandatory every 6 months. Inspection works: Check visually, make sure that no water leaks at any point of the filter. Carry out backwash process (see also chapter F-1). Check the differential pressure of the device via the pressure gauges by opening the nearest extraction point. In case the differential pressure of the device cannot be reduced by one or several backwash processes, there is a disturbance. For further proceedings, see table G-1 Troubleshooting. 21

3 Maintenance In accordance with DIN EN 806, part 5, maintenance works on drinking water treatment plants may only be carried out by Grünbeck s technical service/authorised service company or an approved specialist company. 3.1 Overview: Maintenance Works 1. Check tightness of the filter. To check the tightness of the device, apply the highest possible operating pressure to the filter. Observe max. admissible operating pressure! In particular, check tightness: at water meter screw unions or flange at pressure gauges and dummy plugs between filter casing and funnel at drain outlet between driving pin and casing, remove adjusting knob, if necessary. 2. Carry out backwash process (see chapter F-1). 3. Check differential pressure of the device by extracting water. To check the differential pressure, open several adjacent extraction points. The differential pressure can be read from the two pressure gauges and thus impurities in the filter can be detected. We recommend to carry out a backwash at a differential pressure of > 0.4 bar. To check points 4 and 5, it is required to open the GENO backwash filter (see also chapter H-3). We recommend to proceed in the following order: 4. Visually check state of filter element (impurities, possible damage) and clean it, if necessary. 5. Check thread of upper and lower suction nozzle for wear. 22

3.2 Filter installation Caution! Follow the steps and instructions mentioned below by all means to Open filter and Dismount suction nozzle. Otherwise there is a risk of damaging the backwash filter. How to open the filter Close the shutoff valves upstream and downstream of the filter. Actuate the adjusting knob by turning it approx. three times in order to empty the filter. Unscrew funnel by turning it to the left. Unscrew lower suction nozzle (refer to fig. H-3) from upper suction nozzle, remove the sieve bottom and check the coating of the thread as well as the O-ring on the pipe nozzle for wear and tear. If the thread is in proper order, clean the thread and lubricate it with food-compatible Grease, e. g. UNI-Silicon L641; Order no. 128 619. Remove filter element and check for persistent impurities and possible damage. Also check the condition of the O-rings of the filter element. Depending on the type of filter, different filter element combinations are assembled (see Fig. H-1). If a filter element is damaged, you can replace either the single element or the complete element set. The element sets can be detached via snap locks. DN 25 + DN 32 DN 40 - DN 65 Fig. H-1:Filter element combinations DN 80 + DN 100 23

In the case of thread wear, the complete suction nozzle unit must be replaced. How to close the filter Mount filter element: Depending on the type of filter, insert the single filter element or the pre-assembled filter set with the mounted O-rings over the suction nozzle into the casing. Make sure that the large diameter is always positioned upwards in the filter casing and the smaller diameter downwards, in the direction of the filter funnel. Insert the sieve bottom between the lower and the upper suction nozzle. Screw lower suction nozzle onto upper suction nozzle by turning it to the right. Only open the drain nozzle until the O-ring on the upper suction nozzle is just not visible anymore. The filter element must always be mounted in the casing with the large diameter, 98 mm, upwards first. large 98 mm small 89 mm Fig. H-2: Filter element 24

Caution! Mount filter funnel: Here it is of particular importance that the spanner flat of the lower suction nozzle is fitted carefully into the two-flat bolt of the filter funnel. This is the only way to mount the filter funnel correctly. As shown in Fig. H-3, both spanner flats must be positioned parallel to each other. Filter element Spanner flat lower suction nozzle Spanner flat filter funnel Fig. H-3:How to mount filter funnel Start up backwash filter: The backwash filter can be started up again according to the instructions in chapter E, Starting up. 25

3.3 Dismount Suction Nozzles The suction nozzle must be dismounted, if the thread is worn or if the two O-rings must be replaced due to wear. After opening the filter and dismounting the filter element (refer to chapter H, 3.2), remove the adjusting knob (item 1) and the retaining plate (item 2). Now push the suction nozzle (item 3) upwards and remove the two half-disks (item 4). Burr formation possible Fig. H-4: Drawing with item numbers for dismounting suction nozzle Caution! At the suction nozzle, namely at the mounting location of the half-disks, burrs may have formed due to wear. Before dismounting the suction nozzle, the burrs must be removed using a file. The suction nozzle may be pulled downwards only then. We recommend deburring the pipe nozzle at the mounting location of the half-disks with a file before mounting the new O-rings. 26

4 Spare Parts Please also note the General Terms of Warranty (see chapter A-2). Spare parts and consumption material can be ordered from your regional agency (see attached directory) or by authorised specialist companies. In operation, various parts are subject to a certain degree of wear or ageing. Wear parts are: Item 1* lower suction nozzle; item 2*, upper suction nozzle, item 3 filter element, item 3 O-ring sealing suction nozzle/casing Fig. H-5: Sectional drawing with wear parts with item numbers Although these are wear parts, we grant a limited warranty period of six months. *will only be replaced together! 27

Spare filter elements Notice: Application of the filter elements 50 μm, 200 μm and 500 μm only after consultation. Suitable for Filter type Version Packing Unit Order no. GENO backwash filter MX/MXA 1 1¼ filter fineness 50 μm PU 1 piece 107 052 GENO backwash filter MX/MXA 1½ DN 65 filter fineness 50 μm PU 1 piece 107 053 GENO backwash filter MX/MXA DN 80 DN 100 filter fineness 50 μm PU 1 piece 107 054 GENO backwash filter MX/MXA 1 1¼ filter element 100 μm PU 1 piece 107 061 GENO backwash filter MX/MXA 1½ DN 65 filter element 100 μm PU 1 piece 107 062 GENO backwash filter MX/MXA DN 80 DN 100 filter element 100 μm PU 1 piece 107 063 GENO backwash filter MX/MXA 1 1¼ filter element 200 μm PU 1 piece 107 072 GENO backwash filter MX/MXA 1½ DN 65 filter element 200 μm PU 1 piece 107 073 GENO backwash filter MX/MXA DN 80 DN 100 filter element 200 μm PU 1 piece 107 074 GENO backwash filter MX/MXA 1 1¼ filter element 500 μm PU 1 piece 107 082 GENO backwash filter MX/MXA 1½ DN 65 filter element 500 μm PU 1 piece 107 083 GENO backwash filter MX/MXA DN 80 DN 100 filter element 500 μm PU 1 piece 107 084 (Further spare parts upon request) 28