Aalborg Universitet. Performance Evaluation of the Wavestar Prototype Kramer, Morten; Marquis, Laurent; Frigaard, Peter Bak

Similar documents
Performance Evaluation of the Wavestar Prototype

Aalborg Universitet. Published in: Proceedings of Offshore Wind 2007 Conference & Exhibition. Publication date: 2007

Vertical Distribution of Wave Overtopping for Design of Multi Level Overtopping Based Wave Energy Converters Kofoed, Jens Peter

Wave Dragon A slack moored wave energy converter

Aalborg Universitet. Estimation of wave conditions at Liseleje location Bogarino, Bruno; Brorsen, Michael. Publication date: 2007

Stability of Cubipod Armoured Roundheads in Short Crested Waves Burcharth, Hans Falk; Andersen, Thomas Lykke; Medina, Josep R.

Hydraulic Behaviour of the Floating Wave Energy Converter Wave Dragon Hald, Tue; Friis-Madsen, Erik; Kofoed, Jens Peter

Thermal properties of Fiber ropes

Model Test Setup and Program for Experimental Estimation of Surface Loads of the SSG Kvitsøy Pilot Plant from Extreme Wave Conditions

Yawing and performance of an offshore wind farm

Operating Principle, Performance and Applications of the Wave Mill

Radioactivity in the Risø District July-December 2010

Study on wind turbine arrangement for offshore wind farms

Radioactivity in the Risø District July - December 2009

Influence of Persons' Movements on Ventilation Effectiveness Brohus, Henrik; Hyldig, Mikkel; Kamper, Simon; Vachek, Ulla Maria

Thomas Lykke Andersen, Morten Kramer, Peter Frigaard November 2003

Energy capture performance

Results of an Experimental Study of the Langlee Wave Energy Converter. Pecher, Arthur Francois Serge; Kofoed, Jens Peter; Espedal, J.; Hagberg, S.

Sea state estimation from an advancing ship - The wave buoy analogy Presentation at Skibsteknisk Selskab

Comparison of NWP wind speeds and directions to measured wind speeds and directions

Steady State Comparisons HAWC2 v12.5 vs HAWCStab2 v2.14: Integrated and distributed aerodynamic performance

V MW Offshore leadership

Wave Energy. ME922/927 Wave energy

THE HORNS REV WIND FARM AND THE OPERATIONAL EXPERIENCE WITH THE WIND FARM MAIN CONTROLLER

ORE Open Research Exeter

Wave Energy Atlas in Vietnam

Design Specifications for the Hanstholm WEPTOS Wave Energy Converter

Aalborg Universitet. Ice Control with Brine on Highways Bolet, Lars. Publication date: 2008

Aalborg Universitet. The Wave Energy Challenge Christensen, L.; Friis-Madsen, E.; Kofoed, Jens Peter

Post-mortem study on structural failure of a wind farm impacted by super typhoon Usagi

Overtopping Breakwater for Wave Energy Conversion at the Port of Naples: Status and Perspectives

Farm Energy IQ. Wind Energy on Farms. Objectives of this Module. How windy is it? How windy is it? How windy is it? 2/16/2015

Control Strategies for operation of pitch regulated turbines above cut-out wind speeds

Performance Monitoring Examples Monitor, Analyze, Optimize

Aalborg Universitet. Published in: Proceedings of the 7th European Wave and Tidal Energy Conference. Publication date: 2007

Pile Gripper Systems

Operability Study for DP Vessel Operations at a Deep water Spar-A Decision Support Tool

Wind Resource Assessment Østerild National Test Centre for Large Wind Turbines

Full list of Publications can be accessed at:

Aalborg Universitet. Publication date: Document Version Accepted author manuscript, peer reviewed version

For personal use only

Extrapolation of Extreme Response for Wind Turbines based on FieldMeasurements

Spinner Anemometry Pedersen, T.F.; Sørensen, Niels; Madsen, H.A.; Møller, R.; Courtney, M.; Enevoldsen, P.; Egedal, P.

Single-sided Natural Ventilation Driven by a Combination of Wind Pressure and Temperature Difference Larsen, Tine Steen; Heiselberg, Per Kvols

Validation of long-range scanning lidars deployed around the Høvsøre Test Station

Carnegie Wave Energy Limited

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

Compiled by Uwe Dornbusch. Edited by Cherith Moses

Overtopping Measurements on the Wave Dragon Nissum Bredning Prototype Frigaard, Peter Bak; Kofoed, Jens Peter; Rasmussen, Michael Robdrup

Sea Slot Cone Generator Overtopping Performance in 3D Conditions Margheritini, Lucia; Vicinanza, Diego; Frigaard, Peter Bak

Hydraulics and Maritime Research Centre, University College Cork, Pouladuff Road, Togher, Cork, Ireland

ASX Announcement. May 4, Carnegie Wave All Energy Presentation

Little Spokane River Stream Gage Report: Deadman Creek, Dragoon Creek, and the West Branch of the Little Spokane River

E. Agu, M. Kasperski Ruhr-University Bochum Department of Civil and Environmental Engineering Sciences

Vindatlas i Ægypten. Mortensen, Niels Gylling; Badger, Jake; Hansen, Jens Carsten. Publication date: Document Version Peer reviewed version

Marine Renewables Industry Association. Marine Renewables Industry: Requirements for Oceanographic Measurements, Data Processing and Modelling

OFFSHORE WIND: A CRASH COURSE

DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project)

Aalborg Universitet. Utilizing Wave Energy potential, challenges and status Kofoed, Jens Peter. Publication date: 2012

CHAPTER 132. Roundhead Stability of Berm Breakwaters

THE WAVE CLIMATE IN THE BELGIAN COASTAL ZONE

A Holistic Evaluation of a Typical Coast Nourishment on the Danish West Coast Margheritini, Lucia; Frigaard, Peter Bak; Wahl, Niels Arne

1st Symposium of. The Plan Industry Feedback

Farm Energy IQ. Farms Today Securing Our Energy Future. Wind Energy on Farms

Ocean Energy Policy Brief

The impact of different means of transport on the operation and maintenance strategy for offshore wind farms

WIND DATA REPORT. Bourne Water District

Webinar: Trends in renewable energy support

EFFECTIVENESS OF FLOATING WAVE ATTENUATORS FOR RESTORING AND PROTECTING COASTAL MARSH

Maritime Renewable Energy

7 th International Conference on Wind Turbine Noise Rotterdam 2 nd to 5 th May 2017

DETRMINATION OF A PLUNGER TYPE WAVE MAKER CHARACTERISTICE IN A TOWING TANK

Nordel GRID DISTURBANCE AND FAULT STATISTICS

PARAMETRIZATION OF WAVE TRANSFORMATION ABOVE SUBMERGED BAR BASED ON PHYSICAL AND NUMERICAL TESTS

Author s Name Name of the Paper Session. Positioning Committee. Marine Technology Society. DYNAMIC POSITIONING CONFERENCE September 18-19, 2001

WAVE FORECASTING FOR OFFSHORE WIND FARMS

System Performance, Availability and Reliability Trend Analysis Portfolio Review 2016

Prudhoe Bay Oil Production Optimization: Using Virtual Intelligence Techniques, Stage One: Neural Model Building

Wind Regimes 1. 1 Wind Regimes

WAVE HUB. Dr Mike Patching. A Future for Wave Energy in Cornwall. BEng, PhD, CEng, MEI

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Energy Output. Outline. Characterizing Wind Variability. Characterizing Wind Variability 3/7/2015. for Wind Power Management

The effect of boot shaft flexibility on ankle, knee and hip coupling during mogul skiing Kersting, Uwe G.; McAlpine, Paul; Kurpiers, Nico

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

Laboratory studies on the effect of ozonation on THM formation in swimming pool water

A Holistic Evaluation of a Typical Coast Nourishment on the Danish West Coast <strong/> Margheritini, Lucia; Frigaard, Peter Bak; Wahl, Niels Arne

Welcome! Did You Know...? Aquatic Centre Dock Rebuild. Key Objectives

Wind and Tidal - Benefits and Opportunities in Australia

Laser remote sensing for wind energy

LONG TERM SITE WIND DATA ANNUAL REPORT. Mass Turnpike Authority Blandford, MA

WIND DATA REPORT. Paxton, MA

AC : MEASUREMENT OF HYDROGEN IN HELIUM FLOW

Characterizing Ireland s wave energy resource

Open Research Online The Open University s repository of research publications and other research outputs

Design and manufacturing of a morphing flap for wind turbine blades

BUYER S GUIDE AQUAlogger 530WTD

Offshore wind power in the Baltic sea

Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1

The WaveCat Development of a new Wave Energy Converter

V MW. Exceptional performance and reliability at high-wind-speed sites. vestas.com

Transcription:

Aalborg Universitet Performance Evaluation of the Wavestar Prototype Kramer, Morten; Marquis, Laurent; Frigaard, Peter Bak Published in: 9th ewtec 2011 Publication date: 2011 Document Version Publisher's PDF, also known as Version of record Link to publication from Aalborg University Citation for published version (APA): Kramer, M., Marquis, L., & Frigaard, P. (2011). Performance Evaluation of the Wavestar Prototype. In A. S. Bahaj (Ed.), 9th ewtec 2011: Proceedings of the 9th European Wave and Tidal Conference, Southampton, UK, 5th-9th September 2011 University of Southampton. General rights Copyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of accessing publications that users recognise and abide by the legal requirements associated with these rights.? Users may download and print one copy of any publication from the public portal for the purpose of private study or research.? You may not further distribute the material or use it for any profit-making activity or commercial gain? You may freely distribute the URL identifying the publication in the public portal? Take down policy If you believe that this document breaches copyright please contact us at vbn@aub.aau.dk providing details, and we will remove access to the work immediately and investigate your claim. Downloaded from vbn.aau.dk on: april 10, 2018

Performance Evaluation of the Wavestar Prototype Morten M. Kramer #1, Laurent Marquis #2, Peter Frigaard *3 # Wave Star A/S Park Allé 350A, 2605 Brøndby, Denmark 1 mmk@wavestarenergy.com 2 lma@wavestarenergy.com * Department of Civil Engineering, Aalborg University Sohngaardsholmsvej 57, 9000 Aalborg, Denmark 3 pf@civil.aau.dk Abstract Wave Star has produced and installed a test and demonstration Wave Energy Converter (WEC) by Roshage pier near Hanstholm at the west coast of Denmark. The test unit is a prototype test section of a complete commercial WEC. After an initial period of finalizing the installation and testing, the WEC was launched for production in January 2010 and in May 2010 automatic unmanned operation was initiated. The number of operational hours per month has increased significantly during the following months, but experience with the initial period of continuous automatic unmanned operation has shown difficulties in ensuring the ability to be in daily operation 24/7/365. During the period from January 2010 to April 2011 the control software has been updated three times, and significant increases in the measured power levels have been confirmed. The measurement points have verified the expected level of harvested power, although further development of the control system is expected to increase the level further. Keywords Wavestar, Wave Star, wave power, wave energy converter, wec, performance evaluation, performance assessment I. INTRODUCTION In September 2009 Wave Star installed a large-scale test and demonstration Wave Energy Converter (WEC) by Roshage pier near Hanstholm at the Western coast of Denmark, see Fig. 1 and Fig. 2. The WEC is a prototype/test section of a complete commercial 600 kw WEC. As shown in Fig. 3 and Table 1 the prototype has 2 floats placed on one side whereas the full commercial converter will have 20 floats (10 floats on each side). The prototype was installed at a water depth of approximately 6 m while the commercial converter is expected to be installed at water depths of 10 to 20 m [1],[2]. The primary purposes of the test section are outlined below, and the results received so far concerning the last two bullets are given in the following chapters. Test the structure and components Prove the storm protection strategy Provide a test-platform for future new components Demonstrate the efficiency of the power take off Document the ability to be in daily operation 24/7/365 Check that the measured power absorption is according to the expectations Furthermore, the WEC is used as a demonstration plant for politicians, journalists, investors and other stakeholders. The WEC can be accessed at any time and in any weather condition due to its place by the Roshage pier and a 300 meter long access bridge. Data concerning the performance of the platform together with the sea state is gathered continuously. It is valuable knowledge concerning the long term robustness of the platform which may indicate whether modifications on the future platforms should be considered. A. Wave Star Company Sailing enthusiasts Niels and Keld Hansen came up with the concept behind Wavestar in 2000. Per Resen Steenstrup purchased the rights to the machine in 2003 and the same year Wave Star Energy A/S was incorporated in Denmark (A/S is the Danish version of a Limited company, Ltd.). In February 2010 Wave Star Energy was reorganized and all intellectual property rights and assets related to the concept were consolidated in the company Wave Star A/S. The Clausen brothers, the family behind Danfoss, are now the sole shareholder, and Bent Kristensen is the Chief Executive Officer (CEO) of the company. The Hansen Brothers remain as consultants at Wave Star. The further development and optimization of the concept is performed in cooperation with Aalborg University, with benefits for both the university and Wave Star. B. Wavestar Concept Today, the Wavestar concept is one of the world leading wave energy technologies. During the last ten years, the concept has developed through systematic public and private partnering. Wavestar now has the potential to become one of the first real commercial wave energy technologies. The Wavestar device consists of two rows of round floats attached to a bridge structure, secured to the sea bed by the use of steel piles, which are cast into concrete foundations. All moving parts are therefore above normal seawater level. The device is installed with the structural bridge supporting the floats directed towards the dominant wave direction. When the wave passes, the floats move up and down driven by the passing waves, thereby pumping hydraulic fluid into a common hydraulic manifold system which produces an even flow of high pressure oil into a hydraulic motor that directly drives an electric generator.

Wavestar Hanstholm prototype Fig. 1 Wavestar prototype. Top: Location of site (Google Earth). Bottom left: Photo of installation by barge. Bottom centre: Photo of storm protection. Bottom Right: Photo of normal operation Gangway Footbridge 4 m above top of pier Fig. 2 View of Wavestar prototype from the beach. The distance to the prototype from the beach is 300 m

Fig. 3 Commercial converter with 20 floats (left) and test-section at Hanstholm with two floats (right) TABLE I TECHNICAL DATA FOR COMMERCIAL WAVE STAR C5-CONVERTER AND PROTOTYPE AT HANSTHOLM. MWL IS MEAN WATER LEVEL Parameter Commercial Wave Star C5-600 kw Prototype at Hanstholm Number of floats 20 2 Float diameter Ø5 m Ø5 m Maximum water depth (extreme) 20 m 8 m Maximum wave height (operation) 6 m 6 m Water depth 10 to 20 m 5 to 8 m Arm length 10 m 10 m Main structure dimensions 70m x 17m x 6.5m (LxWxH) 32m x 17m x 6.5m Length of legs Site depended, ~ 15-25 m above MWL ~ 18 m above MWL Operation height 5.5 m above MWL 5.5 m above MWL Storm secure height Site depended, ~ 6-15 m above MWL ~ 8 m above MWL Weight 1600 Tons 1000 Tons Materials Main structure: Steel. Main structure: Steel Floats: Fibreglass Floats: Fibreglass Foundation Four skirted spud cans, or two mono piles or Four gravity based gravity based foundations foundations Design service life Minimum 20 years Minimum 20 years Maintenance interval 1 service period per year - Nominal electrical power 600 kw 110 kw

When the significant wave height exceeds a certain limit the machine automatically enters storm protection mode, see Fig. 4 and 5. Storm protection involves un-ballasting the floats and retracting the hydraulic cylinders which thereby pull the floats out of the water. Each single float will be pulled out one at the time and all floats are out within approximately 30 min. Jacking into safety position takes less than 1 hour. Floats in storm protection mode Fig. 4 Wave Star storm protection concept WEC in operation Holes in legs for jacking Floats in production mode C. Wavestar Test Machines The Wavestar prototype at Hanstholm is the main result of several years of development in Denmark, see Fig. 6. Starting in 2004 a small 6 m long scale 1:40 converter with 40 floats was tested in an indoor wave basin at Aalborg University. In 2006 a 30 m long scale 1:10 converter with 40 floats was installed in the open sea at Nissum Bredning (a sheltered bay in the Western part of the Limfjord). The converter has been in daily operation in Nissum Bredning since, and has been connected to the public grid. The WEC has been able to produce energy persistently during 4 years. During the test period the WEC has demonstrated high reliability. Only very limited maintenance has been necessary. At present (Spring 2011) the scale 1:10 converter is about to be removed as focus is now on the large scale prototype at Hanstholm. Based on positive results from the small-scale experiments Wave Star started designing the large-scale prototype in 2007 and in 2008-2009 it was built at a shipyard. It was installed in September 2009 by Hanstholm at the Western coast of Denmark. After an initial period of finalizing the installation and testing, the WEC was launched for production in January 2010 and from May 2010 power performance measurements have been approved by Energinet.dk (explained in Section III). Aalborg University Deployment: 2004-2005 Scale: 1:40 Float diameter: 0.25 m Nissum Bredning Deployment: 2006-2010 Scale: 1:10 Float diameter: 1.0 m Hanstholm Deployment: 2009 today Scale: 1:2 Float diameter: 5.0 m Fig. 6 Map of Denmark with locations of Wavestar WEC s II. TIMELINE FOR EVENTS AND MAINTENANCE A timeline and table showing the major events and repairs on the Hanstholm prototype is shown in Fig. 7 and Table 2. The timeline starts in August 2009 when the prototype was towed to Denmark and ends by April 2011, i.e. a period of almost two years. In Fig. 7 it should be noted that events are shown above the blue timeline, and damages/repairs are shown below the line. WEC in storm protection Fig. 5 Artist impression of a commercial Wave Star WEC Further information about the Wavestar concept and test machines are given in [3]-[9]. A. Events About the events it is noted that the prototype was installed in September 2009 and the converter was considered appropriately operational after software updates in September 2010, i.e. it took approximately one year to get the prototype to run according to the specifications, which was somewhat longer than expected initially.

Events and maintenance for the Wavestar Roshage prototype WEC Tow to Denmark Jacking test at deep water Drydock test at Frederikshavn Installation at Roshage Bridge finished and first guest visit during COP15 First test with both floats producing to grid Datalogging started Start reporting production to Energinet for subsidies Update of control settings (gen 3) Weather/wave forecast log started Systematic monitoring of operational time started Online Internet presentation of performance data initiated Aug-09 Sep-09 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 Storm no 2 - No damage Storm no 1 - No damage Floats damaged Ultra sonic wave sensor fixed Nut in roller screw W12 fixed Bearing in W21 fixed Ultra sonic wave sensor failure Nut in roller screw W12 damaged Electrical component fixed Bearing in roller screw W21 damaged Electrical component damage Nut in roller screw W12 damaged Floats in operation after repair Fig. 7 Timeline for events (above blue timeline) and maintenance (below blue timeline) for the Wavestar prototype TABLE II DATES OF EVENTS AND REPAIRS ON THE WAVESTAR PROTOTYPE Date Event or maintenance 02/08/2009 Nut in roller screw W12 damaged 07/08/2009 Tow to Denmark 10/08/2009 Nut in roller screw W12 fixed 14/08/2009 Jacking test at deep water 17/08/2009 Drydock test at Frederikshavn 18/09/2009 Installation at Roshage 18/11/2009 Storm no 1 - No damage 16/12/2009 Bridge finished and first guest visit during COP15 15/01/2010 First test with both floats producing to grid 10/02/2010 Datalogging started 01/05/2010 Start reporting production to Energinet.dk for subsidies 06/05/2010 Bearing in roller screw W21 damaged 26/05/2010 Bearing in W21 fixed 18/06/2010 Floats damaged 31/08/2010 Floats in operation after repair 02/09/2010 Nut in roller screw W12 damaged 07/09/2010 Update of control settings (gen 3) 23/09/2010 Electrical component damage 29/09/2010 Weather/wave forecast log started 13/10/2010 Electrical component fixed 15/12/2010 Systematic monitoring of operational time started 21/12/2010 Ultra sonic wave sensor failure 03/01/2011 Ultra sonic wave sensor fixed 08/02/2011 Storm no 2 - No damage 01/03/2011 Online Internet presentation of performance data initiated Another interesting event is the automatic weather and wave forecast system that was started in September 2010. Two times a day the company StormGeo is providing a digital weather forecast of temperature, wind speeds, and most importantly significant wave heights, wave periods and wave directions (StormGeo is a weather services provider in Scandinavia and the North Sea region with worldwide operations in the renewables and offshore industries). The weather forecast is automatically read and stored by the machine. The weather forecast reach several days into the future, and it will be used primarily for: Estimate the future production from the converter Storm protection strategy Planning periods for maintenance and suitable test-periods The main active use of the forecast so far has been for planning maintenance and test-periods. In this respect the forecast has been used in addition and as supplement to public forecasts available from the Internet. Further, the data are being used in studies on wave power prediction, integration of wave power in the grid, and integration of wave power in renewable energy parks together with wind and solar. This work is ongoing in corporation with Aalborg University and Energinet.dk (Energinet.dk is a non-profit enterprise owned by the Danish Climate and Energy Ministry) [10]. In the period after September 2010 difficulties turned up in ensuring a stable and continuous operation, and the operational time in September to November 2010 was rather low (less than 10 %). To examine the reason for this in a systematic manner on a daily basis a system for online monitoring was integrated in the software. Hereby it was possible to follow the course of the downtime regularly and evaluate whether the course needed action or not. Results are explained further in Section IV. B. Maintenance In general there has been no major problem with the design of the prototype. All structural and mechanical components in the WEC have proven functionality as intended. The WEC has survived two large storms with no damages and no service afterwards. Only minor design faults with the float design and the jacking-system has been indentified and corrected. The WEC is running in automatic unmanned operation and the control system automatically extracts the floats from the water lifting them to the upper latched position when needed. However, the jacking procedure to storm protection level is still operated manually, as some roller screws and bearings in the jacking system still needs adjustment.

In June 2010 the upper part of the outer float shell showed damages in the fibreglass. The problem was caused mainly by too weak support structures inside the floats. The problem was fixed by strengthening the inside of the floats with reinforcements, and the floats were back in operation by the end of August 2010. III. APPROVED BY ENERGINET.DK A contract between Wave Star and Energinet.dk was established in July 2010 with the project title Energy production on Roshage test systems (WSE-02), project no. 2009-1-10305. The aim of the project is to document that the prototype is able to deliver the expected power according to the actual wave climate and the expectations for the full commercial converter. The project is part of the so-called ForskVE-programme [11], and it is completed with Aalborg University as partner. The documentation is performed in practice using monthly reporting of measurements and results. Since 1 May 2010 Wave Star A/S has been measuring the power produced by the Wavestar prototype and recorded all the data with intervals of 10 minutes. Every month a report and accompanying data file containing the raw measurements are submitted to Energinet.dk for approval. The idea with the test section was not to make a commercial production unit. From the beginning it was clear that the amount of produced kwh would be low, and that the price per kwh would be high. In other words subsidies based on a specified price per kwh (i.e. a system such as typically used for energy from wind turbines) would not be appropriate for the Wavestar prototype. Instead a system was chosen such that if the measured production in a period was higher than a limit it would release an amount of money. In this way the subsidies are in fact not given due to an actual production in kwh, but instead on whether the power performance is satisfactory or not. The limit was simply given as a target power performance curve (green curve in Fig. 8). In order to establish the target power performance curve historic measurements of the wave climate at the location and correspondingly simulated power performance was studied. The wave climate at the location was established using 7 years of measurements acquired using a wave rider located near Hanstholm Harbour. Wave data was provided by the Danish Coastal Authority (KDI). From the simulations an expected power curve for the test section at Hanstholm was established. The original curve used to settle the subsidies is in fact given as production in kwh in a period of 10 minutes. As this corresponds to a given average power in kw, this representation is used here. If the measured production in a ten minute period is above the limit, subsidies are received from Energinet.dk. An example with 2 hours of production is shown in Table 3. In the shown period all the measurements were above the limit, and subsidies were received. This has not always been the case as explained in the following. Each line in Table 3 represents one 10 minute period corresponding to one data-point in Fig. 8. The limit for the subsidies is given as the green curve and measurements are given as dots. It is seen that the measurements from May 2010 Power (kw) Capture width ratio (%) Capture width ratio (%) 30 25 20 15 10 5 Measured Sept 2010 to Feb 2011 (Control gen. 3) Measured June 2010 (Control gen. 2) Measured May 2010 (Control gen. 1) Simulation, Control gen. 3 ForskVE Limit Curve 0 0 0.5 1 1.5 2 2.5 3 Significant wave height Hs (m) 90 80 70 60 50 40 30 20 10 0 0 0.1 0.2 0.3 0.4 0.5 H /D (-) s 90 80 70 60 50 40 30 20 10 0 0 2 4 6 8 10 12 14 16 Wave power (kw/m) Fig. 8 Wavestar Hanstholm prototype power measurements. The same data are shown in the three plots. D = 5 m is the float diameter. Capture Width Ratio (CWR) is given by:

was below the ForskVE curve (i.e. no subsidies was received from May 2010), but due to optimization of the control software the majority of the measurements are now above the curve (i.e. subsidies are now received for most of the time when in operation). The following should be noted when looking at Fig. 8: Power is 10 minute average values of harvested power from one float (hydraulic power leaving the cylinder connected to the first float) Simultaneous measurements of the wave climate and the power production are performed at the location. All raw measurements are shown. No filtering has been performed and no invalid data have been discarded. A typical wave climate (typical wave direction, peak wave period, and spectral shape) for the Hanstholm location is used for the simulated curves In order to limit the forces from the Power Take Off (PTO) a very gentle control parameter setting was initially applied using a linear damping control strategy (control generation 1 and 2). On the 7th of September 2010 the control software was updated with new parameter settings using reactive force control (control generation 3), which increased the power performance. The most recent measurements using control generation 3, i.e. the measurements marked with red dots in Fig. 8, confirms that the machine is now able to harvest power according to the expectations. In high waves (Hs ~2m) the power production using the new control generation has increased by more than 50 % compared to the former control generations. For information on modelling and control on the Wavestar reference is given to [12],[13]. New control strategies are under investigation as calculations shows a potential for further increases in production. On the middle graph in Fig. 8 it is seen that the capture width ratio is about 40 to 60 %, with the peak efficiency achieved at Hs/D 0.25. As the float diameter D = 5 m the maximum efficiency is corresponding to a wave climate with Hs = 1.25 m which is equivalent to a wave climate with wave power 3 kw/m. The figure shows remarkably scatter in the data. A more detailed post analysis has been performed on the data, but this analysis was not completely finished by the deadline. However, this investigation shows that the scatter is caused mainly because no filtering has been performed on the wave data and no invalid data have been discarded. Another reason is the influence of other parameters such as wave period, spectral shape and wave direction. IV. OPERATIONAL TIME The prototype can be set in different modes; stop, manual mode, or automatic mode. Production measurements and operational time is only considered valid when in automatic mode producing to grid. The prototype is rather often in manual mode, for example when special testing is performed. The time with production in automatic mode is shown in Fig. 9. The operational time in June 2010 was relatively high but the measured power level was relatively low. The following two months the float repairs caused the prototype to be out of operation. After the software update in September 2010 the power performance was satisfactory (i.e. the majority of the measurements were above the ForskVE curve as shown in Fig. 8), and the following months small steps have been taken to increase the operational time. % Fig. 9 Time in % of month with production The period from September 2010 up to present is shown in greater detail in Fig. 10. Here it is seen that some part of the remaining time the prototype has been stoped due to: 70 60 50 40 30 20 10 0 Production below ForskVE curve Production above ForskVE curve Down time and transition states: Machine has been manually stoped or special testing is being performed Storm protection: Entered when the significant wave height rises above a certain limit. The limit has been adjusted up and down, but was typically set to 2.5 m or even lower in the shown period in order to minimize the risk of damage. Calm sea: The machine is stoped when the significant wave height is below a certain limit, which typically has been set to 0.5 m. Fig. 10 Details on operational time from September 2010 to March 2011. Screen dump from HMI (Human Machine Interface) on prototype

V. CONCLUSIONS The Wavestar prototype at Hanstholm was installed in September 2009. Starting from May 2010 measurements of wave climate and production are verified and approved by Energinet.dk. Since September 2011 the measurements of the power production are in agreement with the expectations. New and improved control strategy is under investigation, as these have proved mathematically to increase the power production even further. In general there have been no major problems with the design of the prototype. All structural and mechanical components in the WEC have proven functionality as intended. The WEC has survived two large storms with no damages and no service afterwards. Only minor design faults with the float design, the jacking-system, and some electrical problems have been indentified and corrected. Small steps have been taken to increase the operational time, but so far the operational time during a whole month has just reached about 40 % to 60 %. Further steps are needed in order to prove the reliability and document the ability to be in daily operation 24/7/365. A longer period (of several months) with continuous operation without stops is still to be documented. The Wavestar prototype at Hanstholm is an ideal test WEC for the further development of the Wavestar concept. So far the prototype has proved valuable in design validation, and based on the experiences with the prototype several modifications to the original design are now being incorporated in the design of future commercial WEC s. Building, installing and operating the prototype has provided a unique chance to correct design errors, which for the prototype was of minor consequence, but which for a full converter could have been a show-stopper for the concept. The first test results have shown challenges in ensuring a high efficiency of the complete power transmission to the electrical grid. A focus point for the future work with Wavestar is optimization and efficiency improvements of the hydraulic and electrical systems [14]. New components are planned to be tested on the test-unit before inclusion in the commercial WEC. ACKNOWLEDGMENT The authors acknowledge the financial support from the Danish ForskVE-programme, and from the Danish Council for Strategic Research under the Programme Commission on Sustainable Energy and Environment (Contract 09-067257, Structural Design of Wave Energy Devices), which made this work possible. REFERENCES [1] (2011) The Wavestar website. [Online]. Available: http://www.wavestarenergy.com. [2] (2011) The Wavestar webpage on Facebook. [Online]. Available: http://www.facebook.com/wavestarenergy [3] A. Bjerrum The Wave Star Energy Concept, in Proc. ICOE2008, www.icoe2008.com, International Conference on Ocean Energy, Brest, France, 15-17 October, 2008. [4] J.P. Kofoed, P. Frigaard, and M. Kramer Recent Developments of Wave Energy Utilization in Denmark, in Proc. Workshop on renewable ocean energy utilization at 20th annual conference, Korean Society of Ocean Engineers, 2006. [5] P.R. Steenstrup Wave Star Energy new wave energy converter, which is now under going sea trials in Denmark, International Conference Ocean Energy, Bremerhaven, October 2006. [6] K. Nielsen and M.S. Jensen WaveStar multi-float system performance calculation, http://www.risoe.dk/rispubl/nei/nei-dk-4501.pdf, Rambøll ref. no. 4301, 2004. [7] P. Frigaard, L. Marquis, M. Kramer, and J. P. Kofoed Wave Star, in Proc. PRADS2010, http://www.prads2010.org.br/, The 11 th International Symposium on Practical Design of Ships and Other Floating Structures, Rio de Janeiro, Brazil, 19-24 September, 2010. [8] P. Frigaard and T. L. Andersen Power figures from Wave Star in Nissum Bredning, Final report PSO-F&U 2008-1-10023, DCE Technical Report No. 61, Department of Civil Engineering, Aalborg University. ISSN 1901-726X, 2009. [9] L. Marquis, M. Kramer, and P. Frigaard First Power Production figures from the Wave Star Roshage Wave Energy Converter, in Proc. ICOE2010, www.icoe2010bilbao.com, 3rd International Conference on Ocean Energy, Bilbao, 6 October, 2010. [10] J.F. Chozas, N.E. Helstrup, H.C. Sørensen, J.P. Kofoed, A. Kabuth, "Predictability of the Power Output of Three Wave Energy Technologies in the Danish North Sea," in Proc. EWTEC2011, http://www.ewtec.org/, The 9 th European Wave and Tidal Energy Conference, Southampton, UK, 2011 [11] (2001) The Danish Agency for Science Technology and Innovation webpage about technology projects (in Danish). [Online]. Available: http://www.fi.dk/filer/publikationer/2010/energi_2010/html/kap03.htm [12] R. Hansen and M.M. Kramer, "Modelling and Control of the Wavestar Prototype," in Proc. EWTEC2011, http://www.ewtec.org/, The 9 th European Wave and Tidal Energy Conference, Southampton, UK, 2011 [13] R. Hansen, T.O. Andersen, and H.C. Pedersen. Model based design of efficient power take-off. Submitted for Proc. SICPF2011, http://webhotel2.tut.fi/iha/sicfp11/, The Twelfth Scandinavian International Conference on Fluid Power, May 18-20, Tampere, Finland, 2011. [14] R. Hansen, T.O. Andersen, and H.C. Pedersen. Analysis of Discrete Pressure Level Systems for Wave Energy Converters, submitted for Proc. FPM2011, http://www.fpm2011.org/, International Conference on Fluid Power and Mechatronics, August 17-20, Beijing, China, 2011.

TABLE III EXAMPLE OF MEASUREMENTS FROM THE WAVESTAR HANSTHOLM PROTOTYPE. HS AND TMEAN IS MEASURED SIGNIFICANT WAVE HEIGHT AND AVERAGE WAVE PERIOD, RESPECTIVELY. P_TWOFLOATS IS THE SUM OF MEASURED ABSORBED POWER FROM BOTH FLOATS, AND FORSKVE_LIMIT IS THE LIMIT FOR SUBSIDIES FROM ENERGINET.DK. PLC_Datetime AllDataValid Hs Tmean P_TwoFloats ForskVE_limit AboveLimit [%] [m] [s] [kw] [kw] [True/False] 21/09/10 09:20 100 2.08 4.72 48.98 34.24 True 21/09/10 09:30 100 1.91 4.31 37.50 28.71 True 21/09/10 09:40 100 1.94 4.10 38.02 29.80 True 21/09/10 09:50 100 2.01 3.95 33.69 32.07 True 21/09/10 10:00 100 2.03 4.47 39.91 32.85 True 21/09/10 10:10 100 2.17 4.23 42.91 37.42 True 21/09/10 10:20 100 2.01 4.39 38.94 32.04 True 21/09/10 10:30 100 2.01 4.14 39.84 32.02 True 21/09/10 10:40 100 2.10 4.27 40.97 35.12 True 21/09/10 10:50 100 2.03 4.01 41.76 32.55 True 21/09/10 11:00 100 1.83 4.13 32.29 26.21 True 21/09/10 11:10 100 1.97 4.28 37.60 30.71 True