Dear Mayor Murray, Top SR-520 Design Innovations and Remaining Opportunities

Similar documents
CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

September 2010 Review Project Concepts SCHEMATIC DESIGN NEGOTIATION CONSTRUCTION

Safe Streets. City of Lake Forest Park. March 21, 2017

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Chapter 5. Complete Streets and Walkable Communities.

C C C

SAFE ROUTES TO SCHOOL (SR2S)

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Duwamish Way-finding and CTR Report

Perryville TOD and Greenway Plan

Major Bike Routes 102 Avenue Workshop April 21, 2015

Sebastopol Charter School Traffic Management Plan

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

LANCASTER CITY BICYCLE NETWORK

ACTIVE TRANSPORTATION

Chapter 2: Standards for Access, Non-Motorized, and Transit

Active Transportation Facility Glossary

Rightsizing Streets: The Seattle Experience

Hennepin County Bicycle and Pedestrian Planning

Northeast 65 th Street Vision Zero Project Proposals From A Roosevelt High School Student Joe Mangan

Engineering - Bicycle and Pedestrian

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

EXECUTIVE SUMMARY. Vision

Off-road Trails. Guidance

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

Welcome. If you have any questions or comments on the project, please contact:

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Cascade Bicycle Club Recommendations

City of Seattle Edward B. Murray, Mayor

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Bicycle Facilities Planning

NACTO Designing Cities 2014 Dongho Chang, City Traffic Engineer October 23, 2014

Chapter 7 Nonmotorized Facilities

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Morristown, NJ Complete Streets Policy

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

City of Madison: 2017 Capital Budget Capital Improvement Plan

Dec 2, Dear Tri Ong, Sam Woods, and Scott Kubly,

Blue Ribbon Commission Report Recommendations on Pedestrian and Bicycle Infrastructure Improvements

The Transformation of Portland into a Two-Wheeled Mecca. Mia Birk, Principal, Alta Planning + Design

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution

Municipal and School PROUD TO SERVE. Transportation Assistance

Welcome to the Sellwood Bridge Project Open House!

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Complete Streets. Designing Streets for Everyone. Sarnia

Bicycle Master Plan Goals, Strategies, and Policies

Complete Streets: Policy to Pavement

City of Davis East Covell Corridor Plan

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Glebe Neighbourhood Cycling Plan

Pedestrian and Bicycle Improvements in Balboa Park Station Area

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Introduction. Who is WILMAPCO. Why are walkable communities important

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

The Bike Buzz in Richland. November 2017 Carl Berkowitz

Road Diets FDOT Process

AMATS Complete Streets Policy

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

CHAPTER 1 INTRODUCTION

What Is a Complete Street?

ACTION TRANSMITTAL No

CURBSIDE ACTIVITY DESIGN

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Central Avenue Bikeway Traffic and Safety Impact Assessment

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

Bobbie Walthall. Hi Bobby, please include these comments in tonight s CC packet. Thanks for your consideration, Phil Collison Lawrence Resident

2012 Capital Budget Capital Improvement Program

KEARNY MESA COMMUNITY PLAN UPDATE

Access Management Regulations and Standards

MARTIN LUTHER KING JR. WAY

Who is Toole Design Group?

Designing Complete Streets: What you need to know

Vision. Goals and Objectives. Walking

We support the following: Tom Davies Square 200 Brady Street Sudbury, Ontario

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

If a person walks within this focus area, these are examples of the places he or she could walk to or from:

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Potential Bicycle Facility on Bayou Street Mobile, Alabama

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Roosevelt Estates Neighborhood Improvements

Downtown Davidson Pedestrian and Bicycle Safety Plan

Broadway Complete Streets Project

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

102 Avenue Corridor Review

Appendix C 3. Bicycle / Pedestrian Planning

BUDGET FOR RESEDA BOULEVARD, STREET RECONSTRUCTION / VISION ZERO PROGRAM, REPORT BACK, COUNCIL FILE

CONTRA COSTA. Countywide Bicycle and Pedestrian Plan. Executive Summary. July Contra Costa Countywide Bicycle & Pedestrian Plan

Transcription:

Dear Mayor Murray, Thank you for your leadership building a transportation system that moves people efficiently throughout the region, and creates healthy places to live, work, and play. We are glad you share our vision of a modern transportation system that furthers Seattle s economic, social justice, climate, livability, public health, and safety goals. We want to start by thanking you for the significant improvements that have been made to the SR-520 design over the past year. The collaboration between SDOT, WSDOT, and consultants has resulted in better solutions than previous iterations. We understand WSDOT has unduly constrained this collaborative effort, and been unwilling to reconsider some of the underlying assumptions. By locking down the requirements for the number of access ramps and the Montlake interchange configuration, WSDOT has closed the door to innovations that would significantly improve the comfort and safety for people walking and biking (such as options X, Y, and Z on page 44 of the SR 520 Final Concept Design document). We recognize these constraints are unlikely to be reexamined before funding is secured this legislative session. We recommend the following changes that would make this project safer and healthier for Seattle. This $1.5 billion project will be set in concrete for the next eighty years. It must work for kids walking to Montlake Elementary, elders walking from the Husky Light Rail Station to the Arboretum, or a physician in scrubs biking from the Central District to the UW Medical Center. We urge you to continue to lead us towards a better transportation future. Top SR-520 Design Innovations and Remaining Opportunities A. North-South: A Montlake Cut walking and biking bridge will alleviate the failing level of service on the existing bridge for people walking and biking. Alignment B would add the most value to Seattle s transportation system by connecting to the proposed protected bike lanes on Montlake Boulevard and to the future UW Light Rail Station. This connection is part of the 2014 Seattle Bicycle Master Plan. B. North-South: The Land Bridge will provide a useful and iconic connection over the SR-520 highway mainline. C. East-West: An E Roanoke Greenway and short E-W protected bike lane along E Roanoke St will form the critical East-West connection in this system for people of all ages and abilities. D. East-West: The Portage Bay Bridge Trail will be a critical piece of the healthy transportation infrastructure for the city and region. This facility is part of the 2014 Seattle Bicycle Master Plan.

1. North-South and East-West: Given that separated above grade options have been taken off the table for now, it is incumbent upon WSDOT to create the safest possible Montlake interchange pedestrian crossings along both sides of Montlake Blvd for people of all ages and abilities. To accomplish this, all on-ramp and off-ramp conflict points should be raised crosswalks, lane widths should be reduced to NACTO standards, turning radii should be consistent with NACTO standards, and the on-ramp storage lanes should be narrowed to a single lane at pedestrian crossings. These improvements are consistent with WSDOT approved NACTO and SDOT s ROWIM. 2. North-South: A two-way protected bike lane on the east-side of Montlake Blvd from E Roanoke St, across a new walking and biking bridge, to the University Light Rail Station at Husky Stadium is important to creating a safe and convenient system for people biking through this area. This facility is part of the adopted 2014 Seattle Bicycle Master Plan. 3. North-South: Funding for neighborhood greenway improvements along the Lake Washington Loop from the SR-520 Lid south will simultaneously improve a key link in the non-motorized system and improve the livability of the neighborhood by mitigating cut-through traffic from the relocation of the eastbound SR-520 ramp. These improvements are part of the adopted 2014 Seattle Bicycle Master Plan. Thank you for your continued commitment to improving the SR-520 project. Sincerely, Barb Chamberlain, Washington Bikes Bob Edmiston, Madison Park Greenways, Seattle Board of Park Commissioners Cathy Tuttle, Seattle Neighborhood Greenways Dennis Shaw, MD, Montlake Greenways Elizabeth Kiker, Cascade Bicycle Club Forrest Baum, University Greenways Jerry Fulks, Arboretum Neighbors for Safer Streets Lionel Job, Montlake Community Club Transportation Committee, Montlake Greenways Lisa Quinn, Feet First Mike Archambault, Capitol Hill Community Council, Central Seattle Greenways Shefali Ranganathan, Transportation Choices Coalition

Full comments on the 520 West Side Final Concept Design Draft Documents Using the SR 520 and City of Seattle Non-Motorized Connectivity Network and 520 West Side Final Concept Design Draft documents as our reference, we strongly support or recommend the following design improvements. Montlake area Montlake Cut walking and biking bridge: A new walking and biking bridge over the Montlake Cut, with a strong preference for alignment B to connect with protected bike lanes on Montlake Boulevard and the future UW Light Rail Station. We do not support alignment A, which includes unnecessary travel lanes for motor vehicles. 520 Land Bridge: The land bridge (labeled #36). E Roanoke Greenway and short E-W protected bike lane: A neighborhood greenway treatment of E Roanoke St from Lake Washington Blvd to Montlake Blvd (labeled 31), improved crossing of E Roanoke and Montlake Pl E (labeled 32), and protected bike lane from Montlake Pl E to the Portage Bay Bridge Regional Shared-Use Path (labeled 31 and 32). Raised Crosswalks: Raised crosswalks and other crossing enhancements such as raised intersections should be incorporated at every off ramp and on ramp location at at the intersection of 24th Ave E and Lake Washington Blvd (labeled 21 and 21d). Stop Signs: A stop controlled intersection at 24 th Ave E and Lake Washington Blvd will greatly improve driver compliance of the crosswalk (labeled 35). Other design improvements: We support the design improvements labeled 25, 26, 21b, 27, 21c, 25, 39, 29, 28, and 30. Montlake interchange pedestrian crossings: Given that separated above grade options have been taken off the table for now, it is incumbent upon WSDOT to create the safest possible surface crossings along both sides of Montlake Blvd for people of all ages and abilities. To accomplish this, all on-ramp and off-ramp crossings should be raised to provide speed reduction at crosswalks. Crossing distances should be shortened further by reducing the number of excess on-ramp storage lanes at the junctions with Montlake Blvd. This excess on-ramp space is meant to provide queuing storage for vehicles waiting to get on the highway. These lanes could function equally well as storage space if curb bulbs were created at the intersections to narrow the opening to a single lane, and then expanded to WSDOT s desired two lanes after the crosswalk. Turning/corner radii should be consistent with NACTO standards. Crossing distances should be further shortened by reducing lane widths to NACTO standards. Instead of 14.6-17.5 lanes, lanes that are meant to accommodate buses should be 11 and general purpose lanes should be 10.

Montlake Blvd protected bike lane: A north-south two-way protected bike lane on the east-side of Montlake Blvd from E Roanoke St, across a new walking and biking bridge, to the University Light Rail Station at Husky Stadium. We support the option labeled 23c or option 3. This facility is part of the 2014 Seattle Bicycle Master Plan. Lake Washington Loop traffic calming and connections: Funding for additional neighborhood greenway treatment from the SR-520 Lid south along the existing Lake Washington Loop signed bicycle route, creating a critical improvement to the nonmotorized system and simultaneously improving the livability of the neighborhood by mitigating cut-through traffic from the relocation of the eastbound SR-520 ramp. These improvements are part of the 2014 Seattle Bicycle Master Plan. Other crossing improvements: An improved crossing of Montlake Blvd at E Shelby St. An improved crossing of Lake Washington Blvd E to the Arboretum Trail at E Roanoke St. An improved crossing of 24 th Ave E at E Lynn St. Portage Bay Bridge and Bill Dawson Trail area Portage Bay Bridge Trail: A non-motorized path on the Portage Bay Bridge (labeled #8). This facility is part of the 2014 Seattle Bicycle Master Plan. Portage Bay Bridge Trail connections: At grade connection from the non-motorized Portage Bay path to E Roanoke St protected bike lane and to the Delmar Dr protected bike lane, and on the other end from the bridge to E Roanoke St and the Bill Dawson Trail labeled 12a, 12b, and 17. Bill Dawson Trail: Improvements to the Bill Dawson Trail labeled 16, 18, and 19. Reduction of trail conflicts: Best practices to reduce conflicts between people biking and people walking on the Portage Bay Bridge Trail. Continued improvement of social safety: International best practices to improve social safety on the Bill Dawson Trail and Montlake Blvd underpass. Roanoke Park Lid areas Delmar lid undercrossing: Connect the Delmar Lid trail to Federal Ave E, 10 th Ave E, Broadway Ave E, and E Roanoke Park (labeled #8).

Improved I-5 crossing: A 30 foot wide separating crossing on the south side of East Roanoke Street over I-5 with an improved sidewalk in front of the fire station (labeled 3 and 7). East Roanoke Street and 10th Ave E crossing: Improving the t-intersection to facilitate safe crossings for people walking and biking (labeled 6). Other Roanoke area improvements: We support the design improvements labeled 4,5a, 5b, and 5c. Protected bike lane on Delmar Dr E: Install a short protected bike lane on Delmar Dr E and E Roanoke St from E Interlaken Blvd and the Portage Bay Bridge Regional Shared- Use Path to the Tops K-8 School. Neighborhood non-motorized connections and traffic calming: Funding for a protected bike lane on 10 th Ave E or a neighborhood greenway on Federal Ave E.