Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Similar documents
2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

122 Avenue: 107 Street to Fort Road

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

Blair/Williamson Intersection Expressed Needs

Duwamish Way-finding and CTR Report

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Welcome to the Sellwood Bridge Project Open House!

COMMUNITY MEETING AGENDA

Station Plan: Penn & 43rd Avenue

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

Guildwood Village Traffic Response Prepared by City of Toronto Transportation Department

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018

10.0 CURB EXTENSIONS GUIDELINE

CITY OF VANCOUVER ADMINISTRATIVE REPORT

Welcome! San Jose Avenue Open House August 25, 2015

Why invest in the 1 Street S.W. Corridor?

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Design Criteria. Design Criteria

Richmond-Adelaide Cycle Tracks

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Item No. 14 Town of Atherton

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Dec 2, Dear Tri Ong, Sam Woods, and Scott Kubly,

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

Welcome to the Open House

Public Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha

The following notes describe comments received that were written/drawn on maps by workshop participants.

Public Works and Infrastructure Committee. General Manager, Transportation Services

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

Monroe Street Reconstruction

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

Chapter 3 DESIGN SPECIFICATIONS

Work Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager

Bellevue Downtown Association Downtown Bike Series

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Functional, Preliminary Design and Detailed Design

Comments EXECUTIVE SUMMARY

Draft North Industrial Area-Wide Traffic Plan

Construction Staging Area Vaughan Road

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

Bay to Bay Boulevard Complete Streets Project

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Decision on North Waterloo Routing

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Submission to Metrolinx on Eglinton LRT - East End. Response to December 2012 Public Meeting

Pavement Rehabilitation & Buffered Bike Lane

3.0 PROJECT DESCRIPTION

Seattle Department of Transportation (SDOT) Preliminary Responses to Madison-Miller Community List of Site-Specific Concerns

Harrah s Station Square Casino

Glebe Neighbourhood Cycling Plan

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

PROJECT FACT SHEET March 21, 2018

10 th STREET BRIDGE REPLACEMENT Schedule 'C' EA: Phase 3 Presentation to Council Recommended Design Alternatives City of Owen Sound August 27, 2018

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

The procedures to be followed in undertaking Non-Emergency work depend on the degree of traffic disruption caused by the work.

Chapter 3 BUS IMPROVEMENT CONCEPTS

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Terwillegar Drive Expressway Draft Concept Plan

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

Multi-Modal Traffic Analysis. Parisi and Associates

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Columbia Pike Implementation Team (CPIT) Meeting

Mission Bay Loop (MBL) Public Meeting

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Transportation Corridor Studies: Summary of Recommendations

2. Executing a legal agreement with respect to (1) above.

Public Event 1 Community Workshops

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

PROJECT FACT SHEET May 25, 2018

Welcome 78 Ave S.E. Underpass and Road Widening Project Update

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Transcription:

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

PROJECT LOCATION 2

SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active rail tracks Provides for one lane of traffic in each direction Narrow sidewalks on both sides of the road underneath Provides a southbound right turn to travel westbound onto Dundas St. W.; no southbound left turn to go eastbound 3

EXISTING BRIDGE CONDITIONS Current clearance from the road to the bottom of the bridge is 4.0 m Bridge creates a bottleneck as two. traffic lanes merge into one traffic lane in each direction Vehicles cannot turn left onto Dundas St. W. from Scarlett Rd. Sightline constraints under the bridge affecting vehicles, pedestrians and cyclists Unprotected two-stage pedestrian crossing on the north side of Dundas St. W. Unprotected bridge pier 4

STUDY RECOMENDATIONS The City completed a study in October 2008 to address safety and operational issues City Council adopted the recommendations, which include: Rebuilding the Scarlett Road Bridge o Making it wider to allow for an added traffic lane in each direction and future bike lanes o Lowering Scarlett Rd. to allow large vehicles and trucks to pass underneath o Improving the sidewalks under the bridge Reconfiguring the intersection at Scarlett Rd./Dundas St. W/St. Clair Avenue W.: o Adding a second eastbound left-turning lane on Dundas St. W. o Adding a new southbound left-turning lane from Scarlett Rd. to Dundas St. W. o Adding a new traffic signal for Gooch Ave. at Dundas St. W. and a new westbound leftturning lane from Dundas St. W. to Gooch Ave. o Improving sidewalks and adding for a future bike lane 5

BRIDGE IMPROVEMENTS Space for added rail track for Metrolinx expansion Added lane north and south bound, more sidewalk space, future bike lane 6

INTERSECTION IMPROVEMENTS Location Proposed Improvement Scarlett Rd., Dundas St. W. and St. Clair Ave. W Widen to include an accessible sidewalk and future bike lanes in both directions within the construction limits Scarlett Rd. onto Dundas St. W. New southbound left-turn lane St. Clair Ave. W. and the north portion of Scarlett Rd. Lane widths remain unchanged Dundas St. W. to Scarlett Rd. New dual eastbound left-turn lane Gooch Ave. from Dundas St. W. New westbound left-turn lane Dundas St. W. and Gooch Ave. New traffic signals North side of Dundas St. W. Unprotected pedestrian crossings to be replaced with new traffic signals Dundas St. W. Relocation of the bus stop on traffic island to west of the Scarlett- Dundas Intersection 7

Looking north from Dundas St W 8

Looking south from Scarlett Rd & St Clair Ave W Dundas Street W St. Clair Avenue W Scarlett Road 9

Aerial view Scarlett Road St. Clair Avenue W Dundas Street W 10

EXISTING & PLANNED CYCLING CONNECTIONS The City of Toronto is planning to install a physically separated cycle track under the Scarlett Road Bridge as part of the bridge reconstruction. The proposed cycling connections shown on the map are part of The 10 Year Cycling Network Plan, and are subject to design feasibility, public consultation, and approvals. toronto.ca/cyclingnetwork 11

CONSTRUCTION SCHEDULE Timing What work is happening STAGE 1 2018 Utility and road construction Underground utility relocation STAGE 2 SPRING 2019 to FALL 2019 Construction of new east side of bridge Construct new structural elements and foundations of bridge Road work and retaining wall construction STAGE 3 SPRING 2020 to FALL 2020 Construction of new west side of bridge Construct new structural elements and foundations Road work and retaining wall construction STAGE 4 FALL 2020 Landscaping Road line painting Site restoration 12

TRAFFIC MANAGEMENT Minimizing traffic disruption is a priority. Here is a summary of how traffic will be affected throughout construction: STAGE 1 2018 STAGE 2 SPRING 2019 to FALL 2019 STAGE 3 SPRING 2020 to FALL 2020 Short term lane closures will be expected during utility relocations and road construction One lane will be maintained in each direction on Scarlett Rd., St. Clair Ave. W. and Dundas St. W. Weekend closures may be required at Scarlett Rd. and Dundas St. W. intersection. Traffic will be detoured onto St. Clair Ave. W. Weekend closures may be required at the Scarlett Rd. and St. Clair Ave. W. intersection. Traffic will be detoured onto Dundas St. W. Scarlett Rd. traffic will be directed under the newly-constructed east side of the bridge during the construction of the west side. One traffic lane will be available in each direction. Pedestrian access will be maintained. Traffic will move into the new lanes. STAGE 4 FALL 2020 13

WHAT TO EXPECT DURING CONSTRUCTION Access to commercial and residential properties will be maintained throughout construction The commercial parking spaces along Scarlett Rd. will be regraded as a result of lowering the road Property driveways on St. Clair Ave. W. will be regraded as a result of lowering the road. Some sidewalks and parking space widths will be slightly reduced to accommodate wheelchair and access ramps. Parkette at the northeast corner of Scarlett Rd. and St. Clair Ave. W. will be reconstructed along with the lowering of the intersection The City is in discussions with all affected property owners. If you have not been contacted by a City of Toronto representative, your property will not be affected by this project. 14

NEXT STEPS Work will begin in Summer 2018 Anticipated completion is Fall 2020 15

STAY INFORMED Speak with a Project Team member tonight Fill out a comment form Visit www.toronto.ca/scarlettroadbridge to sign up for email updates, notifications and newsletters. 16