Western Riverside County

Similar documents
RIVERSIDE COUNTY TRANSPORTATION COMMISSION - UPDATE

North Coast Corridor:

Highway 217 Corridor Study. Phase I Overview Report

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Transportation Master Plan Advisory Task Force

SUMMARY OF TRANSPORTATION INVESTMENTS

SANTA MONICA BOULEVARD CORRIDOR

Chapter 5 Future Transportation

Governor s Transportation Vision Panel

Basalt Creek Transportation Refinement Plan Recommendations

Proposed Project I 35 from Denton to Cooke County Line

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

San Tomas Expressway

3.0 PROJECT DESCRIPTION

Washington DC Section of ITE Project Briefing

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

I-80 Corridor Overhaul

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Nevada s Transportation Infrastructure and Future Transportation Needs

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

2045 Long Range Transportation Plan. Summary of Draft

A Federal Perspective on Congestion Pricing. Wayne Berman Federal Highway Administration July 8, 2010

Santa Clara I-280 CORRIDOR STUDY

Circulation and Parking

July 10, :00-11:30 a.m.

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

Staff Report. Within the $10 million funding limit, ten projects submitted by six different jurisdictions are recommended for funding:

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

3.9 - Transportation and Traffic

SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM

STUDY ADVISORY COMMITTEE. October 8, 2015

Keep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents

Table of Contents SR-91 IMPLEMENTATION PLAN i

395 Express Lanes Extension

New Seward and 36 th Avenue Intersection Conceptual Design

Project Budget and Schedule Status

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

What if YOU could help plan Northern Virginia s transportation future?

City of San Bernardino

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Chapter 6 Transportation Plan

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

Typical Rush Hour Commute. PennyforTransportation.com

Giles Run Connector Road

BUILDING THE CASE FOR TRAVEL OPTIONS IN WASHING TON COUNTY. Image: Steve Morgan. Image: Steve Morgan

A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA

3.6 Traffic and Transportation/Pedestrian and Bicycle Facilities

PEDESTRIAN ACTION PLAN

State Highway 44/State Street High Capacity Corridor

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

Key objectives of the survey were to gain a better understanding of:

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

CHAPTER 7.0 IMPLEMENTATION

Regional Transportation Needs Within Southeastern Wisconsin

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line

TRASBURG RANSPORTATION

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

Merced County Association of Governments: Voter Survey

Capital Beltway HOT Lanes - Frequently Asked Questions

There are traffic jams on Highway 1

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

4. CIRCULATION ELEMENT

Foothill Expressway Improvements Between El Monte and San Antonio

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

I-105 Corridor Sustainability Study (CSS)

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

Transportation Authority of Marin Renew Existing ½-cent Transportation Sales Tax

This page intentionally left blank

Welcome. If you have any questions or comments on the project, please contact:

Perryville TOD and Greenway Plan

State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

I-395 Express Lanes Northern Extension Project Public Hearings

Berkeley Strategic Transportation Plan A-76

POTENTIAL SANTA CLARA COUNTY TRANSPORTATION MEASURE

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements


Managed Lanes in California:

Dear City Council Members,

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

405 Express Lanes General Information & Frequently Asked Questions

C C C

Bicycle Master Plan Goals, Strategies, and Policies

Transportation Corridor Studies: Summary of Recommendations

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

Transcription:

Riverside County Transportation Commission Riverside County Transportation Commission Created in 1976 by state law, RCTC is comprised of elected officials with one city councilmember or mayor from each incorporated city and all five members of the Riverside County Board of Supervisors. California s Governor also appoints a member who serves in a non-voting capacity. The legal structure of the Commission sets it apart from Riverside s county government and gives it independent authority to fulfill its statutory roles and responsibilities. One of RCTC s primary responsibilities is to administer the voter-approved Measure A half-cent sales tax program. Measure A was first approved by voters in 1988. It was later extended in 2002 and will remain in place until 2039. Measure A funds highway, street and road, and transit projects throughout Riverside County. In addition to Measure A funding, RCTC also allocates state and federal transportation dollars. Western Riverside County FULFILLMENT OF PROMISES CLEARS ROAD TO PROGRESS Streeter Avenue Grade Separation Investment: $36 million Jobs: 648 RCTC/ Measure A s COMPLETED Western County Start Date: February 2013 Finish Date: June 2015 Investment: $170 million Jobs Created: 3,060 I-215 Central Start Date: January 2013 Finish Date: October 2015 Investment: $123.5 million Jobs Created: 2,223 SR-74 Curve Widening Start Date: May 2014 Finish Date: June 2015 Investment: $5.6 million Jobs Created: 101 Auto Center Drive Grade Separation Start Date: August 2013 Finish Date: September 2015 Investment: $32.6 million Jobs Created: 588 Streeter Avenue Grade Separation Start Date: December 2012 Finish Date: April 2015 Investment: $36 million Jobs Created: 648 Investment: $170 million Jobs: 3,060 The Riverside County Transportation Commission (RCTC) has been serving Riverside County for nearly 40 years. When voters passed Measure A in 1988 they voted for a half-cent sales tax that would deliver greater mobility for everyone. RCTC delivered on the promises of that first voter mandate with freeway projects in every region, local street and road improvements in 24 cities, brand new commuter rail service, support for bus service, and transportation for seniors and persons with disabilities. In 2002, RCTC asked voters to continue with Measure A, to plan and complete transportation developments vital to regional growth and vibrancy. Since 1988 more than $1 billion generated by Measure A has been allocated to Western Riverside County. State Route 74 curve widening, completed in June 2015, was the final project funded by original Measure A dollars. RCTC is also delivering projects designated in the second Measure A. For example, the I-215 Central project meant the completion of a six-lane freeway from the 15/215 junction in south Riverside County all the way to the SR-60 near March Air Reserve Base. Measure A has facilitated partnerships for RCTC with the citizens it serves, as well as other public agencies that play a critical role in daily mobility. Partners San Bernardino Associated Governments and Caltrans worked with RCTC to close the high occupancy vehicle (HOV) lane gap between Riverside and San Bernardino Counties along the I-215. I-215 Central Investment: $123.5 million Jobs: 2,223 These types of achievements are the fulfillment of promises made by RCTC to a region invested in its own prosperity. As Riverside County grows, so does its mobility needs. Larger populations and increases in commuter and commercial traffic place added demands on major freeways and neighborhood streets alike. With traffic returning to levels unrivaled since 2007, reducing congestion and protecting public health and safety are important components of each and every project. RCTC is working to clear the roads to economic prosperity while maintaining quality of life for those who live and travel along these roadways. Completed projects include: Constructed an eight mile HOV lane in each direction from the 60/91/215 interchange to Orange Show Road in San Bernardino County. Work included rebuilding two railroad bridges and bridges crossing the Union Pacific railroad tracks, I-10, and the Santa Ana River were widened. I-215 Central Widen 12.5 miles of the I-215 between Scott Road and Nuevo Road adding one general-purpose lane in each direction. Included bridge, flood control channel, overcrossing improvements, and noise studies and sound walls where necessary. SR-74 Curve Widening Widen median, shoulders, and lanes between Calvert Avenue and California Avenue.

Investment: $248.3 million Jobs: 4,469 91 Investment: $1.4 billion Jobs: 16,200 RCTC/Measure A s LANES, TRAINS, AND UNDER CONSTRUCTION Western County Enhanced Mobility RCTC is hard at work delivering the latest round of Measure A projects in Western Riverside County. Expanded Metrolink service, freeway congestion, surface street traffic, and multimodal transportation options are all the focus of ongoing efforts. The and HOV lanes on the 91 freeway through Riverside are among a group of important projects nearing completion. Widening the 91 freeway to Orange County is well underway. These improvements bring with them some very important ancillary benefits. Even though construction zones are never easy to deal with, the long-term economic and mobility benefits of these activities will be worth it. In addition to widening the freeway, RCTC is leveraging its commitment to public transit by using the 91 as an opportunity to expand express bus service bolstering multimodal options available to commuters and area residents. RCTC asks for commuters patience while the 91 is under construction. The long-term goal of better mobility and a smoother commute will arrive in 2017. In the meantime, try Metrolink. Additional service to Orange County is now available. New Metrolink service is also transforming the way Riverside County residents get to work within Riverside County. The opening means commuters from Perris, Menifee, Murrieta, and Temecula can now take the train to employment centers such as March Air Reserve Base, Hunter Park, Downtown Riverside, and Corona. Leaving your car at home means less traffic, better air quality, and a less stressful commute. s under construction include: Extend the existing Metrolink 91 Line service from the Downtown Riverside station, 24 miles along the existing San Jacinto Branch Line terminating in Perris. Includes four new stations, nine miles of new track, rehabilitation of existing track, and new Citrus Connection to Burlington Northern Santa Fe tracks north of Riverside. 91 Add regular lanes, tolled express lanes, auxiliary lanes, and a direct express lane connecter from northbound 15 to westbound 91 and eastbound 91 to southbound 15. Improvements to interchanges, bridges, ramps, and local streets also will be made along the 91. SR-91 HOV Widen six miles of the SR-91 between Adams Street and the 60/91/215 interchange by constructing one HOV lane in each direction, closing the existing HOV gap. Includes ramp and interchange improvements. Start Date: October 2013 Finish Date: December 2015 Investment: $248.3 million Jobs Created: 4,469 91 Start Date: July 2014 Finish Date: January 2017 Investment: $1.4 billion Jobs Created: 16,200 SR-91 HOV Start Date: August 2011 Finish Date: Substantial completion Summer 2016 Investment: $248 million Jobs Created: 4,464 Riverside Avenue Grade Separation Finish Date: Winter 2015 Investment: $32.2 million Jobs Created: 580 Sunset Avenue Grade Separation Start Date: Early 2014 Finish Date: January 2016 Investment: $34.8 million Jobs Created: 626 Magnolia Avenue Grade Separation (County) Finish Date: November 2015 Investment: $51.6 million Jobs Created: 929 Clay Street Grade Separation SR-91 HOV Investment: $248 million Jobs: 4,464 Sunset Avenue Grade Separation Investment: $34.8 million Jobs: 626 Finish Date: March 2016 Investment: $30.8 million Jobs Created: 554

I-15 Express Lanes RCTC/Measure A s NEAR TERM Western County I-15 Express Lanes Start Date: 2018 Finish Date: 2020 Investment: $462.4 million Jobs Created: 8,321 Start Date: When funding becomes available. Investment: $1.7 billion Jobs Created: 30,600 SR-79 Realignment Start Date: When funding becomes available. Investment: $1.1 billion Jobs Created: 20,258 SR-60 Truck Climbing and Descending Lane Start Date: When funding becomes available. Investment: $138.4 million Jobs Created: 2,491 RCTC s Strategic Assessment/ Transportation Summits August 26, 2015 City Hall, Perris August 29, 2015 California Baptist University, Riverside September 2, 2015 Harveston Center, Temecula September 3, 2015 UC Riverside Palm Desert Center, Palm Desert September 23, 2015 Winchester Park Community Center, Winchester Proactive Planning FOR A BRIGHT FUTURE RCTC s job is to plan projects in advance of traffic demands that can clog roadways and make congestion a way of life. Being proactive, instead of playing catch-up later, is critical as transportation projects require a long lead time to plan, engineer, and construct. Two of RCTC s strengths are its ability to structure project implementation to save money and time, and second, to find the financing needed, even when projects are beyond the revenues generated by Measure A alone. Tolled express lane revenues and leveraging Measure A funds to meet state and federal matching requirements are just a few examples. While funding for the and the SR-79 Realignment projects have not yet been identified, those roadways are both moving into engineering phases that will allow them to move forward to meet future transportation needs before mobility is compromised. In the meantime, RCTC is working to identify the funding resources for construction. RCTC is also reaching out to the public to plan our region s transportation future. Riverside County residents were invited to transportation summits to help provide an on-the-ground look into how they are currently affected by transportation conditions and what they would like to see happen across the county in the future. These pulse-taking transportation summits provide RCTC with valuable insight it can use to formulate a decade-long strategy for transportation and transit planning to guide its activities in the future. Results of the Strategic Assessment will be presented to the Commission at its January 2016 workshop and will also be posted on the RCTC website. Future projects include: I-15 Express Lanes Construct one to two tolled express lanes in each direction between Cajalco Road and the 15/60 interchange. Construct a new eastbound/westbound corridor connecting San Jacinto with the Perris area terminating at the I-215. SR-79 Realignment Realign the SR-79 between the Domenigoni Parkway and Gilman Springs Road. SR-60 Truck Climbing and Descending Lane Add truck climbing lanes in the Badlands area east of Moreno Valley. RCTC s Strategic Assessment/Transportation Summits Look toward the future to outline a funding plan for the next 10 years, evaluate and review Measure A, determine project priorities, and formulate a long-term view of the future of transportation in Riverside County. SR-79 Realignment Investment: $1.1 billion Jobs: 20,258 Investment: $1.7 billion Jobs: 30,600

I-10/Monterey Avenue Interchange Investment: $12.7 million Jobs: 229 Eastern Riverside County EXTENDING THE REACH OF PROGRESS TO THE COACHELLA VALLEY RCTC s COMPLETED Eastern County I-10/Monterey Avenue Interchange Start Date: 2012 Finish Date: November 2014 Investment: $12.7 million Jobs Created: 229 Avenue 56/Airport Boulevard Grade Separation Investment: $27.7 million Jobs: 499 Avenue 52 Grade Separation Start Date: 2013 Finish Date: November 2015 Investment: $29.9 million Jobs Created: 538 UNDER CONSTRUCTION Eastern County Avenue 56/Airport Boulevard Grade Separation Start Date: 2013 Finish Date: March 2016 Investment: $27.7 million Jobs Created: 499 I-10/Jefferson Street Interchange Start Date: Spring 2015 Finish Date: May 2018 Investment: $80.9 million Jobs Created: 1,456 NEAR TERM Eastern County Active Transportation Program CV Link Start Date: 2017 Investment: $99.4 million Jobs Created: 1,789 Coachella Valley San Gorgonio Pass Corridor Rail Service Start Date: When funding becomes available. Avenue 66 Grade Separation Start Date: Winter 2016 Finish Date: Winter 2018 Investment: $39.08 million Jobs Created: 703 The Coachella Valley has a unique set of mobility needs. As a region, it functions as both a population center and a transportation corridor. Balancing the demands of these two very different, but equally expanding functions is the focus of transportation planning along I-10 and on local roadways. RCTC s partner, the Coachella Valley Association of Governments (CVAG), is the agency responsible for this effort. Measure A funds totaling $67.5 million have been spent on local streets and roads in the valley since 2010. Drivers on I-10 include commuters from as far as the western edges of Riverside County as well as logistics vehicles from throughout Southern California using the interstate as a conduit for goods to and from western states. Population growth and a growing economy in the origin and destination cities along those routes drive increased traffic levels. Over the past five years CVAG successfully eased congestion by completing projects that improve conditions and highway access along I-10 as well as the major roads connecting valley communities. Improvements to the interchanges at Monterey Avenue and Jefferson Street eased freeway access and traffic conditions on adjacent local streets. Westbound Monterey Avenue on and off ramps were realigned, including new traffic signals and additional lanes that improve traffic flows. The Jefferson Street ramps in both directions were also improved along with complete replacement of the existing bridge and north Indio Boulevard overcrossing. These projects included features like new drought-tolerant landscaping, bike lanes, and sidewalks to enhance usability for local residents. Health and safety are among the primary benefits of improvements to the more interior portions of valley communities. The grade separation at Avenue 52 provides relief for the conflict between rail and vehicle traffic on city streets. Wait times at crossings are reduced, setting off a chain of positive environmental benefits like improved air quality and noise reduction. Residents and commuters, both behind the wheel and on foot, also enjoy the safety of traveling in a separate corridor from the trains. Completion of these projects is another sign of progress and fulfilled promises. The impact of Measure A is widespread and residents across the county have helped make worthwhile change happen. Life in a growing region is exciting, but requires imagination and vision. Completed projects include: I-10/Monterey Avenue Interchange Widen and realign on and off ramp westbound to connect with Varner Road instead of Monterey Avenue and add traffic signal at Varner Road. Lengthen left turn lane from southbound Monterey Avenue to eastbound I-10. Remove traffic signal at Monterey Avenue and ramps, widen existing westbound on ramp, add ramp metering, and install landscaping. Avenue 52 Grade Separation Construct a grade separation where Avenue 52 crosses the Union Pacific Railroad in Coachella.

CV Link RIDING THE ROADS AND RAILS TO THE Future of Transportation in the Coachella Valley 2015 RCTC COMMISSION MEMBERS CHAIR Daryl R. Busch City of Perris VICE CHAIR Scott Matas City of Desert Hot Springs 2nd VICE CHAIR John F. Tavaglione Linda Krupa City of Hemet Dana Reed City of Indian Wells Troy Strange City of Indio Frank Johnston City of Jurupa Valley CVAG is looking at the future of mobility in Coachella Valley through the lens of innovation. As eastern Riverside County continues to grow, the agency is focusing on developing options for additional multimodal transportation. The larger goal is to positively affect quality of life by mitigating environmental impacts and promoting healthy living. In addition to the new grade separation completed at Avenue 52, Avenue 66 is again underway. Traffic delays at Avenue 66 affect not only daily commuters, but also large agricultural freight trucks. The congestion impacts of these backups are not lost on CVAG. The agency and RCTC are working together to secure funding resources for the project in the interest of further improvements to local traffic and environmental conditions. The potential of the rail system to better serve the Valley is also being explored in other ways. CVAG and RCTC are currently examining a project that would use passanger rail service to open up a whole new gateway to Coachella Valley residents and visitors. A 141-mile passenger rail route is being considered that will run from Los Angeles all the way to downtown Indio. The route would offer both commuters and travelers an option for reaching cities along the route without adding to already growing traffic levels. The potential for positive impacts to congestion and air quality make this project particularly exciting. Encouraging healthy lifestyles plus creating a more sustainable community is at the crux of another CVAG project. The CV Link project will develop 50 miles of trail friendly to pedestrians, cyclists, and small electric vehicle operators. The new throughway will give local residents a new option for intercity mobility, as well as designate a safe space for recreation and fitness. Less traffic, more physical activity, and better air quality all help make a better Coachella Valley. Future projects include: Active Transportation Program CV Link A multi-community path for pedestrians, cyclists, and cart-style electric vehicles. The 50-mile trail will largely run along the Whitewater River channel from Palm Springs to Coachella, and then extend to Desert Hot Springs and the Salton Sea. Coachella Valley San Gorgonio Pass Rail Corridor Service 141-mile intercity passenger rail route offering service from Los Angeles Union Station to downtown Indio. Avenue 66 Grade Separation Construct a two-lane elevated structure over Union Pacific Railroad. COMMISSIONERS Marion Ashley John J. Benoit Kevin Jeffries Chuck Washington Debbie Franklin City of Banning Brenda Knight City of Beaumont Joseph DeConinck City of Blythe Ella Zanowic City of Calimesa Dawn Haggerty City of Canyon Lake Greg Pettis City of Cathedral City Steven Hernandez City of Coachella Karen Spiegel City of Corona Adam Rush City of Eastvale Robert Radi City of La Quinta Bob Magee City of Lake Elsinore Scott Mann City of Menifee Jesse Molina City of Moreno Valley Rick Gibbs City of Murrieta Berwin Hanna City of Norco Jan Harnik City of Palm Desert Ginny Foat City of Palm Springs Ted Weill City of Rancho Mirage Rusty Bailey City of Riverside Andrew Kotyuk City of San Jacinto Michael S. Naggar City of Temecula Ben Benoit City of Wildomar John Bulinski Caltrans, District 8