Construction Site Safety Handbook

Similar documents
Risk Control at United Fire Group

1.0 Scope and Application

Fall Protection. 29 CFR Appendix C 29 CFR 1926 Subpart M

City of Turlock Heat Illness Prevention Procedures for Outdoor Work In accordance with Title 8 CCR Section 3395

Wildland Fire School. Heat Illness Prevention Program

HEAT ILLNESS PREVENTION TRAINING. Presented by: Du-All 2018

1 Great Western Painting Inert Space Entry

HEAT ILLNESS PREVENTION PLAN

California State University Bakersfield Heat Illness Prevention Policy. Revised November 2017

Heat Stress Policy UFEHS-SAFE-04/04/01 Environmental Health and Safety Finance and Administration University of Florida

Title- Fall Protection Effective Date: 03 Jan 14 Revision-0

CONSTRUCTION SAFETY PROGRAM FOR. Golder Acoustics Inc.

Fall Protection Resource Guide P AGE 1

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

Heat Stress Prevention Written Program Laredo ISD Safety/Risk/Emergency Management Department

Heat Stress Prevention Program

Fall Protection- Part 1

SAFETY POLICY Office Address 5195 W. 58 th Ave. Unit F Arvada, CO 80002

Doc. No. SP-14 Rev. No. 1 Date: 07/17/2012 Page 1 of 08

Heat Stress Prevention

James E. Thompson, Inc. dba JTS Construction

Health, Safety, Security and Environment

FALL PROTECTION PLAN July 2012

New Hire Safety Orientation. Welcome to Flexicrew, our number one priority is you and your safety.

CONTRACTOR SAFETY RULES

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

Responsibilities / Accountability

Fall Protection Program

1.1 OHS Policy and Responsibilities

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

New Mexico Institute of Mining & Technology. Fall Protection Program

8. Fall Protection Procedures WAC

CHAPTER 10 FALL PROTECTION

Workplace Heat Illness Prevention

Walking-Working Surfaces and Fall Protection Standards Update. OSHA General Industry

29 CFR 1926, Subpart M. Fall Protection Program Table of Contents

Health & Safety Policy

FALL PROTECTION PLAN INSTRUCTIONS

Safety is a priority at Vault Pipelines.

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

Minimum Safety Requirements for Contractors Working on Railway Property

This subject outlines procedures to prevent accidents or injuries to you and others from inappropriate selection and use of fall protection equipment.

Contractor / Exhibitor Handbook

The Johns Hopkins University/The Johns Hopkins Hospital Health, Safety and Environment Manual Safety Policies:

The purpose of this document is to establish the procedures for accident prevention and investigation at (Insert Company Name) jobsites.

Safety Management System. Initial Revision Date: Version Revision No. 02 GENERAL SAFETY HEALTH PROVISION

Heat Illness Prevention Plan. California State University, Chico

CONFINED SPACE ENTRY PROGRAM

Contractor/Visitor Safety Orientation UNBC

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

OSHA Compliance Saves Money, See How They Are Connected. Ryan S. Hellman, MS Principal EHS Consultant

Heat Stress & Illness Prevention

HEAT ILLNESS TRAINING. By: Contra Costa Water District

FALL PROTECTION PLAN FALL PROTECTION PROGRAM

Heat Illness Prevention

CONFINED SPACE WRITTEN PROGRAM

EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE

Written Program. For. Fall Protection. <<Company Name>> <<911 Address>> <<City, state, zip code>>

July Safety Topic: Grain Bin Safety & Heat Exhaustion

Heat Illness Prevention Program Effective Date: Revision #:

HEAT ILLNESS PREVENTION POLICY

Loss Control Alert. Preventing Falls in the Construction Industry

2.2. Anchorage Point A secure point of attachment for Lifelines, lanyards or deceleration devices.

FALL PROTECTION / ELEVATED WORK

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities.

An Overview of Confined Space Rescue Course Objectives

Course Objectives. An Overview of Confined Space Rescue

User Instructions 1790 Rail Anchor

Part #: 15158; 15159; 15188; 61027; 61029; 61140; 61141

HEAT ILLNESS PREVENTION PROGRAM. Cal/OSHA Web Reference:

Written Programs Listing

FALL PROTECTION POLICY

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Hazard Communication Program. San José State University

ARKANSAS TECH UNIVERSITY FACILITIES MANAGMENT HEALTH AND SAFETY MANUAL

FALL PROTECTION. Supplement to Standard Training Module

A MESSAGE FROM THE MD

EXHIBIT A FALL PROTECTION POLICY

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS

Hazard Communication Plan (HCP) 29 CFR

Imhoff Custom Services Inc.

Key Technology, Inc. Confined Space Entry Program. July, 2017

9/7/2018. Introduction to the. Presenter. Disclaimer ADD PRESENTER PHOTO HERE. Richard A. Lantz, CVI, ASCS, VSMR

Employer s Name. Heat Illness Prevention Program

Safety Plan for Sole Proprietors

Reviewed: New Effective: 5/18/12 Supersedes: New Preparer: Owner: Approver: Team Member, Occupational Safety Industrial Hygiene

This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.

Doc No: FPP CARDINAL SURVEYS COMPANY. Safety Management System. Initial Revision Date: Version Revision No. 02 FALL PROTECTION

OSHA 29CFR 1910 Subpart D Walking-Working Surfaces Content

Conducting An Effective. Welcome!

HEAT MANAGEMENT PROCEDURE

Confined Space. Program Responsibilities

A. Evaluation of the written program

The content of this resource has been generously provided by the AGC Houston, the Associated General Contractors of America.

Product Name: Non-Shock Lanyard

A. Employer Provide fall protection to effected employees Ensure that all employees understand and adhere to the procedures of this plan

OSHA s new walking working surfaces standards

Student Shop Safety. University of Tennessee Safety Guide GS-005. Purpose. Scope and Applicability. Definitions and Abbreviations.

SITE SPECIFIC SAFETY PLAN (SSSP)

10-Hour OSHA Training

Transcription:

Construction Site Safety Handbook DP-06611 Rev 5-8 August 2014 331 32nd Ave PO Box 5128 Brookings SD 57006 tel 605-697-4034 or 877-605-1113 fax 605-697-4444 www.daktronics.com sales@daktronics.com

DP-06611 Project 1000 Rev 7 03 August 2014 DAKTRONICS, INC. Copyright 2006 All rights reserved. While every precaution has been taken in the preparation of this manual, the publisher assumes no responsibility for errors or omissions. No part of this book covered by the copyrights hereon may be reproduced or copied in any form or by any means graphic, electronic, or mechanical, including photocopying, taping, or information storage and retrieval systems without written permission of the publisher.

Table of Contents Section 1: Introduction and Purpose... 6 Section 2: Construction Site Safety Handbook... 7 Section 3: Subcontractor Responsibilities for Safety and Health Compliance... 8 Minimum Requirements... 8 Subcontractor Project Management... 9 Subcontractor's Safety Representative... 9 Subcontractor's Jobsite Superintendent... 10 Subcontractor's Employee Responsibilities... 10 Other Responsibilities... 11 Section 4: New Contractor Safety Orientation... 13 Section 5: Emergency Action Plan(s)... 14 Purpose... 14 Section 6: Heat Illness Prevention... 15 Purpose... 15 Applicability... 15 Scope... 15 General Work Practice... 15 Water... 15 Shade... 16 Rest Breaks... 16 Acclimatization... 16 Prompt Medical Attention... 16 Heat Related Illness and their Symptoms (identification and treatment)... 16 Field Procedures for Heat Stress Prevention (Table 6-1)... 18 Tips for Working in the Sun... 18 Heat and Humidity (Table 6-2)... 19 Section 7: First Aid Policy... 20 Section 8: Injury Reporting... 21 Purpose... 21

Section 9: Hazardous Communication Program... 22 Purpose -... 22 Chemical Inventory... 22 Container Labeling... 22 Safety Data Sheets (SDS)... 22 Employee Training... 23 Personal Protective Equipment... 23 Emergency Response... 23 Hazards of Non-Routine Tasks... 23 Informing Other Employees... 23 Posting... 23 Section 10: Daktronics Fall Arrest Protection Policy... 24 Purpose -... 24 When Fall Protection is REQUIRED:... 24 Other General Guidelines:... 25 Fall Protection Systems Criteria and Practices... 26 Pre-work Job Site Assessment... 30 Contractor Responsibilities Use of Fall Protection... 30 Fall Protection Systems Criteria and Practices Safety Nets... 33 Section 11: OSHA Inspections... 34 Opening and Closing Conference... 35 Conducting the Inspection Citation... 35 Closing conference... 35 Letter of Citation or Letter of no Citation... 36 Types of Violations... 36 Alternatives to Inspections... 36 Section 12: Safety Orientation... 37 Section 13: Emergency Action Plan... 42 Section 14: Personal Protective Equipment Hazard Assessment... 44 Section 15: Safety Communication Board... 46 Section 16: Daktronics Subcontractor Accident Investigation Report... 47 Section 17: Fall Protection Rescue Plan... 48 Section 18: Notice of Non-Compliance... 49

Section 19: Construction Jobsite Safety Inspection Checklist... 50 Section 20: Construction Training Requirements... 53 Section 21: Sub-Contractor Safety Information... 67 Section 22: Safe Work Plan Example... 69 Section 23: Critical Lift Permit... 70 Section 24: Instructions for Completing Critical Lift Permit... 71 Section 25: Lockout Tagout Program... 73 Section 26: Typical Minimal Lockout Procedure... 76 Section 27: Substance Abuse Policy - Alcohol... 78 Section 28: Substance Abuse Policy - Drug... 79 Section 29: Firearms / Weapons Policy... 80 Section 30: Environmental Protection Policy... 81 Section 31: Sexual Harassment Policy... 82 Section 32: Bomb Threat... 83 Section 33: Bomb Threat Call Checklist... 84

Section 1: Introduction and Purpose Daktronics, Inc. is committed to a safe project free of recognized hazards. To achieve this common goal, it is necessary that accident prevention efforts be clearly defined and maintained throughout the course of construction. The information in the Construction Site Safety Handbook shall not be construed to mean that Daktronics, Inc. has direct control over, or charge of, the acts or omissions of Subcontractors, its Subcontractors, their agents or employees, or any other person performing Subcontractor s work or portions thereof. If you have questions or comments you need to contact the Daktronics, Inc. Project Manager or Site Installation Supervisor. To ensure the safety and health of our employees, specific responsibilities have been assigned. These responsibilities include are assigned to management, supervisors and employees. These responsibilities include the following elements: Site Installation Supervisor: Communicate safe work practices regularly during the installation. Formally recognize outstanding safety performance by any/all personnel. Assist the Project Safety Officer or any other personnel with the safety process as needed or as requested. This can include formal worksite periodic inspections. Review on a regular or periodic basis incident reports, inspection report data, etc. so that these indicators of potential system deficiencies can be, reviewed or further assessed the root causes and considerations for improvement can be assessed. Uphold and enforce all known safe work practices. Ensure new-hire orientation is given to new employees, or is followed up at the work level Ensure employees are given training that includes safe work practices on equipment, tools, machines, processes, etc. Project Safety Officer Personally conduct--or designate a qualified personnel to conduct-- regular inspections of the workplace Conduct frequent (daily) work discussions prior to the start of work that include safe work practices Uphold and enforce safe work practices. This includes influencing safe behavior by positive reinforcement such as recognition of worker s safe work performance. Enforcement action can also influence safe behavior when applied towards workers who blatantly perform unsafe acts, or who continually perform in an unsafe manner. Investigate all incidents and take immediate corrective action to prevent re-occurrence Provide safety meetings on a regular basis and require attendance of all workers All Employees Are to follow safe work practices, and if they are unsure of what is the correct/safe way to perform a task or a job, they are to ask their foreman, supervisor or manager Must immediately report all unsafe equipment or tools to their foreman, supervisor or manager. This includes reporting unsafe behavior of other workers, if these workers are approached and remain unwilling to correct their unsafe actions or conditions. Are to uphold the safe work practices this company has established If injured on the job, or become ill, immediately inform their supervisor, or manager

Section 2: Construction Site Safety Handbook Daktronics, Inc. endeavors to provide a jobsite free of recognized hazards to our employees and subcontractors. In order to achieve this goal, it is necessary for all parties to work together to address and remedy the occupational hazards that we face every day on every jobsite. This Subcontractor Safety Handbook will set out the responsibilities of each party and describe how to fulfill those responsibilities. Meeting ever increasing regulatory requirements is demanding more time and effort from our employees than ever before. Like every other facet of business, better management of time and resources is necessary to keep this important issue from getting out of control. We have to devote more attention to the management of accidents and injuries in order to minimize losses, both monetary and personal. It is our goal to provide sufficient education and direction to allow our employees to perform their safety duties with a minimum of effort and confusion. When each person performs his or her duties pertaining to safety, the end result will be a significant reduction in accidents, greater productivity, lower insurance costs, and an increased competitiveness in our market. No less than our continued success is dependent on these issues. Because of the necessity of an effective safety program, the following management commitments have been established: To devote adequate and reasonable resources to providing safety support to each jobsite. To hold accountable each employee for the performance of his or her job duties pertaining to safety as set out in this manual. To review overall safety performance and assist in developing plans to remedied problem areas. That this company will abide by all applicable Occupational Health and Safety Standards appropriate for all jobsites. Any and all changes to this Subcontractor Safety Handbook must be approved by the Daktronics Project Manager and the Installation Supervisor. Project Manager: Date: (Sub-Contractor) Installation Supervisor: Date: (Daktronics)

Section 3: Subcontractor Responsibilities for Safety and Health Compliance The following sections of this document outline the responsibilities of subcontractors when completing work on Daktronics work-sites. Adherence to these requirements is expected from all sub-contractors. Minimum Requirements Complete and submit the Contractor Safety Information Questionnaire (Section 21:), prior to beginning any work. Complete and submit a written Project Specific Safety Plan. Which contains, at a minimum, the following: o A statement of the Employer's commitment to providing a safe and healthful workplace for all employees; o A statement of the Employer's ultimate responsibility for the implementation of the Safety and Health Plan; o New hire safety orientation training at the time of the initial hire of each new employee to the Project; o As applicable, safety and health training meetings for supervision and employees; o Specific assignment of responsibilities for jobsite safety and health inspections; o Complete Tool Box Safety meetings at least weekly; o At a minimum complete weekly inspections for the detection of hazardous conditions or hazardous work performance; o Procedures for the investigation and documentation of job-related accidents/incidents to determine possible cause, including a commitment to provide Daktronics with a copy of all accident/incident reports within 24 hours of knowledge of the occurrence; o Maintain procedures for recording and reporting of accidents/incidents in accordance with OSHA requirements, including the specific designation of the Management person responsible for review of accident/incident reports; o Maintain an emergency response plan that sets forth the procedures to be followed upon the occurrence of serious injuries, fatalities, structural failures, or other emergencies, including procedures for the administration of first aid and/or other necessary medical treatment; o Develop and implement a policy with procedures for disciplinary action for the enforcement of the Safety Plan requirements; o Implemented safety and health procedures must reference to all applicable federal, state and local safety and health laws and regulations; o The sub-contractors safety and health plan shall establish safe and healthful work practices for site specific hazards, i.e. fall protection, respiratory protection, confined spaces, excavations, Lock-Out/Tag-Out, scaffolding, steel erection, ETC. Written Safe Work Plans will be required in most instances (Section 22: is an example). o A commitment to assure that the Subcontractor's lower tier subcontractors will be required to comply with all matters pertaining to safety, including the appointment of a Safety Representative for each subcontractor. Submit a written Site Specific Hazard Communication program as well as Safety Data Sheets and an inventory list for ALL hazardous materials to the Daktronics Work Site Safety Specialist. Submit Certificates of Insurance, as required.

Submit name of the Project Manager and 24 hour emergency telephone numbers. Submit name and qualifications of the Safety Representative assigned to the Project. Submit names and qualifications of all OSHA designated "Competent and Qualified Persons," assigned to the Project. Submit name of the Corporate Safety Manager and telephone number. Submit required Permits for job operations to be performed on the Project. Submit names of all first aid and CPR trained employees. Submit location and number of first aid kits available to employees. Submit number and location of fire extinguishers. It is recommended, as a minimum, that a fire extinguisher be provided for each gang box. Subcontractor Project Management Ultimate responsibility for each subcontractor's portion of the Project Safety Program rests with the Subcontractor Project Management Oversee completion and completeness of the written Project Specific Safety Plan. Assure that the Safety Plan is being managed as specified. Review results of General Contractor Safety Audits. Provide necessary resources at the jobsite level for the implementation and enforcement of the Safety Plan. Respond in a timely manner to a Notice Of Non-Compliance (Section 18:) that has been issued to the Subcontractor for a Contract deficiency. Subcontractor's Safety Representative The Safety Representative: From commencement of Subcontractor's Work and at all times while Subcontractor's Work is being performed. Subcontractor shall have on the Job Site a designated, qualified and competent Safety Representative empowered to act on behalf of Subcontractor in all matters pertaining to safety. The Subcontractor Project Management will appoint the Subcontractor's Safety Representative, and will furnish Daktronics a written notice of the appointment prior to commencement of work. This person will be competent to recognize and abate actual and potential hazards on the jobsite as they pertain to the work, and workers on the jobsite. This person's duties shall consist of the following: Conduct safety orientation sessions for employees new to the site, prior to their beginning work. Maintain copies of documentation on file and available for Daktronics review. Conduct, participate in, or assist field supervisors with weekly tool box safety meetings. Maintain copies of documentation on file and available for Daktronics review. Attend the weekly Contractor Safety Meeting, conducted by subcontractor's or general contractor's personnel. Instruct and inform supervisors on safety rules and regulations. Instruct employees in the proper use and care of personal protective equipment Instruct employees concerning special procedures (e.g. confined space entry,. trenching/shoring, etc.). Conduct OSHA required training. A copy of Training Requirements In OSHA Standards (Section 20:) is included in this Handbook, it may assist in determining what training is required Keep copies of documentation on file and available for Daktronics review. Complete OSHA, state, federal, company, and project-specific reports. Initiate and coordinate all accident investigations. Complete accident investigation reports, and provide copies to Daktronics. Make periodic safety inspections (at a minimum, at least weekly) and initiate appropriate corrective action to obtain necessary compliance with all Safety Rules.

Maintain copies of documentation on file and available for Daktronics review. A copy of a Construction Job Site Safety Inspection Checklist is attached (Section 19:) that can be used as a minimum standard for inspections. Maintain copies of training documentation on file and available for Daktronics review. Implement site-specific safety policies and procedures. Maintain copies of documentation on file and available for Daktronics review. Coordinate transportation of employees with minor injuries to the designated Medical Clinic. Maintain an up-to-date OSHA Form 300. Keep copies of documentation on file and available for Daktronics review. Accompany Daktronics on periodic Safety Audits for the jobsite. Remain abreast of developments in the area of safety and be aware of all current State and Federal safety regulations applicable to the project. Attend all required safety training. Maintain all Emergency Telephone numbers. Ensure that they are posted conspicuously on the jobsite and in the trailer when appropriate. Submit copies to Daktronics Installation Supervisor. Complete and submit the Daktronics Subcontractor Accident/Injury Report Form/Monthly Recap. Subcontractor's Jobsite Superintendent Coordinate the work so that hazards are recognized and avoided and work is performed in the safest possible manner. Ensure that hazardous conditions are abated. Attend all required safety training and be familiar with the applicable standards for the jobsite in general and more specifically the work being performed. Subcontractor's Employee Responsibilities Report all unsafe conditions to their supervisor. Report all injuries to their supervisor promptly. Wear a hard hat, with Company name and/or logo, at all times on the jobsite. Use eye and face protection when required, or where there is reasonable possibility of injury. Dress Properly. Wear appropriate work clothes, gloves and sturdy work shoes or boots. Tennis shoes, running shoes, casual street shoes, sandals or shoes made of other thin material shall not be worn. Loose clothing and jewelry that presents a hazard shall not be worn. Sleeveless shirts, tank tops and shorts are not permitted. Do not operate any machine unless all guards and safety devices are in place and in proper working condition. Do not operate machinery if you are not a trained and authorized operator, and if you have not been directed to do so by your immediate supervisor. Keep all tools in safe working condition. Never use defective tools or equipment. Do not modify any tool to perform a function for which it was not intended. Properly care for and use all personal protective equipment as instructed in required training. Watch for overhead loads. Look for potential floor openings. Do not leave materials or scraps in aisles, walkways, roads or other means or points of access/egress. Practice good housekeeping at all times.

Participate and cooperate with the Project's Hazard Communication Program. Do not ride material hoists. Do not ride on moving equipment or vehicles, except on seats provided by the manufacturer. Do not report for work under the influence of intoxicating beverages or illegal drugs. Do not engage in horseplay or rough-housing. Comply at all times with all commonly recognized and understood safe work practices for the construction industry. All posted safety rules must be followed. Understand that violations of any of these rules will be cause for immediate disciplinary action, up to and including termination. Other Responsibilities Public Statements or News Releases No individual will make any comments or statements to the public other than Daktronics designated Personnel. Parties requesting any information shall be informed to contact Daktronics Project Manager. If questioned by representatives of TV, newspapers, or other media, OSHA or insurance investigators, or any other party, no response shall be made, and those representatives shall contact the Daktronics Project Manager. Housekeeping Per Section 16 of "SUBCONTRACTOR AGREEMENT": Cleaning. 16.1 Subcontractor's Duty to Clean Up: Subcontractor, daily, shall clean and remove from the Project and lawfully dispose of any dirt, marks, grease, surplus materials, obstructions, hindrances or debris resulting from Subcontractor Work. Additional section 16.2 Daktronics Rights if Subcontractor Does Not Adequately Clean: If Subcontractor fails to perform necessary or required clean up during the course of and at completion of its Work, upon twenty-four (24) hours written notice to Subcontractor, Daktronics may provide such clean up work on "behalf of Subcontractor and charge Subcontractor for the costs incurred, plus ten percent (10%) for overhead and ten percent (10%) for profit." Perimeter Protection Perimeter protection railing systems at unprotected sides and edges, floor openings, and elevator shafts will be provided for the safety of all trades working on this project. If any railing system needs to be removed by a Subcontractor while performing scheduled work in a specific area, it shall solely be that Subcontractor's responsibility to maintain and replace any and all of the railing systems to their original condition. Subcontractor shall ensure fall protection is maintained at all times while the perimeter railing system is removed. In the event Subcontractor fails to comply with the provisions if this requirement, Subcontractor shall bear all costs, liabilities, and damages, without limitation, arising from its negligence; including at Daktronics sole discretion and without notice, any and all costs of performance of this work by Daktronics. Cranes and Critical Picks Employer shall comply with manufacturer's specifications and limitations for crane operations. Instructions and warnings shall be visible to the operator at control station. Rated load capacities, operating speed, hazard warnings shall be conspicuously posted on all equipment. Hand signals to crane operator shall be those prescribed by the applicable ANSI standard for type of crane in use. Copy of the signals shall be posted at job site and maintained with the

crane and at each landing location. Crane operator shall take signals from one person only, except the emergency stop signal that is taken from anyone. Employer shall designate a competent person to conduct inspection of crane prior to use each day, and during use, to make sure it is in safety operating condition. Inspection shall be in writing and a copy maintained with crane. Deficiencies shall be repaired or defective parts replaced before continued use. Monthly inspections will be completed A thorough, annual/comprehensive inspection of the hoisting machinery shall be made by a competent person, or by a qualified organization. The employer shall maintain a record of the dates and results of the inspections for each hoisting machine and piece of equipment for a period of twelve months. Barricades shall be installed around the accessible areas of crane's swing radius. Fire extinguisher of 5 BC rating or higher shall be available at the operator stations or cabs. A Critical Lift Permit (Section 23:) shall be written and submitted to Daktronics Project Management prior to any lift that meets any the following criteria: A lift that exceeds 75% of the crane s rated capacity for the crane configuration. Any lift utilizing more than one crane. Any lift in an inherently hazardous location or under severe weather or emergency conditions. Any lift in which the crane working clearances to adjacent equipment or electrical power lines are within plus 10% of minimum clearances specified in applicable ANSI standards. Any lift when unconventional rigging, attachments, or methods are employed. Any lift where error or equipment failure could cause significant property loss or loss of human life. Lockout Tagout To ensure employees of the subcontractor (including adjacent employees) are effectively protected during the servicing of electrical, hydrollic and pneumatic systems, Lockout Tagout must be utilized. An example Lockout/Tagout can be reference in Section 25 of this document. Effected employees shall be trained in the developed procedures.

Section 4: New Contractor Safety Orientation All Subcontractor employees will be given a concise, well-planned orientation before being allowed to work on a Daktronics Project. This orientation will include general safe work practices as set out in this Handbook, and will be presented to each employee and he/she will be required to sign an Attendance Roster to acknowledge understanding of the procedures before he/she begins work on a project. Subcontractor shall maintain the Attendance Rosters and make them available for Daktronics review. The New Hire Safety Orientation, for all subcontractors employee(s), shall be the sole responsibility of the Subcontractor. The Orientation, as a minimum, shall cover the applicable information contained in the Safety Orientation section (Section 12:) of this Handbook. When Subcontractors are working on Daktronics campus locations a copy of the Subcontractors Safety Guide (DD1687281) will be reviewed and signed. The Job Site Safety Specialist will maintain a signed copy of this document.

Section 5: Emergency Action Plan(s) Purpose The purpose of this program element is to ensure effective and consistent report of work site emergencies and injuries. This section establishes guidelines and recommendations for subcontractors and Daktronics employees. Daktronics employees must also the additional Emergency Action Plan document: ED-11957. The Emergency Action Plan for the Project is the responsibility of the Daktronics Project Manager. A sample Project Emergency Action Plan is attached (Section 13:). All employees are to assist in whatever way is necessary during an emergency. The goals in any emergency are as follows: 1.) Obtain care for anyone who is injured. 2.) Stabilize any hazardous conditions. 3.) Minimize damage to property. 4.) Notify the appropriate parties. 5.) Conduct an extensive accident investigation. Subcontractor Reporting Subcontractors and their employees are responsible for reporting ALL emergency issues to Daktronics immediately, and to assist and cooperate in any way possible to alleviate the situation. Examples of the types of emergencies that must be reported are; Any accident/injury involving a Subcontractor employee. All incidents of a serious nature (requiring medical care or damage to property involving any jobsite). All incidents involving ANY fatality(ies) that are associated with a jobsite in any way. Any potentially serious injury, fatal, or near miss situations. These situations would include contact with high voltage power lines, a fall from above 6' where the employee was caught by his lanyard and harness, collapse or upset of equipment, structural failure of any portion of the building, any incident involving the general public, etc. Any incident with foreseeable result in liability to the subcontractor, Daktronics, or the Owner; or lawsuits involving the same. Daktronics Reporting Requirements All Daktronics employees are expected and responsible for reporting emergencies to the Installation Supervisor and to assist and cooperate in any way possible to alleviate the situation. Any accident/injury involving a Daktronics employee. Daktronics accident/incident forms must be completed by the employees supervisor. All incidents of a serious nature (requiring medical care or damage to property involving any jobsite). All incidents involving ANY fatality(ies) that are associated with a jobsite in any way. Any potentially serious injury, fatal, or near miss situations. These situations would include contact with high voltage power lines, a fall from above 6' where the employee was caught by his lanyard and harness, collapse or upset of equipment, structural failure of any portion of the building, any incident involving the general public, etc. Any incident with foreseeable result in liability to Daktronics, or the Owner; or lawsuits involving the same.

Section 6: Heat Illness Prevention Purpose Working in hot environments, outdoors or while wearing varying levels of personal protective equipment can pose special hazards regarding sun exposure and heat stress. Daktronics Company employees and subcontractors must protect themselves against heat and sun exposure. This document establishes guidelines and recommendations regarding the prevention of heat stress related injuries and illnesses. Applicability Daktronics Companies employees may follow customer's Heat Stress Policy provided Daktronics Companies employees are trained in their procedures and meets and or exceeds our program requirements. Scope Action needs be taken to effectively reduce heat illness risk when working in hot and humid conditions. General Work Practice Supervisor Responsibility Supervisors must consider the potential for heat stress associated with work in their areas. They should understand their role in heat stress management and the principals of preventing heat illness in their area of responsibility. Specific responsibilities for supervisors include, but are not limited to: Assess Conditions - All supervisors are to assess the temperature for each specific project at the job site. Temperature change occurs often, so it is important to assess the temperature throughout the day. o Table 6-1 Field Procedures for Heat Stress Prevention o Table 6-2 Heat and Humidity Table Guidelines as Part of Job Planning o Ensure workers have received awareness training. o Ensure workers have access to sufficient quantity of water during the entire work shift. o Remind individuals to start drinking fluids at the beginning of the work period. o Allow employees to adequately acclimate themselves to the heat. Introduce new personnel, or personnel who have not been accustomed to wearing fire retardant or impermeable clothing, to heat exposure gradually. o When practical, have employees work in the shade. Exposure to full sunshine can increase the heat load on the individual. Providing an awning or tarp, umbrella, or other shade will reduce the radiant heat load. o Provide access to shade to protect personnel during rest periods. o Consider performing the hardest work early in the morning and saving the lighter work for the warmer time of day. o Be aware that use of some heat stress controls (external and personal cooling devices) will require advanced planning o Modify work/rest schedules according to temperature and workload. o Rotate personnel; alternate job functions to minimize overstress or overexertion at one task. Water There must be an adequate supply of clean, cool, potable water. Employees who are working in the heat need to begin drinking water at the start of the shift, and continue to drink 3-4 glasses or at least one 8- ounce cup of water every 15 minutes, to prevent excessive loss of body fluids and replace the water lost to sweat. This means, for an eight-hour day two or more gallons per person must be provided. Thirst is an

unreliable indicator of dehydration. Employees often need ongoing encouragement to consume adequate fluids, especially when the workload or process does not encourage breaks. Shade The direct heat of the sun can add as much as 15 degrees to the heat index and increase the heat load on an individual. When practical, work should be performed in the shade. If not, shaded areas such as an awning, tarp, umbrella, or other shade should be provided for breaks or when employees need relief from the sun. Wide brimmed hats can also decrease the impact of direct heat. Rest Breaks Rest breaks are important to reduce internal heat load and provide time for cooling. Heat illness occurs due to a combination of environmental and internal heat that cannot be adequately dissipated. Breaks should be taken in cooler, shaded areas. Rest breaks also provide an opportunity to drink water. Acclimatization People need time for their bodies to adjust to working in heat. This acclimatization is particularly important for employees returning to work after: a prolonged absence, recent illness, or Recently moving from a cool to a hot climate. For heavy work under very hot conditions, a period of 4 to 10 days of progressively increasing work time starting with about 2 hours work per day under the working conditions is recommended. For less severe conditions at least the first 2 or 3 days of work in the heat should be limited to 2 to 4 hours. Employees must be monitored closely for signs and symptoms of heat illness, particularly when they have not been working in heat for the last few days, and when a heat wave occurs. Prompt Medical Attention Recognizing the symptoms of heat illness and providing an effective response requires promptly acting on early warning signs. Common early symptoms and signs of heat illness include headache, muscle cramps, and unusual fatigue. However, progression to more serious illness can be rapid and can include unusual behavior, nausea/vomiting, weakness, rapid pulse, excessive sweating or hot dry skin, seizures, and fainting or loss of consciousness. Heat Related Illness and their Symptoms (identification and treatment) Even the initial symptoms may indicate serious heat exposure. If medical personnel are not immediately available on-site, and you suspect severe heat illness, you must call 911. Regardless of the worker s protests, no employee with any of the symptoms of possible serious heat illness noted above should be sent home or left unattended without medical assessment and authorization.

Type of Heat Stress Symptoms Treatment Heat Rash Red bumpy rash with severe Change into dry clothes and itching avoid hot environments. Rinse Sunburn Heat Cramps Fainting Heat Exhaustion Heat Stroke Red, painful, or blistering and peeling skin Painful cramps in legs, stomach, or arms. Cramps may be an indication of a more serious condition. Sudden loss of consciousness after at least two hours of work; cool moist skin and a weak pulse Heavy sweating, cool moist skin, weak pulse; person is tired, weak, or confused and complains of thirst; vision may be blurred. Person may be confused, weak, clumsy, tired, or acting strangely. Skin is flushed, red, and dry; fast pulse; headache or dizziness. Person may lose consciousness. skin with cool water. If the skin blisters, seek medical aid. Use skin lotions (avoid anesthetics) and work in shade if possible. Move to cool area, loosen tight or restrictive clothing. Drink fluid replacement to replenish vital nutrients. If cramps continue, seek medical attention. Get medical aid immediately. Assess breathing and heart rate. Loosen tight or restrictive clothing. If person regains consciousness, offer sips of cool water. Get medical aid immediately. This condition can progress quickly to heat stroke. Move person to cool shaded area. Remove excess clothing, spray with cool water, and fan to increase cooling. Deliver ongoing care until medical aid is provided. Get medical aid immediately. Time is very important. Remove excess clothing, spray with cool water, and fan to increase cooling. If person loses consciousness, monitor breathing and heart rate. Place person in recovery position. Deliver ongoing care until medical aid is provided.

Field Procedures for Heat Stress Prevention (Table 6-1) The following table below provides recommended action steps to be taken when working in ambient temperatures when wearing regular clothing and when wearing additional Personal Protective Equipment. Ambient Temp. ( F) wearing regular clothing Ambient Temp. ( F) wearing PPE Recommended Action Steps <80 <70 - No specific heat stress action steps. 80-90 70-80 - Fluids mandatory; workers should - drink 8 ounces every 15 min. - Periodic breaks - Access to shade - Monitoring of individuals for - symptoms by supervisor 90-100 80-90 - Recommended work/rest - schedule of 45 min/15 min - Fluids mandatory; workers should - Drink 8 ounces every 15 min. - Use shading - Monitoring of individuals for - symptoms by supervisor 100-110 90-100 - Recommended work/rest - schedule of 30 min/30 min - Fluids mandatory; workers should - drink 8 ounces every 15 min - Use shading - Monitoring of individuals for - symptoms by supervisor External cooling devices Reflective barriers for radiant heat External cooling devices Use personal cooling devices Plan work at cooler times Tips for Working in the Sun Sunlight contains ultraviolet (UV) radiation, which causes premature aging of the skin, wrinkles, cataracts, and skin cancer. There are no safe UV rays or safe suntans. People who burn easily must be very diligent about the amount of sun exposure they get. People with the following physical features must be especially careful: numerous, irregular or large moles; freckles; fair skin; or blond, red, or light brown hair. How to block harmful rays while working: Cover up wear your PPE with sleeves rolled down Use sunscreen a sun protection factor (SPF) of at least 15, blocks 93 percent of UV rays. Be sure to follow application directions on the bottle or tube.

Wear a hat your head should be covered at all times. Wear UV-absorbent safety glasses most shaded safety glasses are made to protect you from 99-100% of UVA and UVB. Heat and Humidity (Table 6-2) The combination of heat and humidity can significantly increase the risk of heat illness. The following table below represents the apparent temperature when the relative humidity is increased. Air Temperature 70 75 80 85 90 95 100 105 110 Relative Apparent Temperature Humidity 0 64 69 73 78 83 87 91 95 99 10 65 70 75 80 85 90 95 100 105 20 66 72 77 82 87 93 99 105 112 30 67 73 78 84 90 96 104 113 123 40 68 74 79 86 93 101 110 122 50 69 75 81 88 96 107 120 60 70 76 82 90 100 114 132 70 70 77 85 93 106 124 80 71 78 86 97 113 136 90 71 79 88 102 122 100 72 80 91 108 133

Section 7: First Aid Policy Purpose Daktronics, Inc. require that each construction jobsite make provisions for "prompt medical attention in case of serious injury". On most of our Projects, the emergency medical provider will be the local Fire Department due to their response time and close proximity to the site. We recognize, however, that most of the injuries sustained on any given jobsite are not life threatening, and that adequate First Aid care immediately after the injury can help minimize the damage done. Each subcontractor must comply with the requirements set forth in the OSHA Standards 29 CFR 1926.23 and 29 CFR 1926.50. All employees will be instructed at orientation that they are required to report to their Supervision if they feel that they have been exposed to any bodily fluids other than their own. Each person who receives First Aid/CPR training through their employer should be advised of the following: This policy on providing First Aid. The potential hazards of providing First Aid/CPR and. The precautions that they should take if they choose to provide care. The location of equipment and materials that are made available on every jobsite to protect them from blood borne and other pathogens. The provisions of the Good Samaritan Act. The requirement to report any exposure to blood or other bodily fluids in the course of their employment. What measures the Subcontractor will take in the event of an exposure, i.e., providing a hepatitis vaccine, testing for hepatitis, tuberculosis, HIV, etc. First Aid Supplies There will be adequate first aid supplies and/or an adequate first aid kit available at each workplace. Each subcontractor is required to provide sufficient First Aid provisions (kits) that are easily accessible to their employees when required. Blood Cleanup In the event that the incident resulted in blood loss the contaminated work surface will need to be disinfected. During clean-up procedures outline in the Daktronics Bloodborne Pathogens program (ED- 07596) will need to be followed. If you don't have a Bloodborne Pathogen Cleanup Kit available, or have any questions, comments or suggestions regarding the clean-up process, please call Daktronics Environmental Health & Safety at 605-692-0200.

Section 8: Injury Reporting Purpose The section outlines the roles and responsibility for the reporting of job site injuries. These roles and responsibilities apply to both Daktronics and sub-contractors employees. Adherence to these requirements and effective communication between both Daktronics and sub-contractors will reduce the possibility of a similar incident occurring. 1.) Sub-Contractor responsibilities All injuries sustained by subcontractor employees shall be reported to their immediate supervisor and the Subcontractor's Safety Representative immediately. The Safety Representative shall be responsible for arranging for medical attention (if required), conducting an accident investigation, notifying Daktronics, and completing the required documentation. If the Subcontractor does not have an Accident/Incident Investigation Report that meets the requirements of (Section 16:), then they shall be required to use the Section 16 when reporting an injury/incident to Daktronics. Unless any law or requirement of the Contract Documents requires earlier notice, Subcontractor shall deliver copies of all accident and injury reports (from itself and from all of its subcontractors or suppliers) to Daktronics and any other person or entity entitled thereto by applicable law, this Subcontract or the Contract Documents within twenty-four (24) hours of occurrence. 2.) Daktronics employees All injuries sustained by Daktronics employees shall be reported to their immediate supervisor immediately. The Project Manager or Site Installation Supervisor shall be responsible for arranging for medical attention (if required), conducting an accident investigation, and completing the required documentation.

Section 9: Hazardous Communication Program Purpose - This program has been developed to enhance employees understanding of the Hazardous Communication standard. This program has been prepared to comply with the requirements of the Federal OSHA standard and to insure that information necessary for the safe use, handling, and storage of hazardous chemicals is provided to and made available to employees. This written program includes guidelines on identification of chemical hazards and the preparation and proper use of containers, labels, placards, and other types of warning devices. Chemical Inventory 1. Daktronics, Inc., maintains an inventory of all known chemicals in use on the worksite. A chemical inventory list is available from Daktronics, Inc. (Daktronics). 2. Hazardous chemicals brought onto the worksite by Daktronics will be included on the hazardous chemical inventory list. Container Labeling 1. All Daktronics chemicals on the worksite will be stored in their original or approved containers with a proper label attached, except small quantities for immediate use. Any container not properly labeled should be immediately identified to the Daktronics Manufacturing Manager (DMM) for labeling or proper disposal. 2. Workers may dispense chemicals from original containers only in small quantities intended for immediate use. Any chemical left after work is completed must be returned to the original container or Daktronics Supervision for proper handling. 3. No unmarked containers of any size are to be left in the work area unattended. 4. Daktronics will rely on manufacturer applied labels whenever possible, and will ensure that these labels are maintained. Containers that are not labeled or on which the manufacturer's label has been removed will be relabeled. 5. Daktronics will ensure that each container is labeled with the identity of the hazardous chemical contained and any appropriate hazard warning. Safety Data Sheets (SDS) 1. Employees working with a Hazardous Chemical may request a copy of a SDS. Requests for SDS sheets should be made to Daktronics Environmental Safety and Health Department. Additional, SDS s can be accessed at the following Daktronics, Inc. web site: http://www.daktronics.msdss.com/msdssearch.aspx?fm=0

2. SDS should be available and-standard chemical reference may also be available on the site to provide immediate reference to chemical safety information. 3. An emergency procedure to gain access to SDS sheets information will be established. Employee Training Employees will be trained to work safely with hazardous chemicals. Employee training will include: (1) Methods that may be used to detect a release of a hazardous chemical(s) in the workplace, (2) Physical and health hazards associated with chemicals, (3) Protective measures to be taken, (4) Safe Work practices, emergency responses and use of personal protective equipment, (5) Information on the Hazardous Communication Standard including: Labeling and warning systems, and An explanation of Material Safety Data Sheets. Personal Protective Equipment To ensure effective protection when handling and utilizing chemicals, personal protective equipment maybe required. Personal protective equipment requirements will be outlined on the products Safety Data Sheets. Required PPE will be available from the Daktronics Installation Supervisor. Any employee issued Personal Protective Equipment, but found in violation of PPE requirements shall be subject to retaining, and possibility of disciplinary actions up to and including discharge. Emergency Response 1. Any incident of overexposure or a spill of a hazardous chemical/substance must be reported to Daktronics Project Safety Officer. 2. The foreman or the immediate supervisor will be responsible for insuring that proper emergency response actions are taken in leak/spill situations. Hazards of Non-Routine Tasks 1. Supervisors will inform employees of any special tasks that may arise which would involve possible exposure to hazardous chemicals. 2. Review of safe work procedures and use of required PPE will be conducted prior to the start of such tasks. Where necessary, areas will be posted to indicate the nature of the hazard involved. Informing Other Employees 1. Other on-site employers are required to adhere to the provisions of the Hazard Communication Standard. 2. Information on hazardous chemicals known to be present will be exchanged with other employers. Employers will be responsible for providing necessary information to their employees. 3. Other on-site employers will be provided with a copy of Daktronics Hazard Communication Program. Posting Daktronics, Inc., has posted information for its employees at this jobsite on the Hazard Communication Standard. More information on the Hazard Communication Standard may be obtained by contacting your Supervisor or the Project Safety Officer.

Section 10: Daktronics Fall Arrest Protection Policy Purpose - To prevent the occurrence of death and or serious injury Daktronics, Inc. has implemented a fall protection program. This fall protection program requires 100 percent usage of fall protection and or other suitable methods such as railings, cabling or other suitable barrier methods. Strict conformance with this policy is an obligation of all Daktronics, Inc. employees and sub-contractors. This manual will help you to instruct Daktronics on-site employees on the uses and limitations of fall protection. Note: This manual is only intended as a guide, not as a strict set of steps. If needed, steps may be changed or added. This manual includes the following sections: 1. Construction Fall Protection: addresses Daktronics policies and OSHA regulations on fall arrest protection and goes over different fall arrest protection equipment used on-site. 2. Definitions: 3. Appendix: contains a copy of the Fall Protection Sign-Off Sheet (DF-1813), the Safety Inspection List (DF-2172) and tests given with answers. When Fall Protection is REQUIRED: To insure the protection of Daktronics employees and subcontractors the following fall protection procedures must be followed: 1. Unprotected sides and edges: Each employee on a walking/working surface (horizontal and vertical surface) with an unprotected side or edge which is 6 feet (1.8 m) or more above a lower level shall be protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems. 2. Leading edges: a) Each employee who is constructing a leading edge 6 feet (1.8 m) or more above lower levels shall be protected from falling by guardrail systems, safety net systems, or personal fall arrest systems. Exception: When the employer can demonstrate that it is infeasible or creates a greater hazard to use these systems, the employer shall develop and implement a fall protection plan that meets the requirements of paragraph (k) of 1926.502. b) Each employee on a walking/working surface 6 feet (1.8 m) or more above a lower level where leading edges are under construction, but who is not engaged in the leading edge work, shall be protected from falling by a guardrail system, safety net system, or personal fall arrest system. If a guard rail system is chosen to provide fall protection, and a controlled access zone has already been established for leading edge work, the control line may be used in lieu of a guardrail along the edge that parallels the leading edge. 3. Hoist areas: Each employee in a hoist area shall be protected from falling 6 feet (1.8 m) or more to lower levels by guardrail systems or personal fall arrest systems. If guardrail systems (or chain, gate or guardrail) or portions thereof are removed to facilitate the hoisting operation, (e.g., during landing of materials) and an employee must lean through the access opening or out over the edge of the access opening (to receive or guide materials and equipment, for example) that employee shall be protected from fall hazards by a personal fall arrest system. 4. Holes: a. Each employee on walking/working surfaces shall be protected from falling through holes (including skylights) more than 6 feet (1.8 m) above lower levels, by personal fall arrest systems, covers, or guardrail systems erected around such holes.

b. Each employee on a walking/working surface shall be protected from tripping in or stepping into or through holes (including skylights) by covers. c. Each employee on a walking/working surface shall be protected from objects falling through holes (including skylights) by covers. 5. Formwork and reinforcing steel: Each employee on the face of formwork or reinforcing steel shall be protected from falling 6 feet (1.8 m) or more to lower levels by personal fall arrest systems, safety net systems, or positioning device systems. 6. Ramps, runways and other walkways: Each employee on ramps, runways, and other walkways shall be protected from falling 6 feet (1.8 m) or more on to lower levels by guardrail systems. 7. Excavations: a) Each employee at the edge of an excavation 6 feet (1.8 m) or more in depth shall be protected from falling by guardrail systems, fences or barricades when the excavations are not readily seen because of plant growth or other visual barrier. b) Each employee at the edge of a well, pit, shaft and similar excavation 6 feet (1.8 m) or more in depth shall be protected from falling by guardrail systems, fences, barricades or covers. 8. Dangerous Equipment: a) Each employee less than 6 feet (1.8 m) above dangerous equipment shall be protected from falling into or onto the dangerous equipment by guardrail systems or equipment guards. b) Each employee 6 feet (1.8 m) or more above dangerous equipment shall be protected from fall hazards by guardrail systems, personal fall arrest systems, or safety net systems. 9. Wall Openings: Each employee working on, at, above, or near wall openings (including those with chutes attached) where the outside bottom edge of the wall opening is 6 feet (1.8 m) or more above lower levels and the inside bottom edge of the wall opening is less than 39 inches (1.0 m) above the walking/working surface, shall be protected from falling by use of a guardrail system, a safety net system, or a personal fall arrest system. 10. Walking/Working Surfaces not otherwise addressed: Except as provided in 1926.500(a)(2) or in 1926.501(b)(1) through (b)(14), each employee on a walking/working surface 6 feet (1.8 m) or more above lower levels shall be protected from falling by a guardrail system, safety net system, or personal fall arrest system. 11. Protection from Falling Objects: a) Erect toeboards, screens, or guardrail systems to prevent objects from falling from higher levels; or b) Erect a canopy structure and keep potential falling objects far enough from the edge of the higher level so that those objects would not go over the edge if they were accidentally displaced; or c) Barricade the area to which objects could fall, prohibit employees from entering the barricaded area, and keep objects that may fall far enough away from the edge of a higher level so that those Other General Guidelines: Employees are expected to use fall arrest protection when: Working in a Condor Articulating Lift Working on floats or other unguarded scaffolds or platforms Riding in a skip box (man basket) or using a skip box as a suspended work platform Stationary, moving or climbing in any difficult or dangerous position where one slip of a hand or foot would mean a serious fall Catenaries (horizontal lifelines) are provided for snapping off while moving Performing any task that is 6-feet or higher in Construction settings. Use guarded walkways to get to and from work areas. Do not take short cuts through unguarded areas when protection is available. Tie off when lifelines are provided in place of guardrails, even when moving from one place to another. Tie off or use other fall protection when 6-feet or higher in Construction settings. Check caution devices, including: