SPRINGFIELD REVITALIZATION REPORT

Similar documents
Table #6 VISION CHARACTERISTICS

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

Executive Summary Route 30 Corridor Master Plan

S T A T I O N A R E A P L A N

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

5 Circulation & Parking

Non-Motorized Transportation 7-1

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Basalt Creek Transportation Refinement Plan Recommendations

Prince George s County plans, policies, and projects

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

COMPLETE STREETS PLANNER S PORTFOLIO

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Huntington Station Metro Zone / North Kings Highway Concept Plan

STONY PLAIN ROAD STREETSCAPE

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Lynchburg District Update

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

TECHNICAL MEMORANDUM. Introduction

DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Y O R K R O A D. Baltimore, Maryland. ULI Technical Assistance Panel June 18 & 19, York Road Technical Assistance Panel

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

PRIORITIES RESULTS YOUR PRIORITIES FOR BRIDGEPORT 5% 4% 13% RESIDENTIAL CHOICES TRAILS & PARKS

New Park Avenue Corridor West Hartford

Transportation Management Program Office Newsletter N O V E M B E R

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

PenPlace SPRC #6. September 27, DRAFT

Ann Arbor Downtown Street Plan

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

Streetscape: Core Shopping District

BROOKLAND Multi-Modal Transportation & Streetscape Study* NE Washington, DC

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Transportation Management Program Office Newsletter J U L Y

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Appendix C 3. Bicycle / Pedestrian Planning

PRESS RELEASE San Joaquin Council of Governments

2045 Long Range Transportation Plan. Summary of Draft

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Chapter 3: Multi-Modal Circulation and Streetscapes

McLean Main Street Public Forum Follow-up

10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014

KEARNY MESA COMMUNITY PLAN UPDATE

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

San Jose Transportation Policy

Clackamas County Comprehensive Plan

Complete Streets. Designing Streets for Everyone. Sarnia

MASTER BICYCLE AND PEDESTRIAN PLAN

Thesis Presentation. Moorhead City Walk: A Master Plan to Reimage Moorhead, Minnesota s Urban Core. Brad Garcia Advisors: Jason Kost & Dominic Fischer

Chapter 5 Future Transportation

CONNECTING PEOPLE TO PLACES

TRANSPORTATION & MOBILITY

NJDOT Complete Streets Checklist

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Project Narrative. Albuquerque, NM. July 31, 2015

See Figure 38, Existing Nonmotorized Connections.

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Public Opinion about Transportation Issues in Northern Virginia

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Crystal City Citizen Review Council Meeting. July 10, 2013

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

This page intentionally left blank.

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

Transforming the. Michigan Avenue Corridor. a complete streets and transit-oriented development study Michigan State University Student Research Team

Omaha s Complete Streets Policy

Land Use and Transportation Town Hall September 17, 2018

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

Draft Recommended List of Potential Projects

Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

Project Description Form 8EE

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

Linking Transportation and Health in Nashville & Middle Tennessee

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Illustrated Principles of Good Planning

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Transportation Corridor Studies: Summary of Recommendations

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Martha Coello, Fairfax County DOT Jeffrey Hermann, Fairfax County DOT Abi Lerner, VDOT. May 19, 2014

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Fulton Market Streetscape

ARLINGTON COUNTY, VIRGINIA

Existing Pedestrian Conditions. PSAC February 8, 2011

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

Public Information Meeting. Warren County Pathway Corridor Project September 27, 2018

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Paoli Road Improvement Feasibility Study

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015

Development of Arlington County s Marked Crosswalk Guidelines. Jon Lawler, P.E. Design Engineer Arlington County, VA

County of Fairfax, Virginia. Department of Transportation

Transcription:

SPRINGFIELD REVITALIZATION REPORT August 2015 Homewood Suites Springfield Town Center Promenade

2 SPRINGFIELD OVERVIEW This report covers recent development activity in the Springfield Commercial Revitalization District (CRD) and the Franconia-Springfield Transit Station Area (TSA), collectively referred to as Central Springfield. The 250 acre Springfield CRD is located south and west of the I-495 and I-95 interchange and contains a mixture of retail, office, and residential uses. The 676 acre Franconia-Springfield TSA is located southeast of the I-95 and Old Keene Mill Road/Franconia Road interchange, and contains a number of distinctive commercial and institutional uses, including the Springfield Town Center, the General Service Administration (GSA) Warehouse one of three sites under consideration for the future home of the Federal Bureau of Investigation (FBI), the NOVA Medical Education Campus, and the future Metro Center II office park development. The Joe Alexander Transportation Center is located at the heart of the Franconia-Springfield TSA, and collocates Metro, VRE, local bus, and Greyhound, in one facility. The transit hub along with the rebuilt I-95 interchange and redesigned travel ramps, provide significant advantages with respect to location and regional transportation access for Central Springfield. A vision for Central Springfield as a walkable, well connected, urban village was established in the 2008 "Springfield Connectivity Study". This vision included changing land uses and increasing intensities within the CRD and portions of the TSA to spur redevelopment. New development would be supported by transportation infrastructure improvements, and guided by high quality urban design, streetscape, and placemaking. Recommendations from this study were adopted into the Comprehensive Plan by the Board of Supervisors in 2010. Since the Springfield Connectivity Study was adopted, several sites have redeveloped, beginning implementation of the urban design goals encouraged in the Study. DEVELOPMENT ACTIVITY The Springfield CRD and the Franconia-Springfield TSA have approximately 10,276,213 square feet (SF) of existing development. Of this amount, approximately 7,485,002 SF or 7 3 %, i s c o m m e r c i a l development, which include r en ta l a pa r tmen ts, and 1,122,303 SF, or 11%, is nona p a r t m e n t r e s i d e n t i a l development. More information on each development can be obtained through the County s Land Development System, found online at: http://ldsnet.fairfaxcounty.gov/ ldsnet Springfield CRD and TSA Development Activity Map Springfield Town Center Grand

3 DEVELOPMENT ACTIVITY Plan Amendment/Rezoning/Site Plan Number (Approval Date/Status) 1) FRANCONIA TWO, LP RZ/FDP 2007-LE-007 (app. 2/12/2009) 7463-RGP-003 (approved 8/7/2012) 7463-SP-006 (approved 1/31/2013) (Phase I complete 2014) 2) DDR SOUTHEAST SPRING MALL SE 2013-LE-003 (approved 1/19/2013) 3) MTPD SUBSTATION SEA 91-L-053-06 (approved 5/22/2012) 9990-SP-007-2 (approved 1/27/2014) 9990-RGP-001 (approved 7/19/2013) (construction complete 2015) 4) SPRINGFIELD METRO CENTER II, LLC PCA/CDPA/FDPA 2011-LE-022 (under review) RZ/FDP 2011-LE-022 (app. 5/1/2012) PCA 2008-LE-015 (approved 5/1/2012) 5) SUNOCO, INC (R & M) SEA 90-L-045-3 (approved 9/25/2012) PCA 90-L-050-2 (approved 9/25/2012) 8355-SP-002-3 (approved 2/26/2015) 6) WPPI SPRINGFIELD HS, LLC RZ/FDP 2010-LE-013 (app. 6/7/2011) 4072-SP-004 (approved 4/16/12) (opened March, 2013) 7) SUNOCO, INC (R & M) SEA 89-L-080 (approved 12/7/2009) 8532-SP-002 (approved 9/2/2010) (construction complete 2012) 8) YAVARI BUILDING 3108-SP-002 (approved 5/11/11) (construction complete 2012) 9) SPRINGFIELD PLAZA, LLC SE 2010-LE-011 (approved 10/19/2010) 3018-MSP-001 (approved 5/5/2011) 10) BACKLICK SHOPPING CENTER, LLC 2865-MSP-001 (approved 7/11/2011) (construction complete 2012) Springfield CRD Development Activity Redevelopment plans for the Springfield Town Center include 1.3 million SF of retail space. Phase I renovations to the interior and exterior of the existing mall structure and improvements to public facilities including new bicycle and pedestrian connections to the Metro and a new plaza have been completed. Approval of a Special Exception to continue the use of an existing retail site as a fast-food restaurant. New planting beds and screening will be added to the existing surface parking lot area. Approval to construct a 54,000 SF Metro Transit Police Department sub-station and training facility. Approval to construct a 992,000 SF, three building office park with structured parking and a pocket park near the pedestrian connection to the Franconia-Springfield Metro Station. Approval of a Special Exception Amendment to permit the existing Sunoco service station to be expanded and upgraded. Approval of a Rezoning for the development of an approximately 120,000 SF, LEED silver certified, Homewood Suites hotel with 165 guest rooms and structured parking. Approval to expand a service station and convert auto repair bays into a quick-service food store. Approval to demolish a vacant retail site and construct a 5,000 SF structure with three retail bays. Approval of a Special Exception to establish a Panda Express fast-food restaurant within a vacant structure at Springfield Plaza. Approval of a Minor Site Plan to demolish a pad building and construct interior renovations to a Chick-fil-A fast-food restaurant in the Backlick Shopping Center.

4 TRANSPORTATION INITIATIVES A number of significant transportation related activities and studies were completed or active. 1. Frontier Drive Extension Study. This 2012 study considered whether a Frontier Drive extension could be constructed while maintaining adequate traffic and transit operations to the Franconia-Springfield Metrorail station. Ten percent design plans and planning level cost estimates for road construction have been completed. Project funding has not been allocated, but will be prioritized if the site is selected for the future location of the FBI headquarters. 2. Springfield Parking Garage. Completed in December 2010, Phase I delivered the 278 parking space garage called the Old Keene Mill Park-and-Ride. Phase II, which is anticipated to be completed in 2019, will deliver an approximately 1,000 space structured parking facility with bus bays and space for a commuter slug line. 3. I-95 Express Lanes. Completed in December 2014, the project expanded HOV capacity along the I-95 corridor by extending the existing lanes nine miles from Dumfries to Garrisonvilie Road in Stafford, and adding new access points and a third HOV lane in Fairfax County. 4-8. Bicycle and Pedestrian Safety Improvements. There are several projects to improve safety for non-motorized transportation users that are currently in design or have been constructed. They include a redesigned midblock crosswalk across Commerce Street; bicycle access improvements on Metropolitan Center Drive at the entrance to the Franconia-Springfield Parkway trail; replacement of damaged or deteriorated paver crosswalks with high-visibility pavement markings; the addition of pedestrian signals and new crosswalks at the Loisdale Drive entrance to the town center; and, a new bicycle lane, sidewalks, and plaza between the Metro Station and the Springfield Town Center. 6 7 8 M Springfield CRD and TSA Transportation Initiatives Map Springfield Road Club & Complete Streets Analysis. The county is evaluating the feasibility, scope, and economic benefits of initiating a road club for Central Springfield, which would use funds proffered though the zoning process to finance transportation improvements. In 2013, a project list was compiled based on recommendations identified in the Springfield Connectivity Study, and includes intersection improvements, road extensions, roadway widening and reconfigurations, and a complete streets project. Springfield Circulator Service. The Transportation Association of Greater Springfield (TAGS) and the Washington Metro Area Transit Authority (WMATA) have partnered to provide a circulator shuttle service from the Joe Alexander Transportation Center to points within the Springfield TSA, including the Town Center, area hotels, and Metro Park on Beulah Street.. For more information go to, www.tagsva.org.

5 SPRINGFIELD COMMUNITY WALKABILITY INITIATIVE Before After Amherst Avenue Tree Well Replacement Project High-Visibility Crosswalks in Central Springfield Over the past two years, a committee of the Greater Springfield Chamber of Commerce, has been working with county staff, the Lee District Supervisor s office, and VDOT to identify ways to improve walking and biking routes in and around Central Springfield. As a result, new safety improvements are being implemented, including a new mid-block crosswalk with a pedestrian refuge across Commerce Street, improved access around bus stops, new bus shelters, and a new bicycle entrance to the Franconia-Springfield Parkway trail at Metropolitan Center Drive. Also, pedestrian-vehicle safety concerns were evaluated at two intersection on Commerce Street by VDOT and modifications were made to traffic patterns and signage. In May 2015, a county streetscape project was completed along Amherst Avenue in the Springfield CRD. It relocated street trees to a location along Bland Street where they can thrive and widened sidewalks to meet accessibility standards (see before and after photos above). An upcoming project will replace broken paver crosswalks at several intersections in the Springfield CRD with highvisibility crosswalks, and bicycle lanes will be added to several streets. Both improvements will occur during VDOT road resurfacing projects scheduled over the next 18 months. SPRINGFIELD TOWN CENTER GRAND OPENING Phase I of a $200 million transformation of the aging Mall into a multi-faceted, pedestrian-friendly Springfield Town Center was completed. Improvements include new facades, redesigned entrances, and an outdoor promenade with shopping and restaurants and cafe style outdoor seating. Other changes include a complete redesign of the interior, the addition of two outdoor plazas, and the implementation of pedestrian improvements between the town center and the Joe Alexander Transportation Center. Retailers and restaurants will continue to open on a rolling basis over the next year. Future phases will redevelop the Springfield Town Center s parking lots with new residential, retail, office, and hotel uses along with new parks, plazas and parking garages to accommodate the parking needs of the various uses. Town Center Grand Opening October 2014

6 DEVELOPMENT ACTIVITY PROJECT IMAGES Before After Main Entrance of the Revitalized Springfield Town Center MTPD Substation and Range Training Facility Springfield Town Center Interior Renovations Homewood Suites Contact Information Fairfax County Office of Community Revitalization (OCR) 12055 Government Center Parkway, Suite 1048 Fairfax, VA 22035 http://www.fcrevite.org Fairfax County is committed to a policy of nondiscrimination in all County programs, services, and activities and will provide reasonable accommodations upon request. To request this information in an alternate format, call 703-324-9300 or TTY 711.