Football Equipment. 5 9/16" Gooseneck Goalposts

Similar documents
TUBE SIGN POST PRODUCTS

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

10.2. Basketball Single Post System

NEXT EXIT THE GREAT OUTDOORS POPULATION: EVERYONE


THOR 10 HAMMER CAGE INSTRUCTIONS

hockey hockey Integral Weighted Goals Aluminium Goals Fence Folding Goals Premier Hockey Goals Folding Wheelaway Goals

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

Order No Projection Backboard

Outdoor Basketball Units - Square Posts

Livestock Equipment Bale Movers/ Bale Spears. Tractor Linkage. Grade 5 & 8 Hitch Pins. Tractor Linkage

Invacare Top End Parts Catalog

Quickie Matchpoint IN THIS SECTION

NEXT EXIT THE GREAT OUTDOORS

mmdugouts portable dugout range 2017

Two-Wheel Hand Trucks

10.2. Basketball Single Post System

Invacare Top End Parts Catalog

Model: 5100 OmniSteel Volleyball System

Soccer Goal. Model: SG20 Series. Installation, Operation and Maintenance Instructions

-- SGP (NOVA TEAM SQUARE)

Gilman Gear 2012 Price List Effective January 1, 2012

List of Figures. List of Tables

Rev J Terminator Parts Book Page 1 of 15 Top End

E-trike Li Assembly Guide

WELL COMPLETION & PROTECTION. www. .com MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD

Parts Manual. Scraper Hitches PH:

Football. Equipment & Flooring. 3G Stadium Goals. 3G Parks Goals. Mini Soccer Goals. Five-a-side Goals. Goalpost and Net Accessories.

Important Note: Tighten lock nuts so the support tubes still swing freely see figure 2. There must be 1 2 threads of bolt past end of lock nuts.

User s Manual. Model SWTC800. CAUTION: Adult Assembly Required

No ' Long No ' Long

Residential Fence Tubing

Invacare Top End Parts Catalog

OUTDOOR BACKSTOP WITH 5'-0" EXTENSION

BALL STOP INSTALLTION GUIDE

GAS DISTRIBUTION PRODUCTS TRANSITION FITTINGS

PRODUCT CARD WALL MOUNTED SIDE FOLDED BASKETBALL CONSTRUCTION PROJECTION: FROM 1,2 TO 2,45 M

badminton badminton Premier Posts Competition Socketed Posts Competition Floor Fixed Posts Training Posts Schools Posts

rugby rugby Millennium Posts Aluminium Posts No.1 Posts No.2a Posts No.3 Posts Heavy Duty Posts Post Protectors Rucking Pads

2 X 4 PORTABLE ALUMINUM SOCCER GOALS

Extension Platform. Base Platform. Crossover. Exit railing. Exit Railing

Assembly Guide ST200 FUNCTIONAL TRAINER

Continental Industries TRANSITION FITTINGS or FAX Visit

Installation Instructions

Invacare Top End Parts Catalog

SUMMITTM 400 & 600. Natural Gas Barbecues. Step-By-Step Guide

Rev S Terminator Parts Book Page 1 of 14 Top E nd

HoldUp Plus2. Safety Kit included: See additional instructions for installation. REAR WHEEL TRAY. BASE (1x) lock WASHER (1x) KEY (2x) SAFETY CLIP (1x)

Model: 7200 Collegiate Volleyball System

V-PLOW. ACCUFLO Conveyor Belt Cleaning System MAX SYSTEMS GUIDE. Engineering. LIB-CP-SYS-01-E Rev.9. Page 1

CHAINLESS ANCHORING SYSTEM USER MANUAL

Pac West Supply LLC Gorilla Guard Ladder Cage Enclosure Installation Guide

Advantage Lockers & Bike

PRODUCT CARD WALL MOUNTED FIXED BASKETBALL CONSTRUCTION PROJECTION: FROM 1,00 TO 2,25 M

First Team Sports, Inc. Stellar Recreational Volleyball System

CLEANROOM GEL GRID CEILING SYSTEM PRODUCT DATA Division

Miller DuraHoist Safety Systems

Installation Guide Wall Mounted Angled Flagpole

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

Product Information Packet

Made in U.S.A. Narrow-U Bike Rack Heavy Duty Submittal Sheet. Materials: Finishes: Mount Options: Setbacks:

E-118 Assembly Guide

Tower Accessories & Hardware

INSTALLATION INSTRUCTIONS

INSTRUCTIONS 360 Y-DROP HAGIE STS 2015

Boat Boat Loader Fitting Instructions

PARTS MANUAL. Pencoed Technology Park Pencoed Bridgend CF35 5HZ Tel: Fax: E Mail:

OWNER'S MANUAL. Copyright 2003 GAMMA - All Rights Reserved

5. STRUCTURAL ANALYSIS

Goals are crucial pieces of equipment. They should be good quality in terms of both playing performance and durability.

Custom Extension Wall Mounted Basketball Backstops

CLIMBING Pads. Straps Gaffs Spikes Hardware

Pro-Form Direct Vent System

Fitness Lifestyles (Secondary Contractor)

Troyer s Gourd Rack 8 unit F R H O P

SK101 : Transporting & Storing your Kayak

600 / 600FC OWNER'S MANUAL

1. Section Summary for loose climbing equipment provided by Owner. 2. Section "Cast in Place Concrete"

Backboard and Rim Owners Manual

W A L D M A N U F A C T U R I N G C O M P A N Y, I N C.

2019 MADONE ASSEMBLY MANUAL

Installation Guide RHT-380. This Manual Must Be Read Before Operating The Equipment CUSTOMER COPY

Mini Channel & Fittings

Product Information Packet Product Name: Stadium Pro 8000 Goal Post Product Part Numbers:

ATHLETICS Track & Field Equipment

Playground Product Specifications

Moai Bike Rack Heavy Duty Submittal Sheet. Materials: 2.0 Schedule 40 Pipe (2.375 OD) Finishes: Capacity: Mount Options: Setbacks: 2 Bikes

Continental Industries STEEL SERVICE TEES or FAX Visit


E-116 Assembly Guide

INSTALLATION INSTRUCTIONS


Assembly Instructions. -Cantilever Boat Lifts

l DESCRIPTION l FEATURES l LIMITATIONS l TYPICAL APPLICATIONS l MATERIAL SPECIFICATIONS TECHNICAL MANUAL SECTION 2.3 PAGE 1 / 6

Detroit Speed, Inc. A-body Rear Coilover Conversion Kit A-body (Moser Rear Axle) P/N: , , , , ,

Portable Soccer Goal Safety Program

IMPORTANT: RECEIVING INSTRUCTIONS:

by Master Halco ANCHOR GATE SYSTEMS Swing Gates Overhead Slide Gates Cantilever Slide Gates Vertical Lift Gates Fencing Without Boundaries.

80 SERIES MOBILE-KARRIERS. The Specialist In Drum Handling Equipment OPERATOR S MANUAL FOR MORSE 80 SERIES

HANGERS & SUPPORTS CLIP-IT CLIP-IT STUD STRAPS BAR JOIST CLIP CONDUIT HANGERS CLIP-IT

Transcription:

5 9/16" Gooseneck Goalposts Football Equipment FB55CG 5 9/16" Gooseneck College Goalposts Applies also to FB55CG-SY and FB55CG-WT Goalposts shall meet all NCAA rules. Goalposts shall be of the single bent post design and provide a minimum of 72" of setback from the front of the post to the front of the horizontal crossbar. The bent post shall be a minimum of 5" schedule 40 (5 9/16" outside diameter) ASTM A500 grade C structural pipe and provide for no less than 48" bury into the ground. college 18'6" between the upright members. Two vertical uprights shall rise a minimum of 20' above the top of the crossbar. Uprights shall be constructed of 2 3/8" diameter 6063-T6 aluminum with a minimum 0.154" wall thickness. Uprights shall be connected to each end of the crossbar by means of a machined aluminum insert that allows the angle of the uprights to be adjusted at the time of field installation. The insert design shall allow rain to escape through the insert from the top of the uprights. approximately 1075#/pair.

FB55HS 5 9/16" Gooseneck High School Goalposts Applies also to FB55HS-SY and FB55HS-WT Goalposts shall meet all National High School Federation rules. Goalposts shall be of the single bent post design and provide a minimum of 72" of setback from the front of the post to the front of the horizontal crossbar. The bent post shall be a minimum of 5" schedule 40 (5 9/16" outside diameter) ASTM A500 grade C structural pipe and provide for no less than 48" bury into the ground. high school 23'4" between the upright members. Two vertical uprights shall rise a minimum of 20' above the top of the crossbar. Uprights shall be constructed of 2 3/8" diameter 6063-T6 aluminum with a minimum 0.154" wall thickness. Uprights shall be connected to each end of the crossbar by means of a machined aluminum insert that allows the angle of the uprights to be adjusted at the time of field installation. The insert design shall allow rain to escape through the insert from the top of the uprights. approximately 1200#/pair.

FB55HSCG 5 9/16" Combination High School/College Football Goal Posts Applies also to FB55HSCG-SY and FB55HSCG-WT Goalposts shall meet all National High School Federation rules. Goalposts shall be of the single bent post design and provide a minimum of 72" of setback from the front of the post to the front of the horizontal crossbar. The bent post shall be a minimum of 5" schedule 40 (5 9/16" outside diameter) ASTM A500 grade C structural pipe and provide for no less than 48" bury into the ground. gauge wall thickness. Crossbars shall extend from official 18'6" college length to official 23'4" high school width by means of a telescoping aluminum inner tube. Two vertical uprights shall rise a minimum of 20' above the top of the crossbar. Uprights shall be constructed of 2 3/8" diameter 6063-T6 aluminum with a minimum 0.154" wall thickness. Uprights shall be connected to each end of the crossbar by means of a machined aluminum insert that allows the angle of the uprights to be adjusted at the time of field installation. The insert design shall allow rain to escape through the insert from the top of the uprights. The crossbar shall be attached to the bent post by means of an adjustable "T" adapter that approximately 1350#/pair.

FB58CG 5-9/16" Gooseneck College Goalposts Applies also to FB58CG-SY and FB58CG-WT Goalposts shall meet all NCAA rules. Goalposts shall be of the single bent post design and provide a minimum of 96" of setback from the front of the post to the front of the horizontal crossbar. The bent post shall be a minimum of 5" schedule 40 (5 9/16" outside diameter) ASTM A500 grade C structural pipe and provide for no less than 48" bury into the ground. college 18'6" between the upright members. Two vertical uprights shall rise a minimum of 20' above the top of the crossbar. Uprights shall be constructed of 2 3/8" diameter 6063-T6 aluminum with a minimum 0.154" wall thickness. Uprights shall be connected to each end of the crossbar by means of a machined aluminum insert that allows the angle of the uprights to be adjusted at the time of field installation. The insert design shall allow rain to escape through the insert from the top of the uprights. approximately 1250#/pair.

FB58HS 5-9/16" Gooseneck High School Goalposts Applies also to FB58HS-SY and FB58HS-WT Goalposts shall meet all National High School Federation rules. Goalposts shall be of the single bent post design and provide a minimum of 96" of setback from the front of the post to the front of the horizontal crossbar. The bent post shall be a minimum of 5" schedule 40 (5 9/16" outside diameter) ASTM A500 grade C structural pipe and provide for no less than 48" bury into the ground. high school 23'4" between the upright members. Two vertical uprights shall rise a minimum of 20' above the top of the crossbar. Uprights shall be constructed of 2 3/8" diameter 6063-T6 aluminum with a minimum 0.154" wall thickness. Uprights shall be connected to each end of the crossbar by means of a machined aluminum insert that allows the angle of the uprights to be adjusted at the time of field installation. The insert design shall allow rain to escape through the insert from the top of the uprights. approximately 1250#/pair.

FB58HSCG 5 9/16" Combination High School/College Football Goal Posts Applies also to FB58HSCG-SY and FB58HSCG-WT Goalposts shall meet all National High School Federation rules. Goalposts shall be of the single bent post design and provide a minimum of 96" of setback from the front of the post to the front of the horizontal crossbar. The bent post shall be a minimum of 5" schedule 40 (5 9/16" outside diameter) ASTM A500 grade C structural pipe and provide for no less than 48" bury into the ground. gauge wall thickness. Crossbars shall extend from official 18'6" college length to official 23'4" high school width by means of a telescoping aluminum inner tube. Two vertical uprights shall rise a minimum of 20' above the top of the crossbar. Uprights shall be constructed of 2 3/8" diameter 6063-T6 aluminum with a minimum 0.154" wall thickness. Uprights shall be connected to each end of the crossbar by means of a machined aluminum insert that allows the angle of the uprights to be adjusted at the time of field installation. The insert design shall allow rain to escape through the insert from the top of the uprights. The crossbar shall be attached to the bent post by means of an adjustable "T" adapter that approximately 1400#/pair.

4 ½" Gooseneck Goalposts FB45CG 4 ½" Gooseneck College Goalposts Applies also to FB45CG-SY and FB45CG-WT Goalposts shall meet all NCAA rules. Goalposts shall be of the single bent post design and provide a minimum of 60" of setback from the front of the post to the front of the horizontal crossbar. The bent post shall be a minimum of 4" schedule 40 (4 ½" outside diameter) ASTM A500 grade C structural pipe and provide for no less than 48 bury into the ground. college 18' 6" between the upright members. Two vertical uprights shall rise a minimum of 20' above the top of the crossbar. Uprights shall be constructed of 2 3/8" diameter 6063-T6 aluminum with a minimum 0.154" wall thickness. Uprights shall be connected to each end of the crossbar by means of a machined aluminum insert that allows the angle of the uprights to be adjusted at the time of field installation. The insert design shall allow rain to escape through the insert from the top of the uprights. approximately 925#/pair.

FB45HS 4 ½" Gooseneck High School Goalposts Applies also to FB45HS-SY and FB45HS-WT Goalposts shall meet all National High School Federation rules. Goalposts shall be of the single bent post design and provide a minimum of 60" of setback from the front of the post to the front of the horizontal crossbar. The bent post shall be a minimum of 4" schedule 40 (4 ½" outside diameter) ASTM A500 grade C structural pipe and provide for no less than 48" bury into the ground. Horizontal crossbars shall be no less than 4-1/2" OD flow coated steel tubing with a 7 high school 23'4" between the upright members. Two vertical uprights shall rise a minimum of 20' above the top of the crossbar. Uprights shall be constructed of 2 3/8" diameter 6063-T6 aluminum with a minimum 0.154" wall thickness. Uprights shall be connected to each end of the crossbar by means of a machined aluminum insert that allows the angle of the uprights to be adjusted at the time of field installation. The insert design shall allow rain to escape through the insert from the top of the uprights. approximately 1050#/pair.

Gooseneck Goalpost Ground Sleeves FB45S (FB55S) Deluxe Adjustable Height Goalpost Ground Sleeves Sleeves shall be specifically designed to allow removable and adjustable installation of Bison gooseneck style football goalposts. Sleeves shall consist of an 8" square steel structure with a powder coated finish, a minimum of 50" long with a formed pan, that is welded and hot dip galvanized, attached at the top of the structure to allow for bury below the playing surface. Sleeve design shall allow for rotational goalpost crossbar height adjustment of up to 4" at installation by means of a 2 ½" diameter threaded adjustable screw located in the bottom of the sleeve to allow exact 10 official crossbar height. Post shall be adjusted plumb by means of four ¾" adjusting screws. An anti-rotation device shall hold the goalpost square to the field. An aluminum finish cap shall fill the sleeve pan both when the goal is installed and when it is removed. Specify whether sleeve is used for 4 ½" OD (FB45S) or 5 9/16" OD (FB55S) goalposts. Shipping weight shall be 120# (FB45S) and 125# (FB55S) each. H-Style Goalposts FB35-GV H-Style Galvanized Goalposts Goalpost uprights and crossbar shall be constructed of 3 ½" diameter zinc flow coated tubing with a minimum 8 ga. wall thickness. When assembled, goal shall meet official 23'4" high school rules but can be field cut to official 18'6" college width. Uprights shall rise 10' above the official 10' high crossbar. Crossbar shall attach to the uprights by means of U-bolt and saddle clamp brackets. Top of upright tubes shall be capped to eliminate rain. Hardware shall be zinc plated grade 5 minimum. Shipping weight approximately 815#/pair. Goalpost Padding FBCPP-XX Goalpost Padding Padding shall meet all NCAA and National High School Federation rules. Foam shall be a minimum of 5" thick and be covered with sewn vinyl covering in 12 school colors. Order FBCPPW for Goalpost Padding Wrap. Height shall be 72" minimum and be designed to attach by means of Velcro fasteners to all goalposts up to 5 9/16" diameter or 4" square. Shipping weight shall be 18# each.

Field Hockey Goals FH200 Official Field Hockey Goals Face of goal shall be constructed of 2" square extruded 6063-T6 aluminum with ¼" radii for safety, and a minimum wall thickness of 1/8". Extrusion shall have a net track extruded in the rear face to allow for net attachment using specially designed clips. The backstays shall be constructed from 1-½" square aluminum tubing with a minimum of 16ga. wall thickness and shall be welded to the front upright to complete each side assembly. The inside of the goal shall be lined with 18" high kickboards constructed of ¼" thick black UHMW polyethylene sheet. All Aluminum parts of goal shall be finished with a white powder coat to prevent corrosion. Goals include net clips and nets, and meet all applicable rules. Order FH200WK for optional wheel kit. Order FH200N for replacement nets. Goal shall carry a 2-year limited warranty and weigh approximately 300#/pair. Lacrosse Goals LC200 Official Lacrosse Goals Goal shall be constructed of a 1-½" Schedule 40 steel frame work that is 6' high by 6' wide. Bottom of goal shall be flat steel construction to allow for installation outdoors as well as indoors and provides a 7' deep goal opening. Goal shall have an orange powder coated finish. Set includes nets, and ground anchors for outdoor use. For replacement nets order LC050N. Goal shall carry a 1-year limited warranty and shall weigh approximately 145#/pair. LC300 Official Lacrosse Goals Goal shall be constructed of a 1.90" O.D. 6005-T5 Aluminum frame that is 6' high by 6' wide. Bottom of goal shall be flat Aluminum construction to allow for installation outdoors as well as indoors and provides a 7' deep goal opening. Aluminum extrusions shall have Qwik Track net attachment and a push button knock down design for easy set up and tear down. Goal shall have an orange powder coated finish. Set includes nets, ground anchors for outdoor use, and a zippered transport bag. For replacement nets order LC050N. Goal shall carry a 3-year limited warranty and shall weigh approximately 75#/pair. Rugby Goals FBRUGBY Official Rugby Goals Goalpost uprights and crossbar shall be constructed of 3 ½" diameter zinc flow coated tubing with a minimum 8 ga. wall thickness. When assembled, goal shall meet official 18'4" width. Uprights shall rise 27' above the playing surface and bury 3' into the ground. Crossbar shall attach to the uprights by means of U-bolt and saddle clamp brackets. Top of upright tubes shall be capped to eliminate rain. Hardware shall be zinc plated grade 5 minimum. Shipping weight approximately 1000#/pair.