Duwamish Way-finding and CTR Report

Similar documents
Cascade Bicycle Club Recommendations

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Draft North Industrial Area-Wide Traffic Plan

Active Transportation Facility Glossary

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Bicycle Facilities Planning

Lake to Sound Trail FEASIBILITY STUDY. February 2009

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Complete Streets. Designing Streets for Everyone. Sarnia

Safe Routes to School Action Plan Aberdeen, Idaho

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Multi-Modal Traffic Analysis. Parisi and Associates

5. RUNNINGWAY GUIDELINES

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

CONNECTING PEOPLE TO PLACES

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Tonight is for you. Learn everything you can. Share all your ideas.

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Physical Implications of Complete Streets Policies

Broad Street Bicycle Boulevard Design Guidelines

Ottawa Beach Road Study

Southside Pilot Proposal

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Central Avenue Bikeway Traffic and Safety Impact Assessment

City Snapshot September 27, 2018

City of Davis East Covell Corridor Plan

C C C

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Perryville TOD and Greenway Plan

St. Francis Drive through the City of Santa Fe Corridor Study

On-Street Bicycle Facilities

Long Island Rail Road Expansion Project Floral Park to Hicksville

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Bicycle Boulevards and Neighborhood Greenways

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

This page intentionally left blank.

Chapter 3 DESIGN SPECIFICATIONS

Off-road Trails. Guidance

Complete Streets Funding Program Project Prioritization Plan

Dowling/Beaty Cycling Route

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Welcome to the Sellwood Bridge Project Open House!

Minutes: A motion was made to approve minutes from both the July and August BPAC meetings. That motion was approved.

Route 29 Solutions Projects

ACTIVE TRANSPORTATION

Bicycle + Pedestrian Connectivity Gap Analysis

Bay to Bay Boulevard Complete Streets Project

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Glebe Neighbourhood Cycling Plan

TO: VDoT, FDoT. CC: Cathy Hudgins, Paul Davis FROM: RA. RE: Critical intersections surrounding the Wiehle-Reston East Metro station

Bowman-Melton Associates, Inc. june 2011

11/28/2016 VIA

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

The Bike Buzz in Richland. November 2017 Carl Berkowitz

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

5 CIRCULATION AND STREET DESIGN

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan

Pavement Rehabilitation & Buffered Bike Lane

Meadow Woods Elementary School

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Chapter 5 Future Transportation

Chapter 2: Standards for Access, Non-Motorized, and Transit

TRANSPORTATION COMMISSION Agenda Staff Report

LANCASTER CITY BICYCLE NETWORK

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

March 2008 FINAL DRAFT. Supplemental Bikeway Design Guidelines

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

This page intentionally left blank.

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Appendix 3 Roadway and Bike/Ped Design Standards

City of Seattle Edward B. Murray, Mayor

May 4, Dear Mr. Thomas and Mr. Snyder,

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

G AT E WAY PLAN. Community BRIEFING KIT GATEWAY BIKE

Color your stress away

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Completing the Street: Denning Drive

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Major Bike Routes 102 Avenue Workshop April 21, 2015

APPENDIX D LEVEL OF TRAFFIC STRESS METHODOLOGY

Toronto Complete Streets Guidelines

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Route 28 Critical Locations Bicycling Network Connectivity November 2017

City of Madison: 2017 Capital Budget Capital Improvement Plan

Orange Center Elementary School

Appendix O. Assessment of Bicycle Facility Alternatives

DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY

Who is Toole Design Group?

Transcription:

V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail station along the Boeing Access Road as part of the new light-rail system that was then being planned. However, the proposed station was indefinitely postponed because of cost-benefit issues, and the nearest light-rail station was built instead at the Tukwila transit center on International Boulevard, about 3 miles south of the Boeing Access Road. Companies in the North Tukwila area still want the station. Other issues cited by community members include: Poor east-west connectivity in the road system; Underutilization of the Green River Trail; Large blocks that make pedestrian crossings uncomfortable; and Many transit routes require two or more transfers. Like Seattle s industrial areas to the north, North Tukwila has a disconnected sidewalk network and a high volume of truck traffic on its streets. Unlike Seattle, Tukwila possesses a major regional bike route, the Green River Trail, running right through the M & I Center, that can be used as part of a bike or pedestrian separated commute. The Green River Trail could tie in the Airport Way route for a new regional, north-south bike connection between north Seattle and south King County. But the effort would probably require collaboration between the cities of Seattle and Tukwila in partnership perhaps with King County International Airport. A similar opportunity exists to better continue the Green River Trail into South Park along West Marginal Way to connect with 14th Avenue South leading to the South Park retail area. From there, cyclists could travel west to the 1st Avenue South Bridge over the Duwamish River, or continue north on the Duwamish Trail along West Marginal Way to West Seattle. Or, they could ride from the retail area over the new South Park Bridge and on to Georgetown. The multi-modal group reviewing North Tukwila also recommended: Promoting hybrid bike / bus / rail commutes to increase east-west connectivity, taking advantage of Tukwila being served by both light and heavy rail; Increasing signage and lighting on the Green River Trail to encourage its use as a commute option, not just a recreational facility; and Installing mid-block crossings on selected roadway segments to reduce block size to a more approachable scale for pedestrians and transit users. 39

The two most recent plans that have been developed relating to non-motorized transportation in North Tukwila include the City of Tukwila s Walk and Roll Plan (adopted in 2009) and the Tukwila Bicycle Friendly Routes and Sidewalk Segments Design Report. The Walk and Roll Plan recommends a network of bicycle facilities throughout the city. The Design Report provides detailed design recommendations and cost estimates for specific bicycling projects along the city s recommended network. Note about S 102nd Street. A privately owned facility (by The Boeing Company), S 102nd St is identified in both the Walk and Roll Plan and the Design Report as a recommended bicyclefriendly route. The Design Report also recommends improvements along S 102nd St; however, the report also states that S 102nd St is private from East Marginal Way to S River St, and that any work would require agreements with The Boeing Company. The Tukwila Walk and Roll Plan identifies S 102nd St as a bicycle friendly route and indicates a planned trail between the S 102nd St Bridge and W Marginal Place, however, there is no discussion of proposed bicycle facilities along S 102nd St and no discussion of the ownership of this right of way. While S 102nd St presents a key opportunity for bicycle connectivity, issues involving access and improvements to this facility would need to be worked out with the private property owner. Barriers The multi-modal group agreed on the following barriers to safe pedestrian and bicycle travel in North Tukwila. Location Barriers/Issues Image Airport Way Lack of bicycle infrastructure; highspeed traffic; no paved shoulder (pavement edge drops off creating unsafe bicycle conditions); important commute route. 40

E Marginal Way Disconnected bicycle infrastructure; varying right-of-way widths; high-speed corridor; major intersections; key commute route. W Marginal Pl Existing gap in trail network; high-speed traffic; narrow shoulder in sections; poor pavement quality; difficult intersections at S 102nd St and 14th Ave S. Boeing Access Road Lack of bicycle infrastructure; high traffic volume and speeds (36,301 ADT; 40 mph posted speed limit); ramp merge areas (Airport Way, I-5); free right turning movements at the intersection of E Marginal Way & Boeing Access Rd. S 129 th St S 112 th St Lack of bicycle infrastructure; high speed, narrow shoulder width. Wide right-of-way; disconnected bicycle infrastructure; no signage to Green River Trail. 41

Tukwila International Boulevard (Boeing Access Rd to S 130th St) Sections lacking curbs and gutters; wide entrances to adjacent business parking lots; key connection to the Green River Trail; conflict points at SR 99 merge areas; lack of bicycle infrastructure. S 102nd St Private road; bridge over the Duwamish River; intersects with E Marginal Way. Green River Trail Intersection / driveway conflicts, poorly design trail entrances / exits, pavement issues in sections; signage needed directing to / from trail; sand bags blocking trail access (south of I-405). Intersection of S Boeing Access Rd (BAR), East Marginal Way S (EMW) & Tukwila International Blvd No dedicated bicycle facilities; long signal phases; multi-leg/lane intersection; no crosswalk at free-right turn from westbound BAR to northbound EMW; difficult connection for bicyclists continuing south to East Marginal Way through the intersection. 42

Merge areas along S Boeing Access Road (Airport Way, I-5) Major conflict points for bicyclists traveling along Boeing Access Road. S Norfolk St & E Marginal Way Signal detectors are not calibrated to sense bicycles, requiring bicyclists to wait at the intersection until a motor vehicle triggers the light. S 102nd St & W Marginal Pl Navigating the Green River Trail at this intersection is not intuitive bicyclists must cross diagonally to continue on the trail, however no signage exists providing direction to the trail. Terminus of Green River Trail (W Marginal Pl & S 96th St) Gravel area; bicyclists need to walk bikes; no trail access signage; trail deadends. 43

14th Ave S & W Marginal Pl S Difficult connection from southbound 14th Ave S to W Marginal Pl (cyclists forced to ride facing oncoming traffic). 116th & E Marginal Way (SE entrance to trail) When the E Marginal Way Bridge was reconstructed, the SE entrance to the trail was removed cyclists ride facing oncoming traffic on E Marginal Way. 56th Ave S & Railroad Ave Road blocked (unable to access Railroad Ave). Green River Trail entrance / exit north of BECU Parking blocking trail exit / entrance. 44

Green River Trail driveways / unsignalized intersections Maintenance needed for vegetation encroaching trail; poor sight lines. Green River Trail intersection at 56th Ave S and Interurban Ave S Unprotected left turn crossing the trail, no trail crossing signage. 45

RECOMMENDATIONS The multi-modal group endorsed the recommendations set forth in both the Walk and Roll Plan and the Tukwila Bicycle Friendly Routes and Sidewalk Segments Design Report, subject to additional review as noted in the recommendations. The Duwamish TMA would suggest a caveat that the cities of Tukwila and Seattle should collaborate in planning for their mutual connections between Airport Way, East Marginal Way, and West Marginal Way, hopefully in partnership with King County International Airport (KCIA) and other property owners including The Boeing Company. Boeing employees make up a large share of cyclists and pedestrians in the local vicinity of the potential improvements. They along with the broader community should be engaged. The following recommendations provide timely starting points for a collaborative review. Issue Recommendation Location (Image) Airport Way (Boeing Access Road to Seattle city limits) #21 on Map Widen the existing pathway on the west side of Airport Way/north side of BAR to facilitate a safer connection between Airport Way and East Marginal Way S 12-foot multi-use trail from EMW to Airport Way to Norfolk. Provide painted bike lanes at merge areas (Boeing Access Rd and Airport Way). E Marginal Way #22 on Map Recommendation 1 (near-term): Provide dedicated bicycle facilities between S 128th St and the Seattle city limit. Bicycle facilities could include cycle tracks or buffered bicycle lanes with painted bike lanes at key conflict points. Opportunities for installing bicycle lanes include: BAR to S 90th St: Remove 1 southbound lane (to provide cycle tracks or buffered bicycle lanes); S 90th to S 81st St if ADT is too high to remove 1 south- or northbound lane, evaluate turn lane necessity; S 81st St north: remove 1 southbound lane. Recommendation 2 (long-term): Remove inactive rail line to install a separated multi-use trail on the west side of EMW, connecting to the Green River Trail. 46

W Marginal Place S See #1 on Tukwila portion of the map in Appendix A. #23 on Map Multi-use Trail Opportunity #24 on Map S Norfolk St (between Airport Way S and E Marginal Way S) #25 on Map W Marginal Place S: Continue Green River Trail north connecting to South Park Trail alignment recommended on the east side of W Marginal Pl S; Near term improvements are needed at existing trail terminus, including signage and paving at entrance. If construction of multi-use trail is determined a long-term project, sharrows along West Marginal Way S may be an appropriate facility during the interim. As recommended in the Walk and Roll plan, the proposed trail connection between S 115th St along the western edge of the future Duwamish Riverbend Hill Park up to S Boeing Access Rd and Airport Way S would provide a much-needed trail bypass route to the complex intersection of Boeing Access Rd S and E Marginal Way S. S Norfolk St (Airport Way S and E Marginal Way S): Rechannelize to provide 6-foot bicycle lanes on both sides of roadway (existing: four travel lanes, low traffic volumes). 47

S Boeing Access Rd S Ryan Way #26 on Map S 112th St #27 on Map Widen existing pathway on the north side of S Boeing Access Rd to provide a multi-use trail connection between E Marginal Way S and Airport Way S. Install buffered bicycle lanes on both sides of Boeing Access Rd along with signage and bike lanes at merge areas. Bike lanes should extend along from E Marginal Way S to S Ryan Way to 51 st Avenue S. In the future, a multi-use trail corridor adjacent to Sound Transit s light-rail alignment (or in close proximity to S Boeing Access Rd) should be explored to provide a bypass option for pedestrians and bicyclists using the Boeing Access Roadway corridor. Restripe to provide 5-foot bicycle lanes on both sides; Construct sidewalk; Install bicycle Wayfinding, directing cyclists to Green River Trail; Ensure signal loop detectors are calibrated to sense bicycles (E Marginal Way S and Tukwila International Blvd). Railroad Ave Provide sharrows and bicycle signage along Railroad Ave. Provide bicycle access from S 56th St. 48

Tukwila International Blvd #28 on Map 42nd Ave S (Macadam S 115th St) Long-term: Green River Trail should be extended on the east side of the waterway, along TIB and East Marginal Way; Near-term: Rechannelize roadway to provide buffered bicycle lanes on both sides of the roadway between BAR and S 130th St. Rechannelization opportunities include removing one north- or southbound lane or removing a turn lane and providing turn pockets. Painted bike lanes are recommended at SR 599 on and off-ramps Provide signage directing to GRT; Address access management issues (between Boeing Access Rd and S 112th St); parking encroaching sidewalk. Install traffic calming measures; Preferred: Provide bicycle lanes on both sides of the roadway; If right-of-way is constrained, provide sharrows and signage. 40th Ave S / 42nd Ave S (E Marginal Way S S 144th St) Continue bicycle lanes from S 128th St to 40th Ave S; Install sharrows and traffic calming measures along 40th Ave S (potential for bicycle boulevard); Provides access to a park, school, library, and residential properties. 49

Green River Trail Extend Green River Trail north along W Marginal Pl and along the east side of the Duwamish Waterway (providing a connection to Seattle and ultimately downtown Seattle). Trail is currently closed south of I-405 due to potential flooding associated with failure of the Howard Hanson Dam. Sandbags temporarily in place to be removed in Fall 2012. Please note: The trail closure is not located within North Tukwila; however the impacts of this closure extends to North Tukwila commuters (and commuters throughout south King County). Improve bicycle access from GRT to the 42nd Ave S Bridge (paved trail entrance); Complete trail gap east of 42nd Ave S. In the near-term, work with property owners to provide sharrows and/or signage along trail gap east of 42nd Ave S (along Access Roadway privately owned); Install wayfinding signage at key locations throughout north Tukwila directing to GRT; Discourage unintended trail use near Starfire (soccer fans sitting on the trail during games); Provide additional signage where trail intersects driveways, unsignalized and signalized intersections. For example, where the trail intersects an unsignalized intersection or commercial driveway, a Trail X-ing sign might be used. 50

S 102nd St Currently in work Work with Boeing to support bicycle access along S 102nd St; Reconstruct shoulders to support bike lanes on both sides; Near-term: Provide sharrows on both sides of the S 102nd St Bridge; Long-term: Provide a grade-separated bicycle and pedestrian path on the north side of S 102 St connecting to E Marginal Way S (will require reconstruction of the S 102nd St Bridge to support a grade-separated path). S 115th St With low traffic volumes, S 115th St can serve as a bicycle boulevard or neighborhood greenway, connecting from E Marginal Way to the Allentown neighborhood. Traffic calming, sharrows, and signage are recommended along S 115th St. S 124th St Organize right-of-way to provide dedicated and consistent space for bicyclists. If right-of-way allows, provide 5-foot bicycle lanes on both sides; If right-of-way is constrained, provide sharrows and bicycle signage. S 56th St Provide traffic calming and signage to establish a bicycle boulevard along S 56th St, providing a residential connection to the Green River Trail and Railroad Ave. Bicyclists should be given access to Railroad Ave (the road is currently blocked for all users from 56th Ave S). Continue the bicycle boulevard / signed route through Allentown neighborhood (suggested routes below). 51

S 19th St Pedestrian Bridge Improve signage and access for bicyclists using the S 19th St Pedestrian Bridge. This should serve as an access route to the Green River Trail. Bicycle Boulevard Opportunity Bicycle Boulevard Opportunity S 56th St Railroad Ave 50th Pl S S 125th St 46th Ave S 44th Pl S 44th Ave S S 116th St S 115th St. S 56th St Railroad Ave 50th Pl S S 124th St 42nd Ave S S 19th St Pedestrian Bridge GRT Intersection Recommendations Direction Recommendation Location (Image) Railroad Ave & S 56th St Provide bicycle access to Railroad Ave from S 56th St. 14th Ave S / Des Moines Memorial Drive & W Marginal Pl Continue the multi-use trail through this intersection (on east side) into Downtown South Park (to provide access for southbound bicyclists). In the interim, until the full trail can be constructed, a continuation of the 2-way sidepath facility (existing on 14th Ave S) is recommended to connect to W Marginal Pl. Alternatively, a signed route through the properties to the east of 14th Ave S / Des Moines Memorial Drive should be provided. 52

Terminus of Green River Trail (north of S 102nd St) Provide trail signage; Continue multi-use trail north (in the meantime, pave trail entrance). Interurban S/Green River Trail & S 56th St Provide dedicated left-turn phase to reduce left-hook potential (trailcrossing); Provide signage above left-turn arrow indicating trail crossing. Vicinity of East Marginal Way & S 116th St Improve Green River Trail Access at this location (signage, improved trail entrance on SE and SW side). Curb cut needed on SW side of E Marginal Way S. Entrance/Exit for Green River Trail (north of BECU) Work with property owner to relocate parking spaces blocking the entrance/exit to the Green River Trail (wheel stops have now been removed, however painted parking spaces still need to be removed). 53

Other Recommendations Improve signage throughout the neighborhood, directing bicyclists to safe and direct routes (such as the Green River Trail). Key locations: International Blvd S and S 112th St; E Marginal Way S and S 112th St; Intersection of S 102nd St and W Marginal Pl S (GRT) diagonal crossing for bikes, hard to navigate to trail on SW corner. Provide bicycle signal-detection at traffic signals, with a bicycle marking at the location where cyclists should align their bike. Enforce parking restrictions along bicycle and pedestrian ways. Install bicycle push-buttons at trail intersections. Key location: Green River Trail and S 102nd St. 54

Provide regular maintenance along existing (and future) multi-use trails and bicycle facilities improve sightlines at trail / driveway crossings. 55

56