Paving for Progress Municipal Streets Seminar

Similar documents
City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

City of Davis Pavement Management Program

Pavement Management Report. City Council Meeting of May 21, 2013

Pavement Management Program

SECTION 5: PEER CITY REVIEW

Smoothing Out the Bumpy Road Ahead

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

Building Great Neighbourhoods QUEEN ALEXANDRA

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Keeping good roads good

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

Streets Presentation. Public Works Department. Jill Mercurio, P.E. City Engineer November 19, 2013

Lake Waterford Community Association Meeting. November 15, 2016

City of Coquitlam. Pavement Management Technology. Profile/GPS/Videolog Vehicle. Pavement Management System. SUBSURFACE PROFILING - Road Radar

Otter Tail County 2040 Transportation Plan. Asset Management Peer Exchange

Complete Streets. Designing Streets for Everyone. Sarnia

Chapter 4: Funding and Implementation

Building Great Neighbourhoods LANSDOWNE

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Building Great Neighbourhoods BONNIE DOON

Welcome! Sherbrooke Neighbourhood Renewal Open House. Sherbrooke Open House February 3, Capital Construction

Executive Summary. Introduction

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

GDOT Fiscal 2015 Year 2017 GDOT PowerPoint. Title Page

IMPLEMENTATION STRATEGIES

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

Promoting Active Communities Award Application

City of Lakewood. Public Works Transportation. Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E.

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

Environment and Public Works Committee Presentation

Paving the Way to a Sustainable Future: The City of Russell s

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

2018 ROAD MAINTENANCE PROGRAM

Non-Motorized Transportation 7-1

GDOT GDOT PowerPoint. Title Page

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

City of Waterloo Complete Streets Policy

Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida

Tonight is for you. Learn everything you can. Share all your ideas.

Utah Department of Transportation Division of Asset Management taking care of what we have

4 Goals, Objectives & Actions

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

VDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

CHAPTER 7.0 IMPLEMENTATION

THE EFFECTS OF UTILITY CUT PATCHING ON PAVEMENT LIFE SPAN AND REHABILITATION COSTS

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

CITY OF NEW ORLEANS. City-Wide Pavement Condition Assessment Results August 30, 2016

City Sidewalk Repair and Replacement Program

Citywide Sidewalk and Crosswalk Programs

DEVELOPMENT OF A PAVEMENT REHABILITATION STRATEGY FOR NATIONAL ROADS IN QUEENSLAND

ADA TRANSITION PLAN. For

LOCAL REVENUE MEASURE ANNUAL COMMUNITY REPORT

DRAFT. Table of Contents. Background

DRAFT. Lecompton. Table of Contents. Background

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

ACTIVE TRANSPORTATION

Bicycle Master Plan Goals, Strategies, and Policies

Appendix C 3. Bicycle / Pedestrian Planning

Engineering - Bicycle and Pedestrian

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Eastern PA Trail Summit October 1, 2018

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

Secondary Road Program

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

Steps to Conducting a Complete Streets Assessment

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report

POTHOLES IN EDMONTON. Updated: April 4, 2013

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

This page intentionally left blank.

5. RUNNINGWAY GUIDELINES

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Michael Y. Ereti, Director of Capital Projects

Westgate/Belvedere Homes Community Redevelopment Agency. Belvedere Heights. Streetlights & Sidewalks Improvements Project.

Incorporating Sidewalks into Transportation Asset Management. Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc.

DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas

POLICY STATEMENT: VISION ZERO

7 Complete Streets & Roadway Aesthetics

MIAMI & ERIE CANAL SHARED USE TRAIL

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

Implementation Maintenance 263

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

City of Kingston Information Report to Rural Advisory Committee Report Number RAC

City of Jacksonville Mobility Fee Update

CITY OF SOUTH DAYTONA

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary

Transcription:

Paving for Progress Municipal Streets Seminar November 15, 2017 Doug Wilson, PE City of Cedar Rapids Paving for Progress Program Manager

State and National Rankings

$10,996,122 Prior Funding: General Obligation Bond Revenue $7,404,771 $4,237,500 $3,077,345 $281,496 $5,727,875 $9,301,808 $6,631,412 $6,447,000 $1,535,000 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014

What is Paving for Progress? Objective: Improve the neighborhoods of Cedar Rapids, making them more comfortable, convenient and desirable places to live, play and work. Strategic, data-driven approach Residential + main streets Complete rehabs + proactive preservation Stop the deterioration of our roads Unique funding source

What is Paving for Progress? Goals: Improve/maintain the network so the average road is in Fair or better condition. Follow through on promises to the citizens of Cedar Rapids who approved the tax. Dedicate additional effort to the local street network. Commit to spending the revenues wisely on behalf on the public through a strategic, data driven plan.

Utilizing Local Option Sales Tax 1% local option sales tax approved November, 2013 Effective July 1, 2014 June 30, 2024 Estimated to generate approximately $18M per year 100% of the revenues generated going toward the maintenance, repair, construction and reconstruction of public streets.

Developing the Plan Plan was under development by Spring 2014. Highest and best use of taxpayer dollars. Prioritization that is data driven, impartial, and measurable. Answers the need to reconstruct and rehabilitate poor roads while also maintaining good roads proactive maintenance!

Pavement Maintenance a small investment at the right time can drastically improve the life of a pavement

Pavement Management 101 Inventory/condition assessment Set pavement condition thresholds Develop maintenance and reconstruction strategies Prioritize improvements Development pavement management plan Measure and track performance

Pavement Management 101 Inventory/condition assessment Set pavement condition thresholds Develop maintenance and reconstruction strategies Prioritize improvements Development pavement management plan Measure and track performance

Inventory/condition assessment Pavement condition data collected on all Cedar Rapids 600 miles of roadways by an ARAN. Data and field inspections combined in modeling software ArcGIS, by Iowa State University s Institute for Transportation. Roads categorized: Very Poor to Very Good, with PCI. Fugro Roadware Automatic Road Analyzer (ARAN)

Pavement Management 101 Inventory/condition assessment Set pavement condition thresholds Develop maintenance and reconstruction strategies Prioritize improvements Development pavement management plan Measure and track performance

Pavement Condition Thresholds Apply the right treatment at the right time

Pavement Condition Thresholds PCI thresholds set to determine when roads should be repaired. Local and arterial streets have different thresholds.

Pavement Management 101 Inventory/condition assessment Set pavement condition thresholds Develop maintenance and reconstruction strategies Prioritize improvements Develop pavement management plan Measure and track performance

Maintenance & Reconstruction Strategies Reconstruction: The complete removal and replacement of a pavement section Rehabilitation: Asphalt resurfacing, concrete patching, surface profiling Maintenance: Crack filling and sealing, diamond grinding Reconstruction Rehabilitation Maintenance

Pavement Management 101 Inventory/condition assessment Set pavement condition thresholds Develop maintenance and reconstruction strategies Prioritize improvements Develop pavement management plan Measure and track performance

Prioritize Improvements Functional class Pavement condition Pavement types Truck traffic Speed limit Underground infrastructure Complete Streets Improvement costs

Pavement Management 101 Inventory/condition assessment Set pavement condition thresholds Develop maintenance and reconstruction strategies Develop pavement management plan Measure and track performance

Final Plan - 2015 Plan was presented to the community in May, 2015 Phased prioritization of projects Quick Start: 2015 Phase 1: 2016-2018 Phase 2: 2019-2021 Phase 3: 2022-2024

Final Plan - 2015 Recommendations for treatment & preservation Improvements to 150 miles of roadway Funding split between high traffic roads and residential streets (40/60) Pavement condition data updated every two years and plan re-evaluated

Road Outlook Without PfP Without this program, 90% of the Cedar Rapids road network would likely fall below the Poor condition threshold sometime in the next 10 years.

Road Outlook With PfP

Launching the Program: Quick Start Projects with minimal underground utilities, no rightof-way needs Ability to show progress immediately Glass Road Before & After

Launching the Program: Phase 1 Program grew in project intensity and design 42 nd Street During & After Focused more on reconstruction projects and the arterial network

Pavement Management 101 Inventory/condition assessment Set pavement condition thresholds Develop maintenance and reconstruction strategies Develop pavement management plan Measure and track performance

Measure and Track Performance 2017 is year three of the program 105 projects completed, to date As of October, 2017, over $52.7M spent on roads 35 miles of Cedar Rapids roadways have been improved so far More than 5% of all CR traffic (VMT) is now on PfP improved roads

Paving for Progress: Completed & Future Projects 2014 -- 2018

What s New for Paving for Progress? 10-Year Plan updated in March 2017: New pavement data Utility needs included Adjusted treatment costs Improved calculations and projections Approximately 75% of the projects in the updated 2017 plan were included in the original 2015 plan

Passed in 2014 Complete Streets Ensures we are asking Quality of Life questions as we improve roads we may not touch again for 30 50 years. Supports community desires expressed through EnvisionCR: Walkable neighborhoods Bike-able roads Moving naturally and easily

Driving Factors of Complete Streets Route Selection and Prioritization 10-Year Paving for Progress Plan Utilities Trails Unexpected Needs Deterioration

Community Outreach and Branding Program name: Paving for Progress Signage on construction sites Public open houses to communicate plan Farmer s Market, CR Kernels Game, other public events Program specific URL, website and social media presence

Public Meetings & Resident Outreach Challenges with More Complex Projects Need for EDUCATION on City policies and programs. Need for CLARITY on City vision for walkability. Need for COMMUNICATION on policy s flexibility and implementation.

Presentation at open houses Paving for Progress Complete Streets More individualized attention for property owners at tables. Staff Response Retool Public Meetings Additional communication throughout entire length of projects.

PCC use on Projects 14 complete reconstruction projects More than 20,000 CY of Patching 20 Miles of new and patched PCC streets More than $1.5M spent on curb and gutter replacement

Why PCC? Proven Performance Strength and Durability ADA compliance Competitive Bidding

PCC Street Design Changes Geogrid 12 granular subbase No less the 8 thickness Subdrain and Storm Sewer

Before and After

Before and After

What s Coming up for PfP? 270 projects are programmed over three, 3-year phases Phases 1 & 2 focus heavily on reconstruction projects and the arterial network Phase 3 will likely include large amounts of rehab work with heavy emphasis on local streets

What s Coming up for PfP? By 2024, 30% of traffic in CR will be on PfP roads. Nearly 2300 of roughness will be smoothed twice the height of the Empire State Building! Approximately 150 miles of roads will be improved by 2024 (60% will be local roads).

Thank you www.cityofcr.com/pavingforprogress d.wilson@cedar-rapids.org pavingforprogress@cedar-rapids.org