On the Lee Tunnel project, some significant near misses involving cranes have occurred this year.

Similar documents
SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER)

Appointed person Note: It is recommended that you read the Supporting Information page before you read this factsheet.

FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998

Wilkins Safety Group

CPCS renewal test factsheet

GUIDELINES. Guidelines. SAFed Guidelines on the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) The Safety Assessment Federation Ltd

EQUIPMENT. (See also: Management of Health & Safety (51); Fork Lift Trucks (32); Warehousing (87); Work Equipment (91))

Lifting Operation & Lifting Equipment Procedure

Thorough examination of lifting equipment

Lifting Beam. Introduction. Important Notes. Key Benefits. User Guide

Lifting Equipment Protocol

OMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part , , , , , & ANSI B30.5, ANSI B30.

Guide to Documentation and Marking Part 5 Lifting Accessories, Slings

Receipt By Jurong Port Representative -To be filled by Jurong Port Representative No Item Yes No Remark 1.

Lifting Equipment Procedure. Committees / Group Date Consultation: Health and Safety Sub Committee Nov 2016

GUIDANCE NOTES ON LOLER REGULATIONS FOR RIVERIA MK1.MK2 & MK3 AND BELLAVITA BATH LIFT. Lifting Operations and Lifting Equipment Regulations 1998

March 1999 Presentation on "Lifting Operations and Lifting Equipment Regulations 1998" by Chris Davies, HM Inspector, HSE Midlands Region.

Health & Safety Policy and Procedures Manual SECTION 25 RIGGING AND HOISTING EQUIPMENT

BANKSMAN / SLINGER. 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline?

Company Health and Safety Policy

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

SOP GEN-007X Crane and Winch Operations

PROCEDURE. Revision: 1. Operative Date: 10/04/2018 Department: HSEC. Author: D Steel CONTENTS

"RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS"

PURPOSE: The purpose of this Operating Policy/Procedure (OP) is to ensure that material handling devices are used correctly and safely.

Rigging Safety. 1 Copyright 2014 by PEC Safety Management, Inc. PPT-SM-RIGGING 2014

Guidance on Using Temporary Suspended Access Equipment

SEMFEW339 - SQA Unit Code H1WC 04 Slinging, lifting and moving materials and components

Rigging Safety 16 Hour (API RP 2D 7 th Edition) Course Outline

M&EE Networking Group

Managing Mobile Crane Hazards. Paul Satti Construction Safety Council. Hazards of Working Around Cranes. Key Concepts:

BEST PRACTICE GUIDE LIFTING OPERATIONS

Provider of Training for the Management & Supervision of Lifting Operations

Geotechnics, Face and Stockpile Operations

Safe Work Method Statement

A GUIDE TO BUYING FALL ARREST EQUIPMENT. uk.rs-online.com (UK customers) (International customers)

Crane & Rigging Brain Teasers

CONTROL OF HAZARDOUS ENERGY

Lift-All Wire Rope & Slings

Instructions for Use Wire Rope Hoist SAT 08 / SAT 16 / SAT 32

MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM

DREW UNIVERSITY FALL PROTECTION PROCEDURE (DRAFT 12/11)

September 27, DOE-RL-92-36, Hanford Site Hoisting and Rigging Manual. Wire Rope. Page 1 CONTENTS

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

PRO Lifting Operations

Roughneck TM Mesh Slings

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)

Suitability of Work Equipment

RECOMMENDED PRACTICE & GUIDELINE

LIFTING PLAN PERMIT TO WORK RISK ASSESSMENT

Premium PowerPoint Presentation. Rigging Review

BCSA Guide to the Management of Site Lifting Operations

Duties of WAH Competent Persons

GENERAL GUIDELINES FOR PROPER RIGGING PRACTICES AND INSPECTION & REMOVAL CRITERIA FOR SLINGS PER OSHA

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

8. Fall Protection Procedures WAC

Lyftkranar Utbildning av lastkopplare och signalmän (ISO 23853:2004, IDT) Cranes Training of slingers and signallers (ISO 23853:2004, IDT)

Ground Release Shackle

M S I C R A N E S C A L E

(Draft) Guidance Notes on Safe Use of Lorry-mounted Crane

Health and Safety Inspection Procedure

Versie Date: USAGE AND SAFETY MANUAL SPREADERBEAMS

JOB HAZARD ANALYSIS (JHA)

1. Product Name. 2. Product Code. 3. Colour. 4. Brief Description. 5. Contents. Itinerant Frame. Likely to be as shown

The purpose of this document is to establish the procedures for accident prevention and investigation at (Insert Company Name) jobsites.

BRITISH STANDARD BS : Code of practice for. Safe use of cranes. Part 11: Offshore cranes ICS

FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

Worker s Safety Handbook for Rigger and Signalman

steel wire rope slings and fittings

Safe Working at Heights Theory Assessment

Care, Use and Inspection

Removal of Lead-Based Paint

1.0 Purpose: To provide guidelines for selection, usage, inspection and rejection of rigging equipment

Commercial Chain & Fittings

T130/T131/T147. Economy Basket Stretcher with Lifting Kit

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

This written Compressed Gas Plan is kept at the corporate office and in the written Safety & Health Program.

GUIDE 2002 HEALTH AND SAFETY FOR ARTIFICIAL CLIMBING STRUCTURES AND OPERATIONS FOR DESIGNERS, MANUFACTURES, SUPPLIERS, OPERATORS AND USERS

Reduced impact Forces Built-in energy absorber limits the average fall arresting forces to 900 lbs. (4kN) for added safety.

5. Requirements for Lifting Operation

Potential risk of injury to staff

File: PRODUCT SUPPORT Paweł Ciechanowski Technical specification Competition steel hammers

Trailer Cargo Anchoring Devices

ARKANSAS TECH UNIVERSITY FACILITIES MANAGMENT HEALTH AND SAFETY MANUAL

Crane Rental Heavy Machinery Moving Project Management

HOW TO PREPARE FOR THE LEVEL A CRANESAFE CERTIFICATION ASSESSMENT

MoBiLe CrAnes. surelift. B y W i r e r o p e i n d u s t r i e s. tower CrAnes. port CrAnes

Air Conditioner Installer Initial work capacity form

WIRE ROPE AND SLING BASICS. Total. of Wires WIRE ROPE SLINGS. Use of EIP, IWRC rope gives 15% greater capacity than IP, IWRC ropes.

Testing and Inspection. eurosafesolutions.com

GENERAL SAFETY INSTRUCTION GSI-M-2 STANDARD PRESSURE EQUIPMENT

EM385 Construction Safety and Health Certification Course Section 12 Control of Hazardous Energy

Confined Space Program

INSTRUCTIONS FOR USE

SECTION FACILITY FALL PROTECTION PART I - GENERAL

Lifting equipment for the health and care sectors

Safety Services Guidance. Guidance on Statutory Inspections

The Lifting Operations and Lifting Equipment Regulations 1998 ('LOLER') How they apply to rope-based access systems for work at height

Training For The Future

MANITOWOC MODEL TON CAPACITY

Transcription:

On the Lee Tunnel project, some significant near misses involving cranes have occurred this year. Experience has shown that lifting operations can be hazardous work activities if not properly planned. Safe lifting operations will depend upon: - The availability of suitable lifting equipment, that is properly maintained, checked and certified. - The provision of adequate information, instruction, training or supervision for everyone involved - Thorough pre-planning of each lifting operation. A lifting plan must be in place before any lifting operation. - Compliance with safe systems of work as detailed in risk assessment and method statement (lifting plan) How about lifting? Lifting Equipment Lifting Accessories One and two leg Chain Slings Webbing sling Hooks Wire rope sling Leverhoists Shakles Lifting points Eyebolt

What to do? Before Lifting MONTHLY SAFETY FOCUS JULY 2013 Any lifting operation identified in your method statement must be risk assessed. Ensure that a lifting plan is produced by a competent crane (LA) Appointed Person. The lifting plan must be implemented by a Crane Supervisor who is appointed to supervise the operation. Ensure that the crane operator and slinger/signaller are fully briefed on the lifting plan. Both of them must have current CPCS competency cards in their possession. Check the lifting equipment and the lifting accessories. Consider the environment and the weather conditions. A Crane Coordinator shall be appointed whenever there are more than two cranes operating in the same area and there is a risk of collision of the loads or crane jibs. Their duty will be to coordinate the lifting operations to ensure there is no collision. The crane coordinator must hold the crane supervisors competency certificate as a minimum. Examination Prior to commencement of work the Site Manager/Deputy shall: Ensure that a current Declaration of Conformity or a test & thorough examination certificates exist for each item of lifting equipment. Ensure that marking and capacity on the chain correspond to the information given on the inspection certificate or certificate of conformity; Ensure that a thorough examination has been carried out in accordance to the following table. Ensure that all lifting accessories are marked with the Safe Working Load. Ensure that the weights of loads to be lifted are known in advance. Ensure that a visual inspection and detect any broken or damaged parts.

Lifting Equipment FREQUENCY 6 months (used for people) 12 months otherwise Lifting Accessories 6 months MVB System Colour Coding of Lifting Accessories: Keep the record of the thorough examination Check the working environment... And the weather Crane manufacturer s operating instructions will specify a maximum wind speed for safe operations. These will be specified in the lifting plan.

Lifting Follow the Lifting Plan. Follow the rules. All loads must be slung by a competent slinger / signaler that remains in contact with the operator to direct the load at all times (visually or using radio) Ensure that the crash radio is working and is turned up sufficiently. All crane operators must have an in-date suitable competence card and follow the instruction of the slinger / signaller. Note: Ensure that the slinger / signaller is known by the operator undertaking the lifting operation. Use a tag line / guide rope to guide the load 450 kg 120 o 240 kg 30 o 320 kg 260 kg 60 o 90 o

Examples of how to calculate sling leg loads After Lifting Note: 1000 LBS = 453.592 kg Where possible chain slings should be stored in clean and dry conditions and protected from corrosion.