Standard Operating Manual

Similar documents
Standard Operating Manual

Standard Operating Manual

Standard Operating Manual

Standard Operating Manual

Standard Operating Manual

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

Oerlikon Sputtering Evaporator SOP

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1.

Unaxis ICP/RIE SOP Revision 8 09/30/16 Page 1 of 5. NRF Unaxis ICP/RIE Etch SOP

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions

Nordiko Metal Sputtering System Standard Operating Procedure

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

Standard Operating Manual

SPUTTER STATION STANDARD OPERATING PROCEDURE

Basic ICP Operating Procedures

Operating Procedures for Metal Evaporator I

OXFORD PLASMALAB 80PLUS (CLOEY)

PLASMA ENHANCED CHEMICAL VAPOR DEPOSITION (PECVD) SOP OXFORD PLASMALAB SYSTEM 100

STS PECVD Instructions

Standard Operating Manual

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Edge Isolation Tool. Standard Operating Procedure. Version 1.1. Date: Prepared by, Sandeep S S. Department of Electrical Engineering

Arizona State University Center for Solid State Electronic Research. Table of Contents. Issue: C Title: Oxford Plasmalab 80plus (Floey) Page 1 of 8

Revised: June 7, 2017

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

Usage Policies Notebook for AMST Molecular Vapor Deposition System MVD 100

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

Usage Policies Notebook for Trion RIE / ICP Dry Etch

Unaxis PECVD. SiH4 (5% in He)

COMELEC C-30-S Parylene Coating System

Angstrom E-Beam Instructions. PROCESS CHECKS: the tooling factors of each metal; Ti/Au layer for wire bonding pull test.

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS

QUORUM TECH 150RES THE FIRST AND THIRD WEEK WILL BE SET UP FOR CARBON COATING THE SECOND AND LAST WEEK WILL BE SET UP FOR GOLD COATING

Usage Policies Notebook for Parylene Coating System

Notes-PECVD: Chamber 1

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS

University of MN, Minnesota Nano Center Standard Operating Procedure

University of MN, Minnesota Nano Center Standard Operating Procedure

Angstrom Dielectric Sputterer Operation Manual

Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch

Arizona State University NanoFab PLASMATHERM 790 RIE. Version A

Plasma Asher: March PX-500 User guide (May-30, 2017)

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

STS ICP-RIE. Scott Munro (2-4826,

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

Usage Policies Notebook for STS DRIE System

Standard Operating Procedure. For. PVD E-Beam

KARL SUSS MJB3 UV400 Mask Aligner Standard Operating Procedure

Standard Operating Manual

Approved by Principal Investigator Date: Approved by Super User: Date:

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

COBILT CA-800 Mask Aligner Equipment Operation

Plasma-Therm PECVD. Operating Characteristics. Operating Instructions. Typical Processes. I. Loading. II. Operating

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

NORDSON MARCH PX-1000 PLASMA ASHER STANDARD OPERATING PROCEDURE Version: 1.0 July 2016

Cryo-Evaporator Operation

Thermcraft Tube Furnace General Use

The SPI Sputter Coater Handbook

Leaks, contamination and closed loop control how RGAs make coating processes more profitable

Operating Procedures for the. SAMCO ICP RIE System

Savannah S100 ALD at SCIF, UC Merced Standard operating Procedure

Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7

Standard Operating Manual

THERMAL EVAPORATION UNIT (for Al evaporation)

March CS-1701F Reactive Ion Etcher

Usage Policies Notebook for Karl Suss MA6 Mid / Deep UV Mask Aligner

OPERATION OF THE DIMPLER

University of Minnesota, MN Nano Center Standard Operating Procedure

Nanofabrication Facility: Sputter Evaporator SOP Rev. 04, June 2007

LESKER #1 STANDARD OPERATION PROCEDURE

The MRL Furnaces USED FOR THIS MANUAL COVERS

NRF Suss Delta 80 Spinner SOP Revision /14/2016 Page 1 of 11. Suss Delta 80 Spinner SOP

Temescal BJD-1800 E-Beam Evaporator 1 System Overview - Cryo-pumped for typical base pressures in the low 10e-7 Torr range. - Four pockets in the

1)! DO NOT PROCEED BEYOND THIS MARK

OLED vacuum deposition cluster system Sunicel Plus 400 / Plus 400L (Sunic Systems)

Cambridge NanoTech: Savannah S100. Table of Contents

WATER CONTROL SYSTEM QUICK START

Plasma II (AXIC) Standard Operating Procedure. Revision: 1.0 Last Updated: Feb.6/2013, Revised by Grace Li

REPRODUCIBILITY IN OPTICAL THIN FILM PROCESSING PART 1, THE VACUUM AND PUMPING

Xactix XeF2 OPERATION MANUAL

Chapter 2 General description of the system

Plasma Cleaner. Yamato Scientific America. Contents. Innovating Science for Over 125 Years. Gas Plasma Dry Cleaner PDC200/210/510 PDC610G.

March Asher Operation

RAM 4021-DPX Operation Manual

Quickstart Installation Checklist (Please refer to operation manual for complete installation instructions)

PRad Target. Chris Keith JLab Target Group

BEST KNOWN METHODS. Transpector XPR3 Gas Analysis System. 1 of 6 DESCRIPTION XPR3 APPLICATIONS PHYSICAL INSTALLATION

Xactix Xenon Difluoride Etcher

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Usage Policies Notebook for Thermco Atmospheric Diffusion Furnace system

Login to ilab Kiosk. Revised 05/22/2018. Load your sample:

Approved by BNC Managing Director Paul Lum Date: Approved by PI (s) /Super User (s): _Peter Hosemann/Andy Minor_Date:

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

CLEANLINESS STANDARD NCPRE tool contamination classification

Operating Instructions

RAM Operation Manual

Automatic LN2 Fill Station Instructions

OXY Integral. INTERCON ENTERPRISES INC Tel: Fax: Internet:

Transcription:

Standard Operating Manual Denton Explorer 14 RF/DC Sputter Version 1.0 Page 1 of 11

Contents 1. Picture and Location 2. Process Capabilities 1. Cleanliness Standard 2. Available for Sputtering Materials 3. Performance of the Denton Explorer 14 RF/DC Sputter 3. Contact List and How to Become a Qualified User 1. Emergency Responses and Communications 2. Training to Become a Qualified Denton Explorer 14 RF/DC Sputter User 4. Operating Procedures 1. System Description 2. Safety Warnings 3. Operation Rules 4. Initial System Checks 5. Status Checks 6. Venting the Chamber (Before Loading Wafers) 7. Inspecting the Chamber Before Use 8. Load Wafers 9. Pumping Down the System for Sputtering 10. Start your Sputtering Process 11. Venting the Chamber (Before Unloading Wafers) 12. Pumping Down the Systen for Idle Version 1.0 Page 2 of 11

Denton Explorer 14 RF/DC Sputter Cathode #3 Picture and Location Cathode #1 Cathode #2 Main Chamber RF Power Readout Denton Explorer 14 RF/DC Sputter Ar Gas Valve DC Power Readout Version 1.0 Page 3 of 11

Display ON/OFF Switch (RF Power) ON/OFF Switch (DC Power) This tool is located at NFF Enterprise Center Cleanroom Room 4162 Version 1.0 Page 4 of 11

Process Capabilities Cleanliness Standard Denton Explorer 14 RF/DC Sputter is Non-Standard equipment for DC and RF sputtering process of metals. Available for Sputtering Materials The following sources are available in Denton Explorer 14 RF/DC Sputter. Denton Explorer 14 RF/DC Sputter: Ti, TiW, Ag, Al (pure), AlSi and Cu for 2 to 4 wafer or small piece sample. NOTE: Consult a NFF EC staff member prior to do new materials other than above listed materials. Hazardous or Radioactive materials are not allowed to be sputtered in Denton Explorer 14 RF/DC Sputter. Performance of the Denton Explorer 14 RF/DC Sputter What the Denton Explorer 14 RF/DC Sputter CAN do Denton Explorer 14 can provide to sputter thin films thickness ( 50A thick) or thick films thickness ( 1.5um thick). Thin films: Ti, TiW and Ag. Thick films: Al (pure), AlSi and Cu. Denton Explorer 14 is suitable up to 4 wafer or small piece sample. What the Denton Explorer 14 RF/DC Sputter CANNOT do Denton Explorer 14 RF/DC Sputter should not be used for replacement of VARIAN 3180 and CVC-601 to sputter thick films, e.g. over 1.5um Denton Explorer 14 RF/DC Sputter should not be used for dielectric material sputtering. Users cannot modify the recipes, such as process minimum vacuum, cathode power (RF/DC), ignition pressure, argon gas flow, please consult NFF EC Version 1.0 Page 5 of 11

staff member. Process time is not allowed for longer than 400 seconds per run and there should be 10 minutes for chamber cooling. Contact List and How to Become a User Emergency Responses and Communications Security Control Center: 2358-8999 (24hr) & 2358-6565 (24hr) Safety Officer: Mr. Wing Leong CHUNG 2358-7211 & 64406238 Deputy Safety Officer: Mr. Man Wai LEE 2358-7900 & 9621-7708 NFF EC Technician: Mr. Peter Yiu Cheong PUN 2358-7225 & 2358-7218 NFF Phase 2 Technician: Mr. Wilson Pui Keung YIP 2358-7894 Training to Become a Qualified Denton Explorer 14 RF/DC Sputter User Please follow the procedures below to become a qualified user of Denton Explorer 14 RF/DC Sputter. 1. Read all materials posted on the NFF website about Denton Explorer 14 RF/DC Sputter. 2. Send an e-mail to Mr. Peter PUN requesting Denton Explorer 14 RF/DC Sputter safety operation training. Schedule of training will be informed within several weeks, depending on number of requests. Operating Procedures System Description Denton Explorer 14 RF/DC Sputter is a sputtering system installed with three targets and it allows single layer and multilayer processes. One of the cathodes is energized by a radio frequency (RF) power source whereas the other two are direct current (DC) Version 1.0 Page 6 of 11

powered. This means that the RF/DC cathodes can sputter from conductive targets. A large collection of targets is available for this sputtering system but obviously, only three can be installed at any given time. In the event that a target is required which is not currently installed in the sputtering system, the user must submit a target change request via email or phone to NFF EC staff. The request must be submitted at least 2 days prior to needing the target. Emergency off and Interlock facilities Emergency Stop is provided to shut down the sputtering system in an emergency. An emergency off switch, with normally-closed contacts, is mounted on bottom of the console. The switch is activated by pressing a 40mm diameter red Emergency Stop button. PLC interlock chain The interlock chain is monitored by the software, but acts independently. It is also supplemented by machine protection sensors, which operate only via the software. Safety Warnings This equipment can cause injury if not used in a cautious manner. 1. Do not operate the system if any of the doors, panels or covers is removed. 2. Ensure that all personnel who operate this equipment are trained to use the equipment, and are alerted to the range of hazards present. 3. When opening the chamber, ensure that personnel stand clear of the chamber door. 4. Close chamber door carefully, ensure that personnel vacate the vicinity of the door and its operating mechanism before it is closed to avoid trapped fingers etc. 5. Ensure that you do not leave tweezers from the chamber, damage the turbo pump could occur. 6. If the sample to be sputtered contains thin film photo resist for liftoff, then the Version 1.0 Page 7 of 11

substrate must be baked immediately before placing it in the chamber. Operation Rules 1. If an equipment failure while being used, never try to fix the problem by yourself. Please contact NFF staff. 2. Do not operate equipment unless you are properly trained and approved by NFF staff. 3. Do not leave an on-going experiment unattended. 4. Do not run sputtering process for long than 400 seconds per run. 5. Should be at least ten minutes for chamber cooling after sputtering process or in between two processes. Initial system checks 1. Verify that the needed targets have been installed in the chamber. The targets currently installed can be checked on the log sheet or via correspondence with NFF EC staff. 2. If the required targets are not in place, submit a target change request via email or phone to NFF EC staff. The request must be submitted at least 2 days prior to needing the target. 3. Review the desired recipe to check that every parameter is set as required, especially the deposition time which determines the coating thickness. Status checks 1. Check the NFF website for reservations, problems and to see if it is already occupied by other users. 2. Check for an EMPTY sign attached to the machine. Do not use if an IN USE signs or MAINTENANCE sign is there. Check for problem notes. 3. The system is available if the initial system and status checks are normal. Check-in the equipment and enable the system on NFF Machine Reservation System. Place sign IN USE on the machine. Version 1.0 Page 8 of 11

Venting the Chamber (Before Loading Wafers) 1. Make sure that the system is not in the service mode position. 2. Turn off all internal sources of power (RF power and DC power). 3. Select the Auto Control screen indicator. 4. Select the Auto Vent indicator button. 5. System status will display Auto Mode. 6. Chamber will safely vent to atmospheric pressure. Inspecting the chamber before Sputtering 1. Review the previous entry in logbook to ensure there are no reported problems. 2. Fill in the log sheet with your name, NFF project number, reservation timeslot, source, thickness, RF power, DC Bias, gases flow rate and processing time being used. 3. Minimize time that the chamber opens. Load wafers 1. Place your sample to face upward in the center of the substrate holder. Before beginning, be sure to wear gloves to reduce contamination and to protect the hands. 2. Allow to load 3 pieces of 4 full wafers (100mm) at the same time. 3. Check the O-ring of the chamber lid to ensure that they are free of particles, dirt and not damaged. Pumping Down the System for Sputtering To pump down the system, use the following procedures: 1. Make sure the system is NOT in Service mode. 2. Select the Auto Control screen indicator. 3. Select the Auto Pump indicator button. 4. System Status will display Auto Mode. 5. System will safely pump from atmosphere to high vacuum. 6. The base pressure is 6e-06 Torr. Version 1.0 Page 9 of 11

Remark: Turning off the rough pump will cause all process and pumping actions using that pump to stop. Start your Sputtering Process Automatic Process Run: 1. Make sure in System Control page, press the Auto Control button, select Auto Pump button for pump down the system. 2. Check that the system has pumped down to base pressure. (The base pressure is 6e-06 Torr). 3. Auto RF/DC Sputtering is the easiest and fastest procedure overall. However, note that the Pre-Sputter Time and Sputter Time vary with different sputtering material and output power. You can select Auto Control button and then select Auto Setup button to modify the Pre-Sputter and Sputter time. 4. Make sure you will select RF or DC sputtering process. 5. Ensure to turn on DC power supply (XANTREX, XFR 600) when you choose DC sputtering process. 6. Otherwise, when you choose RF sputtering process, please turn on RF Generator (SEREN R600 13.56MHz) and RF Automatic Matching Network Controller (SEREN MC 2 ). 7. And then press Close button to return to Auto Control page. 8. Select desired Cathode number (1, 2 or 3) and then press Auto Process for start your sputtering process. 9. Until the process completed, please give 10 minutes for chamber and target cooling. 10. Then turn off DC power supply or RF Generator and RF Automatic Matching Network Controller. 11. Press Auto Control button and select Auto Vent button for chamber vent. 12. Until the pressure has reached to atmospheric pressure, open the chamber door for unloading your samples. 13. Close the chamber door and press Auto Pump to pump down the system. Version 1.0 Page 10 of 11

Venting the Chamber (Before Unloading Wafers) 1. Ensure that the system is not in service mode position. 2. Turn off all internal sources of power (RF power and DC power). 3. Select the Auto Control screen indicator. 4. Select the Auto Vent indicator button. 5. Chamber will safely vent to atmospheric pressure. Pumping Down the System for Idle To pump down the system, use the following procedures: 1. After unloading the samples, close the process chamber door and lock the door. 2. Ensure that the System Control screen is displayed. 3. Ensure that the system status is displayed at Auto Mode. 4. Then select the Auto Control button and press Auto Pump button for system pump from atmosphere to high vacuum. 5. Ensure that the status indicators (Vacuum/Skin/Door/Water/Crossover Switches/Turbo at speed/minimum Vacuum) are in green color. 6. DON T GO AWAY YET! 7. Monitor the pressure to make sure that the base pressure can reach to 6e-05 Torr. 8. Clean up the area and move the items back to their proper positions. 9. Place an EMPTY sign on the machine. 10. Fill in the logbook, completely noting any problems. Remark: Turning off the rough pump will cause all process and pumping actions using that pump to stop. Version 1.0 Page 11 of 11