SPECIALISED SERVICES. Kris Vlaeminck, Jan De Nul Group, Luxembourg, explains the use of dredging vessels on the Macedon Project in Australia.

Similar documents
Ocean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras

DREDGING. with particular emphasis on Oil and Gas activities in Canada

Dredging Keeping Our Underwater Highways Open

Pre-Trenching, Pre-Sweeping and Backfilling for the 36 Offshore Pipeline Project in Taiwan

Protectingpipelinesfor

CONDITIONS OF USE OF THIS REPORT COPYRIGHT NAMIBIAN MARINE PHOSPHATE (PTY) LTD 2014 ALL RIGHTS RESERVED

Ocean Structures and Materials Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras

APPENDIX D Oil Loading Pipeline - Options

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

EXECUTIVE SUMMARY MARINE AGGREGATE DREDGER (MAD) 5600

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

Life COAST-BEST ENV/IT 426

R. Randall Center for Dredging Studies Texas A&M University

Ennore Coal Port Project: Port Basin and Entrance Channel

Shallow successes. OES, previously Ocean Engineering Systems,

Dredging Stiff to Very Stiff Clay in thewielingen Using the DRACULA System on a Hopper Dredger

Cook Inlet pipeline crossing is about making the best choices

Eemszinker: Safely Trench Dredging a Live Gas Line

Rule 3 - General definitions

3 CONSTRUCTION. 3.1 Construction Methods and Sequence. 3.2 Construction Sequence

TACKLING JACK-UP RIG NO-GO LOCATIONS. Prakasha Kuppalli ABSTRACT

A Professional Commercial Diving & Marine contractor. Tel :

GLS New Technology Rising to the Challenge of Subsea lifting. Subsea 2012 Paddy Collins

BEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI. Capt. MVR MURTHY ABSTRACT

Trenching of Pipelines for Protection in Ice Environments

A DECADE OF EXPERIENCE

Self Propelled Backhoe Dredger. Pat M BV CLASSED I 3/3 COASTAL PC 1400 AQUADIGGER MONTABERT VSS SHD HAMMER

Item 404 Driving Piling

MILE POINT TRAINING WALL JACKSONVILLE, FL. Geotextile Tube Installation

Joseph Plateau. stone dumping & MINING VESSEL SIMON STEVIN

Certified Professionals in Hydrographic Solutions

Fully Submersible Heavy Lift Vessel

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM. TABULATED DATA Effective August 25, 2015

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS PSH HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM. TABULATED DATA Effective December 10, 2013

INSTALLING SUBAQUEOUS PIPE

Measurement of underwater noise arising from marine aggregate operations

14 NOISE AND VIBRATION

WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE

Fehmarnbelt Fixed Link. Geotechnical Large Scale Testing

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

Order no. 939 of 27 November 1992 on the protection of submarine cables and submarine pipelines (the Cable Order)

1. Outline of the newly developed control technologies

Geo-Vibro Corer

Lecture 8&9: Construction Dewatering

Update on Canadian Research Vessels Ship Procurement Projects

Hydrographic Surveying Methods, Applications and Uses

Ninilchik Harbor Page 2 of 11

THE MISSING LINK - INSPECTING THE FINAL CRITICAL SECTION OF A LARGE CRUDE TRANSMISSION AND EXPORT SYSTEM

Richards Bay Coal Terminal

Navarre Beach & Dune Restoration Project Status Report to be regularly updated June 17, 2016 Report

Construction Dewatering

Nome Harbor Page 2 of 12

DONGE FLUSHING YARD. This combination of using and constructing equipment improves the quality of our products since 25 years.

Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras

The SDS Skip. Subsea Deployment Systems Ltd.

Stability of Pipeline and details of Anchor blocks

AN INNOVATIVE TRAILING SUCTION HOPPER DREDGER WITH AFT-CENTER DRAG SYSTEM AND A WIDE SPAN DRAG-HEAD

ROYAL VANCOUVER YACHT CLUB

E4014 Construction Surveying. Hydrographic Surveys

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

photo: deltaport berth 2 project

CentrePort Shipping Channel Deepening Project

Platelets & Plasma The Management of Unplanned Flow

Port of Zeebrugge: Upgrading the Brittannia Dock

Planning Considerations for Nearshore Placement of Mixed Dredged Sediments

Stevpris installation

Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland

AUTOMATIC DREDGING PROFILE AND CONTOUR CONTROL

Site-Specific Assessment of Jack-Ups Part 5: When Things Go Wrong Lessons and Mitigations

Angela Lane, Lowe Environmental Impact / Karen Akuhata (WDC) The Wairoa wastewater treatment system requires a replacement consent by May 2019.

Offshore engineering science

Learn more at

Implications of proposed Whanganui Port and lower Whanganui River dredging

3. Types of foundation

TECHNICAL MEMORANDUM 002 EMORANNO. 001

Real Property Institute of Canada Marine Infrastructure National Workshop. A new era in dredging for Eastern Canada

ROV Development ROV Function. ROV Crew Navigation IRATECH SUB SYSTEMS 2010

INCREASE OPERATING DAYS ENHANCE DECK SAFETY AND SPEED MINIMIZE SEA SICKNESS HEAVY DUTY GYROSTABILIZERS FOR COMMERCIAL & DEFENCE APPLICATIONS

Sustainable Installation & Maintenance Methods Keith McDermott Commercial Director for Tidal Energy Mike Wilson - Managing Director Mike Wilson

OECS Regional Engineering Workshop September 29 October 3, 2014

Fully Submersible Heavy Lift Vessel

REPORT OF INITIAL SURVEY OF AN UNKNOWN BARGE OFF OF CEDAR POINT, SANDUSKY, OHIO. July 26-27, Submitted to Cleveland Underwater Explorers, Inc.

Challenges in Ship Design to Maintain Thrusters inside Ship

Dynamic Positioning: Method for Disaster Prevention and Risk Management

Engineering Surveying - II CE313. Hydrographic Survey Lecture 06 Muhammad Noman

Risk Assessment and Mitigating Measures Regarding Pile Installation at EBS Biohub Jetty

HARBOUR SEDIMENTATION - COMPARISON WITH MODEL

CARGO OPERATIONS (TANKER) MANUAL CH.05 BALLAST HANDLING. Rev. No: 2. Page: 1 of PURPOSE

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual

HDPE. Dredging Pipeline

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation

A Single-Point Mooring System for Direct Pumpout of Hopper Dredges

Field Development & Construction

EXCITING WORLD OF STEEL STRUCTURES

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF SHIPS IDENTIFIED BY THEIR MISSIONS DREDGERS AND MUD BARGES CHAPTERS SCOPE

Before considering the present day offshore diamond mining industry, it is useful to first step back and understand the origin of this industry.

A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING

BOURNEMOUTH BEACH MANAGEMENT

Gold Coast Barges-Vessel Information Sheet Vessel Name: 'ICEBREAKER'

Caltec. The world leader in Surface Jet Pump (SJP) and compact separation systems for upstream oil and gas production enhancement

Transcription:

SPECIALISED SERVICES Kris Vlaeminck, Jan De Nul Group, Luxembourg, explains the use of dredging vessels on the Macedon Project in Australia.

Figure 1. Shore approach for the Macedon project in Australia. IN AUSTRALIA S pecialised services for the offshore oil, gas and renewable energy industries are a key part of the services provided by Jan De Nul Group. These works include pre-trenching for offshore pipelines, pre-sweeping of the sea bottom and backfilling of the trenches. The services also include shore approaches and possible related structures that might need to be installed, such as cofferdams. Jan De Nul s large fleet of dredging and offshore installation vessels provides the necessary flexibility to execute these kinds of offshore services, as shown by its trenching works for the Macedon Project in Australia.

General working methods Pre-sweeping On the seabed, sand dunes often occur. To avoid over stressing and free spans of the offshore pipelines, the dunes need to be removed to prepare a smooth enough seabed before the actual trenching works and pipeline installation can start. The presweeping is mostly done by means of trailing suction hopper dredgers. Pre-trenching Defining the required equipment for a pre-trenching project depends on the water depth and the type of soil to be dredged. Jan De Nul Group uses three types of vessels to excavate an offshore trench: trailing suction hopper dredgers, cutter dredgers and backhoe dredgers. For shore approaches, land based excavation cranes or backhoe dredgers can be used. In order to meet the market demands, the Group can purchase, build or rebuild project specific equipment. For example, the Group invested in amphibious excavators Starfish I and Starfish II. Thanks to the raised location of the engine and cabin, Starfish I Figure 2. The backhoe dredger Vitruvius can be equipped with buckets with a grab capacity varying from 15-40 m³ and is often used to dredge land approaches. Figure 3. One of the 28 hopper dredgers of Jan De Nul Group. These vessels are used to dredge loose material and are able to excavate trenches up to 155 m deep. can work in water depths up to 10 m, while Starfish II even disposes of an excavator that can be placed on the seabed, while the control unit and cabin are connected with an umbilical and placed on a pontoon. Using trailing suction hopper dredgers These dredgers are seagoing self-propelled vessels that are equipped with either one or two suction pipe(s), which are designed to trail over the side of the vessel on the sea bed. These vessels are mostly used for dredging loose material such as sand, clay or gravel, in deeper water depths. Once the dredger approaches the trenching area, it reduces its sailing speed and hoists its suction pipe overboard, lowering it to the required depth. The vessels use a dynamic tracking system that allows the drag head to follow a predefined trench at low tolerances, resulting in minimum quantities being trenched at a lesser cost. Dynamic position and dynamic tracking systems are essential for such operations. Generally speaking, they allow working vessels to maintain position, course and track accurately. In addition, they often enhance safety considerably and indirectly reduce fuel consumption and emissions. At the lower end of the suction pipe a drag head is attached, which ensures that the maximum amount of seabed material is drawn in via the suction pipe during the dredging process. Suction is provided by a dredge pump situated in the hull of the vessel. Some vessels have an underwater pump on the suction pipe in order to enable them to dredge at greater depths. When in operation with its drag head on the sea bottom, the hopper dredger moves fairly slowly relative to the ground. The speed is varied depending on the material being dredged. The trench is excavated by removing consecutive layers of the seabed material. The average minimum width of the trench depends on the width of the used drag head. With respect to the average trench dimensions, 1 m over width at each side is dredged as a result of positioning tolerances. As soon as the dredger is fully loaded, she hoists the suction pipe onboard and sets course towards the discharge point. Once positioned the dredger opens its hull to unload, followed by a cleaning process making use of the jets inside the hopper, until the hull is completely empty and free of any dredge soil where after the bottom doors are closed. A new dredging cycle can commence by sailing back to the trench area. The dredging process is controlled by a combination of sophisticated computerised automation and highly skilled operators. The navigator and the dredge pipe operators work in close co-operation during the dredging process. All important parameters are continuously controlled during the dredging process by computers and feedback systems. The fleet of Jan De Nul Group includes 28 hopper dredgers. Using the largest of its kind in the world: Cristóbal Colón and Leiv Eiriksson, trenches up to 155 m water depth can be dredged. Using cutter suction dredgers The large seagoing cutter dredgers can tackle the hardest and most difficult soil conditions during shore approach dredging. These vessels are equipped with a rotating cutter head cutting hard soil into fragments. The cut soil is then sucked in by dredge pumps. Cutter dredgers are mostly stationary suction World Pipelines / REPRINTED FROM DECEMBER 2014

dredgers that cut the soil according to pre-set profile. In other words, the vessel does not sail during dredging activities. The material is then pumped ashore using pumps and a floating pipeline or loaded into a split hopper barge moored alongside, which in turn can the offload the dredge sediment at the set location. Large cutter suction dredgers are self-propelled which means they can sail autonomously. Jan De Nul Group disposes of 14 cutter dredgers, including the most powerful cutter dredger in the world J.F.J. De Nul, with a total installed diesel powers of 27.240 kw. Using backhoe dredgers A backhoe dredger is a spud barge, equipped with a hydraulic excavator, the main component, and three spuds: one spud is located in the centre of the pontoon at the stern in a spud carriage system. This spud can be lifted and moved along the centre line of the pontoon. The two other spuds can only be lifted/lowered. The working method of the dredger is as such that it is towed into location and then fixed into position by its three spuds. Before lowering the spuds, the exact position as shown on the DGPS positioning system is checked in order to ensure that the spuds are lowered in the trench alignment. The dredger will then move into the exact starting position by using the spud carrier and the bucket. The dredger will excavate in steps of 6 m length. When one step has been completed, the dredger will release the front spuds from the sea bottom and raise them approximately 2 m above the seabed. The spud carrier then shifts the dredger 5 m backwards in the dredging lane and a new dredging cycle restarts. The dredger typically operates backwards, i.e., it moves in the opposite direction of the excavator. Consequently, the material that falls down the slope created perpendicular to the centreline falls towards the bucket, leaving a levelled trench bottom. The dredger material can be side cast alongside the trench for reuse as backfill material or can be loaded into a selfpropelled Split Hopper Barge and dumped at a designated dump location. Jan De Nul Group disposes of six backhoe dredgers, of which five are self-propelled. Survey during pre-trenching In order to be able to chart its offshore trenching projects in an accurate manner and to follow them up promptly and efficiently, Jan De Nul Group has set up its own survey division with experts and engineers deployed on various projects worldwide. The division has state-of-the-art, high-tech measuring equipment for hydrographical and topographical measurements at its disposal. The team also monitors closely all recent technological developments and tests them out in preparation for future challenges in the dredging and offshore industry. When pre-trenching is executed survey works can be done by means of a single or a multi-beam echo sounding system, depending on the water depth. The system can be installed in the moon pool of the hopper dredger or in case of dredging with another type of vessel a separate shallow draft survey vessel equipped with a hydrographical survey system will be used. The survey system provides online day-to-day survey information for the project team and client representatives. Cofferdam installation When an open trench is not possible, a cofferdam will be installed at the beach area in the tidal zone. A cofferdam is a temporary enclosure and is a welded steel structure, with components consisting of sheet piles, walls and cross braces. Once the installation of the sheet pile walls is complete, excavation between them can proceed. Normally, the trench of the seaside of the cofferdam is dredged by means of an elevated excavator of by a backhoe dredger. The area between the sheetpiles (i.e., the actual cofferdam) is excavated by means of shore equipment (excavator or crane). Cofferdam structures are dismantled after the ultimate work is completed. Backfilling After pipeline installation, the trench will be backfilled with previously excavated materials. This can be done using a backhoe dredger, a split hopper barge or a trailing suction hopper dredger, depending on the water depth. The backhoe dredger will position itself either alongside the trench. When side casting, it will install the excavated materials in the trench on top of the pipeline. When side casting is not allowed, the materials will be redredged and dumped in a barge which is moored alongside the dredger. The barge will split above the trench and the trench will be backfilled by dumping the materials in a controlled manner. The hopper dredger will be loaded and position itself above the trench where the material will be dumped by opening the bottom doors. It is also possible to execute trench backfilling by pumping material reversely through the suction pipe. In that case, the dredge pipe will be positioned above the trench. By use of interim surveys, it is possible to avoid displacement of the pipelines from its as-laid position. Specific case in Australia The Macedon and adjacent Pyrenees fields are located in offshore retention lease WA-12-R that is situated in the Northern Carnarvon Basin, approximately 100 km west of Onslow and 40 km north of Exmouth, Western Australia. The Macedon development included offshore services for the installation of Figure 4. Simulation of a drag head used to dredge trenches for the installation of offshore pipelines. REPRINTED FROM DECEMBER 2014 / World Pipelines

Figure 5. A typical cofferdam construction. Figure 6. The cutter dredger J.F.J. De Nul in front of a typical cofferdam construction. Figure 7. Jan De Nul Group s cutter suction dredger Fernão de Magalhães and Starfish I executing trenching works. World Pipelines / REPRINTED FROM DECEMBER 2014 a 75 km x 20 in. wet gas pipelines and a 75 km x approximately 120 mm OD umbilical from the subsea field to the onshore valve station. Pipeline and umbilical were to be buried below the natural seabed and shoreline and ensures sufficient backfill on top of the pipe/umbilicals, with a minimum of 2 m cover on top at the shore crossing. The awarded dredging case included trenching and backfilling the pipeline and umbilical in a common trench. The trench was excavated using two backhoe dredgers, one to execute the landfall dredging, and another one for the deeper sections. Hard layers of calcirudite were found in a few sections along the trench alignment. These layers needed to be pretreated using the backhoe dredger equipped with a hydraulic hammer. The hammer has been adapted to work underwater by connecting an air hose which creates overpressure preventing seawater from entering. After removal of the top soil by means of the conventional bucket, a layer thickness of 0.5-1 m was pretreated. As the length of the hammer s chisel is about 50 cm, the layer it can fracture is normally limited to the same depth, but depending on the rock quality the layer could be broken up to 1 m. The typical working method with the hammer is as follows: after fragmentation of a certain area, the hammer is replaced with the bucket to remove the fractured layer. Once the fragmented rocks are removed, the hammer is re-installed and the next layer can be fragmented. The same process is repeated until the required trench bottom level and stable slopes have been reached. The excavation was conducted with the aid of a diggercomputer, calibrated previously in x, y, z values for both seabed and design BOT levels. The dredging depth and width control and the dredging operations were closely and frequently monitored by regular interim surveys. The material was side cast next to the trench and re-used for backfill. The shore crossing was an open cut trench with a cofferdam. The termination point for the open cute shore crossing portion was approximately 150 m from the shoreline. The cofferdam was constructed by land based equipment. The actual execution was done using a temporary causeway into the surf area. A specialised rig was used to install the sheet piles. During the installation operations the progress of the sheet piling was closely monitored. Daily surveys were done to enquire quick feedback on the results. This feedback allowed the superintendent to control and if applicable to adjust operations and improve the process. In order to allow excavation of the cofferdam without failure of the sheet piling, horizontal reinforcement was needed. This was done by placing horizontal struts connecting both sides of the cofferdam. A hydraulic excavator (HEX) was used to dredge this part of the trench. The HEX was based on tracks and moved on and off its operational location. The dredged material was side casted and reused as backfill material afterwards. The overall project took 12 months to complete.