Minta Farm Precinct Structure Plan

Similar documents
Minta Farm Berwick S96A Transport Impact Assessment

STATEMENT TO PLANNING PANELS VICTORIA BY WILLIAM DE WAARD, TRAFFIC ENGINEER

Traffic Engineering Assessment. Additional Traffic Modelling at Minta Farm PSP 11. Prepared for Victorian Planning Authority

Acland Street, St Kilda

BROMPTON LODGE, CRANBOURNE PRECINCT STRUCTURE PLAN TRAFFIC ENGINEERING ASSESSMENT WOLFDENE PTY LTD PREPARED FOR

PROPOSED RESIDENTIAL SUBDIVISION

Traffic and Transport Assessment

PLAN 20 PUBLIC TRANSPORT NETWORK

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria

Classification Criteria

Barwon Heads Road, Armstrong Creek Traffic Impact Assessment Prepared for: Newland Developers Pty Ltd

Transit boulevard: A new road type for Sydney s Growth Centres

2.0 LANE WIDTHS GUIDELINE

Daleston Masterplan Traffic & Transport Assessment

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

10 SHERFORD Town Code

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

Policy Statement. Objective. Context. References and Supporting Documentation

DUNBOW ROAD FUNCTIONAL PLANNING

Access Management Guidelines February 2013 THE CITY OF

INDEX. Geometric Design Guide for Canadian Roads INDEX

Pakenham East PSP 1210

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road)

Table of Contents... i. 1. Introduction Proposed Amendment C162 (Mt Atkinson and Tarneit Plains PSP) Overview...

CITY OF SASKATOON COUNCIL POLICY

10.0 CURB EXTENSIONS GUIDELINE

COMMITTEE RECOMMENDATIONS. That Council approve:

Traffic and Parking Surveys

Proposed Residential & Retail Development at Geelong Rd Portarlington

To position power poles a safe distance from the road to minimise the likelihood of being accidentally hit by vehicles.

Design and Installation of Low Level Cycle Signals

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

Services Department A September 18, 2006 Region of Durham Recommended Arterial Corridor All Wards Guidelines Study

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Frome Street Bicycle Route

Downey Road. Transportation Improvement Study

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Highway 111 Corridor Study

Intersection Traffic Control Feasibility Study

Guide to Road Design Part 3: Geometric Design Session I 18 October 2016

Traffic Modelling and Intersection Analysis

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Growth Areas Authority 31 May Wyndham North Traffic Modelling and SIDRA Analysis

Truck Climbing Lane Traffic Justification Report

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Project Description Form 8EE

13M /09/13. St Germain Special Activity Precinct 1425 Pound Road & 2100 Thompsons Road Clyde North Transport Impact Assessment.

Liveable Neighbourhoods Design Code and Policy

Roadway Classification Review

NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE

Geometric Design Tables

Traffic Modelling Report

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

Public Works and Infrastructure Committee. General Manager, Transportation Services

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

Using Computer Modelling to Identify Road Safety Risks Vecovski, P. 1, Mak, J. 1, Brisbane, G. 1

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

Access Location, Spacing, Turn Lanes, and Medians

SECTION 1 - TRAFFIC PLANNING

Review of Guidelines for Cycleway Safety Fencing

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

The Safe System Approach

Sixth Line Development - Transit Facilities Plan

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

St Germain Special Activity Precinct 1425 Pound Road & 2100 Thompsons Road Clyde North Transport Impact Assessment

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

Giles Run Connector Road

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

MACKA S SAND PTY LTD

Appendix 5B Accessway standards and guidelines Appendix 5B Accessway standards and guidelines

SH1, Karo Drive Wellington Crash Reduction Study

Design Criteria. Design Criteria

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

SPEED CONTROL AT ROUNDABOUTS USE OF MAXIMUM ENTRY PATH RADII

INTERSECTIONS AT GRADE INTERSECTIONS

MEMORANDUM. Our project study area included the following locations:

Works Approval Application. G.2 Traffic

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) A: Class 2 Pedestrian / Cycle Ways. Pedestrian and Cycle Ways:

Road Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew

By: CHE ROS ISMAIL PROF DR MOHD ROSLI HAININ DR HARYATI YAACOB DR SITTI ASMAH HASSAN JGP-FKA, UTM

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

CHAPTER 1 STANDARD PRACTICES

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

102 Avenue Corridor Review

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION)

Sharrow Markings. Best Practice Guidance Note. February 2016

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016

Terwillegar Drive Expressway Draft Concept Plan

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

Transcription:

Minta Farm Precinct Structure Plan Concept Road Design Report Client: Victorian Planning Authority Project No. 161910 Final Report 05/10/17 1 st Floor 132 Upper Heidelberg Road Ivanhoe Vic 3079 PO Box 417 Ivanhoe Vic 3079 Ph: (03) 9490 5900 Fax: (03) 9490 5910 www.trafficworks.com.au

DOCUMENT CONTROL RECORD Document prepared by: Trafficworks Pty Ltd ABN 59 125 488 977 1 st Floor 132 Upper Heidelberg Rd Ivanhoe Vic 3079 PO Box 417 Ivanhoe Vic 3079 Ph (03) 9490 5900 Fax (03) 9490 5910 www.trafficworks.com.au DISCLAIMER The information contained in this document is intended to be received, used and relied upon by the named addressee or client only for the purpose for which it has been prepared. Trafficworks Pty Ltd does not warrant the accuracy or relevance of the information, including by implication, contained in this document if it is used or relied upon by any person other than the named addressee or client. Copying, reproduction including by electronic means, unauthorised use or disclosure of this document is prohibited except with the express written authorisation of Trafficworks Pty Ltd. Document Control Report Title Project Number 161910 Client Client Contact Rev Date Issued Minta Farm PSP Concept Road Design Report Victorian Planning Authority Cath Olive / Elizabeth McIntosh Revision Details / Status Prepared by Authorised by Draft 24/11/16 Draft Alison Corcoran / Renney Kratky Ali Abdou Draft_2 25/01/17 Draft_2 Alison Corcoran / Renney Kratky Ali Abdou Draft_3 27/04/17 Draft_3 Alison Corcoran / Renney Kratky Ali Abdou Final 28/06/17 Final Alison Corcoran / Renney Kratky Ali Abdou Final_2 14/08/17 Final_2 Alison Corcoran / Renney Kratky Ali Abdou Final_3 05/10/17 Final_3 Alison Corcoran / Renney Kratky Ali Abdou Final_3: 05/10/2017 i

TABLE OF CONTENTS 1 INTRODUCTION... 1 2 BACKGROUND... 2 3 DESIGN PHILOSOPHY... 4 3.1 Road Cross Sections... 4 3.2 Lane Geometry... 7 3.3 Intersection Geometry... 8 3.4 Road Alignment... 9 3.5 Interim and Ultimate Layout Interaction... 9 3.6 Pedestrian and Cyclist Facilities... 10 3.7 Land Acquisition... 10 3.8 Services Affected by Proposed Works... 11 ATTACHMENT A CONCEPT ROAD DESIGN Final_3: 05/10/2017 ii

1 INTRODUCTION Trafficworks has been engaged by the Victorian Planning Authority (VPA) to undertake concept designs for key intersections and road lengths within the Minta Farm precinct in Berwick. This includes six intersections and four road segments, as follows: IN-01 North-south Arterial / O Shea Road IN-02 North-south Arterial / East-west connector (north) IN-03 North-south Arterial / East-west connector (central) IN-04 North-south Arterial / East-west connector (south) IN-05 North-south Arterial / Grices Road IN-06 North-south Connector / Grices Road RD-01, RD-02, RD-03, RD-04 North-South Arterial, between O Shea Road (north) and Grices Road / Soldiers Road (south). The Minta Farm precinct concept designs have been prepared in line with the following documents to ensure the appropriate standards, regulations and guidelines are satisfied. GAA Engineering Design and Constructing Manual for Subdivision in Growth Areas the VicRoads Guidelines for Planning Road Networks in Growth Areas Austroads Guide to Road Design Part 3: Geometric Design Austroads Guide to Road Design Part 4A: Unsignalised and Signalised Intersections Australian Standards VPA standard cross-sections for Minta Farm Precinct This report has been prepared to outline the methodology applied in relation to design vehicles, geometric design parameters, cross sections etc. and to determine the existing services that may impact on the design. Final_3: 05/10/2017 1

2 BACKGROUND The Minta Farm is a single property previously used for farming purposes and covers an approximate area of 286 hectares. The properties surrounding the site comprise a combination of existing residential dwellings, parklands and schools, as well as additional proposed future residential development, generally to the south of the site. The site is also bordered by the Princes Freeway to the north and Cardinia Creek to the east. The VPA is in the process of preparing a precinct structure plan (PSP) to guide the future development of this site. The PSP seeks to provide a mix of residential and employment opportunities, a local town centre, school and a range of parks and sporting facilities. These concept design plans will inform the Minta Farm PSP. The subject site and the surrounding road environment is shown in Figure 1. Figure 1: Site Location (reproduced with permission from Melway Publishing Pty Ltd) SUBJECT SITE The Minta Farm development area will gain access to the surrounding network via an extension of O Shea Road to the north, Grices Road to the south and Soldiers Road to the west. O Shea Road is currently classified as a local road, configured with one traffic lane in each direction. Future planning for O Shea Road indicates that it will become a six-lane arterial road. A new north-south arterial through the development site will provide the last link in the major northsouth arterial network. This north-south arterial will provide access to the Princes Freeway at the Beaconsfield interchange (via O Shea Road) for the south-east development corridor, including the Clyde North PSP area located south of the Minta Farm development site. The draft precinct structure plan for the site is shown in Figure 2. This plan indicates the key features and land uses within the precinct, as well as the key arterial and collector roads to be developed. Final_3: 05/10/2017 2

Figure 2: Precinct Structure Plan, with key intersections and road segments to be designed Final_3: 05/10/2017 3

3 DESIGN PHILOSOPHY Concept road design plans for both interim and ultimate arrangements have been prepared for the five key intersections and four road segments to be considered within the Minta Farm precinct. This design philosophy report provides guidance on the principles, guidelines and standards applied in preparing the concept designs. 3.1 Road Cross Sections The VPA has prepared a series of standard cross sections for roads of varying function for the Minta Farm Precinct. All concept road and intersection designs have been developed in line with these standard road cross sections. The function of the road has been used when considering which cross section to apply (primary arterial, secondary arterial or connector street). 3.1.1 Primary Arterial Road (6 lanes) The VPA has provided a standard cross section for a six-lane primary arterial road, with an operating speed of 80km/h (refer to Figure 3). This specifies a 41m wide road reserve, with two 10.5m wide carriageways separated by a 6m wide central median. There is also provision for two-way off-road bicycle paths and separate pedestrian paths on both sides of the road. The north-south arterial and O Shea Road function as primary arterials. Figure 3: Primary Arterial Road standard cross section Final_3: 05/10/2017 4

3.1.2 Secondary Arterial Road (4 lanes) The VPA has provided a standard cross section for a four-lane secondary arterial road, with an operating speed of 60km/h (refer to Figure 4). This specifies a 34m wide road reserve, with two 7.0m wide carriageways separated by a 6m wide central median. There is also provision for onroad bicycle lanes in each direction and shared paths on both sides of the road. Grices Road functions as a secondary arterial. Figure 4: Secondary Arterial Road standard cross section 3.1.3 Connector Streets The VPA has provided a standard cross section for a boulevard connector street, an industrial connector street and a residential connector street. The type of cross section applied will rely on the abutting land use. The VPA standard cross sections for connector streets specify a 25m road reserve for connector streets, a 26m road reserve for industrial connector streets and a 28 31m wide road reserve for connector boulevards. Additionally, cross sections comprise two 3.5m wide traffic lanes (separated by a central median for a boulevard) and an indented parking lane on both sides of the road. The parking lane is either 2.1m wide (connector streets and connector boulevards) or 2.6m wide (industrial connector streets). There is also provision for a two-way off-road bicycle path on one side of the road and separate pedestrian paths on both sides of the road. The standard cross sections for the three types of connector street are shown in Figure 5, Figure 6 and Figure 7. Final_3: 05/10/2017 5

Each of the connector streets have been designed in accordance with one of the possible connector street cross sections. The cross section applied in each location has been based on the proposed abutting land uses. Figure 5: Boulevard Connector Street standard cross section Figure 6: Industrial Connector Street standard cross section Final_3: 05/10/2017 6

Figure 7: Residential Connector Street standard cross section 3.2 Lane Geometry The intersection layouts include turn lanes to accommodate left and right turning vehicles at each of the intersections. VicRoads Guide for Planning Road Networks in Growth Areas specifies lengths for turn lanes to be provided along arterial and connector streets. Table 1 (reproduced from Table 4-1 in VicRoads Guide for Planning Road Networks in Growth Areas) indicates the typical turn lane lengths to be implemented for the ultimate intersection configurations. The turn lane lengths specified in Table 1 have been applied when designing each of the intersection concept designs. The north-south arterial and O Shea Road are classified as primary arterials and Grices Road is classified as a secondary arterial. Each of the remaining intersecting roads are classified as connector streets. Table 1: Typical Turn Lane Lengths Ultimate intersection configuration Final_3: 05/10/2017 7

Austroads Guide to Road Design Part 4A: Unsignalised and Signalised Intersections (AGRD4A) also provides guidance on the required length of deceleration turn lanes. AGRD4A specifies the required dimensions of deceleration turn lanes in terms of the deceleration length to ensure vehicles can safely slow to a stop from the approach speed and the additional length required to store a design vehicle while waiting to turn. As per AGRD4A: turn lanes along primary arterial roads (80km/h speed) should be 120m long (100m deceleration plus 19m storage) turn lanes along secondary arterial roads (60km/h) should be 75m long (55m deceleration plus 19m storage) turn lanes along connector streets (50km/h) should be 60m long (40m deceleration plus 19m storage). It is noted that turn lane lengths as per AGRD4A are shorter than indicated by the VicRoads Guide. Hence, the turn lane lengths have been designed in accordance with Table 1. 3.3 Intersection Geometry 3.3.1 Slip Lanes Slip lanes have been considered at the intersections along the primary arterial road (north-south arterial). Slip lanes have been included in the design at the north-south arterial / Grices Road intersection (IN-05). However, slip lanes have not be included at IN-02, IN-03 and IN-04, as per the brief. 3.3.2 O Shea Road and North-South Arterial intersection - VicRoads concept design O Shea Road has been designed by VicRoads. The design of the intersection with the north-south arterial included a left turn slip lane from east to south which provided three traffic lanes. The design also resulted in the north-south arterial and O Shea Road intersection being skewed (i.e. at 70 degrees). Trafficworks design of the north-south arterial at O Shea Road accommodates these three left turn lanes and the intersection skew. As a result of the alignment of the O Shea Road and the north-south arterial intersection, the design of IN-02 is also at 70 degrees. This can affect the opposing right turns along the north-south arterial at the intersection. These turns have been accommodated at the intersection, but particular consideration should be given to the opposing right turns during detailed design. Final_3: 05/10/2017 8

3.3.3 Swept Paths Swept path assessments at each of the intersections have been undertaken to ensure the following design (and check) vehicles can safely perform turning manoeuvres: The north-south arterial / O Shea Road intersection and the north-south arterial / Grices Road intersection (two arterial roads) have been designed to allow two 19m semi-trailers to concurrently perform opposing (diamond) right turns Intersections between an arterial road and a connector road have been designed to allow: o o o o one 12.5m rigid truck and one 19m semi-trailer to concurrently perform opposing (diamond) right turns a 12.5m rigid truck (design vehicle) to perform a left turn at the intersection a 19m semi-trailer (check vehicle) to perform a left turn at the intersection, however will be required to encroach into the through lane Industrial connector roads have been design to accommodate 19m semi-trailers. 3.4 Road Alignment 3.4.1 Vertical Alignment Grade lines have been checked along the north-south arterial. The grade is undulating, generally follows the topography of the land and review indicates grades of up to 4% along its length. 3.4.2 Horizontal Road Alignment The horizontal curve radii in the road alignment along the north-south arterial have been designed in excess of the desirable requirements for V80 design speeds on urban roads (desirable 230m minimum radius). 3.5 Interim and Ultimate Layout Interaction The interim intersection and road layouts have been designed to fit within the ultimate layouts in order to minimise the rework required to implement the ultimate layout. The north-south arterial, O Shea Road and Grices Road comprise divided carriageways in the ultimate condition. The interim layout of these roads (mid-block) is to be designed to ensure that the interim two-way traffic lanes will fit within a single carriageway in the ultimate condition. This will result in the interim carriageway being shifted to one side of the road reserve, rather than being centrally placed. The interim layout at intersections should be designed so that the intersection is located in its ultimate position. This involves shifting traffic lanes along the single undivided carriageway to match in with the ultimate divided carriageway intersection layout in advance of the intersection. Implementation of this also involves creating the interim right turn lane in the ultimate location of the central through lane. Installation of a wider central median adjacent to the interim right turn lane allows for the ultimate right turn lane to be widened into the median. Final_3: 05/10/2017 9

To match in with existing road infrastructure and carriageway locations, the interim layout will utilise the following carriageways: eastbound carriageway along O Shea Road southbound carriageway along the north-south arterial eastbound carriageway along Grices Road 3.6 Pedestrian and Cyclist Facilities The proposed road network within the Minta Farm Precinct indicates that pedestrian and cyclist facilities are to be provided along all arterial and connector type roads. This includes a combination of pedestrian footpaths, shared paths, off-road bicycle paths and on-road bicycle lanes. The north-south arterial and O Shea Road (primary arterial roads) propose an off-road bicycle path to be provided along both sides of the road, with an adjacent pedestrian footpath. Grices Road (secondary arterial road) proposes on-road bicycle lanes, with a 0.5m painted buffer zone, along both sides of the road and shared paths on both sides of the road. All other connector roads propose an off-road bicycle path to be provided along one side of the road and pedestrian footpaths to be provided on both sides of the road. The above facilities should be provided as per the standard cross sections and provide suitable connections between shared paths, off-road bicycle paths and footpaths at intersections to ensure confusion is minimised and the function of each paths is clearly understood. Connectivity needs to be provided between shared paths / off-road bicycle paths across intersections. This has been designed in accordance with VicRoads Guide for Planning Road Networks in Growth Areas. Crosswalks at intersections are at least 3.0m wide, to accommodate both pedestrians and cyclists at the intersection. In addition, the installation of bicycle lanterns at crosswalks and/or implementation of cut-through islands to safely accommodate bicycles should be considered. 3.6.1 IN-06 Grices Road At IN-06 (Grices Road), an equestrian lantern should be installed at the crossing alongside the pedestrian lantern. 3.7 Land Acquisition All land required to accommodate the road reserves is located within the existing Minta Farm property (single property). Hence, no external land acquisition is required for other properties. Final_3: 05/10/2017 10

3.8 Services Affected by Proposed Works A Dial Before You Dig enquiry of the services in the vicinity of the proposed works has been undertaken. A review of the services / utilities information indicates the following notable services are located within the vicinity of the Soldiers Road / Grices Road intersection: Soldiers Road / Grices Road intersection o APA Gas distribution gas main (south side of Grices Road, crossing Solders Road on south side of intersection) o o o o o o Ausnet Electricity underground high voltage cable (south side of Grices Road, crossing Solders Road on south side of intersection) Casey City Council drainage channel (south side of Grices Road, crossing Solders Road on south side of intersection) South East Water - water main (south-west side of Soldiers Road north and south side of Grices Road) South East Water - sewer main (west side of Soldiers Road south, crossing Grices Road west of the intersection) South East Water recycled water main (east and west sides of Soldiers Road south and south side of Grices Road, crossing Soldiers Road south of the intersection) NBN cable cable and duct (south side of Grices Road west, north side of Grices Road east, crosses Soldiers Road on the south side of the intersection) Locations of underground services need to be verified on-site and approvals to work within the vicinity of these services sought from the relevant service authority / company. Final_3: 05/10/2017 11

ATTACHMENT A CONCEPT ROAD DESIGN Final_3: 05/10/2017

W W W W W W TM R O A D W ORDSW ORTH DR O'SHEA RD PS-01 PRINCES IN-01 RD-01 FREEWAY RESIDENTIAL S O LDIE R S IN-02 RD-02 CJ-01 GLASSCOCKS RD IN-03 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W RD-03 BR-01 W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W SOLDIERS ROAD W W W W W W W W W RESIDENTIAL RD-04 IN-04 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W MELWAY DIRECTORY MAP REFERENCE 131 J-6 161910-CPT-01 4/10/17 T:\1617 Projects\161910\Design\161910-CPT-01-P5.dgn 4:23:11 PM ISSUE APP'D DATE AMENDMENT GRICES GENERAL NOTES 1 BASE INFORMATION FROM AERIAL PHOTOGRAPHY FOR CONCEPTUAL PURPOSES ONLY. 2 ALL DIMENSIONS ARE TO FACE OF KERB AND CHANNEL UNLESS OTHERWISE SHOWN. SOLDIERS ROAD IN-05 ROAD IN-06 RESIDENTIAL DESIGNED TRAFFICWORKS NOV'16 PTY LTD APPROVED 1st Floor 132 Upper Heidelberg Road IVANHOE VIC. 3079 P.O. Box 417 IVANHOE VIC. 3079 Tel (03) 9490 5900 Fax (03) 9490 5910 www.trafficworks.com.au 0 SCALE HOR CLIENT SCALE of METRES VER 1:10000 @ A3 100 200 VICTORIAN PLANNING AUTHORITY PRECINCT STRUCTURE PLAN - PSP11 CITY OF CASEY CONCEPT LOCALITY PLAN SHEET NO. DRAWING NO. ISSUE 161910-CPT-01 1 P5

TM PROPOSED O'SHEAROAD NO RTH SO UTH ARTERIAL - RD 01 161910-CPT-03 T:\1617 Projects\161910\Design\161910-CPT-01-P5.dgn PRELIMINARY PLAN FOR DISCUSSION PURPOSES ONLY SUBJECT TO CHANGE WITHOUT NOTIFICATION DATE OF ISSUE: 04/10/2017 GENERAL NOTES 1 BASE INFORMATION FROM AERIAL PHOTOGRAPHY FOR CONCEPTUAL PURPOSES ONLY. 2 ALL DIMENSIONS ARE TO FACE OF KERB AND CHANNEL UNLESS OTHERWISE SHOWN. DESIGNED APPROVED TRAFFICWORKS NOV'16 PTY LTD MELWAY DIRECTORY MAP REFERENCE 131 J-5 CITY OF CASEY WARNING BEWARE OF UNDERGROUND SERVICES The locations of underground services shown are approximate only and their exact position should be proven on site. PRECINCT STRUCTURE PLAN - PSP11 4/10/17 4:23:24 PM ISSUE APP'D DATE AMENDMENT 1st Floor 132 Upper Heidelberg Road IVANHOE VIC. 3079 P.O. Box 417 IVANHOE VIC. 3079 Tel (03) 9490 5900 Fax (03) 9490 5910 www.trafficworks.com.au SCALE HOR CLIENT SCALE SHEET NO. DRAWING NO. ISSUE of 1:1000 @ A3 METRES VER 2 P5 0 10 20 VICTORIAN PLANNING AUTHORITY CONCEPT LAYOUT - O'SHEA ROAD - IN 01 161910-CPT-03

TM NO RTH SO UTH ARTERIAL - RD 01 CONNECTOR ROAD CONNECTOR ROAD 161910-CPT-04 T:\1617 Projects\161910\Design\161910-CPT-01-P5.dgn PRELIMINARY PLAN FOR DISCUSSION PURPOSES ONLY SUBJECT TO CHANGE WITHOUT NOTIFICATION DATE OF ISSUE: 04/10/2017 GENERAL NOTES 1 BASE INFORMATION FROM AERIAL PHOTOGRAPHY FOR CONCEPTUAL PURPOSES ONLY. 2 ALL DIMENSIONS ARE TO FACE OF KERB AND CHANNEL UNLESS OTHERWISE SHOWN. NO RTH SO UTH ARTERIAL - RD 02 DESIGNED APPROVED TRAFFICWORKS NOV'16 PTY LTD MELWAY DIRECTORY MAP REFERENCE 131 J-5 CITY OF CASEY WARNING BEWARE OF UNDERGROUND SERVICES The locations of underground services shown are approximate only and their exact position should be proven on site. PRECINCT STRUCTURE PLAN - PSP11 4/10/17 4:23:28 PM ISSUE APP'D DATE AMENDMENT 1st Floor 132 Upper Heidelberg Road IVANHOE VIC. 3079 P.O. Box 417 IVANHOE VIC. 3079 Tel (03) 9490 5900 Fax (03) 9490 5910 www.trafficworks.com.au SCALE HOR CLIENT SCALE SHEET NO. DRAWING NO. ISSUE of 1:1000 @ A3 METRES VER 3 P5 0 10 20 VICTORIAN PLANNING AUTHORITY CONCEPT LAYOUT - IN 02 161910-CPT-04

N O R TH S O U TH A R TE RIA L - R D 02 TM CONNECTOR ROAD CONNECTOR ROAD 161910-CPT-05 T:\1617 Projects\161910\Design\161910-CPT-01-P5.dgn PRELIMINARY PLAN FOR DISCUSSION PURPOSES ONLY SUBJECT TO CHANGE WITHOUT NOTIFICATION DATE OF ISSUE: 04/10/2017 GENERAL NOTES 1 BASE INFORMATION FROM AERIAL PHOTOGRAPHY FOR CONCEPTUAL PURPOSES ONLY. 2 ALL DIMENSIONS ARE TO FACE OF KERB AND CHANNEL UNLESS OTHERWISE SHOWN. N O R TH S O U TH A R TE RIA L - R D 03 DESIGNED TRAFFICWORKS NOV'16 APPROVED PTY LTD MELWAY DIRECTORY MAP REFERENCE 131 J-6 CITY OF CASEY WARNING BEWARE OF UNDERGROUND SERVICES The locations of underground services shown are approximate only and their exact position should be proven on site. PRECINCT STRUCTURE PLAN - PSP11 4/10/17 4:23:32 PM ISSUE APP'D DATE AMENDMENT 1st Floor 132 Upper Heidelberg Road IVANHOE VIC. 3079 P.O. Box 417 IVANHOE VIC. 3079 Tel (03) 9490 5900 Fax (03) 9490 5910 www.trafficworks.com.au SCALE HOR CLIENT SCALE SHEET NO. DRAWING NO. ISSUE of 1:1000 @ A3 METRES VER 4 P5 0 10 20 VICTORIAN PLANNING AUTHORITY CONCEPT LAYOUT - IN 03 161910-CPT-05

TM CONNECTOR ROAD N O R TH S O U TH A R TE RIA L - R D 03 MELWAY DIRECTORY MAP REFERENCE 131 J-7 161910-CPT-06 T:\1617 Projects\161910\Design\161910-CPT-01-P5.dgn PRELIMINARY PLAN FOR DISCUSSION PURPOSES ONLY SUBJECT TO CHANGE WITHOUT NOTIFICATION DATE OF ISSUE: 04/10/2017 NO RTH SO UTH ARTERIAL- RD 04 GENERAL NOTES 1 BASE INFORMATION FROM AERIAL PHOTOGRAPHY FOR CONCEPTUAL PURPOSES ONLY. 2 ALL DIMENSIONS ARE TO FACE OF KERB AND CHANNEL UNLESS OTHERWISE SHOWN. DESIGNED TRAFFICWORKS NOV'16 APPROVED CONNECTOR ROAD PTY LTD WARNING BEWARE OF UNDERGROUND SERVICES The locations of underground services shown are approximate only and their exact position should be proven on site. PRECINCT STRUCTURE PLAN - PSP11 CITY OF CASEY 4/10/17 4:23:36 PM ISSUE APP'D DATE AMENDMENT 1st Floor 132 Upper Heidelberg Road IVANHOE VIC. 3079 P.O. Box 417 IVANHOE VIC. 3079 Tel (03) 9490 5900 Fax (03) 9490 5910 www.trafficworks.com.au SCALE HOR CLIENT SCALE SHEET NO. DRAWING NO. ISSUE of 1:1000 @ A3 METRES VER 5 P5 0 10 20 VICTORIAN PLANNING AUTHORITY CONCEPT LAYOUT - IN 04 161910-CPT-06

S S S S S S S S G G G G G G D D D W W W G D G D TM D G D D S S S RESIDENTIAL G G G G G E E E E E E E E E E E E E W W W W W W W W W W W W S S S S S S S S S S S S S S S G G G G G G G G G G G G G G G G G G G G G G SOLDIERS ROAD S S S S S S S S S T T T T T T T T T T T T T T T T T T T T T T T S S S S S S S E E E E E E E E E E N O R TH S O U TH A R TE RIA L - R D 04 E E E E E E E E E E D D D D D D D D D W W W G G G G G G G G T T T T T T T T T W W W W W W W W W W GRICES ROAD D D D E E E E E E D D D D D D D D G G G G G G G G G G G E E E E E E E E G G G G G W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W T T T T T T T T T T T T T T T T T T T T T T S S S S S S S S S S S S D D D D D T T G G G G G G G G G G G G G G T T T T T GRICES ROAD T T T T T T T T T T T T T T T T T T T T D D D D D G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W G G 161910-CPT-07 4/10/17 T:\1617 Projects\161910\Design\161910-CPT-01-P5.dgn 4:23:40 PM ISSUE PRELIMINARY PLAN FOR DISCUSSION PURPOSES ONLY SUBJECT TO CHANGE WITHOUT NOTIFICATION DATE OF ISSUE: 04/10/2017 APP'D DATE D D D D D D D D D D D D D D AMENDMENT RESIDENTIAL GENERAL NOTES D D D D D D D D D D D D D D D D D D D D D D D D S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W T T T T T T T T T T T T D D D D D D D D D D 1 BASE INFORMATION FROM AERIAL PHOTOGRAPHY FOR CONCEPTUAL PURPOSES ONLY. 2 ALL DIMENSIONS ARE TO FACE OF KERB AND CHANNEL UNLESS OTHERWISE SHOWN. S O LDIE R S R O A D DESIGNED APPROVED G G G G G G G G G G G TRAFFICWORKS NOV'16 D D D D D D D D D D D G G G G RESIDENTIAL D D D D D D D D D D D D D D D G G G G G G G G G 1st Floor 132 Upper Heidelberg Road IVANHOE VIC. 3079 P.O. Box 417 IVANHOE VIC. 3079 PTY LTD Tel (03) 9490 5900 Fax (03) 9490 5910 www.trafficworks.com.au D D D D D G G G G G G SCALE HOR CLIENT SCALE SHEET NO. DRAWING NO. ISSUE of 1:1000 @ A3 METRES VER 6 P5 0 10 20 VICTORIAN PLANNING AUTHORITY MELWAY DIRECTORY MAP REFERENCE 131 H-8 CITY OF CASEY W W W W W W W D D D D WARNING BEWARE OF UNDERGROUND SERVICES The locations of underground services shown are approximate only and their exact position should be proven on site. PRECINCT STRUCTURE PLAN - PSP11 CONCEPT LAYOUT - IN 05 161910-CPT-07

T T T T T T T G G G G G G G G G G G TM C O N N E C TO R R O A D GRICES ROAD L R G SUPPLEMENTARY LANTERNS TO BE INCLUDED INTO SIGNAL INSTALLATION W W W W W W W W W W W W W W W W GRICES ROAD 161910-CPT-08 T:\1617 Projects\161910\Design\161910-CPT-01-P5.dgn PRELIMINARY PLAN FOR DISCUSSION PURPOSES ONLY SUBJECT TO CHANGE WITHOUT NOTIFICATION DATE OF ISSUE: 04/10/2017 G G G G G G G RESIDENTIAL G G G G G G G GENERAL NOTES 1 BASE INFORMATION FROM AERIAL PHOTOGRAPHY FOR CONCEPTUAL PURPOSES ONLY. 2 ALL DIMENSIONS ARE TO FACE OF KERB AND CHANNEL UNLESS OTHERWISE SHOWN. C O N N E C TO R R O A D DESIGNED TRAFFICWORKS NOV'16 APPROVED RESIDENTIAL PTY LTD MELWAY DIRECTORY MAP REFERENCE 131 K-9 CITY OF CASEY WARNING BEWARE OF UNDERGROUND SERVICES The locations of underground services shown are approximate only and their exact position should be proven on site. PRECINCT STRUCTURE PLAN - PSP11 4/10/17 4:23:44 PM ISSUE APP'D DATE AMENDMENT 1st Floor 132 Upper Heidelberg Road IVANHOE VIC. 3079 P.O. Box 417 IVANHOE VIC. 3079 Tel (03) 9490 5900 Fax (03) 9490 5910 www.trafficworks.com.au SCALE HOR CLIENT SCALE SHEET NO. DRAWING NO. ISSUE of 1:1000 @ A3 METRES VER 7 P5 0 10 20 VICTORIAN PLANNING AUTHORITY CONCEPT LAYOUT - IN 06 161910-CPT-08

SEM1 SEM1 TRUCK SEM1 SEM1 SEM1 SEM1 TM NO RTH SO UTH ARTERIAL - RD 01 SEM1 TRUCK SEM1 CONNECTOR ROAD CONNECTOR ROAD SEM1 SEM1 SEM1 SEM1 161910-CPT-09 4/10/17 T:\1617 Projects\161910\Design\161910-CPT-01-P5.dgn 4:23:44 PM ISSUE PRELIMINARY PLAN FOR DISCUSSION PURPOSES ONLY SUBJECT TO CHANGE WITHOUT NOTIFICATION DATE OF ISSUE: 04/10/2017 APP'D DATE AMENDMENT GENERAL NOTES 1 BASE INFORMATION FROM AERIAL PHOTOGRAPHY FOR CONCEPTUAL PURPOSES ONLY. 2 ALL DIMENSIONS ARE TO FACE OF KERB AND CHANNEL UNLESS OTHERWISE SHOWN. N O RTH SO UTH ARTERIAL - R D 02 DESIGNED TRAFFICWORKS NOV'16 APPROVED 1st Floor 132 Upper Heidelberg Road IVANHOE VIC. 3079 P.O. Box 417 IVANHOE VIC. 3079 PTY LTD Tel (03) 9490 5900 Fax (03) 9490 5910 www.trafficworks.com.au SCALE HOR CLIENT SCALE SHEET NO. DRAWING NO. ISSUE of 1:1000 @ A3 METRES VER 8 P5 0 10 20 VICTORIAN PLANNING AUTHORITY MELWAY DIRECTORY MAP REFERENCE 131 J-5 CITY OF CASEY WARNING BEWARE OF UNDERGROUND SERVICES The locations of underground services shown are approximate only and their exact position should be proven on site. PRECINCT STRUCTURE PLAN - PSP11 CONCEPT LAYOUT - TURNING MOVEMENTS 161910-CPT-09

TM RL 80.00 RL 75.00 RL 70.00 RL 65.00 RL 60.00 RL 55.00 RL 50.00 RL 45.00 DCH 46810.652 RL 72.713 3.73% CH 46830.652 RL 73.459 DCH 46850.652 RL 72.570 L=40.000 K=4.892 SOLDIERS ROAD -4.45% DCH 46904.850 RL 70.160 CH 46964.850 RL 67.492 L=120.000 K=70.756 DCH 47024.850 RL 63.807-6.14% DCH 47130.416 RL 57.323 WORDSWORTH DRIVE CH 47250.416 RL 49.952 L=240.000 K=46.283 DCH 47370.416 RL 48.804-0.96% DCH 47469.164 RL 47.859 CH 47569.164 RL 46.902 L=200.000 K=492.871 DCH 47669.164 RL 46.351 INTERSECTION IN-01-0.55% DCH 47859.916 RL 45.300 CH 48009.916 RL 44.474 INTERSECTION IN-02 DCH 48159.916 RL 42.834 RL 40.00 L=300.000 K=552.994 RL 35.00 RL 30.00 RL 25.00 EXISTING LEVELS 72.316 70.304 66.284 65.348 64.577 58.989 53.474 49.730 48.223 47.791 47.072 46.666 46.043 46.142 45.336 44.577 43.956 42.803 42.244 42.212 CHAINAGE CH.46800.000 CH.46900.000 CH.46985.079 CH.47000.000 CH.47012.432 CH.47100.000 CH.47200.000 CH.47300.000 CH.47400.000 CH.47500.000 CH.47553.333 CH.47600.000 CH.47700.000 CH.47718.528 CH.47800.000 CH.47900.000 CH.48000.000 CH.48100.000 CH.48200.000 CH.48206.230 161910-CPT-10 T:\1617 Projects\161910\Design\161910-CPT-01-P5.dgn PRELIMINARY PLAN FOR DISCUSSION PURPOSES ONLY SUBJECT TO CHANGE WITHOUT NOTIFICATION DATE OF ISSUE: 04/10/2017 GENERAL NOTES 1 BASE INFORMATION FROM AERIAL PHOTOGRAPHY FOR CONCEPTUAL PURPOSES ONLY. 2 ALL DIMENSIONS ARE TO FACE OF KERB AND CHANNEL UNLESS OTHERWISE SHOWN. DESIGNED TRAFFICWORKS NOV'16 APPROVED PTY LTD WARNING BEWARE OF UNDERGROUND SERVICES The locations of underground services shown are approximate only and their exact position should be proven on site. PRECINCT STRUCTURE PLAN - PSP11 CITY OF CASEY 4/10/17 4:23:44 PM ISSUE APP'D DATE AMENDMENT 0 1st Floor 132 Upper Heidelberg Road IVANHOE VIC. 3079 P.O. Box 417 IVANHOE VIC. 3079 Tel (03) 9490 5900 Fax (03) 9490 5910 www.trafficworks.com.au SCALE HOR CLIENT SCALE of METRES VER 1:4000 @ A3 40 80 0 4 8 VICTORIAN PLANNING AUTHORITY LONGITUDINAL SECTION SHEET NO. DRAWING NO. ISSUE 9 161910-CPT-10 P5

TM RL 80.00 RL 75.00 RL 70.00 RL 65.00 RL 60.00 RL 55.00 RL 50.00 RL 45.00 RL 40.00 RL 35.00 RL 30.00 DCH 48564.276 RL 38.412 INTERSECTION IN-03 CH 48704.276 RL 36.881 L=280.000 K=127.720 DCH 48844.276 RL 38.419 1.10% DCH 49034.398 RL 40.508 INTERSECTION IN-04 CH 49124.398 RL 41.497 L=180.000 K=42.563 DCH 49214.398 RL 38.680 DCH 49229.258 RL 38.215-3.13% CH 49319.258 RL 35.398 L=180.000 K=93.709 DCH 49409.258 RL 34.309-1.21% DCH 49477.199 RL 33.487 CH 49557.199 RL 32.520 L=160.000 K=96.849 INTERSECTION IN-05 DCH 49637.199 RL 32.874 DCH 49656.179 RL 32.958 0.44% CH 49706.179 RL 33.179 L=100.000 K=82.255 DCH 49756.179 RL 34.009 DCH 49774.027 RL 34.305 1.66% CH 49824.027 RL 35.134 L=100.000 K=105.631 DCH 49874.027 RL 35.490 0.71% RL 25.00 40.225 GRADELINE 39.192 38.762 37.603 37.169 37.224 37.537 38.421 40.343 40.825 40.012 39.273 35.782 34.043 34.000 34.000 28.308 15.251 33.140 35.105 35.228 CH.48400.000 CHAINAGE CH.48500.000 CH.48600.000 CH.48608.636 CH.48648.139 CH.48700.000 CH.48800.000 CH.48900.000 CH.49000.000 CH.49100.000 CH.49176.827 CH.49200.000 CH.49300.000 CH.49342.319 CH.49400.000 CH.49500.000 CH.49558.996 CH.49600.000 CH.49700.000 CH.49800.000 CH.49824.351 CH.49900.000 161910-CPT-11 T:\1617 Projects\161910\Design\161910-CPT-01-P5.dgn PRELIMINARY PLAN FOR DISCUSSION PURPOSES ONLY SUBJECT TO CHANGE WITHOUT NOTIFICATION DATE OF ISSUE: 04/10/2017 GENERAL NOTES 1 BASE INFORMATION FROM AERIAL PHOTOGRAPHY FOR CONCEPTUAL PURPOSES ONLY. 2 ALL DIMENSIONS ARE TO FACE OF KERB AND CHANNEL UNLESS OTHERWISE SHOWN. DESIGNED TRAFFICWORKS NOV' 16 APPROVED PTY LTD WARNING BEWARE OF UNDERGROUND SERVICES The locations of underground services shown are approximate only and their exact position should be proven on site. PRECINCT STRUCTURE PLAN - PSP11 CITY OF CASEY 4/10/17 4:23:45 PM ISSUE APP'D DATE AMENDMENT 1st Floor 132 Upper Heidelberg Road IVANHOE VIC. 3079 P.O. Box 417 IVANHOE VIC. 3079 Tel (03) 9490 5900 Fax (03) 9490 5910 www.trafficworks.com.au SCALE HOR CLIENT SCALE SHEET NO. DRAWING NO. ISSUE of 1:4000 @ A3 METRES VER 10 P5 0 40 80 0 4 8 VICTORIAN PLANNING AUTHORITY LONGITUDINAL SECTION 161910-CPT-11

1 st Floor 132 Upper Heidelberg Rd Ivanhoe Vic 3079 PO Box 417 Ivanhoe Vic 3079 ABN: 59 125 488 977 Ph: (03) 9490 5900 Fax: (03) 9490 5910 www.trafficworks.com.au