COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

Similar documents
COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals

Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two)

CCR Fugitive Dust Control Plan

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

Coal Combustion Residuals Annual Fugitive Dust Control Report. Prepared for Montana-Dakota Utilities Company R.M. Heskett Station.

CCR Fugitive Dust Control Plan

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

FUGITIVE DUST CONTROL PLAN

FUGITIVE DUST CONTROL PLAN

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

D.B. Wilson Station CCR Landfill

Closure Plan for CCR Surface Impoundments

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

2018 Annual Inspection Report

CCR Closure Plan Ash Impoundment

TABLE OF CONTENTS LEGAL NOTICE

2017 Annual Inspection Report

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

Hazardous Materials Management Guidelines

2016 Annual Inspection Report

Secondary Aluminum NESHAP 40 CFR Part 63 Subpart RRR. Example Malfunction Plan for Plant ABC

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado

Start-up, Shutdown and Malfunction Plans. Norman L. Morrow Fresh Air Consulting

2016 Annual Inspection Report

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

1.0 PURPOSE 2.0 REFERENCES

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

New Castle County Guidelines for the Certified Construction Reviewer, Owner/Developer, Site Contractor and Professional Engineer

CCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area

INSTITUTIONAL REVIEW BOARD (IRB) PROCEDURES

Explosive gas migration monitoring for a sanitary landfill facility.

The purpose of this document is to establish the procedures for accident prevention and investigation at (Insert Company Name) jobsites.

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report

Mine Dust Management Plan

THE SCHOOL DISTRICT OF TORRINGTON, CONNECTICUT TRANSPORTATION POLICY 6200

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

University of Cincinnati. Radiation Safety Committee Operations Guidelines Statement of Policy (RSC Guidelines) RSC Guidelines (revision 5)

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities.

SCHEDULE 08 Public Safety Plan

Traffic Calming Policy

SPRING-FORD AREA SCHOOL DISTRICT

Respirable Crystalline Silica

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

UNIVERSITY OF TENNESSEE HEALTH SCIENCE CENTER INSTITUTIONAL REVIEW BOARD CONTINUING REVIEW OF RESEARCH

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

Regional School District #19 Transportation Policy

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

OSHA s Proposed Silica Rule Randy Nicholls Northwestern Energy

CSU Channel Islands Lead Operations and Maintenance Program

Effective Date: 24-April-2017 Version: 6 Page: 1 of 8 TITLE: SAF-370, PERSONAL PROTECTIVE EQUIPMENT GUIDELINES. Table of Contents

TRAFFIC IMPACT STUDY CRITERIA

1995 Metric CSJ SPECIAL PROVISION ITEM 7. Legal Relations And Responsibilities To The Public

RESPIRATORY PROTECTION PROGRAM

A Residential Guide to Neighborhood Speed Enforcement

Watson Chapel School District. School Bus Safety Plan

Gettysburg College. Energy Control Program

Geotechnics, Face and Stockpile Operations

AMENDMENTS TO PREVIOUSLY APPROVED RESEARCH 3/01/2016

Appendix B. Emissions Inventory

This guidance applies to those individuals who perform acid cleaning or chemical treatment aboard Marine Depot Maintenance Command Yermo CA.

This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.

ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR )

BP U.S. Pipelines & Logistics (USPL) Safety Manual Page 1 of 8

MSW Objective 1.1: Level of Service Standards To maintain the IMSWMS MSW collection system to meet or exceed established LOS standards.

Health, Safety, Security and Environment

City of Memphis On-Street Parking Modification Guidelines

Borough of Danville, PA Traffic Calming Program Guidelines

The Corporation of the City of Sarnia. School Crossing Guard Warrant Policy

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_

Northern Kentucky University Issue Date: 11/02/2018 Revised Date: Title: PERSONAL PROTECTIVE EQUIPMENT PROCEDURE OBJECTIVE AND PURPOSE

SAFETY DIRECTIVE. 2.0 DEPARTMENTS AFFECTED This directive applies to all departments and employees of the Town of Marana.

HAZARDOUS INCIDENT SITE SAFETY PLAN

Yale University Human Research Protection Program

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

CHAPTER Committee Substitute for Committee Substitute for Senate Bill No. 1318

The Children s Hospital of Philadelphia Committee for the Protection of Human Subjects Policies and Procedures. Cooperative Agreements

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established:

Instructions for Completing the UW-Madison Laboratory Chemical Hygiene Plan Template

INTEROFFICE MEMORANDUM

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE (HAZWOPER)

PROCEDURES FOR STANDBY

Transcription:

~ Colorado Springs Utilities Ir's h<1w we,., all connected COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN Colorado Springs Utilities' Clear Spring Ranch Coal Combustion Residuals Landfill El Paso County December 19, 2016 Prepared By: Colorado Springs Utilities Environment, Health, & Safety Division Technical Services Section P.O. Box 1103, Mail Code 940 Colorado Springs, CO 80947-0940 http://www.csu.org I declare that I am familiar with the provisions of 40 CFR Part 257.80 and in my professional opinion, as a Professional Engineer currently licensed in the State of Colorado, would consider this plan to meet the requirements of 40 CFR Part 257.80. This Plan Is For The Sole Use Of Colorado Springs Utilities.

TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PURPOSE OF THIS PLAN... 1 3.0 PLAN COORDINATOR & MATERIAL HANDLING PERSONNEL... 1 4.0 CCR FUGITIVE DUST CONTROL MEASURES... 2 4.1 Conditioned CCR... 3 4.2 Daily Checks... 3 4.3 Truck Covering... 3 4.4 Unpaved Roads - Watering... 3 4.5 Reduced Vehicle Speed... 4 4.6 Deposit of Dirt and Mud on Improved Streets... 4 4.7 Material Unloading / Final Placement / Cover / Re-vegetation... 4 4.8 Material Excavation, Staging / Stockpiling, & Truck Loading Associated With Beneficial Use... 4 5.0 CITIZEN COMPLAINTS... 5 6.0 ANNUAL CCR FUGITIVE DUST CONTROL REPORT... 6 7.0 EFFECTIVENESS ASSESSMENT... 6 8.0 PLAN AMENDMENTS & CERTIFICATION... 7 9.0 RECORDKEEPING REQUIREMENTS... 7 10.0 NOTIFICATION REQUIREMENTS... 8 11.0 PUBLICLY ACCESSIBLE INTERNET SITE REQUIREMENTS... 8 APPENDIX A - Citizen Complaint Log CCR FUGITIVE DUST CONTROL PLAN Page i

1.0 INTRODUCTION The Environmental Protection Agency (EPA) has established national regulations within Title 40 of the Code of Federal Regulations [40 CFR Parts 257 & 261] that provide a comprehensive set of requirements for the disposal of Coal Combustion Residuals (CCR), commonly known as coal ash, from coal-fired power plants. CCR means fly ash, bottom ash, boiler slag, and flue gas desulfurization materials generated from burning coal for the purpose of generating electricity by electric utilities and independent power producers [257.53]. These regulations, often referred to as the CCR Rule, contain provisions that are applicable to Colorado Springs Utilities Clear Spring Ranch CCR Landfill located in El Paso County. 2.0 PURPOSE OF THIS PLAN The general purpose of this CCR Fugitive Dust Control Plan is to aid in ensuring that Colorado Springs Utilities operations at the CCR Landfill are performed in accordance with the applicable air criteria provisions of the CCR Rule, specifically those within 40 CFR Part 257.80 (a) through (d). CCR fugitive dust means solid airborne particulate matter that contains or is derived from CCR, emitted from any source other than a stack or chimney [257.53]. Colorado Springs Utilities has adopted measures that will effectively minimize CCR from becoming airborne at the CCR Landfill, including CCR fugitive dust originating from the landfill s roads and other on-site CCR management and material handling activities [257.80(a)]. The measures are presented in this CCR Fugitive Dust Control Plan. 3.0 PLAN COORDINATOR & MATERIAL HANDLING PERSONNEL Colorado Springs Utilities shall operate the CCR Landfill in accordance with this CCR Fugitive Dust Control Plan [257.80(b)]. The Nixon Materials Handling Operations Supervisor is assigned as the Plan Coordinator and is responsible for ensuring that the measures outlined in this plan are followed. The Plan Coordinator may designate responsibilities, as deemed appropriate, to achieve the plan s objectives and requirements. The success of dust control measures depends upon the involvement and cooperation of all Material Handling Personnel who may handle, load, transport, place, and/or otherwise manage CCR at the Clear Spring Ranch CCR Landfill, Drake Power Plant, and Nixon Power Plant. The Plan Coordinator should CCR FUGITIVE DUST CONTROL PLAN Page 1

ensure these Material Handling Personnel are aware of this plan, where it can be found, and its contents; as well as when plan amendments are made. If such Material Handling Personnel observe significant CCR fugitive dust being emitted from an operation or activity, it is their responsibility to notify the Plan Coordinator (if available) and stop work until the dust issue can be rectified. At that time, operation may recommence. Personnel must do their part to ensure that this is accomplished. 4.0 CCR FUGITIVE DUST CONTROL MEASURES This section identifies and describes the CCR fugitive dust control measures that Colorado Springs Utilities will use to minimize CCR from becoming airborne at the CCR Landfill [257.80(b)(1)]. The CCR management process generally consists of the following steps: CCR is generated at the Drake and Nixon Power Plants, loaded into trucks as conditioned CCR, transported to the CCR Landfill by roadway, unloaded, placed, covered, and re-vegetated. The majority of the roadways are paved, with a short unpaved section leading into the CCR Landfill. Additionally, a portion of the previously placed CCR is removed from the CRR Landfill for beneficial use. The related activities generally consist of CCR excavation from the landfill, staging / stockpiling within the landfill boundary prior to transport, truck loading, and transport off-site. The primary CCR fugitive dust sources at the CCR Landfill are: 1) Material Transport / Haul Roads, 2) Material Unloading at CCR Landfill, 3) Final Material Placement at CCR Landfill, and 4) Material Excavation, Staging / Stockpiling, & Truck Loading Associated With Beneficial Use. The primary CCR fugitive dust causes are: 1) Wind Erosion and 2) Mechanical Disturbance. The CCR fugitive dust control measures presented in the following subsections are currently considered most appropriate for the site s conditions. Colorado Springs Utilities believes the measures presented are applicable and appropriate for site conditions based on the type of operation (i.e. landfill), nature of the material, management practices, typical weather, and the facility s lengthy operational experience [257.80(b)(1)]. Other CCR fugitive dust control measures may be used, if applicable and appropriate for site conditions. If other measures will be routinely or periodically used, or conversely, if a current measure is no longer considered effective, this plan should be amended (see Section 8.0). CCR FUGITIVE DUST CONTROL PLAN Page 2

4.1 Conditioned CCR This CCR Fugitive Dust Control Plan must include procedures to emplace CCR as conditioned CCR [257.80(b)(2)]. Conditioned CCR means wetting CCR with water to a moisture content that will prevent wind dispersal, but will not result in free liquids. Mechanical systems are in place at both the Drake and Nixon Power Plants whereby CCR are loaded into trucks as conditioned CCR prior to transport to the CCR Landfill. This addition of water prior to transport reduces fugitive emissions. Daily checks (see Section 4.2) and water spray (see Section 4.7) should further ensure conditioned CCR is emplaced at the CCR Landfill. 4.2 Daily Checks A daily check of the on-site haul roads, unloading areas, final placement activities, activities associated with beneficial use, and overall CCR Landfill shall be conducted by the Plan Coordinator, or their designee(s), to monitor whether fugitive dust is being generated and to ensure conditioned CCR is being emplaced. High temperatures, low humidity, windy conditions, and days with above average load counts may merit additional checks. If fugitive dust is being generated, additional water shall be applied, or other dust control techniques shall be promptly initiated. In lieu of water, CCR conditioning may be accomplished with an appropriate chemical dust suppression agent. The Environment, Health, & Safety Division - Regulatory Services Sections should be contacted prior to utilizing a chemical dust suppression agent, as Colorado Department of Public Health & Environment approval may be needed. Reducing or halting operations may be required at times during high wind events causing fugitive dust emissions. Any actions required to control a fugitive dust problem identified by the daily observations shall be recorded in a written or electronic facility log. 4.3 Truck Covering Truck covering is common practice in many industries to minimize fugitive dust and spillage during hauling. Trucks transporting CCR shall be covered to reduce the potential for emissions of fugitive dust and spillage while in transit to and/or from the CCR Landfill. Maintaining adequate freeboard between the load and top of hopper can further help reduce air emissions and road deposits. 4.4 Unpaved Roads - Watering Unpaved roadways are a potential source of fugitive dust emissions due to vehicular traffic and wind. Applying water to unpaved roads is known to be effective in mitigating fugitive dust emission at industrial CCR FUGITIVE DUST CONTROL PLAN Page 3

and construction sites. Regular water addition suppresses dust emission and prevents the carryout of fugitive dust by the truck traffic. Carryout refers to the dispersion of dust caused by vehicular traffic. The control efficiency of water addition to unpaved roads depends upon the following key variables: (1) traffic volume; (2) climatological conditions (especially rainfall, humidity, wind speed, evaporation); (3) application rates for water; and (4) elapsed time between water applications. With consideration of these key variables, unpaved roadways on-site shall be watered as often as necessary to control fugitive emissions. 4.5 Reduced Vehicle Speed High vehicle speeds on unpaved roadways are more likely to generate fugitive dust. Vehicle speeds on unpaved roadways on-site shall be limited to a maximum of 15 miles per hour. The speed limit shall be appropriately posted and enforced by the Plan Coordinator, or their designee(s). 4.6 Deposit of Dirt and Mud on Improved Streets Fugitive dust emissions from a vehicle traveling over a paved surface originate mostly from material previously deposited on the travel surface. Deposit of dirt and mud on improved streets and roads must be prevented or removed. Any CCR spillage on roads shall be cleaned up in a timely manner. Periodic brushing / sweeping off trucks after unloading can help reduce air emissions and road deposits on return trips and prevent the buildup of excessive CCR in and on the trucks over time. 4.7 Material Unloading / Final Placement / Cover / Re-vegetation When at the CCR Landfill, trucks should be unloaded slowly and at the lowest height possible. Water spray shall be used if material unloading and/or final placement activities are resulting in significant fugitive dust emissions; and shall also be used to provide further CCR conditioning, if needed (see Section 4.1). Water spray as required, or 6 inches of soil cover shall be used daily to prevent fugitive emissions from CCR landfill areas that have not yet had final cover applied. All final cover areas shall be re-vegetated. A natural vegetative cover is an effective way to control of wind erosion; therefore, reasonable efforts should be made to establish vegetation in a timely manner after final cover has been applied. 4.8 Material Excavation, Staging / Stockpiling, & Truck Loading Associated With Beneficial Use The CCR excavation, staging / stockpiling, & truck loading activities associated with beneficial use are potential sources of fugitive dust. Typically, fugitive dust emissions from these activities can be controlled by source extent reduction, source improvement related to work practices & transfer equipment, and CCR FUGITIVE DUST CONTROL PLAN Page 4

surface treatments. The following measures should be routinely considered and utilized, as needed, in association with these activities. When previously placed CCR is being excavated from the landfill, the frequency and extent of disturbance should be minimized to that required (i.e., source extent reduction). Water spray shall be used if the material removal activities are resulting in significant fugitive dust emissions. Additionally, water spray as required, or 6 inches of soil cover shall be used daily to control emissions from the exposed landfill material remaining that has not yet had final cover applied. With regard to the staging / stockpiling and truck loading activities, these material transfer operations should be performed on the leeward (downwind) side of the stockpile, if possible. The movement of vehicles and equipment in the area should be limited to that required. Trucks should be loaded slowly and at the lowest height possible. The area should be routinely cleaned of excess material spillage. Additionally, emissions from the material transfer operations and truck loading shall be controlled by water spray, as needed. Lastly, the Plan Coordinator should ensure that third-parties who perform on-site activities associated with beneficial use are aware of this plan, where it can be found, and its contents; as well as when plan amendments are made. The Plan Coordinator, or their designee(s), should periodically observe the thirdparty activities, to ensure adequate compliance. 5.0 CITIZEN COMPLAINTS Colorado Springs Utilities must log citizen complaints received involving CCR fugitive dust events at the CCR Landfill [257.80(b)(3)]. The Plan Coordinator, or their designee, shall use the following procedure, or similar approach: Periodically communicate with the Customer & Corporate Services Division to establish a reasonable level of assurance that a citizen complaint pertaining to fugitive dust at the CCR Landfill and received through Colorado Springs Utilities primary telephone, mail, email, and/or social media platforms would be routed to the Nixon Materials Handling Operations Supervisor. Gather relevant information from the citizen to understand the circumstances, facts, weather conditions, and timing surrounding the event. Inform the appropriate Material Handling Personnel, who shall investigate the event in a timely manner to evaluate if CCR fugitive dust is being generated, and if so, enact control measures to effectively minimize CCR from becoming airborne. Complete the log provided in Attachment A, or similar log, to document the details provided by the citizen, on-site circumstances surrounding the event, and any corrective measures taken. CCR FUGITIVE DUST CONTROL PLAN Page 5

Any citizen complaints logged shall be included as part of the Annual CCR Fugitive Dust Control report (see Section 7.0). 6.0 ANNUAL CCR FUGITIVE DUST CONTROL REPORT Colorado Springs Utilities must prepare an Annual CCR Fugitive Dust Control Report (Annual Report) that includes a description of the actions taken to control CCR fugitive dust, a record of all citizen complaints, and a summary of any corrective measures taken [257.80(c)]. The Nixon Materials Handling Operations Supervisor, or their designee, shall be responsible for preparing the Annual Report. The Environment, Health, & Safety Division - Technical Services Section shall provide guidance and support, if requested. The initial Annual Report must be completed no later than 14 months after placing the initial CCR Fugitive Dust Control Plan in the facility s operating record. The deadline for completing a subsequent report is one year after the date of completing the previous report. For purposes of this paragraph, Colorado Springs Utilities has completed the Annual Report when it has been placed in the facility s operating record. The reporting periods shall be defined in the Annual Report. 7.0 EFFECTIVENESS ASSESSMENT Colorado Springs Utilities must periodically assess the effectiveness of this CCR Fugitive Dust Control Plan [257.80(b)(4)]. An effectiveness assessment may be appropriate following a significant unanticipated CCR fugitive dust event, or in conjunction with the Annual CCR Fugitive Dust Control Report (see Section 6.0). Additionally, performing an effectiveness assessment as a group (i.e., Plan Coordinator and all Material Handling Personnel) may provide benefits with regard to individual s experiences. The Plan Coordinator, or their designee, shall use the following procedure, or similar approach: Review all actions taken to control CCR fugitive dust, citizen complaints, and corrective measures taken since the prior assessment. Evaluate if there are any obvious deficiencies or consistent / reoccurring patterns with regard to dust events that would merit operational changes. Review general effectiveness of all control measures listed within Section 4.0. Evaluate if any of the control measures are ineffective or outdated and would merit operational changes. Review the general site conditions and typical CCR management practices. Evaluate if any significant changes have occurred that would merit operational changes. Determine if the plan is effective or requires amendments. If amendments appear merited, contact the Environment, Health, & Safety Division - Technical Services Section for assistance. CCR FUGITIVE DUST CONTROL PLAN Page 6

8.0 PLAN AMENDMENTS & CERTIFICATION Colorado Springs Utilities may amend this CCR Fugitive Dust Control Plan at any time provided the revised plan is placed in the facility s operating record (see Sections 9.0, 10.0, & 11.0). Colorado Springs Utilities must amend this plan whenever there is a change in conditions that would substantially affect the plan [257.80(b)(6)]. The Plan Coordinator, or their designee, is responsible for initiating such amendments with the Environment, Health, & Safety Division - Technical Services Section, who shall provide guidance and support. Colorado Springs Utilities must obtain a certification from a Qualified Professional Engineer that the initial CCR fugitive dust control plan, or any subsequent amendment of it, meets the requirements of 40 CFR Part 257.80. This certification is provided on the plan s cover page [257.80(b)(7)]. AMENDMENT HISTORY: Preparer Certifier Date Description of Primary Modifications / Updates Environment, Health, & Safety Division Brock A. Foster, P.E. October 2015 Initial CCR Fugitive Dust Control Plan Environment, Health, & Safety Division Brock A. Foster, P.E. December 19, 2016 Added Measures For Material Excavation, Staging / Stockpiling, & Truck Loading Associated With Beneficial Use. 9.0 RECORDKEEPING REQUIREMENTS Colorado Springs Utilities must place the following information, as it becomes available, in the facility s operating record [257.80(d)]: The CCR Fugitive Dust Control Plan, and any subsequent amendment of the plan. Only the most recent plan must be maintained in the facility s operating record [257.105(g)(1)]. The Annual CCR Fugitive Dust Control Report [257.106(g)(2)]. The Nixon Materials Handling Operations Supervisor, or their designee, shall be responsible for ensuring that these records are maintained in facility s operating record. CCR FUGITIVE DUST CONTROL PLAN Page 7

10.0 NOTIFICATION REQUIREMENTS Colorado Springs Utilities must notify the State Director (i.e., Colorado Department of Public Health & Environment) when [257.80(d)]: The CCR Fugitive Dust Control Plan, or any subsequent amendment of the plan, has been placed in the operating record and on the publicly accessible internet site [257.106(g)(1)]. The Annual CCR Fugitive Dust Control Report has been placed in the operating record and on our publicly accessible internet site [257.106(g)(2)]. The Environment, Health, & Safety Division - Technical Services Section shall be responsible for ensuring these required notifications are made to the State Director. 11.0 PUBLICLY ACCESSIBLE INTERNET SITE REQUIREMENTS Colorado Springs Utilities must place the following information on the CCR website [257.80(d)]: The CCR Fugitive Dust Control Plan, and any subsequent amendment of the plan. Only the most recent plan must be maintained on the CCR website [257.107(g)(1)]. The Annual CCR Fugitive Dust Control Report [257.107(g)(2)]. The Environment, Health, & Safety Division - Technical Services Section shall be responsible for ensuring these website postings are made. CCR FUGITIVE DUST CONTROL PLAN Page 8

APPENDIX A Citizen Complaint Log CCR FUGITIVE DUST CONTROL PLAN Page A-1

FUGITIVE DUST CITIZEN COMPLAINT FORM GUIDANCE: The purpose of this form is to document citizen complaints of Coal Combustion Residual (CCR) fugitive dust events, circumstances of the event, and any facility corrective action. Please provide as much detail as possible in the fields below. This form is to be completed by the Plan Coordinator, or their designee, with any additional documentation or relevant information to be appended to this form. A copy of this completed form should be included as part of the Annual CCR Fugitive Dust Control Report. Section 1: Information Provided by Citizen Name of Citizen (if provided) Citizen Contact Information (if provided) Date and time of fugitive dust event Date and time of complaint (if different) Event ongoing or complete? Observation point Description of event (location, duration, color, meteorological conditions, etc.): Additional comments: Section 2: Information Provided by Colorado Springs Utilities Representative Name of Representative Title of Representative Date and time of investigation Was CCR fugitive dust observed? Additional comments: If CCR fugitive dust observed, complete the items below Description of event (location, duration, color, meteorological conditions, etc.): Description of root cause: Description of corrective action(s) implemented: Describe the effectiveness of any corrective action(s) implemented: FORM REVISION - October 19, 2015