Temporary Equipment Checklist

Similar documents
HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

High-Pressure Boiler Inspection Procedures: A Complete Checklist

PROCESS SAFETY FUNDAMENTAL #1 Always use two barriers for hydrocarbon and chemical drains & vents

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011

NORMAL OPERATING PROCEDURES Operating Parameter Information

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures

SECTION P4 SEPARATION SYSTEMS

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

Operations: HSE. Health and Industrial Hygiene. Laboratory Safe Work Practice

RULES PUBLICATION NO. 119/P

OPERATING PROCEDURES

SEPARATION SYSTEMS. The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501).

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL

TEST BENCH SAFETY VALVES ¼ - 5 DN10 DN125

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

UTAS EH&S INSTRUCTION No. 036 June 2012 Revision No. 3. Purging of Flammable Gas Equipment and/or Piping (Explosion Hazard)

PROCEDURE NUMBER: PRC-SAF-16 (Preparation of Piping and Equipment for Repair) Page 1 of 10 Rev. 1.4 Date: 10/17/2016 Rev. 2.

Surface exploration drilling

Common Discrepancies Uncovered on ADCI Diving Contractor & Training Program Audits

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

Ontario ENGINEERING STANDARD SPECIFICATION 1.0 PURPOSE

BP OIL -- TOLEDO REFINERY

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Every things under control High-Integrity Pressure Protection System (HIPPS)

ADCI Consensus Standards - GAP Analysis Rev. 6 and 6.1 April 2, 2014

Prepared By: Environmental. File Name: WEL-ESOP Effective Date: 17 Sep 2007 Document Owner: EMD

BP OIL -- TOLEDO REFINERY

Collision Repair Shop Inspection Checklist

Standard Pneumatic Test Procedure Requirements for Piping Systems

Date Issued: November 2011 Revision Date: December 2012 Review Date: December 2015 Revision #

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

SSFU SUPER SPRAYFAST UNIVERSAL ADHESIVE APPLICATOR

CALIFORNIA STATE UNIVERSITY, LOS ANGELES WELDING, CUTTING, AND HOT WORK OPERATIONS. October 2007

Lab Assessments Workshop

Operating Instructions

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

Activities. I. General Instructions. Task Information. Advancd Field Training Activities Checklist

National Maritime Center

Aerial Lift Safety Program

INSTALLATION GUIDE Gas Rangetops

Title: Pressure Relieving and Venting Devices Function: Ecology & Safety No.: BC Page: 1 of 7 Reviewed: 6/30/12 Effective: 7/1/12 (Rev.

TABLE OF CONTENTS PART 2 - CONFINED SPACES

GAS COMPRESSION SYSTEM

INTENDED USE TECHNICAL SPECIFICATIONS

170-CG Feed Unit SPONGE-JET USER MANUAL. Sponge-Jet, Inc. (USA) 14 Patterson Lane Newington, NH

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

RASP RX3 Feed UnitTM SPONGE-JET USER MANUAL. Sponge-Jet, Inc. (USA) 14 Patterson Lane Newington, NH

Propane Conversion Kit Instruction

Research Laboratory Safety Self-Inspection: Chemical & Physical Safety Checklists

Lockout / Tagout Safety Program

Emergency Vehicle Driver

SITE INSPECTION PROCEDURE FORM

Risk Management Resources

Title: Recreational Facilities 3 - Athletic Facilities

3/8" Dr. Air Butterfly Impact Wrench

PURPOSE OF THE POLICY

THE TLC COMPANIES. Self Inspection Program. Self Inspection. Program. Revised 12/13/2002 DC00026

ESSENTIAL SAFETY RESOURCES

Safe Work Practices and Permit-to-Work System

English. Introduction. Safety Instructions. All Products. Inspection and Maintenance Schedules. Parts Ordering. Specifications WARNING WARNING

DAILY EXCAVATION CHECKLIST

Title: Biological Treatment

When you complete this module you will be able to: Describe procedures needed to enter into, or work safely in confined spaces.

University of Arkansas Office of Environmental Health and Safety

Thank You for Attending Today s Webinar. Today s Featured Speaker

Title/Description: Fuel Cell Fill Procedure

Proposed Uniform Standards for Equipment Leaks

INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1*

170-SJ Feed UnitTM 470-SJ Feed UnitTM

Frequently Asked Questions Directive 056 Facilities Technical

SHOP SAFETY INSPECTIONS

Hampstead Hill School Health and Safety Policy: Confined Spaces

POTENTIAL HEALTH & SAFETY HAZARDS

Guide for Evaluating Your Hose Assembly Supplier

OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS

Instructions: Use this format to prepare the security plans for ACP contracts. EVERY point has to be covered; if they do not apply, write N/A.

SECTION P4 SEPARATION SYSTEMS

RMP/PSM WEBINAR SERIES

Section 35 Brieser Construction SH&E Manual

CHE Well Testing Package/Service:

RDK-408D2 Cold Head. Technical Manual. SHI-APD Cryogenics Inc Vultee Street Allentown, PA U.S.A. Revision A: September 2005

This guidance applies to those individuals who perform acid cleaning or chemical treatment aboard Marine Depot Maintenance Command Yermo CA.

SLOP RECEPTION AND PROCESSING FACILITIES

Western Sydney University Safety Inspection Checklist - Laboratory Environments

Environmental Standard Operating Procedure Originating Office: MCAS Yuma Environment Department

DeZURIK. KSV Knife Gate Valve. Safety Manual

Confined Space Program

Lockout/Tagout Safety Policy

Laboratory Inspection Checklist

Composite Pistol-Type Air Needle Scaler OWNER S MANUAL

HYDROSTATIC LEAK TEST PROCEDURE

ACCESSORY KIT INSTALLATION INSTRUCTIONS

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

D Square Construction LLC

PIP PNE00012 Piping Examination and Leak Test Guide

ASSE International Product (Seal) Listing Program

Safe Work Instructions For Oxygen Acetylene Equipment

FE Petro vs. New Red Jacket Competitive Comparison

SOP GEN-007X Crane and Winch Operations

Transcription:

Location: Company Name (owner of equipment): Date: ID No.: Type of Equipment: Permit / WCC number: Equipment supporting: Operations Wells Projects General Yes No N/A Will the equipment operator require special PPE? (double hearing protection, respirator, dust mask, goggles, face shield, etc.) If yes, is correct PPE on hand and operator trained in the use of the PPE? Are required SDS readily available on location? Are skid drip pans free of leaks, plugged, and clean? Are spill control and waste management procedures in place? Are temporary hoses in compliance with BP hose management requirements in DWGOM GP-28-0001 (ETP library) and UPS-US-SW-GOM-HSE-DOC-00693-2 (HSSE Atlas)? Identify platform utilities supplied to temporary equipment? Are P&ID or layout drawings available? Are equipment operations manuals or procedures available? Has PSRE reviewed the risk? Has the GoM Environmental Compliance Checklist (UPS-US-SW-GOM-HSE-DOC- 00956-2 in HSSE Atlas) been completed? Platform utilities / services required: Utility Air Instrument Air Sea Water Potable Water Nitrogen Diesel Fuel Electrical Power Other 110v 480v Specify: Verify equipment does not block access to emergency and fire-fighting equipment? Verify equipment does not block line of sight detectors Verify equipment does not block access to emergency eye wash / shower stations? Verify equipment does not block emergency egress routes? Verify equipment does not exceed load rating of deck or floor Verify equipment does not exhaust within 26 feet of HVAC air intake Operations Tech (Print / Signature): Pre-Use Inspection and Qualification Checklist for Temporary Equipment Page 1 of 5

Mechanical Yes No N/A Are warning signs required around this equipment? Are warning and shut down signs properly installed and visible? Are guards for rotating or moving parts properly installed? Are spark arrestors fitted on engine exhausts? Are spark arrestor and exhaust systems properly wrapped? Are high-pressure lines secured properly or snubbed? Is the equipment free from leaks (oil, fuel, acid, nitrogen)? Are pressure vessels protected with properly rated pressure release devices, and are they uniquely identified and tagged or stamped with an ASME code? Are current PSV testing certificates available and do they match the tag/physical identifier of each PSV? Are PSV block valves in a locked open position? Does the equipment have an air manifold shutdown system? Does the equipment have an emergency shut off on the fuel system? Have the ESD systems on this equipment been tested before operation? Are critical spare parts and fluids available as needed? Are most recent maintenance / inspection records available for review? Is the equipment maintenance plan / schedule available on the platform? Have mechanical end connectors that will be mated in the field been visually inspected (i.e. flanges, couplings, fittings, threads, hammer unions, swivels, etc.)? Are they compatible (i.e. type, pressure class, etc.)? Mechanical Tech (Print / Signature): Electrical Yes No N/A Is the equipment to be located in a hazardous area? Is the equipment explosion proof where applicable? Are the terminal connections adequate? Is the equipment properly grounded? Is ground fault protection required? Is surge suppression equipment required? Is sufficient lighting available in the operating area? Do power inputs / outputs have proper terminal connections? Are platform circuits able to handle load requirements of the equipment? Is functional overload protection installed? Will electric motor phase rotation verification be required before start up? Electrical Tech (Print / Signature): Pre-Use Inspection and Qualification Checklist for Temporary Equipment Page 2 of 5

Temporary Buildings / Storage Yes No N/A Is the unit occupied? Is gas detection in the unit? Is smoke detection in the unit? Is fire detection/suppression in the unit? Does the unit have hurricane tie downs? Will the temporary installation exceed the load rating of the deck or floor? Operations Tech (Print / Signature): Equipment Operator Yes No N/A Verified equipment operator has current equipment operating procedures available Verified equipment operator has appropriate skills and knowledge to operate equipment Verified operator understands facility safe work practices including CoW, PTW, LOTO, and safe working practices as they apply to the temporary equipment Verified with operator which Safe Work Practice to apply while operating the equipment, contractor or BP Verified equipment operator understands hazards of the equipment and actions in an emergency situation Verified operator understands facility emergency procedures Verified operator has been briefed on facility SEMS program IA / PA (Print / Signature): Additional Considerations Yes No N/A If equipment is tied into an existing process, has a HAZOP been performed for it? Is an appropriate inherently safer alternative to the use of temporary equipment available? Is a nitrogen or fluid supply device in use that has the potential to exceed system design pressure i.e. consider regulator failure? Are HP / LP interfaces identified? Is pressure regulation and protection in place to protect the interconnected equipment from overpressure? Are procedures in place for pressure testing, purging, or pigging activities? Are vent or pressure relief systems appropriately routed and secured? Consider material flammability and potential area affected by release (i.e. oil on hot surfaces) Does this equipment require a PM in Maximo be created for it, while it is in use offshore? (BP owned equipment only) Is the sound level (steady state or intermittent), produced by the equipment, below 85 dba beyond a 3 ft perimeter from all equipment surfaces? Pre-Use Inspection and Qualification Checklist for Temporary Equipment Page 3 of 5

Identified Deficiencies: Temporary Equipment Checklist Corrective Actions: Function BP OIM Authorizing Use Representative Team Lead Third-Party Representative Name Signature Date AMENDMENT RECORD Amendment Revision Amender Amendment Date Number Initials 18-May-2015 5 KCR Temporary buildings section now encompasses storage units and updated custodian and authority 17-Aug-2015 6 KCR Clarified the need to have a PSV and its paperwork match in the mechanical section 16-Feb-2016 7 KCR Clarified names and locations of hose and environmental procedures in General section Pre-Use Inspection and Qualification Checklist for Temporary Equipment Page 4 of 5

Pre-Use Inspection and Qualification Checklist for Temporary Equipment Page 5 of 5