Bike-Shell Model 301P

Similar documents
Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

Glass Steel, Inc. Fiberglass Composite Troughs

Made in U.S.A. Narrow-U Bike Rack Heavy Duty Submittal Sheet. Materials: Finishes: Mount Options: Setbacks:

S110 Steel Level Panel Installation Instructions

Anchor Component Material Standard Mechanical Properties

8 Square Boating & Beach Umbrella 4 Pc Kit XL-100 by Hydra Shade

Advantage Lockers & Bike

Moai Bike Rack Heavy Duty Submittal Sheet. Materials: 2.0 Schedule 40 Pipe (2.375 OD) Finishes: Capacity: Mount Options: Setbacks: 2 Bikes

K13.12 FACE FIXED PANIC EXIT DEVICE K13 DOORS

List of Figures. List of Tables

WAVE CYBER HANDLING &

l DESCRIPTION l FEATURES l LIMITATIONS l TYPICAL APPLICATIONS l MATERIAL SPECIFICATIONS TECHNICAL MANUAL SECTION 2.3 PAGE 1 / 6

TorqBolt Wedge Anchors Torque Controlled Expansion Anchor

Operations and Instruction Manual Might Swivel Model # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

Installation and Operation Instruction Manual

SECTION SHOWER AND BATH ENCLOSURES. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

THOR 10 HAMMER CAGE INSTRUCTIONS

3190A NEO-ANGLE DOOR INSTALLATION INSTRUCTIONS. Series MODEL NO

ARCA cabinet NEW. High performance polycarbonate cabinet. Protection in demanding environments

Made in the USA. For Fall Protection Only. SafeLok Part Description

3/4 SafeClaw Anchorage Connectors

SPOOLER INSTRUCTIONS. STEP 12 If you are going to paint your posts, that should be done at this time.

POP UP ANCHOR. Part Number Spectrum Lane ~ Missoula MT ~

MAKE BOLLARD IMPACT RESISTANT PROTECT FOUNDATIONS RE-USE BOLLARD

CHEMICAL. Straight cut rod is provided in the materials listed below and includes nuts / washers.

SELF DRILLING/TAPPING SCREWS

Ramp Hand-railing System. Complies with Building Regulations. Lockinex. ea i, ea u i

hockey hockey Integral Weighted Goals Aluminium Goals Fence Folding Goals Premier Hockey Goals Folding Wheelaway Goals

PRESSURE TANKS HANDLING & INSTALLATION INSTRUCTIONS INSTALLATION MANUAL CONTROL VALVES

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

O u t d o o r B i k e a n d B o a r d P a r k i n g P r o d u c t C a t a l o g

BICYCLE ACCESS RAMP INSTALLATION INSTRUCTIONS. Customer Service all4cycling.com.au

TUBE SIGN POST PRODUCTS

NEXT GENERATION FLEX FENCE

Extension Platform. Base Platform. Crossover. Exit railing. Exit Railing

Unit 1, Fullerton Road Rotherham S60 1DJ. Tele: Fax:

WHY COLOR GUARD IS YOUR FIRST CHOICE

Diamond cutting tools Applications guide

Gas Cylinder Storage Structures

Product Guide. Bicycle Silver. Velo-Safe cycle-works.com

CHAINLESS ANCHORING SYSTEM USER MANUAL

Service Bulletin 70. Subject: Vertical fin cracks. Applicability: All Sportsman aircraft

DDS TECHNOLOGY MARKER SYSTEMS

ROCKSOLID DUAL POST ANCHOR

E-trike Li Assembly Guide

WELL COMPLETION & PROTECTION. www. .com MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD

ELEGANT AND SECURE MODERN BICYCLE PARKING SYSTEMS

ZODIAC 601 XL. Position the main spar parallel to the edge of the workbench. Raise the wing skeleton on steel beams or spacers.

U STAND INSTALLATION INSTRUCTIONS

KERSPLASH POOL CLIMBING WALL INSTALLATION INSTRUCTIONS

UPDATE ARLINGTON COUNTY. Bicycle Parking Standards

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

1213B2 Service Regulators Maximum Inlet Pressure 125 PSIG

SEADUCER BOATS GAS MONO COME VISIT US ON THE WEB AT

Lock Descriptions. Cost Categories. Suitability

BP48-1 AND SSP48-1 IN-GROUND POST INSTALLATION INSTRUCTIONS

Security and confidence at height.

STOL CH 701. STOL CH 701 Bubble doors Rear view. Front view Right door. Revision 1.0 (10/03/2003) 2003 Zenith Aircraft Co

cricket Premier Portable Cage Winch System Heavy Duty Parks Parks Cages Wooden Bays Stumps Netting Sundries cricket

SAFETY JOURNAL FOR GIPFEL WEDGE ROCK ANCHOR BOLTS

HOW TO HANDLE POOL LEAKS. Please carefully read this instruction manual when handling leaks in your ipool

3M InCa Individual Cross-Connection Cabinets

PHOENIX, ARIZONA USA

MSA Confined Space Entry Equipment

Casing Spacer Technology Leaders

Kestrel Aluminium Systems Limited. Product Manual Section 10 Thermal Framing System. Manual Version

Plans and Instructions to build a folding reflector oven

CHAIN LINK FENCE GATE

OLYMPIC ARMS, INC. MPR SUPPLEMENTAL OWNER S MANUAL

WHY COLOR GUARD IS YOUR FIRST CHOICE

1 SafeClaw Anchorage Connectors

InstallatIon and owner s InstrUCtIons

TRAVSMART permanent single-cable horizontal lifeline system

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

BOUNDARY Deer & Perimeter Fence

A N C H O R T A B S N O R T H W E S T ANCHOR TAB VF. Patented. User Instructions

M&P Trigger Work. The S&W M&P may be one of the easiest guns ever to do trigger work on.

LOAD HUGGER CARGO CONTROL

1800C and 1800C-HC Service Regulators

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

L.Ph. Bolander & Sons 1355 Evans Ave. 800/

Bicycle Management Products From Columbia Cascade Company

Palmer township, Pennsylvania. Pool Fence Details Based on the 2009 International Residential Code (Designed and Printed January 2012)

ATM PRODUCT LIST FEBRUARY 2018

CO V E R S TA R AU TO MAT I C S A F E T Y CO V E R INSTALLATION GUIDE

Highbond anchor FHB II-A S

BPB26-1 AND SSPB26-1 PATIO BASE INSTALLATION INSTRUCTIONS

Fair Winds Boat Repairs, LLC Riberia St. #7 St. Augustine, Fl

Tower Accessories & Hardware

Safe Work Practices (SWP) SWP (6) FALL PROTECTION PROGRAM

EXTRACTOR PRO MODEL PWC RESCUE SLED

MATRIX CONCEPTS CANADA TOLL FREE:

NEW FEDERAL RULES BREAKAWAY SIGN SUPPORTS ARE REQUIRED

TECHNICAL DATA OBSOLETE

OPERATIONS CHALLENGE 2017

Palmer township, Pennsylvania. Pool & Fence Details Based on the 2009 International Residential Code (Designed and Printed January 2012)

Tripod Setup Guide (M-TPx)

Vertical and Horizontal Bladder Tanks

Log Balance Beam. Product: (4 ), (6 )

Installation and Training Manual

Transcription:

Bike-Shell Model 301P NEW design, one piece FRP Composite bike locker NO ASSEMBLY required Specify the 300 Series lockers for the highest customer satisfaction from the no-assembly ready-touse delivery through years of trouble free operation. Architects, designers and government agencies specify the 300 Series due to the high quality manufacturing which means virtually no installation costs! The 300 Series is the first one piece locker available that is not molded of soft and flammable HDPE plastic material. Lockers are pictured with Part No. 030 Louvered Vents and are Café color All lockers are shipped assembled and can be stand alone or grouped NO COMMON WALLS. Lockers easily relocated. The construction of fiberglass reinforced plastic is highly resistant to impact, stains and will not corrode. Designed after our very popular 350 Series lockers and available in 6 styles providing flexibility for site locations.

Product Capacity Materials Bike-Shell Model 301P 1 door/1 Bike Locker shall be manufactured of molded fiberglass reinforced plastic composite with a smooth X and Y pattern on stippled walls and top, with smooth door frame and stippled door. Material shall be E-glass and polyester resin at 35% ratio. Tensile Strength, 18,000 psi. Locker shall be one piece with no external or internal frame and no seams or joints on tops or side walls. Material shall withstand over 300 lb/sqft on roof and 200 lb/sqft on walls/doors. NO ON SITE ASSEMBLY SHALL BE REQUIRED. Roof shall be crowned for water run-off and all corners shall have a smooth radiused finish. Finish of UV stabilized gelcoat does not need painting, allows solvent removal of graffiti and is resistant to impact and UV damage. 1 door/1 bike Setback Hardware Please allow 5ft clearance for door High quality custom continuous door hinge will not rust. All fasteners on locking system shall be zinc plated or better. Locker shall anchor in all four corners through base flanges using expansion anchors. See last page for anchoring details. Locks 2 Standard Lock Options (No charge) Fort Lock 7 pin tumbler Pop Out T handle locks with three keys and removable lock cylinders. Internal locking hardware consists of three plated hardened steel cams controlling an extruded aluminum locking bar which engages the door frame over three foot span. Heavy duty stainless steel Padlock/U-Lock handle will accommodate high security Padlocks and U-Locks. For U-Locks from ½ to ¾ Diameter. Padlocks and U- Locks not included. T-Handle Padlock/U-Lock Handle Colors 2 Standard Color Options (No charge) Tan Medium Grey Please call for custom color, or color match information Page 1 of 4

* clearance is needed from an obstructer that would prevent access. For example a wall or column* 4 Units 8 Units Typical wall or fence. 16 Units 14 6 = 174 12 Units *Full circle should have a minimum of 24 (288 ) circular area to allow easy access from all angles. 24 6 (294 ) is recommended. Page 2 of 4

ASSEMBLY INSTRUCTIONS 300 SERIES BICYCLE LOCKER Model 301P Your bike locker does NOT require any general assembly. Tools Needed: Minimum requirements 3/8" electric drill (anchoring & installing diagonal divider wall) 3/8" electric rotary hammer drill (anchoring) 1/4" drill bit (anchoring & installing diagonal divider wall) 1/4" hammer drill bit (anchoring) hammer (anchoring) Tape measure - minimum 10' (anchoring & installing diagonal divider wall) Extension cord 25' (anchoring & installing diagonal divider wall) Generator or other source of power (anchoring & installing diagonal divider wall) Safety glasses and any other equipment specified by the tool manufacturer. (All Steps) -Choose location which allows a minimum 4' distance between door face and any obstruction to allow bicycle to maneuver into locker and the door to swing open without hitting high spots such as concrete or asphalt raised by roots. If desired, for grouping of units, chalk a line for straight edge with which to work. A preferred site would be concrete although asphalt can be used. Site should be flat although it does not necessarily have to be level. ANCHORING The lockers should be anchored to the ground for optimum longevity and proper operation of the locking system. Therefore, anchoring each unit to the ground is advisable. The 301 and 302 lockers are anchored in the 4 corners of the flange located around the inside of locker, the 301P, & 301V are anchored in the front two corners of the locker and the rear. First square the doors in the frame. Out of square doors are due to the site being uneven. To square the door, using a flat bar, raise the corner of the locker to make the door in square. If any adjustment is necessary it should only be slight. Place a shim under the corner to retain the alignment and height. Shim should be placed in a location under the base flange very close to hole for the anchor. This allows the downward force of the anchor to be supported underneath and prevent cracking of the base flange at the anchor location. Drill through the base flange on the locker with 1/4" drill. With hammer drill and 1/4" masonry bit you can then drill into concrete surface. Drop the nail-in anchor through flange and into the hole, pound pin down flush with top of mushroom head of anchor. Do this at all four corners of door frame on 301 & 302 lockers. On 301P and 301V do this in the front two corners of the door frame and in center of rear wall. Page 3 of 4

Anchoring Information NOTE: Hole position is only approximate and not critical. A A 301P Top View Anchoring Flange Inside Locker Locker Base Flange Nail in anchor (provided by Manufacturer) Concrete or Asphalt Page 4 of 4