Project Fact Sheet. August 1,

Similar documents
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

City of Wilsonville 5 th Street to Kinsman Road Extension Project

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Chapter 5 Future Transportation

Transportation Corridor Studies: Summary of Recommendations

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

TRASBURG RANSPORTATION

North Shore Transportation Improvement Strategy

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Project Description Form 8EE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

C C C

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Washington DC Section of ITE Project Briefing

Broadway Complete Streets Project

LANCASTER CITY BICYCLE NETWORK

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Transportation Planning Division

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

TOWN OF IRONDEQUOIT ACTIVE TRANSPORTATION PLAN

3.0 PROJECT DESCRIPTION

Station 1: Street & Sidewalk Upgrades

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Solana Beach Comprehensive Active Transportation Strategy (CATS)

4.0 Recommended Transportation Plan

4.0 Recommended Transportation Plan

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Public Meeting #1 Comment Summary

Recommendations. Central Salem Mobility Study

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Columbia Pike Implementation Team (CPIT) Meeting

4.12 TRANSPORTATION Executive Summary. Setting

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Hennepin County Bicycle and Pedestrian Planning

City of Davis East Covell Corridor Plan

NEWMARKET UPHAM S CORNER

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Executive Summary Route 30 Corridor Master Plan

Chapter 3: Multi-Modal Circulation and Streetscapes

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

San Jose Transportation Policy

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM

DEKALB COUNTY. 22. Priority Projects for DeKalb County

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

ARRENTON RANSPORTATION

Tonight is for you. Learn everything you can. Share all your ideas.

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

The Bike Buzz in Richland. November 2017 Carl Berkowitz

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

HYATTSVILLE TRANSPORTATION PLAN. City Council Update March 19, 2018

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

3.0 Future Conditions

2012 PRIORITY TRANSPORTATION PROJECTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

CITY OF LANCASTER PROPOSED NEW PROJECTS

San Pablo High Treatment applied incrementally at each N + ++

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle

North Avenue Corridor Study

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Terwillegar Drive Expressway Draft Concept Plan

City of Hyattsville. Citywide Traffic Study and Transportation Plan. Sabra, Wang & Associates. February, 2010

Route 28 Corridor Safety and Operations Study

North Avenue Corridor Study

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Duwamish Way-finding and CTR Report

Comments EXECUTIVE SUMMARY

City of Moorhead Committee of the Whole Meeting

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

5 CIRCULATION AND STREET DESIGN

Lynchburg District Update

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Route 7 Corridor Study

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Safe Streets. City of Lake Forest Park. March 21, 2017

Waterford Lakes Small Area Study

Route 28 Corridor Safety and Operations Study

Bus Rapid Transit Plans

4. Action Plan & Projects

Summary of Comments Public Meeting: Marietta Street Resurfacing Project Atlanta Contemporary August 29, 2017 / 6:00 pm to 8:00 pm

Orange Center Elementary School

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

Giles Run Connector Road

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

West Circle Drive (CSAH 22) Traffic Operations Study

Staunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

TRANSPORTATION IMPROVEMENT STRATEGY

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

Transcription:

Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation Master Plan. The goal of the Transportation Master Plan is to improve connectivity in the City for all types of users, making travel easier, safer, and more efficient for drivers, pedestrians, cyclists, and transit users. Wide reaching representative community involvement that includes input from City residents, members of the business community, and other stakeholders with varying interests and perspectives is needed to make the project a success. The Transportation Master Plan is broken up into three phases. Ongoing input from the public and other stakeholders will take place throughout each of the phases. The primary actions and timeframe for each phase includes the following: Phase 1, Needs Assessment, January-March 2013 o Review previous plans and analyze existing transportation data o Assess the transportation needs of the City Phase 2, Plan Development, April-May 2013 o Develop potential transportation policies and programs o Identify specific proposed projects based on the results of the needs assessment Phase 3, Implementation Plan, June-August 2013 o Revise the proposed transportation policies, programs, and projects based on input from City residents, the business community, and other stakeholders o Prioritize s Transportation Goals The following transportation Goals were identified to be addressed by the Transportation Master Plan: Manage congestion, focusing on operation of key intersections and critical road sections. Enhance safety for users of all travel modes, including automobile, private and commercial vehicle operators, pedestrians, bicyclists, and transit riders. Increase connectivity of the roadway network for local and regional trips. Support Economic Development and Redevelopment by providing transportation systems that serve existing residents and businesses as well as future potential redevelopment in support of the Comprehensive Plan. Increase pedestrian and bicycle mobility for travel along corridors and for access to transit. Recommendations Recommended improvements were discussed with the public at the June 27 th and August 1 st public meetings. The list on the following pages indicates the proposed roadway and alternative mode recommendations. These proposed projects are shown on the s Map and Alternative Modes Map. This information is also available on the City of Gainesville website at: www.gainesville.org/gainesville-transportation-plan August 1, 2013 1

Fact Sheet Draft Transportation Recommendations: and 1 I-985 Study 2 Athens Hwy at Chestnut St Study 3 Athens Hwy at Ridge Rd 4 5 6 Browns Bridge Rd at Auburn Ave Browns Bridge Rd at Pearl Nix Pkwy Browns Bridge Rd at West End Ave 7 Cleveland Hwy at Limestone Pkwy 8 Cleveland Hwy at Limestone Pkwy 9 10 11 12 Dawsonville Hwy/SR 53 at McEver Rd EE Butler Pkwy at MLK Jr Blvd; Athens Street at MLK Jr Blvd Jesse Jewell Pkwy at EE Butler Pkwy Jesse Jewell Pkwy at EE Butler Pkwy - Major Improvement Conduct a study of I-985 interchange needs from Queen City Pkwy to Jesse Jewell Pkwy. The study shall analyze the potential need for an additional interchange north of Athens Street as part of an extension of Downey Blvd. It shall also focus on the preferred design at each interchange and consider the need for a collectordistributor system or other access changes along the corridor. The need and potential locations for park and ride lots at or near the interchanges shall also be a part of the study. Shift the intersection of Athens Hwy at Chestnut St to the north, further from the intersection of Athens Hwy at Ridge Rd. Extend the southbound left-turn lane on Athens Hwy on the approach to Ridge Road to prevent left-turn traffic queues from extending into the through travel lanes. At the intersection of Athens Hwy at Ridge Rd, add a northbound right-turn lane approximately 200 ft in length At the intersection of Browns Bridge Rd at Auburn Ave, add an eastbound right-turn lane At the intersection of Browns Bridge Rd at Pearl Nix Pkwy, add a second northbound left-turn lane approximately 300 ft in length and add a second southbound left-turn lane approximately 200 ft in length; add an eastbound right-turn lane approximately 250 ft in length and add a westbound right-turn lane approximately 125 ft in length At the intersection of Browns Bridge Rd at West End Ave, add a westbound right-turn lane, approximately 125 ft in length At the intersection of Cleveland Hwy at Limestone Pkwy, signalize the northbound right-turn movement on Limestone Pkwy to allow for the free flow movement of right-turning vehicles during appropriate signal phases Realign the intersection of Cleveland Hwy at Limestone Pkwy so that the north leg, Cleveland Highway, lines up with the southeast leg, Limestone Pkwy. The south leg of the intersection, Cleveland Highway, becomes the side street. At the intersection of Dawsonville Hwy/SR 53 at McEver Rd - TBD, Add lanes as needed, potentially a westbound right-turn lane and second through lane At the intersection of EE Butler Pkwy at MLK Jr Blvd, on the northeast bound approach, extend the left-turn lane to provide more vehicular storage, add a second through lane, and add a short (less than 100 ft long) right-turn lane. On the northeast leg of the intersection, add a second receiving lane which will also be a right-turn lane onto Athens Street. On the southwest bound approach, extend the left-turn lane to approximately 250 ft in length. Remove the traffic signal at the intersection of MLK Jr Blvd at Athens Street and prohibit the westbound left-turn movement from Athens Street. At the intersection of Jesse Jewell Pkwy at EE Butler Pkwy, extend the eastbound right-turn lane to the pedestrian bridge across Jesse Jewell Pkwy At the intersection of Jesse Jewell Pkwy at EE Butler Pkwy, implement a major intersection improvement. An example of a major improvement for this intersection is an intersection design with grade separated left-turn movements. This consists of converting the left-turn lanes to ramps that raise left-turn traffic higher than the rest of the intersection, creating a grade-separated intersection only for left-turn traffic. 13 14 15 Jesse Jewell Pkwy at John Morrow Pkwy/Queen City Pkwy Jesse Jewell Pkwy at John Morrow Pkwy/Queen City Pkwy - Major Improvement Jesse Jewell Pkwy at Limestone Pkwy At the intersection of Jesse Jewell Pkwy at John Morrow Pkwy/Queen City Pkwy, add a right-turn lane on the eastbound and westbound approaches on Jesse Jewell Pkwy and on the northbound approach on Queen City Parkway. The right-turn lanes will each be approximately 300 ft long. At the intersection of Jesse Jewell Pkwy at John Morrow Pkwy/Queen City Pkwy, implement an intersection design with grade separated left-turn movements. This consists of converting the left-turn lanes to ramps that raise left-turn traffic higher than the rest of the intersection, creating a grade-separated intersection only for leftturn traffic. At the intersection of Jesse Jewell Pkwy at Limestone Pkwy, add a second left-turn lane on the eastbound approach on Jesse Jewell Pkwy August 1, 2013 2

Fact Sheet Draft Transportation Recommendations: and 16 17 Jesse Jewell Pkwy at Prior St John Morrow Pkwy at Washington St 18 Park Hill Dr at Enota Ave 19 20 Park Hill Dr at Lakeview Dr Thompson Bridge Rd at Enota Ave 21 Academy Street Extension At the intersection of Jesse Jewell Pkwy at Prior St, add a southbound left-turn lane approximately 65 ft in length At the intersection of John Morrow Pkwy at Washington St, add a concrete island to the southbound right-turn lane and add "Keep Moving" signage At the intersection of Park Hill Dr at Enota Ave, add a southbound right-turn lane approximately 175 ft in length and add an eastbound right-turn lane Reduce the slope on the Lakeview Dr approach and/or signalize the intersection At the intersection of Thompson Bridge Rd at Enota Ave, add a northbound right-turn lane approximately 125 ft in length and add a southbound right-turn lane approximately 105 ft in length Extend Academy Street southeast from its intersection with Jesse Jewell Pkwy to the intersection of Grove Street at Parker Street 22 Community Way Extension/ Re-Alignment Extend Community Way northeast to Limestone Pkwy and continue to White Sulpher Rd; Re-align the intersection of Jesse Jewell Pkwy at Community Way to the intersection of Jesse Jewell Pkwy at the Industrial Blvd extension (existing Branch St) 23 Dawsonville Hwy/SR 53 at McEver Rd - Local Connections 24 Industrial Blvd Extension 25 Ivey Terrace Extension 26 27 Thompson Bridge Rd - Dawsonville Hwy Connector Downey Blvd Extension and ; New Additional local roadway connections near the intersection of Dawsonville Hwy/SR 53 at McEver Rd to provide parallel connections to Dawsonville Hwy/SR 53 Extend Industrial Blvd north along the railroad tracks, under Athens Hwy, to the intersection of Jesse Jewell Pkwy at Branch Street. Include a multi-use trail as part of the roadway extension. Extend Ivey Terrace east to Green Street. The roadway extension will intersect Bradford Street, use a portion of Sylvan Wood Ln, and extend through a parking lot to Green St Construct a new bridge from Thompson Bridge Rd/SR 60 approximately 1 mile south of Thompson Bridge across Lake Lanier to Dawsonville Hwy. This connection includes new roadway segments and may also use segments of existing roadways, depending on the preferred route alternative. Extend Downey Blvd east to I-985. Construct a new interchange at I-985 at the Downey Blvd extension with interchange connecting to the EE Butler interchange to the south. 28 Dawsonville Hwy/SR 53 29 Jesse Jewell Pkwy West 30 MLK Jr Blvd Corridor 31 Atlanta Highway Widening and / Widen Dawsonville Hwy/SR 53 to a 6-lane roadway, including 3 through lanes in each direction and a landscaped median, from Shallowford Rd to Sportsman Club Rd Widen Jesse Jewell Pkwy to a 6-lane roadway, including 3 through lanes in each direction and a landscaped median, from John Morrow Pkwy/Queen City Pkwy to Academy Street Widen MLK Jr Blvd to a 4-lane roadway with streetscapes and a landscaped median from Queen City Pkwy to EE Butler Parkway; Add a two-way left-turn lane and streetscapes from EE Butler Pkwy to Downey Blvd. Implement the following along Atlanta Highway: Add a two-way left-turn lane from Hall Street to Industrial Blvd; Widen to a 4-lane roadway with a landscaped median from Industrial Blvd to Memorial Park Dr; Convert Atlanta Hwy to a Complete Street from Browns Bridge Rd to Memorial Park Dr; Add a two-way left-turn lane and sidewalk from Memorial Park Dr to Tumbling Creek Rd; Continue the sidewalk to the existing sidewalk approximately 1,000 ft south of Tumbling Creek Rd August 1, 2013 3

Fact Sheet Draft Transportation Recommendations: and 32 Green Street Short-Term 33 Green Street Short/Mid-Term 34 Green Street Mid/Long-Term 35 Oak Tree Dr 36 Enota Dr Re-alignment / ; Extended 37 Gainesville Wayfinding Signage Signage 38 39 I-985 at Queen City Pkwy I-985 at Jesse Jewell Pkwy Green St from Academy St to Riverside Dr, TBD, Options do not affect the existing curbs and include - prohibiting left-turns along the corridor, prohibiting left-turns during peak hours, or restriping to provide two NB lanes, one left turn lane, and one SB lane. Add a southbound right-turn lane at the intersection of Green Street at Academy Street; Add a northbound right-turn lane and a southbound left-turn lane at the Post Office entrance Convert Green Street from Academy Street to Riverside Dr to a boulevard with a 20 ft wide landscaped median; Add wide sidewalks with streetscape elements (pedestrian lighting, trees) on both sides of the road. Add a two way left-turn lane on Oak Tree Dr from Thompson Bridge Rd to Riverside Dr; Add a traffic signal to the intersection of Oak Tree Dr at Thompson Bridge Rd; Realign the intersection of Oak Tree Dr at Riverside Dr so the through movement is between Oak Tree Dr and Riverside Dr northbound, with the south leg of Riverside Dr as the side street; Add a traffic signal or roundabout to the intersection of Oak Tree Dr at Riverside Dr Construct a new roadway segment behind Enota Elementary School, connecting Enota Drive near the intersection with Cumberland Dr to S Enota Dr near the intersection with Enota Cir; Add a two-way left-turn lane to Enota Dr from Thompson Br Rd to Park Hill Dr, including along the new roadway segment; Potentially combine construction with the intersection projects at Thompson Bridge Rd at Enota Ave and at Park Hill Dr at Enota Ave Implement a system of wayfinding signage in downtown Gainesville and at key intersections near downtown. The signage should provide a consistent look that facilitates branding for the City At the I-985 at Queen City Pkwy interchange, implement operations changes to the existing intersections at the I-985 on and off ramps. These will potentially include extending the existing turn lanes, adding new turn lanes, and/or changes to the ramp operations. At the I-985 at Jesse Jewell Pkwy interchange, implement operations changes to the existing intersections at the I-985 on and off ramps. These will potentially include extending the existing turn lanes, adding new turn lanes, and/or changes to the ramp operations. 40 I-985 at Athens Hwy At the I-985 at Athens Hwy interchange, implement capacity and operations changes to the existing intersections at the I-985 on and off ramps. These will potentially include new ramps, extending the existing turn lanes, and/or adding new turn lanes. 41 EE Butler Pkwy/Athens Hwy 42 Athens Street-McDonald Street Connector 43 Jesse Jewell Pkwy East 44 Spring St Extension 45 Neighborhood Traffic Calming Traffic Calming Widen EE Butler Pkwy to a 6-lane roadway, including 3 through lanes in each direction and a landscaped median, from Summit St to east of Monroe Dr Re-align Athens Street to the north so that it crosses Purina Dr and connects to McDonald Street. Shift the RR crossing north to serve the re-aligned roadway. This project may need to be constructed as re-development takes place in the area. Widen Jesse Jewell Pkwy to a 6-lane roadway, including 3 through lanes in each direction and a landscaped median, from Community Way/Industrial Blvd Extension to Oconee Cir/Miller Dr Extend Spring St west to Washington St, approximately 600 ft west of Academy St. This will be a one-way roadway eastbound, with Washington St as a one-way roadway westbound. Implement traffic calming (i.e. bulbouts, splitter islands, speed humps, etc.) along Longview Dr from Enota Ave to Springway Dr, Holly Dr from Holly Ln to Green St, and Dixon Dr from Holly Dr to Chestatee Rd August 1, 2013 4

Fact Sheet Draft Transportation Recommendations: and 46 Multimodal Terminal TDM Implement a Multimodal Terminal at or near the existing Amtrak station that brings together local bus routes, express bus and/or commuter rail, Amtrak rail, Greyhound bus, parking, and bike/ped access into one facility. 47 Patricia Dr Extension Extend Patricia Dr west to MLK Jr Blvd. is intended to improve neighborhood connectivity without removing existing residences. 48 Traffic Equipment and Control Center 49 Timing 50 51 52 Traffic Coordination and Communications - Tier 1 Traffic Coordination and Communications - Tier 2 Traffic Coordination and Communications - Tier 3 Modify traffic signal field devices to operate on internet protocol, install monitoring and control equipment in traffic control center, connect to City Fiber optics network for communications with traffic control center. Provide comprehensive signal retiming with consideration of traffic responsive plans along congested corridors (78 intersections). Install fiber optic communications and camera monitoring along the following corridors: Jesse Jewell Pkwy east of downtown, downtown Gainesville, and John Morrow Pkwy. Install fiber optic communications and camera monitoring along the following corridors: Browns Bridge Road west of Pearl Nix Pkwy, EE Butler Pkwy, Athens Highway south of MLK Boulevard, and Green Street - Thompson Bridge Road north of Academy Street. Install fiber optic communications and camera monitoring along the following corridors: Atlanta Highway, Pearl Nix Pkwy, Aviation Blvd, Industrial Blvd, Queen City Pkwy, Downey Blvd, S. Enota Drive, Park Hill Dr, Limestone Pkwy, and MLK Jr. Blvd., as well as a connection down Main Street from MLK Jr. Blvd to the City Traffic Control Center. 53 Driver Information via Changeable Message Signs Provide changeable message signs and operation along state routes in coordination with GDOT Navigator program along I-985. Implementation of 12 signs along three corridors is anticipated (EE Butler Pkwy, Jesse Jewell Pkwy, and Queen City Pkwy) 54 Travel Demand Management Plan 55 Freeway Signage Modifications Travel Demand Management Develop a travel demand management plan and strategy to increase ridesharing and use of alternative transportation modes. Prepare plan in coordination with Hall County as part of regional approach. Modify freeway signage to encourage greater use of Jesse Jewell Pkwy for access to Gainesville and travel to the north. Consider removal of US 129 business designation so that US 129 traffic uses Jesse Jewell Parkway. Draft Transportation Recommendations: Pedestrian and Bicycle 60 Washington St Complete Street and Sharrows 61 Bradford St Complete Street - North 62 Bradford St Complete Street - South 63 College Ave Complete St 64 Fair St Complete Street 65 Main St Complete Street 66 Prior St Complete Street Add Complete Street elements to Washington St from Academy St to Smithgall Ln, ; including; Add sharrows to Washington St from John Morrow Pkwy to Academy St Sharrows Add Complete Street elements to Bradford St from Washington St to Dixon Dr Add Complete Street elements to Bradford St from Industrial Blvd to Jesse Jewell Pkwy Add Complete Street elements to College Ave from Main St to Fair St Add Complete Street elements to Fair St/Summit St from MLK Jr Blvd to Jesse Jewell Pkwy Add Complete Street elements to Main St from MLK Jr Blvd to Jesse Jewell Pkwy Add Complete Street elements to Prior St from Hunter St to Riverside Dr August 1, 2013 5

Fact Sheet Draft Transportation Recommendations: Pedestrian and Bicycle 67 Downtown Corridors Ped Crossings Crossing Enhancements 68 Pearl Nix Pkwy Trail East Multiuse Trail Enhance existing pedestrian crossing locations by re-striping crosswalks or potentially adding stamped asphalt/concrete crosswalks, adding pedestrian countdown timers, and adding additional lighting (where needed). Implement these enhancements at intersections along the following corridors. EE Butler Pkwy/Green St from Jesse Jewell Pkwy to Riverside Dr Jesse Jewell Pkwy from Academy St to Summitt St/Wisteria Dr Academy St from Green St/EE Butler Pkwy to Jesse Jewell Pkwy Construct a multiuse trail along Pearl Nix Pkwy/MLK Jr Blvd from Atlanta Hwy to the existing multiuse trail east of Pine St. 69 Pearl Nix Pkwy Trail West Multiuse Trail Construct a multiuse trail along Pearl Nix Pkwy from Wilshire Dr to Atlanta Hwy. 70 Green St at Riverside Dr Ped Crossing At the intersection of Green St at Riverside Dr, add pedestrian facilities including Pedestrian crosswalks, pedestrian signal phases, pedestrian countdown timers, and additional Crossing Facilities lighting (if needed). 71 Grove St Sharrows Sharrows Add sharrows on Grove St from Parker St to Industrial Blvd. 72 McDonald St Sharrows Sharrows Add sharrows on McDonald St from MLK Jr Blvd to the Industrial Blvd Extension. 73 Ridgewood Ave Sharrows Sharrows Add sharrows on Ridgewood Ave from Wilshire Dr to Green St. 74 Spring St Sharrows Sharrows Add sharrows on Spring St from Academy St to Prior St. 75 Summitt St Sharrows Sharrows Add sharrows on Summitt St from Grove St to Hunter St. 76 Beverly Rd Sidewalk 77 Browns Bridge Rd Sidewalk East 78 Dawsonville Hwy Sidewalk Central 79 Dixon Dr Sidewalk 80 Jesse Jewell Pkwy Sidewalk East 81 Jesse Jewell Pkwy Sidewalk West 82 Maple St Sidewalk 83 McEver Rd Sidewalk 84 Memorial Park Dr Sidewalk South 85 Park Hill Dr Sidewalk North Install sidewalk along Beverly Rd from Limestone Pkwy to White Sulpher Rd. Install sidewalk along Browns Bridge Rd from Memorial Park Dr to Central Ave. Install sidewalk along Dawsonville Hwy from Beechwood Blvd to McEver Rd. Install sidewalk along Dixon Dr from Chestatee Rd to Wessell Rd. Install sidewalk along Jesse Jewell Pkwy from Branch St to White Sulpher Rd. Install sidewalk along Jesse Jewell Pkwy from EE Butler Pkwy to Spring St. Install sidewalk along Maple St from Jesse Jewell Pkwy to Broad St. Install sidewalk along McEver Rd from Browns Bridge Rd to existing sidewalk approximately 750 ft north of Browns Bridge Rd. Install sidewalk along Memorial Park Dr from Titshaw Dr to Atlanta Highway. Install sidewalk along Riverside Dr/Morningside Dr/Park Hill Dr from Oak Tree Dr to Clarks Bridge Rd. 86 Pearl Nix Pkwy Sidewalk 87 S Enota Dr Sidewalk South 88 Shallowford Rd Sidewalk Install sidewalk along Pearl Nix Pkwy from Dawsonville Hwy/John Morrow Pkwy to Shallowford Rd. Install sidewalk along S Enota Dr from Downey Blvd to Takeda Rd. Install sidewalk along Shallowford Rd from Dawsonville Hwy to Pearl Nix Pkwy. August 1, 2013 6

Fact Sheet Draft Transportation Recommendations: Pedestrian and Bicycle 89 Browns Bridge Rd Sidewalk West Sidewalk Install sidewalk along Browns Bridge Rd from McEver Rd to Memorial Park Dr. 90 Clarks Bridge Rd Sidewalk Sidewalk install sidewalk along Clarks Bridge Rd from Cleveland Hwy to Pine Valley Rd. 91 Dawsonville Hwy Sidewalk East Sidewalk Install sidewalk along Dawsonville Hwy/John Morrow Pkwy from McEver Rd to Washington St. 92 Dawsonville Hwy Sidewalk West Sidewalk Install sidewalk along Dawsonville Hwy from Sportsman Club Rd to Ahaluna Dr. 93 Downey Blvd Sidewalk Sidewalk Install sidewalk along Downey Blvd from Myrtle St to S Enota Dr. 94 Jesse Jewell Pkwy Sidewalk at I-985 Sidewalk Install sidewalk along Jesse Jewell Pkwy/Old Cornelia Hwy from White Sulphur Rd to Shady Valley Rd. 95 Kids Way Sidewalk Sidewalk Install sidewalk along Kids Way from Clarks Bridge Rd to Gabriel Cir. 96 Memorial Park Dr Sidewalk South Sidewalk Install sidewalk along Memorial Park Dr from Browns Bridge Rd to Titshaw Dr. 97 Park Hill Dr Sidewalk South Sidewalk Install sidewalk along Park Hill Dr from Green St to Oak Tree Dr. 98 S Enota Dr Sidewalk North Sidewalk Install sidewalk along S Enota Dr from Takeda Rd to Park Hill Dr. 99 Thompson Bridge Rd Sidewalk Sidewalk Install sidewalk along Thompson Bridge Rd from Riverside Dr to Sandridge Ct. 100 W Ridge Rd Sidewalk Sidewalk Install sidewalk along W Ridge Rd from Interstate Ridge Dr to Athens St. 101 White Sulphur Rd Sidewalk Sidewalk Install sidewalk along White Sulphur Rd from Jesse Jewell Pkwy to Beverly Rd. 102 Academy St Add to the west side of Academy St from Jesse Jewell Pkwy to Washington St. August 1, 2013 7