4. Action Plan & Projects

Perryville TOD and Greenway Plan

City of Birmingham Draft Multi-modal Transportation Plan

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

PUBLIC REALM MASTER PLAN

4. Mobility and Transportation Element. Page Bikes and Pedestrians

Austell Road Access Management Plan Public Meeting February 17, 2009

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

Bicycle-Pedestrian Master Plan Update

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

See Figure 38, Existing Nonmotorized Connections.

Parks, Open Space, Trails and Recreation Master Plan

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

East Burke Transportation, Safety and Capacity Improvements

Construction Specifications Manual

TRANSPORTATION COMMISSION Agenda Staff Report

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Table of Contents Introduction. 2 Purpose of the Plan...2 The Benefits of Walking and Bicycling...3 Vision and Goals of the Plan...

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112)

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

UDC Street Cross Sections

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

Plant City Walk-Bike Plan

Favorable factors for bicycling and walking investments & plan implemtation. Road Map for Success

Montgomery County Life Sciences Center. LOOP TRAIL GSSC Implementation Advisory Committee Meeting #2 March 26, 2015

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

Physical Implications of Complete Streets Policies

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

MARTIN LUTHER KING JR. WAY

Section 5: Bike and Pedestrian

Who is Toole Design Group?

TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Seaside Greenway Improvements

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

CHAPTER 3: Vision Statement and Goals

Multimodal Transportation Plan

OKI Awards More Than $41 Million to Transportation Projects Across the Region

RZC Appendix 8A Marymoor Subarea Street Requirements

Golden s Plan. For the Highway 6 & 93 Corridor

Appendix B - Street Sections

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

CONNECTING PEOPLE TO PLACES

CHAPTER 1 INTRODUCTION

Pennsylvania Avenue (CR 484) Design Alternatives Study

Solana Beach Comprehensive Active Transportation Strategy (CATS)

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

The Bike Buzz in Richland. November 2017 Carl Berkowitz

Columbia Pike Implementation Team (CPIT) Meeting

DEKALB COUNTY. 22. Priority Projects for DeKalb County

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

Active Transportation on the Rise

BIKE PLAN CONTENTS GATEWAY

SAFE ROUTES TO SCHOOL

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

To: Mid America Regional Council From: Louisburg Recreation Commission. March 6, 2018

City of Davis East Covell Corridor Plan

LANCASTER CITY BICYCLE NETWORK

SHIFTING GEARS. for a better ride ahead. MONTGOMERY COUNTY DEPARTMENT OF TRANSPORTATION April 5, 2014

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Lynchburg District Update

Non-Motorized Transportation 7-1

West End Connectivity Master Plan

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Montgomery County Life Sciences Center Loop Trail

Public Feedback Comments Appendix G. Appendix G. Public Feedback Comments. Virginia Beach Bikeways and Trails Plan 2011 Page G-1

Plant City Bicycle and Pedestrian Master Plan. Project Update March 2, 2017

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

MASTER BICYCLE AND PEDESTRIAN PLAN

Route 47 (North Main Street) Reconstruction

BIKE ON ROAD NETWORKS: URBAN & RURAL. Non-motorized Transportation Networks. Madison County Council of Governments

Fulton Market Streetscape

Small Town & Rural Multimodal Networks

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

Shifting Gears for a Healthier City.

Application of a Complete Street

Route 29 Solutions Projects

City Snapshot September 27, 2018

ESSEX TOWN AND VILLAGE BICYCLE AND PEDESTRIAN PLAN. Town of Essex Village of Essex Junction CCRPC DuBois & King

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

Bikeable/Walkable Community Plan. Oct. 11, 2012 City Council Workshop

Safe Streets. City of Lake Forest Park. March 21, 2017

Project Fact Sheet July, 2018

Cascade Bicycle Club Recommendations

Transcription:

Public Meeting April 18, 2018 v

Presentation Outline Introductions & Benefits of Trails Master Planning Process Preliminary Findings Trail Branding Construction Standards Next Steps & Schedule

PATH Planning + Design Team PATH Foundation Ed McBrayer, Exec. Director KAIZEN Collaborative Greta demayo, PLA Nico Shen, Associate LA

PATH Foundation 501(c) 3 Non Profit Public-private partnerships with State, Counties, and Cities Private Sector Partner facilitates fundraising and fast tracking

PATH Foundation Built over 275 miles of greenway trails. Raised over $80 Million from private sector for trail development. Caused $130 Million to be allocated from public sector for trails.

Assisted 20+ communities and organizations Master Planned 715+ miles of multi-use trails Designed for Construction 80+ miles of bicycle/pedestrian facilities in the southeast

PATH 400

Photo by: Atlanta Magazine Eastside Atlanta BeltLine

Photo by: Atlanta Magazine PATH Parkway

Carrollton GreenBelt

Arabia Mountain PATH Trail System

Silver Comet Trail

Trail Benefits Economic Development Former Columbus dive bar about to sober up River Flow LLC acquired the corner lot and building across the road from the Dragonfly Trail. Retain local talent Attract new businesses and industry Development of tourism based businesses - Photo by Mike Haskey, Columbus, GA Ledger-Enquirer, January 25, 2018

Trail Benefits Economic Development Saving Main Street: Powder Springs latest town seeking reinvention Atlanta Journal Constitution Article April 16, 2018 Many of our communities are seeing that they would like to connect directly to the trail because it does give them the opportunity to bring people into their downtowns, said Julianne Meadows, Northwest Georgia Regional Commission, which did an economic analysis of the Silver Comet Trail in 2013.

Trail Benefits Health and Wellness Enhance physical and mental health

Trail Benefits Alternate Transportation Less dependency on cars and expanded roads Promotes social dignity for all citizens

Trail Benefits Quality of Life Improvements Social interaction; neighborhood cohesiveness Nearby recreational amenity Enhance neighborhood security

Master Planning Process

Planning Considerations < 1% 7% 60% Interested but Concerned 33% No way No How Need to be separated from the road Strong & Fearless Enthused & Confident Will ride in the road

Trail Types Greenway Trails Within greenspace, separated from street, shared by bicyclists and pedestrians for non-motorized use. Concrete with center line stripping. 10 min. width

Trail Types Greenway Trails

Trail Types Shared-Use Streets (Woonerf) New River Street, Batavia, IL Vehicular space is at-grade with bicyclists and pedestrians. Traffic calming elements and pavers are used to create the shared space. Shared-Use Streets can be closed for city festivals/events.

Trail Types Shared-Use Streets (Woonerf) New River Street, Batavia, IL New River Street, Batavia, IL

Trail Types Side Paths Shared by cyclists and pedestrians. Concrete with center line stripping. 5 min. planted buffer to increase safety and comfort.

Trail Types Side Paths

Trail Types Bike Routes / Sidewalks Low volume street with 25mph or less speed limit. Bicyclist shares the roadway with vehicular traffic. Pedestrians use sidewalk (min. 6 width recommended)

Trail Types Bike Routes / Sidewalks

Villa Rica Trail System Preliminary Findings

City of Villa Rica Existing Challenges Gold Dust Park Fullerville Tanner Medical Center Conners Road Park Downtown I-20

Preliminary Alignments Pine Mountain Gold Museum Gold Dust Park Fullerville Bypass Tanner Medical Center Library Conners Road Park Mirror Lake Neighborhood Elem. Downtown TOTAL = 12.4 mi I - 20 I - 20

Preliminary Trail Segments Pine Mountain Gold Museum Gold Dust Park Fullerville Bypass Tanner Medical Center Library Conners Road Park Mirror Lake Neighborhood Elem. Downtown I - 20 I - 20

Preliminary Trail Segments - #1 Pine Mountain Gold Museum Gold Dust Park Fullerville Bypass Tanner Medical Center Library Conners Road Park Mirror Lake Neighborhood Elem. Downtown I - 20 I - 20

Villa Rica Downtown Master Plan

Proposed Downtown Connector Trail

1 Downtown Connector

1.1 Carroll Road

1.1 Proposed Railroad Crossing

1 Downtown Loop

1.2 Temple Street

1.2 Proposed Shared-Use Street

1.2 Proposed Shared-Use Street (Events)

1.2 Parking Study on Temple Street- Existing (10) Existing Parking Space on Temple St and N Carroll Rd

1.2 Parking Study on Temple Street - Proposed (67) (5) Proposed Condition Utilizing Existing Parking at The Mill

1.2 Parking Study on Temple Street - Proposed (67) (60) (5) Proposed Condition Church Street Improvement

1 Downtown Loop

1.3 Cheeves Street to Main Street

1.3 Proposed Side Path to Existing Trail

1 Downtown Loop

1.4 N Dogwood Street

1.4 Proposed Neighborhood Greenway [to be updated if time allows]

1 Downtown Loop

1.5 Wilson Street

1.5 Proposed Sidepath

1.5 Parking Study on Wilson Street - Existing (5) Existing Parking Space on Wilson St and W View Rd

1.5 Parking Study on Wilson Street - Proposed (8) (5) (7) (5) Proposed Condition No Net Loss

Preliminary Trail Segments Pine Mountain Gold Museum Gold Dust Park Fullerville Bypass Tanner Medical Center Library Conners Road Park Mirror Lake Neighborhood Elem. Downtown I - 20 I - 20

Preliminary Trail Segments - #2 Pine Mountain Gold Museum Gold Dust Park Fullerville Bypass Tanner Medical Center Library Conners Road Park Mirror Lake Neighborhood Elem. Downtown I - 20 I - 20

2 Downtown to Cleghorn Street Park

2.1 Cleghorn Street

2.1 Proposed Sidepath to Cleghorn Street Park

Preliminary Trail Segments - #3 Pine Mountain Gold Museum Gold Dust Park Fullerville Bypass Tanner Medical Center Library Conners Road Park Mirror Lake Neighborhood Elem. Downtown Daniel Rd I - 20 I - 20

3 Cleghorn Street Park to Tanner Medical Center

3.1 Villa Rica Public Library

3.1 Proposed Trail Connection to Library

Final Trail Segments - #4 Pine Mountain Gold Museum Gold Dust Park Fullerville Bypass Tanner Medical Center Library Conners Road Park Mirror Lake Neighborhood Elem. Downtown Daniel Rd I - 20 I - 20

4 Tanner Medical Center to Fullerville Park

4.1 Tanner Medical Center Entrance on Dallas Hwy

4.1 Proposed Signalized Crossing

Preliminary Trail Segments - #5 Pine Mountain Gold Museum Gold Dust Park Fullerville Bypass Tanner Medical Center Library Conners Road Park Mirror Lake Neighborhood Elem. Downtown Daniel Rd I - 20 I - 20

5 Fullerville Park to North Dogwood Street

5.1 North Dogwood Street

5.1 Proposed Tunnel Under Railroad [to be updated]

5 Fullerville Park to North Dogwood Street

5.2 Inactive Rail Line

5.2 Proposed Rail-Trail

Preliminary Trail Segments - #6 Pine Mountain Gold Museum Gold Dust Park Fullerville Bypass Tanner Medical Center Library Conners Road Park Mirror Lake Neighborhood Elem. Downtown I - 20 I - 20

6 Gold Dust Park Connector

Preliminary Trail Segment - #7 Pine Mountain Gold Museum Gold Dust Park Fullerville Bypass Tanner Medical Center Library Conners Road Park Mirror Lake Neighborhood Elem. Downtown Daniel Rd I - 20 I - 20

7 North Loop Bypass Connector

Preliminary Trail Segments - #8 Pine Mountain Gold Museum Gold Dust Park Fullerville Bypass Tanner Medical Center Library Conners Road Park Mirror Lake Neighborhood Elem. Downtown Daniel Rd I - 20 I - 20

8A Conners Road Park Connector

8B Conners Road Park Connector

8 Mirror Lake Parkway at Lake Val-Do Mar

8 Connors Road at Mirror Lake Elem. School

Final Trail Segments - #9 Pine Mountain Gold Museum Gold Dust Park Fullerville Bypass Tanner Medical Center Library Conners Road Park Mirror Lake Neighborhood Elem. Downtown Daniel Rd I - 20 I - 20

9A Pine Mountain Gold Museum Connector

9B Pine Mountain Gold Museum Connector

9 Mirror Lake Blvd End of Existing Sidepath

Villa Rica Trail System Pine Mountain Gold Museum Gold Dust Park Fullerville Bypass Tanner Medical Center Library Conners Road Park Mirror Lake Neighborhood Elem. Downtown I - 20 I - 20

Trail Branding

Trail Logo Examples

Preferred Name 24 K

Initial Trail Logo Ideas

Signage

Amenities Dynasty Collection by Victor Stanley Model: DYN-SD-36 36-gallon side-door opening litter receptacles with vertical steel bars. Steelsites RB Collection by Victor Stanley Model: RBF -28, RBF-12 All-steel bench with horizontal solid steel slats, surface mounted tabs, black powder coat. Cycle Sentry Collection by Victor Stanley Model: BRWS-101 Standard u-shaped bike rack, inground mount, and steel powder coated black.

Structural Slabs

Tunnel under the Railroad

Box Culvert under the Roads

Boardwalks and Bridges

Pocket Parks

Intersections

At-Grade Crossing

Tree Protection & Root Bridging

Infiltration Detail

Next Steps and Schedule

Next Steps Collect Input from the Public Present DRAFT Master Plan to Steering Committee for review and comment Finalize 24 K Master Plan and submit to City Council for Adoption

Contact Information Ed McBrayer 1601 W. Peachtree Street, Atlanta, Georgia 30309 (404) 875-7284 edwin@pathfoundation.org www.pathfoundation.org KAIZENCOLLABORATIVE Greta demayo Nico Shen 2390 Main Street, Tucker, Georgia 30084 (404) 239-2521 greta.demayo@kaizencollaborative.com nico.shen@kaizencollaborative.com www.kaizencollaborative.com

Questions and Answers

Villa Rica Trail System Proposed Alignments Pine Mountain Gold Museum Gold Dust Park Fullerville Tanner Medical Center Library Conners Road Park Mirror Lake Neighborhood Elem. Downtown TOTAL = 12.4 mi I - 20 I - 20