State Highway 44/State Street High Capacity Corridor

Similar documents
State Highway 16 Kuna-Mora Road to Ada/Gem County Line

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

Northwest Foothills Transportation Study Update

What is the Congestion Management Process? What is Congestion? Growth in the Treasure Valley Development and Congestion

State Street Transit and Traffic Operational Plan June Æa «44 «55. Installation of Bus Bays. Land Use Activities

FY Regional Transportation Improvement Program

Chapter 5 Future Transportation

Northwest Foothills Transportation Study Update

5.0 Roadway System Plan

Coming soon: big changes to Eagle Road Many say it's about time, too

ACHD COMMISSION DECISION

State Street and Pierce Park Lane Intersection Concept Report

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Final Report. Southwest Boise Transportation Study. Prepared For: Ada County Highway District

STATION #3 INITIAL ALTERNATIVES

Eliminate on-street parking where it will allow for a dedicated bus only lane %

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

State Street Corridor Study Final Report. Table of Contents

Chapter 6 1 Future Transportation System Priorities and Needs

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

ACTIVE TRANSPORTATION

Review and Comment ACHD s FY Five Year Work Program Draft for Adoption

Chapter 6 Transportation Plan

North Coast Corridor:

Committed to Service

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

WELCOME TO OPEN HOUSE # 1 June 14, 2017

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

A copy of the draft plan is available at:

Safe Routes to School Action Plan Aberdeen, Idaho

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Highway 217 Corridor Study. Phase I Overview Report

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Linking Transportation and Health in Nashville & Middle Tennessee

Sixth Line Development - Transit Facilities Plan

State Street Corridor Study TABLE OF CONTENTS

SNCC Demographic Trends

CONNECTING PEOPLE TO PLACES

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

This page intentionally left blank.

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets

San Rafael School District. Task Force Meeting Notes. November 5, 2012

Terwillegar Drive Expressway Draft Concept Plan

State Street Corridor Study. Table of Contents

2.0 Existing Conditions

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Planning Guidance in the 2012 AASHTO Bike Guide

2045 Long Range Transportation Plan. Summary of Draft

Providing an Efficient and Multi-modal Transportation System

Re: Boise s Annual Transportation Requests Reviewing the List of Projects and Listening to Public Input

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Performance Criteria for 2035 Long Range Transportation Plan

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

SANTA MONICA BOULEVARD CORRIDOR

South King County High-Capacity Transit Corridor Study

Basalt Creek Transportation Refinement Plan Recommendations

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Transportation Master Plan Advisory Task Force

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Santa Clara I-280 CORRIDOR STUDY

Key objectives of the survey were to gain a better understanding of:

Physical Implications of Complete Streets Policies

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

TRANSPORTATION & MOBILITY

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

San Jose Transportation Policy

Operational Comparison of Transit Signal Priority Strategies

FUNDING SOURCES CHAPTER 6

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

El Paso County 2040 Major Transportation Corridors Plan

Proposed Project I 35 from Denton to Cooke County Line

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

TRANSPORTATION NEEDS ASSESSMENT

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Welcome and Introductions Overview of the Study to Date Community Involvement Intersection Improvement Concepts Bike-Ped Recommendations ITS

2018 Transportation Survey October 17, Prepared by:

5. RUNNINGWAY GUIDELINES

Provo City Transportation Master Plan

Castro Valley Municipal Advisory Council March 19, 2018

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

This page intentionally left blank.

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Washington DC Section of ITE Project Briefing

Fairview and Main Local Streets Improvement Plan

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

Improving Mobility Without Building More Lanes

Afeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown

Transcription:

Background State Highway 44/State Street runs from I-84 in Canyon County through parts of the cities of Middleton, Star, Eagle, and Garden City to downtown Boise. It is a commuter route from several communities to downtown Boise and provides access to many businesses and residential neighborhoods. It s also the only major roadway between Ada and Canyon Counties north of the Boise River. Land along State Highway 44/State Street is being developed, transforming parts of the highway from a rural roadway into a busy urban street. The at a Glance Two lanes wide for 14 miles, from I-84 through the cities of Middleton and Star Four lanes wide for about 13 miles, from Linder Road in Eagle to 8 th Street in Boise o ITD completed widening from Linder Road to Ballantyne Road in October 2013 Two lanes wide for several blocks in downtown Boise, from Capitol Boulevard to Fort Street Only continuous east-west route north of the Boise River connecting the two counties No bike lanes; sidewalks in downtowns, but many areas without sidewalks o Several recent sidewalk projects completed by ACHD between Collister Road and 36 th Street/Veterans Memorial Parkway ValleyRide bus route #9 (State Street) has the most riders in the system Urban, suburban, and rural areas throughout corridor Problem Growth in Middleton, Star, and Eagle will bring dramatic increases in traffic and congestion. This will impact all modes of travel in the corridor, including walking. Average driving time between Middleton Road and downtown Boise is projected to double, from 35 minutes in 2013 to 75 minutes in 2040. Current and Future 1 2013 2040 Population 29,731 60,080 Households 12,158 25,288 Employment 10,301 24,959 Traffic between Middleton Road and State Highway 16 will likely increase from about 7,000 vehicles per day in 2013 to 30,000 in 2040. o This would be similar to current traffic on State Highway 55 west of Middleton Road. Levels of traffic between State Highway 16 and Glenwood Street range from 15,000 to 34,000 vehicles per day, and are projected to increase to 55,000 per day. 1 Population, housing, and employment in the corridor are based on neighborhoods and other developments near the road.

Traffic between Glenwood Street and downtown Boise will likely increase from 35,000 vehicles per day in 2013 to 65,000 per day by the year 2040. o This would be higher than current levels of traffic on Eagle Road between Fairview Avenue and Franklin Road. Vehicles per Day between Glenwood Street and Downtown Boise in thousands 2013 2040 Funded * 2040 Funded Plus Unfunded ** capacity/congestion*** capacity/congestion*** * 2040 Funded reflects the 2013 regional transportation system and all the expansion/improvement projects that are funded in agencies approved budgets or capital improvement plans, listed in CIM 2040 (Chapter 6, Tables 6.2 and 6.3). ** Unfunded projects/improvements includes all the unfunded needs discussed in this summary and listed in CIM 2040 (Chapter 6, Table 6.5). *** This is an approximate level where there is too much traffic for the road to carry and speeds will get slower as congestion gets worse. Each road s capacity depends on a number of variables, including truck traffic, number of driveways, and road conditions. Drive Times, 2013 vs. 2040, Middleton Road to Downtown Boise Each pie chart represents one hour. Drive times are in dark brown. 2013 2040 Funded * 2040 Funded Plus Unfunded ** * 2040 Funded reflects the 2013 regional transportation system and all the expansion/improvement projects that are funded in agencies approved budgets or capital improvement plans, listed in CIM 2040 (Chapter 6, Tables 6.2 and 6.3). ** Unfunded projects/improvements includes all the unfunded needs discussed in this summary and listed in CIM 2040 (Chapter 6, Table 6.5).

When a road, transit line, bikeway, or other part of the transportation system is improved, it can accommodate more traffic and, therefore, it attracts more users. Even with more traffic, traveling conditions will be better with the improvements. Other Considerations Preservation Study To plan improvements to the highway, ITD partnered with COMPASS in 2005 to conduct a corridor preservation study. 2 Over the past seven years, ITD has conducted an environmental analysis of the corridor west of Eagle Road (see map below); developed concepts for the highway design and identified access management strategies; 3 and held open houses to communicate with the public and other stakeholders. Once the preservation study is complete, ITD will use it to manage improvements in the corridor. Part of the study involves evaluating and planning for a bypass around downtown Middleton. Options for the s Eastern End The State Street Transit and Traffic Operational Plan (TTOP), which was completed in 2011, outlines innovative ways to keep traffic and transit moving smoothly in the east end of the corridor as development increases. Agencies continue to monitor and update the TTOP document on a regular basis (see map). Long-term recommendations for the eastern part of the corridor include widening the street by adding an outside/curbside lane in each direction. The new outside lanes would be reserved for carpools, buses, and cars that need to make a turn. A highcapacity transit service, such as a bus rapid transit (BRT), would also use the lane in the future. Bike lanes and sidewalks would also be completed. Roadway Users Most of the analysis to identify the increased traffic issue is based on cars, the main mode of transportation on streets and highways. Pedestrians, bicycles, and vehicles such as freight trucks, farm equipment, and buses may also share the road. 2 www.compassidaho.org/prodserv/specialprojects-sh44.htm 3 Access management is the systematic control of the location, spacing, design, and operation of driveways, median openings, interchanges, and street connections to a roadway (Transportation Research Board Committee on Access Management).

Bus Service/Park and Ride Several ValleyRide bus routes and park and ride lots serve the corridor. ValleyRide Bus Routes Route #9 (State Street) Route #9X (State Street Express) Route #10 (Hill Road/Maple Grove Road) Intercity Route #44 (State Highway 44 Express) Public Park and Ride Lots I-84 Exit 25 (ITD Weigh Station) Old Highway 30 (Shell Station/Bud s) Middleton (Middleton Fine Arts Center) Star (Star Christian Church) Ballantyne Road Park and Ride Lot Riverside Drive Park and Ride Lot The Middleton, Meridian, and Boise school districts, as well as several charter and private schools, transport students by bus to various schools along State Highway 44/State Street. This includes Middleton Middle School, Taft and Lowell Elementary Schools, and Boise High School. Walking/Biking No bike lanes on State Highway 44/State Street The Boise River Greenbelt is adjacent (approximately one mile away) to State Highway 44 through Eagle Sidewalks o on both sides in downtown Middleton, Star, and Boise west to 36 th Street o on at least one side near downtown Eagle o on at least one side in Boise/Garden City from Bullrun Lane to 36 th Street o no sidewalks or pathways in areas between the cities Environmental Issues Increased traffic on a road can impact the surrounding environment as well as the people who live nearby. Before major road projects are built, their potential effects are analyzed to make sure they meet environmental regulations as well as provide for environmental justice, ensuring all people can be involved and are treated fairly. 4 There are a number of sensitive areas to consider in this corridor: small concentrations of minority populations in the west and east ends prime farmland soils along State Highway 44 irrigation canals, drains and ditches parallel to and crossing under the roadway Dry Creek (Eagle) and Willow Creek (Middleton) floodways Boise River floodplain Middleton Middle School adjacent to highway west of downtown Middleton elementary schools and charter and private schools next to or near the roadway Veterans Memorial Park (state park) and local parks next to roadway 4 See federal environmental justice definitions at www.epa.gov/region07/ej/definitions.htm.

Each of the following studies include more detailed analyses of environmental factors in the corridor: ITD is conducting an environmental assessment (EA) of the State Highway 44 corridor, which must be submitted to the Federal Highway Administration (FHWA) for approval. 5 The EA must be approved and issued before significant road improvements can occur or before land can be acquired. ACHD prepared an Environmental Impact Statement (EIS) while studying a potential future Boise River crossing between State Highway 44/State Street, Highway 55 (north), and Chinden Boulevard (US Highway 20/26). 6 The study is commonly referred to as the Three Cities River Crossing. Funds are not currently available to design and build the project (see priority #27). ITD completed an EIS in preparation for the State Highway 16 extension and bridge over the Boise River. 7 Budgeted Projects Roadway Construct new intersection for State Highway 16 (and extend State Highway 16 south over Boise River under construction) Widen State Highway 44 between State Highway 16 and Linder Road (four lanes) Add safety improvements at State Highway 55/Eagle Road intersection Widen State Street between Glenwood Street and 27 th Street (seven lanes) 8 o Improve intersections at Glenwood Street/Gary Lane, Pierce Park Lane, Collister Drive, and 36 th Street/Veterans Memorial Parkway o State Street is under the jurisdiction of ACHD from Glenwood Street eastward. Walking/Biking: The City of Eagle plans to build a trail connection between Eagle Island pathways and Dry Creek Trail via a bike/pedestrian underpass, west of Eagle Road/State Highway 55. Operations, Management and Technology Projects: Aside from road widening, other actions such as improving driveways or changing the traffic signals can help improve traffic conditions. The regional Intelligent Transportation System plan 9 includes a special project in.2014 that will upgrade and coordinate the traffic signals on both sides of the Boise River between Eagle Road and Glenwood Street, and State Highway 44/State Street and Chinden Boulevard/US Highway 20/26. 5 http://itd.idaho.gov/projects/d3/sh44 6 www.achdidaho.org/projects/publicproject.aspx?projectid=29 7 http://itd.idaho.gov/projects/garvee/d3/idaho16_i84_44_environmentalstudy.asp 8 See the ACHD Capital Improvements Plan (20-year budget): www.achdidaho.org/departments/rowds/cip.aspx 9 Final Report: Treasure Valley Transportation System: Operations, Management, and ITS can be found online at www.compassidaho.org/prodserv/cms-intro.htm.

Unfunded Future Needs Roadway Widen highway to four lanes from I-84 to Middleton bypass Construct Middleton alternate route south of downtown, from Canyon Lane to Duff Lane o ITD concluded that the alternate route should be considered rather than widening the highway through downtown Middleton o Cemetery Road would be extended to intersect with the bypass Widen highway from Middleton bypass through Star to State Highway 16 Bus Service/Park and Ride: The TTOP and valleyconnect plans identify near-term, medium-term, and long-term needs for the corridor. Some of the specific needs are listed below. Near-term o Increase service on existing ValleyRide routes (#9, #9X, #10, and #44) o Expand park-and-ride lots, and build new lots at select locations (see priority #5) Medium-term o Establish new local ValleyRide routes and extend Route #9 in Eagle o Establish new flex routes serving Middleton, Star, Eagle, and northwest Boise o Establish commuter (rush hour) routes from Horseshoe Bend to downtown Boise o Add high-occupancy vehicle (HOV) lanes from Glenwood Street to 23 rd Street for buses, carpools, and vanpools o Expand park-and-ride lots, and build new lots at select locations (see priority #10) Long-term o Install bus bypass lanes at key intersections o Add high-occupancy vehicle (HOV) lanes from Eagle Road/State Highway 55 to Glenwood Street for buses, carpools, and vanpools o Extend services of ValleyRide Route #9 and other local routes in City of Eagle o Implement high-capacity transit such as Bus Rapid Transit (BRT) using the HOV lanes between Eagle Road and downtown Boise Walking/Biking The City of Middleton plans to have several paths following waterways, and bike routes on streets, that cross State Highway 44 The City of Eagle s pathway plans include a proposed bike lane on the north side of State Highway 44 from Sierra View Way to Eagle Road, with connections to the Greenbelt, and extending the Greenbelt pathway on the south side of the highway west to Eagle Island State Park Improve pedestrian connections and complete gaps in sidewalks (east of Eagle Road) Operations, Management and Technology Projects: The regional ITS plan 10 includes a number of projects for State Highway 44/State Street, including upgrading traffic signals, installing fiber optic cables, and adding traffic cameras. 10 Final Report: Treasure Valley Transportation System: Operations, Management, and ITS can be found online at www.compassidaho.org/prodserv/cms-intro.htm.