O P E R ATING INSTRUCTIONS FOR MODEL SPR-45 Automatic Screen and Stencil Printer

Similar documents
Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

602 STRINGING MACHINE OWNER'S MANUAL

X-6 STRINGING MACHINE OWNER'S MANUAL. Issue 1 - May Copyright 2004 GAMMA Sports - All Rights Reserved

600 / 600FC OWNER'S MANUAL

1500 Follow Spot Yoke

Maintenance Manual. Note: This document is broken up into the following 6 sections of prescribed maintenance.

Santa Fe Cycles Assembly Guide Introduction

MASTER TRUING STAND TS-3. Optional Dial indicator set with brackets Dial indicator bracket set only

OWNER'S MANUAL. Copyright 2003 GAMMA - All Rights Reserved

TECHNICAL INFORMATION

Pressure Dump Valve Service Kit for Series 2300 Units

Final Assembly Instructions Bikes with Threaded Headsets

Pressure Dump Valve Service Kit for Series 3000 Units

Model 130M Pneumatic Controller

ABRASIVE REGULATOR II

Read Before Operating!

Final Assembly Instructions Bikes with Quill Stems

! WARNING. Model PFC-1-G (direct acting) PFC-1-GR (reverse acting) Modulating Pneumatic Liquid Level Controls INSTRUCTION MANUAL MM-110B

Read Before Operating!

Drive Belt Instructions

PTC INSTRUMENTS 2301 Federal Ave Los Angeles CA Phone: Model 500 Automatic Operating Stand Type 3

THE MF-400 SERIES. Operating and Service Manual. Series includes all variants of MF-400/401

Standard Operating Manual

MAGNETIC CYCLING TRAINER SF-B0419 USER MANUAL

OWNER'S MANUAL. Copyright 1999 ATS - All Rights Reserved

SUMMITTM 400 & 600. Natural Gas Barbecues. Step-By-Step Guide

X-6FC STRINGING MACHINE OWNER'S MANUAL. Issue 1 - May Copyright 2004 GAMMA Sports - All Rights Reserved

icreasepro Creaser Operators Manual

Paintball Marker. User s Manual. 530 South Springbrook Road Newberg, OR 97132

INSTRUCTION MANUAL. January 23, 2003, Revision 0

Approved by Principal Investigator Date: Approved by Super User: Date:

Halsey Taylor Owners Manual STOP!

1 DRIVE INDUSTRIAL IMPACT WRENCH

SMTmax Corp. AE-3090D Automatic Stencil printer. User Manual

USER MANUAL

Final Assembly Instructions Bikes with Threaded Headsets

ABRASIVE SYSTEM ABRASIVE REGULATOR II 800# BULK ABRASIVE DELIVERY POT Abrasive Regulator II and 800# Pot Manual

Powermax machine-side reference guide For mechanized applications with Powermax1000, Powermax1250 and Powermax1650

MUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.

Operating Instructions Model and Hydrostatic Test Pump

I.H.S INSTALLATION INSTRUCTIONS

ABRASIVE REGULATOR II

U.S. Patent No. 7,922,246. Patents Pending

Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP!

BMR 2100XL Operating Instructions Page 1 of 13

SAFETY RULES WARNING: READ THESE SAFETY RULES & OPERATORS MANUAL BEFORE HANDLING YOUR FIREARM

PUN M Manual Finger Punch Safety and Operation Manual

632 AccuPro Set-up & Operation

OPERATORS MANUAL MODEL 365 BACK LAPPING MACHINE WARNING

Index Table. Model 794. Installation, Operating and Maintenance Instructions

35 TON HYDRAULIC PUNCH WARNING

Warnings: Notes: Revised: January 8,

MUELLER. Mega-Lite Drilling Machine. Reliable Connections. table of contents PAGE. Equipment 2. Operating Instructions 3-4. Parts Information 5

ATD LB PRESSURE BLASTER INSTRUCTION MANUAL

AUTOMATED INDUSTRIAL MACHINE, INC TOGGLE-AIRE DIVISION

Squeegee Unit for MRS Multi-Recovery System

Final Assembly Instructions Bikes with 16 Wheel Size

A U T O O P E N S E R I E S C A P P R E S S O P E R A T O R S M A N U A L

OPERATION MANUAL Please read this Operation Manual carefully before use, and file for future reference.

The X-11 Molding Chamber

SWIRLFLO Refrigerated fountains with FLEXI-GUARD

CLASS CYCLE P8000 OWNER'S MANUAL JOHNSON HEALTH TECH. CO., LTD.

INFUSION SYSTEM (110V) (220V) USER S MANUAL

INSTALLATION INSTRUCTIONS PUSH BAR PULLMAN PANIC BOLT DEVICE TO EN 1125 : 2008

Operating & Maintenance MANUAL

Vibration isolation system 1VIS10W. User manual

The MAXX Press DIGITAL CAP OPERATOR S MANUAL

7130 Lancer Rear Drive Magnetic Commercial Indoor Cycling Bike

DIRECT DRIVE DIXIE DOUBLE SEAMER Model 25D

O P E R A T O R S M A N U A O P E R A T O R S M A N U A L L

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

USER S MANUAL QUESTIONS? CAUTION. Model No. FMEX Serial No. Write the serial number in the space above for reference. Serial Number Decal

Pressure Differential Automatic Manifold For LPG. PDH1000 Series. LPG Installation & Operations Instructions

LCR-6-WT-EPP CYLINDER ROLLER EXPLOSION PROOF SERIES INSTRUCTION MANUAL MANUAL NUMBER Rev A Issued November 2011

222 Schwinn Recumbent Exercise Bike Parts List Full Size Hardware Chart Product Illustration Assembly Instructions

Paddle Bar Replacement

OPERATOR SERVICE MANUAL

5 Gallon Pressure Pot with HVLP Spray Gun and Hose

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

Miniball Coulomb Excitation Target Chamber


OPERATOR'S MANUAL DIRECT DRIVE DIXIE DOUBLE SEAMER. Model 25D

D I G I T A L C L A M

200 STRINGING MACHINE

Hercules Space Saver Sole Press series

Instruction Manual Updated 7/26/2011 Ver. 2.2

TANDEM plus BLUMOTION 563H/563. installation instructions

STRINGING MACHINE OWNER'S MANUAL. Issue 5 - November 2012

! WARNING! IMPORTANT HPA AIR TANK SAFETY INSTRUCTION AND GUIDELINES ! WARNING! IMPORTANT SAFETY INSTRUCTION AND GUIDELINES

Discontinued. Powers Controls. Technical Instructions Document No P25 RV Rev. 1, May, RV 201 Pressure Reducing Valves.

MAINTANCE MANUAL CNC ROTARY TABLE MODEL: DMNC-5C YUASA INTERNATIONAL.

SERVICE MANUAL SALAMANDER BROILERS RADIANT AND INFRARED 36RB 36IRB VULCAN C36RB C36IRB WOLF

IMPORTANT CO2/ HPA AIR TANK SAFETY INSTRUCTION AND GUIDELINES. Tank valves must be installed or removed by qualified personnel.

INSTALLATION INSTRUCTIONS

AUTOMATED INDUSTRIAL MACHINE, INC

TANDEM plus BLUMOTION 563F installation instructions

Installation Instructions for the AlphaDeck Staging System

CHAINLESS ANCHORING SYSTEM USER MANUAL

TANDEM plus BLUMOTION 569F/569A installation instructions

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

Transcription:

O P E R ATING INSTRUCTIONS FOR MODEL SPR-45 Automatic Screen and Stencil Printer

TABLE OF CONTENTS I. SPECIFICATIONS...3. II. SAFETY INSTRUCTIONS...4. III. INSTALLATION...5. IV. SET-UP...6. V. SYSTEM OPERATION...9. VI. Z AXIS ADJUSTMENT (Screen Height)...11. VII. X, Y AND Ø ADJUSTMENTS...11. VIII. SQUEEGEE ANGLE ADJUSTMENT...11. IX. MAINTENANCE...12. X. (OPTIONAL) VACUUM PLATE ATTACHMENT...13. XI. ELECTRICAL SCHEMATIC...13. XII. PNEUMATIC SCHEMATIC...14.

I. SPECIFICATIONS Power (model 45 only)................... 110 VAC, 50/60 Hz, 2 amp Ai r........................................... 60 TO 100 psi Overall dimensions........................ 30 W x 35 L x 16 H........................................(762 x 900 x 406mm) Di m e n s i o n s w i t h s t a n d...................... 30 W x 35 L x 47 H.......................................(762 x 900 x 11 9 4 m m ) Maximum print area..................... 16 x 18 (406 x 457 m m ) Theta adjustment............................ counter rotating dual knobs.................................................+ 5 range X & Y a d j u s t m e n t............................ + 0.500 (12.7mm) Z axis adjustment.............................. 0 to 5/8 (16mm).....................................single knob (self leveling) Approximate weight SPR-40........................150 lbs (68kg) Approximate weight SPR-45........................160 lbs (73kg) Stand option weight...............................47 lbs (21kg) WARNING: READ AND FOLLOW SAFETY INSTRUCTIONS BEFORE OPERAT I N G

II. SAFETY INSTRUCTIONS: 1. Only one person at a time should operate the system. 2. Stand clear of frame when attaching air to system, FRAME WILL RAISE TO UP-POSITION 3. Stand clear of frame while it is in motion. 4. Keep fingers (yours and others) away from squeegee and frame while it is in motion. 5. Do not try to defeat dual Cycle and Up/Down interlock controls. 6. When disconnecting air, ensure that frame is in down position. 7. CAUTION should be used when handling metal blade/squeegee. 8. Power should be OFF when setting left & right squeegee limit stops.

III. INSTALLATION The model SPR-45 is an automatic stencil or screen printer requiring electricity and shop air for operation. The SPR-45 should be placed on a sturdy work table (or bolted to its optional stand) approximately 28" from the floor to provide a comfortable area for the operator. Use leveling feet to eliminate movement on the bench (or floor) during printing and to level screen/stencil to Printing Plate. The SPR-45 is packed in its carton with the frame attached. Unbolt 4 screws from under carton. These holes in the base of the printer will be used to insert the 4 leveling feet. Remove from carton by lifting base plate assembly. DO NOT REMOVE FROM CARTON BY LIFTING SCREEN FRAME. DO NOT LIFT FROM REAR PANEL. Remove all items from the packing crate: 1. One SPR-45-stencil printer 2. One tubular frame 3. One dual squeegee assembly (attached) 4. Four (4) leveling feet 5. Lexan TM print alignment fixture 6. Six Board Stops for registration (in slots) 7. One 3/32 hex key 8. One 3/16 hex key 9. One power cord 10. One operator manual

IV. SET-UP A. Air and Electric Hook-up C A U T I O N: FRAME MAY LIFT WHEN AIR IS FIRST AT TACHED TO SYSTEM. ENSURE THAT FRAME SPEED REGULATOR AND SQUEEGEE SPEED REGULATOR ARE INITIALLY OFF (TURNED CLOCKWISE) 1. Attach air to 1/4 NPT female fitting provided in the rear of the machine (60 to 100 psig). 2. Plug in power cord to 120 VA C o u t l e t. SAFETY WARNING: STAND CLEAR WHEN RAISING AND LOWERING FRAME WHILE USING AUTOMATIC CONTROLS. B. Installing Screen/Stencil Frame (Refer to Illus. no. 2) 1. It is recommended to lift squeegee assembly to up position before attaching frame/stencil to system (loosen 2 thumb screws at front of assembly) 2. Loosen the front and back Universal Frame Holders via locking thumbscrews. 3. Move frame holders from front to back (and from back to front) so that the frame will be centered in the printer. 4. Place frame/stencil onto frame holders and secure frame/stencil by tightening Frame Clamps. NOTE: Frame holders/clamps will adjust to frames between 1-1/8" and 1-1/2" thick and to any frame smaller than 23" x 23" O.D. 5. Tighten 4 locking knobs on both sides to secure Universal Frame Holders. 6. Position left & right squeegee limit stops on rear guide rail so that squeegee stops short of frame. (Refer to Illustration 1.) 7. Ensure that socket head cap screws on squeegee limit stops face vertical. (see Illus. 1.) C. Registering Board: 1. Lift stencil frame to up position by using both left and right UP/DOWN switches. NOTE: See section III - D. through I. for pneumatic adjustments and initial set-up procedure. 2. Position clear Lexan TM sheet provided using the two brackets at rear of Print Deck. 3. Lower stencil frame to "down" position - use UP/DOWN switches 4. Swipe squeegee to apply paste through stencil to clear Lexan TM sheet. 5. Raise stencil frame to up position again. 6. Lift clear sheet enough to "roughly" place circuit board on Print Deck (match up pads on board to paste on clear sheet). Now remove clear sheet without moving PC board.

3/15 allen key Squeegee Limit Stop (proper orientation) Rear Squeegee Guide Rail Illustration No. 1. Adjustable front and rear Universal Frame Holders Universal frame locking thumb s c r e w s Squeegee limit stops (2) S t e n c i l F r a m e C l a m p s R e a r S q u e e g e e G u i d e R a i l Tubular or Cast Frame Pressure Plate (beneath stenci F r o n t S q u e e g e e G u i d e R a i l X Axis A d j u s t o r S t e n c i l F r a m e C l a m p s C y c l e C o n t r o l s K n u r l e d T h u m b S c r e w s Z Axis A d j u s t o r Illustration No. 2. Left Y (and Ø) Axis Adjustor Right Y (and Ø) Axis Adjustor R e g i s t r a t i o n Guide Pins

Board Stop Slides (6) Print Deck (pressure plate) Fig. 1 Slide Board Stops up to board on all edges Fig. 2 Tighten all Board Stop Slides around board using 3/32 hex key Fig. 3

7. Position Board Stops around PCB and tighten for precise registration*. (Figs. 1, 2, & 3) 8. Adjust height of print deck beneath frame with Z axis knob. The tensioned* stencil can be flush on the board or slightly above the board surface. 9. Using the X,Y and Ø -axis adjustment knobs on the front and sides of the machine, regist e r the pattern of the stencil apertures to the pads on the board. Final registration can be done most accurately by looking directly down on the stencil while moving the plate. (Refer to X, Y and Ø adjustments in sections IV. & V. ) *NOTE: For pin positioning of circuit boards contact factory for recommended methods. *If using a screen or untensioned stencil, it's important to support the area around the PCB with boards of identical thickness to prevent screen damage V. SYSTEM OPERATION (refer to Illustrations 1, 2, 3 & 4) A. Once you have the board-to-stencil registration set, lift frame by toggling UP/DOWN switches simultaneously. B. Place PC board in registration frame (within Board Stops) on Print Deck. C. Lower the frame using UP/DOWN switches. D. Set UP/DOWN (frame lift) speed by turning Clamshell Speed Regulator counter clockwise until desired speed is attained. (clockwise is closed - start there). E. Set squeegee pressure to approx. 20 to 30. Clockwise increases the pressure shown on gauge (use approx. 1.5 psi for each linear inch of squeegee). F. Set the squeegee speed by turning Squeegee Speed Regulator counter clockwise until desired speed is attained by trying several dry runs. (clockwise is closed - start there). G. Select SINGLE or DOUBLE pass of the squeegee (usually double). H. Along inward edge of squeegee apply row of (room temperature) solder paste on stencil. I. J. Simultaneously press 2 (red) CYCLE buttons on either side of control panel and hold until cycle is complete - during the full cycle, frame will close, squeegee will make single or double pass, and frame will lift (cycle is then complete). Inspect paste on board carefully and make speed and pressure adjustments to insure complete coverage of pads. It may take several trial runs to get the quality expected. K. When frame lifts after each cycle, remove board and insert new board. L. Repeat steps, taking note of when more solder paste might have to be added. C A U T I O N: FRAME MAY LIFT WHEN AIR IS FIRST AT TACHED TO S Y S T E M. ENSURE THAT CLAMSHELL SPEED REGULATOR AND SQUEEGEE SPEED R E G U L ATOR ARE INITIALLY OFF (TURNED CLOCKWISE)

Slide Rail Board Stop S l i d e s Print Deck (Pressure Plate) Illustration No. 3. Cycle Controls Squeegee Pressure Regulator Clamshell Speed Regulator (clockwise is closed) Squeegee Speed Regulator (clockwise is closed) Single or double squeegee pass UP/DOWN Switch CYCLE Button UP/DOWN Switch CYCLE Button ON/OFF Switch Squeegee Pressure Gauge in psi Cycle Controls Illustration No. 4.

VI. Z-AXIS ADJUSTMENT A. Z-Axis, or the height of the stencil above the board, is referred to as the stand-off height. B. Z-Axis leveling is factory preset. Insure that stencil printer leveling feet are set properly to level printer (use level) If the stencil plane to print deck plane is not parallel, consult factory. C. To adjust the stand-off height, turn the Z Axis Adjustor knob (front at right) clockwise to raise the print deck and counter-clockwise to lower the print deck. VII. X, Y AND THETA ADJUSTMENTS A. To align the circuit board to the hole pattern on the stencil, the SPR-45 is equipped with registration control knobs that provide +0.5" of movement in the X axis and Y axis and + 5º diagonally (theta rotation). B. On the front of the unit, the 2 adjustment knobs (left and center) control the Y-axis (front and back) and the theta (skew) for board-to-stencil fine registration. C. Turning the Y knobs simultaneously clockwise will move the pressure plate towards the front of the machine. Turning the Y knobs simultaneously counter-clockwise will move the pressure plate towards the rear of the machine. D. Turning the left Y knob counter-clockwise while turning the right Y knob clockwise will cause the pressure plate to rotate clockwise. Turning the right Y knob counter- c l o c k w i s e while turning the left Y knob clockwise will cause the pressure plate to rotate counter-clockwise. E. The adjustment knob on the right side of the unit controls the X-axis (side to side) movement of the Print Deck. Turning the X axis knob clockwise moves the print deck from left-to-right, and turning counter-clockwise moves the print deck right-to-left. F. Align the stencil with the pads on the substrate by looking through the screen or stencil openings while turning the appropriate axis control knob(s). Several test prints are recommended to verify fine registration. VIII. DUAL SQUEEGEE ANGLE ADJUSTMENT A. Squeegee angle is factory set and normally doesn t need to be be changed; however, to do so: B. Loosen set screws of both collars at top of squeegee assembly (9/64 allen key provided) C. Lift squeegee to give squeegee a steeper angle. D. Lower both collars and tighten collar set screws. 9/64 allen key C o l l a r s Illustration No. 5.

IX. MAINTENANCE 1. Clean the unit thoroughly after each use. Use solvent, such as isopropyl alcohol, to remove any ink or paste deposits. 2. Lubricate squeegee guide rails with light oil every 40 hours of use. 3. The unit will give you years of reliable service.

X. SPR-45 VACUUM PLATE ATTACHMENT OPTION A. Position plate so that manifold is towards the rear, and 4 corner holes line up. B. Attach vacuum plate to Print Deck using four (4) screws provided at each corner into pre-tapped holes. C. Attach a shop-vac or other source of vacuum to 1" hose fitting. D. Cover vacuum air holes around board to maximize the available vacuum. Vacuum IN - 1 inch hose fitting Screws (4) Vacuum plate Pressure plate Pre-tapped holes (4)

Foil Disengage 2 (two) screws to enable lifting of squeegee assembly Squeegee lift handle (to access foil stencil for applying solder paste directly to the foil)