Public Meeting #1 Comment Summary

Similar documents
Duwamish Way-finding and CTR Report

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

TRANSPORTATION COMMISSION Agenda Staff Report

Public Meeting #1 Comment Summary

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Complete Streets Funding Program Project Prioritization Plan

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Tuesday, September 25 th Mount Holly Municipal Complex 400 East Central Avenue 5:30pm to 7:30pm. Activity Stations o Where do you Live?

Active Transportation Facility Glossary

Bicycle Facilities Planning

Major Bike Routes 102 Avenue Workshop April 21, 2015

Safe Streets. City of Lake Forest Park. March 21, 2017

City of Davis East Covell Corridor Plan

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

WalkShop. Highland Creek Village

TO: VDoT, FDoT. CC: Cathy Hudgins, Paul Davis FROM: RA. RE: Critical intersections surrounding the Wiehle-Reston East Metro station

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

ROAD SAFETY FOR PRIMARY SCHOOLS

The Wiggle Route in Context

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

127 STREET COLLECTOR CONCEPT PLANNING

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

G AT E WAY PLAN. Community BRIEFING KIT GATEWAY BIKE

Dowling/Beaty Cycling Route

Broad Street Bicycle Boulevard Design Guidelines

Draft North Industrial Area-Wide Traffic Plan

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Glebe Neighbourhood Cycling Plan

Cycle Track Design Best Practices Cycle Track Sections

James Williams Middle School 915 Acacia Lane

Neighborhood Walking, Biking, and Transit Tours Summary BACKGROUND

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS

Pennsylvania Avenue (CR 484) Design Alternatives Study

Off-road Trails. Guidance

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

CONNECTING PEOPLE TO PLACES

Complete Streets. Designing Streets for Everyone. Sarnia

Monroe Street Reconstruction

SUMMARY Public Kick-Off Meeting on June 11, 2031 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study

Tonight is for you. Learn everything you can. Share all your ideas.

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

FOLSOM-HOWARD STREETSCAPE OVERVIEW

Transportation 2040 Update: Eudora Public Input As of June 1, 2017

FELL STREET AND MASONIC AVENUE INTERSECTION SURVEY REPORT

Terwillegar Drive Expressway Draft Concept Plan

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Introduction. North 12 th Complete Street Project Overview

Thank you for attending

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Stakeholders Advisory Working Groups (SAWGs) Bridge and Bike / Pedestrian SAWG (#15)

122 Avenue: 107 Street to Fort Road

San Rafael School District. Task Force Meeting Notes. November 5, 2012

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

EXECUTIVE SUMMARY. Vision

THE OFFICIAL GUIDE TO CYCLING SAFELY IN PHILADELPHIA

1 st and 2 nd Street Couplet FAQ s

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

20 th Avenue Neighborway Project August 2, Second Open House

5 th & Avon Community Brainstorm

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

Lake to Sound Trail FEASIBILITY STUDY. February 2009

@ FRIENDLY ACRES COMMUNITY MEETING

City of Coronado Bicycle Map, Schools, Traffic Signals and Crossing Guard Locations

Public Feedback Comments Appendix G. Appendix G. Public Feedback Comments. Virginia Beach Bikeways and Trails Plan 2011 Page G-1

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

Orange Center Elementary School

H Jumpers Hole Road from MD 2 to MD 177. Compiled Online Posting Public Comments 11/9/17

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Orinda Bicycle, Trails and Walkways Master Plan

City of Birmingham Draft Multi-modal Transportation Plan

Ottawa Beach Road Study

Bike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master.

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

Multi-Modal Traffic Analysis. Parisi and Associates

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

NORTH HIGHLAND LAKE ROAD PROJECT

Governance and Priorities Committee Report For the July 2, 2015 Meeting

SAFE ROUTES TO SCHOOL

Off-Road Facilities Part 1: Shared Use Path Design

Public Information Centre

Chapter 3 DESIGN SPECIFICATIONS

SURVEY minutes to complete this questionnaire. Your feedback will help the City determine a future design for Ocean Avenue and Geneva Avenue. Thanks!

Bikeways Network and Facilities

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Walking and Biking Safety for Tribes: Improving health, safety, and transportation options

Meade Street Bridge Design Alternative Study

Mark Malone, P.E. SD DOT

Shared Use Path Design

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Transcription:

Public Meeting #1 Comment Summary October 2017 The Westerly Creek to Toll Gate Creek Trail Connector project s first public meeting was held on October 17, 2017 at EcoTech Institute in Aurora. This meeting was held from 4:30 6:30 PM in an open house format. Attendees were invited to learn about the project and to comment on the initial alternatives developed for each project segment. More than twenty members of the public attended the meeting. Following is a summary of comments submitted by open house attendees on comment sheets, recorded by staff during one-on-one conversations with attendees, and gathered during meetings with project stakeholders. This summary includes comments received through December 18, 2017. How do you use the transportation system in the project area? I live here: 8 I work here: 3 I commute through: 7 I use the existing trails: 10 I travel to a school in the project area: 1 Describe your ideal bicycle facility by project segment. Which alternative do you prefer and why? What type of vertical separation do you feel is needed? One way separated planters Jewell Avenue West Segment Preference for Alt #1 (Two-Way Separated Bike Lanes on North Side): 3 people» Keeps trail away from schools.» Issue of kids crossing Jewell from south side to the north side where facility is.» Parents probably worried about kids crossing the road too.» Maybe add connection to Prairie Middle School from the south.» Preference on north side.» Less impact with contact to vehicle traffic. Preference for Alt #2 (Two-Way Separated Bike Lanes on South Side): 1 person Preference for off street (not an official alternative): 2 people» I would like to see the use of the flashing light on Jewell Avenue as the transition point if the trail crosses the street (or add another). Public Meeting #1 Comment Summary 1

» A little worried about two-way separated in general. But on south side might be cool to try in front of the school.» Move RRFB further west to where Jewell Wetlands path comes to street.» Cherry Creek School District/Overland High School recognizes benefits and impacts of alignment on both the north and south side of Jewell. Logistics of school transportation will need to be worked through. Alignment on the south side (with adequate crossing to Utah Park) seems to make the most sense if the school transportation issues can be solved. Jewell Wetlands Segment Preference for Alt #1 (Upgraded Off-Street Facility on West/North Side of Potomac Street/Jewell Avenue) 6 people» Like trails that are separated from streets and sidewalks when possible.» Prefer this than Alt #3 (since it's existing and separated).» Might be an issue of Jewell Wetlands people not wanting bikes in the park.» Like separation of bike and peds and then get to go into the park. Preference for Alt #2 (Two-Way Separated Bike Lanes on West/North Side of Potomac Street/Jewell Avenue) 2 people» On-street preferred. Keep bike and ped traffic separate.» Alt #2 preferred because drivers are already looking for peds coming in the wetlands.» Gravel washoff on Wetlands Trail could be an issue for bikes. Preference for Alt #3 (Two-Way Separated Bike Lanes on East/South Side of Potomac Street/Jewell Avenue) 1 person» Riding along the wetland side would have a safer passage and fewer driveways/streets.» Less impact with contact to vehicle traffic. Potomac Street South Segment Preference for Alt #1 (Two-Way Separated Bike Lanes on East Side) 3 people» Only one alternative and I can think of none additional.» Like the separation between traffic and with peds. Don t like Option 1. Ped and bike must cross street. No way for traffic to cross from north segment without crossing traffic. Needs a light, tunnel on bridge. Preference for off street (not official alternative) 2 people The Medical Center of Aurora requested safe physical barrier separation. Potomac Street North Segment Preference for Alt #1 (One-Way Bike Lanes) 1 person Preference for Alt #2 (Two-Way Separated Bike Lanes on East Side) 6 people Public Meeting #1 Comment Summary 2

» Matches next segment. Consistent with #2 on south segment. Less contact with traffic.» Keeps trail away from hospital traffic.» Like separation from traffic.» Prefer trails/separation from traffic instead of riding on the street.» Need more signs as reminders for people to share the space between bikes and peds.» To stay away from medical center on west side (emergency access issue).» Keeps bikes on one side of street and reduces conflicts on west side.» Better on east next because doctor offices which closes early hospital open at all times.» Potomac put bike lanes on east side to avoid hospital traffic.» Preferred by The Medical Center of Aurora to maintain consistency with the Potomac South segment and avoid emergency vehicle traffic. Safe physical barrier separation was requested. Preference for off street (not an official alternative) 2 people» West Toll Gate Creek is really nice now.» To get to light rail, would go to Nine Mile instead of biking up here.» Currently ride on sidewalk instead of in the street because not comfortable on the street. Florida Avenue Segment Preference for Alt #1 (Two-Way Separated Bike Lanes on North Side) 5 people» Keeps trail separated from many, needed access points from heavily used housing side.» Personal reason (either way is good, #1 better for me.) I like #1, homeowner and Florida separation of traffic and backyard with vehicle traffic. Safer for home on south.» Because of fewer driveways. Preference for Alt #2 (One-Way Separated Bike Lanes) 2 people» Parking on north for sight lines. Preference for off street (not an official alternative): 2 people Preference for facility to be on the south side and parking on north side: 1 person» The entrance to the light rail connection bridge is on the South side.» Daily, there are more than 120 vehicles that enter Florida Ave from the South side (Winchester HOA, San Francisco townhomes, Carson Apts.), and less than 20 enter from the North side.» When vehicles are parked on the South side, vehicles entering Florida Ave from the South must pull almost halfway into traffic before they can enter Florida Ave.» The North side is almost all wooden privacy fences, and parking on that side would not hinder the view from any homes on the North side.» There is a small hill that further hinders a line of sight when vehicles are parked on the south side, and an eastbound vehicle cresting the hill cannot be seen until it is too late. Public Meeting #1 Comment Summary 3

» Parking important on Florida but not from someone on Florida in neighborhoods managed by permit program. Too much space for bikes.» Roads are for bikes.» Roads are for cars not bikes!» Bike lanes remove parking!» Aurora Public Schools/Gateway High School has no concerns with the possibility of losing parking on the north side of Florida. The access road on the east side of the Gateway High School property needs to maintain access from Florida for buses entering the school property using the access road east of the track (all buses using this turn right from Florida onto the access road). Toll Gate Creek Connection Preference for Alt #1 (Sharrows along Helena Circle to Idalia Court and Off-Street Facility to Mexico Avenue) 2 people» Prefer Alt #1 instead of Alt #2 because more direct (not going backwards like Alt #2).» Alt #1 and Alt #3 is a tie really like one-way separated bikeway along Mexico.» Alt #1 slightly preferred because of park access instead of having to go on neighborhood streets. Preference for Alt #2 (Sharrows along Helena Circle to Idalia Street through Kingsborough Park) 3 people» Minimizes travel on Mexico.» I like 2B especially because bridge allows connectivity to the east side of Toll Gate but understand dollar considerations.» Alt #2B.» Much better than Alt #1.» Bridge by Toll Gate Creek School (north of here) to cross the creek trail.» Keep lanes on Mexico. Prefer Alt #2 for Toll Gate Creek connection. Preference for Alt #3 best (Sharrows along Helena Circle to Idalia Street to Mexico Avenue) 1 person» Shortest» Using streets shorter route #3. Simple, short, cheap. Preference for off street (not an official alternative) 2 people» Really like separated bike facility along Mexico» Don't worry about providing access to Kingsborough Park just a pocket park Public Meeting #1 Comment Summary 4

» Probably not good to take a lane in each direction (Alt 3) because people want to get to work and they don't want to wait in traffic.» Love the light for Toll Gate Creek Trail.» Sewer improvement project part of Toll Gate Creek Trail improvement. Does that have any impact on this project? General Suggestions and Comments Thanks for asking us to come. Try to avoid crossing traffic to transition to another bike route. Try to keep the side on flow consistent. Separation barrier can be best determined by the alternative selected. On street markings, including green point markings, as well as street signage for driver alert should be used. Would be good to have street markings used, especially the parking lane so people use the roadway space better. Excellent. Nice job. Appears team did a lot of preparation, planning, considering alternatives, and presentation of their work. Presentations were organized and give both graphic and pictorial representations of the different segments along with alternatives considered. Dialog with team members allowed for better understanding and input from users who may have had different opinions. Opinions and observation were recorded. Off street sites. Use Powerline Trail. The bridge at Mexico is dangerous. Off street sites when possible. Consider using the Powerline Trail. No bicycle path over bridges on Mexico cross Tollgate Creek at the Powerline Trails within residential streets slower moving traffic. I prefer the cyclists being on the same side. The fastest route from the Florida Station to Horseshoe Park would work best for me. Connecting along Jewell and Powerline. Off street facilities preferred. Sable between Jewell and Florida, flashing light at school move north to the school zone, small where is it? Curb along W. Potomac good to corral drainage. Box culvert crossing to cross Potomac. Bike detection key. Bike lockers? Toll Gate Creek difference on user commuter vs. recreational. Wheeling bikeway. Public Meeting #1 Comment Summary 5