OPTIMIZING THE LENGTH OF AIR SUPPLY DUCT IN CROSS CONNECTIONS OF GOTTHARD BASE TUNNEL. Rehan Yousaf 1, Oliver Scherer 1

Similar documents
AIRFLOW GENERATION IN A TUNNEL USING A SACCARDO VENTILATION SYSTEM AGAINST THE BUOYANCY EFFECT PRODUCED BY A FIRE

OPTIMIZATION OF SINGLE STAGE AXIAL FLOW COMPRESSOR FOR DIFFERENT ROTATIONAL SPEED USING CFD

CFD SIMULATIONS OF GAS DISPERSION IN VENTILATED ROOMS

An Impeller Blade Analysis of Centrifugal Gas Compressor Using CFD

Investigation on 3-D Wing of commercial Aeroplane with Aerofoil NACA 2415 Using CFD Fluent

CONSIDERATION OF DENSITY VARIATIONS IN THE DESIGN OF A VENTILATION SYSTEM FOR ROAD TUNNELS

FLOW CONSIDERATIONS IN INDUSTRIAL SILENCER DESIGN

Predicting the Suction Gas Superheating in Reciprocating Compressors

Effect of Inlet Clearance Gap on the Performance of an Industrial Centrifugal Blower with Parallel Wall Volute

Determination of the wind pressure distribution on the facade of the triangularly shaped high-rise building structure

ANALYSIS OF AERODYNAMIC CHARACTERISTICS OF A SUPERCRITICAL AIRFOIL FOR LOW SPEED AIRCRAFT

Workshop 1: Bubbly Flow in a Rectangular Bubble Column. Multiphase Flow Modeling In ANSYS CFX Release ANSYS, Inc. WS1-1 Release 14.

COMPLEX COMMISSIONING AND QUANTITATIVE TESTING OF THE GOTTHARD BASE TUNNEL VENTILATION SYSTEM

Wind Flow Model of Area Surrounding the Case Western Reserve University Wind Turbine

AIRFLOW AND TEMPERATURE FIELD CALCULATIONS FOR WINTER SPORTS FACILITIES

Aerodynamics of Winglet: A Computational Fluid Dynamics Study Using Fluent

COMPUTATIONAL FLOW MODEL OF WESTFALL'S LEADING TAB FLOW CONDITIONER AGM-09-R-08 Rev. B. By Kimbal A. Hall, PE

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

The Usage of Propeller Tunnels For Higher Efficiency and Lower Vibration. M. Burak Şamşul

Aerodynamic study of a cyclist s moving legs using an innovative approach

Measurement and simulation of the flow field around a triangular lattice meteorological mast

The Effect of Impeller Width on the Location of BEP in a Centrifugal Pump

THEORETICAL EVALUATION OF FLOW THROUGH CENTRIFUGAL COMPRESSOR STAGE

AIRFOIL PROFILE OPTIMIZATION OF AN AIR SUCTION EQUIPMENT WITH AN AIR DUCT

Single Phase Pressure Drop and Flow Distribution in Brazed Plate Heat Exchangers

CFD Study of Solid Wind Tunnel Wall Effects on Wing Characteristics

New Technologies applied to the design and optimization of tunnel ventilation systems

CFD ANALYSIS AND COMPARISON USING ANSYS AND STAR-CCM+ OF MODEL AEROFOIL SELIG 1223

CFD AND EXPERIMENTAL STUDY OF AERODYNAMIC DEGRADATION OF ICED AIRFOILS

CFD and Physical Modeling of DSI/ACI Distribution

NUMERICAL INVESTIGATION OF THE FLOW BEHAVIOUR IN A MODERN TRAFFIC TUNNEL IN CASE OF FIRE INCIDENT

Wind resource assessment over a complex terrain covered by forest using CFD simulations of neutral atmospheric boundary layer with OpenFOAM

CFD Simulation and Experimental Validation of a Diaphragm Pressure Wave Generator

Aerodynamic Shape Design of the Bow Network Monitoring Equipment of High-speed Train

Two-way Fluid Structure Interaction (FSI) Analysis on the Suction Valve Dynamics of a Hermetic Reciprocating Compressor

Aerodynamic Analysis of Blended Winglet for Low Speed Aircraft

Effect of Diameter on the Aerodynamics of Sepaktakraw Balls, A Computational Study

CFD Analysis of Giromill Type Vertical Axis Wind Turbine

Numerical simulation and analysis of aerodynamic drag on a subsonic train in evacuated tube transportation

Optimization of Ejector's Performance With a CFD Analysis. Amanda Mattos Karolline Ropelato Ricardo Medronho

LONGITUDINAL AIR VELOCITY CONTROL IN A ROAD TUNNEL DURING A FIRE EVENT

Návrh vratného kanálu u dvoustupňového kompresoru Return channel design of the two stage compressor

ZIN Technologies PHi Engineering Support. PHi-RPT CFD Analysis of Large Bubble Mixing. June 26, 2006

Racecar Rear Wing Setup Optimization via 2D CFD Simulations

OPTIMIZATION OF RECUPERATER FIN GEOMETRY FOR MICRO GAS TURBINE

The Study on the Influence of Gust Wind on Vehicle Stability Chen Wang a, Haibo Huang b*, Shaofang Xu c

Modelling the Output of a Flat-Roof Mounted Wind Turbine with an Edge Mounted Lip

A STUDY OF THE LOSSES AND INTERACTIONS BETWEEN ONE OR MORE BOW THRUSTERS AND A CATAMARAN HULL

CFD Analysis of Supersonic Nozzle with Varying Divergent Profile

CFD Analysis ofwind Turbine Airfoil at Various Angles of Attack

Sizing of extraction ventilation system and air leakage calculations for SR99 tunnel fire scenarios

A COMPARATIVE STUDY OF MIX FLOW PUMP IMPELLER CFD ANALYSIS AND EXPERIMENTAL DATA OF SUBMERSIBLE PUMP

Numerical Simulation for the Internal Flow Analysis of the Linear Compressor with Improved Muffler

Bio-Effluents Tracing in Ventilated Aircraft Cabins

A numerical simulation of oil spill in Istanbul strait

A Numerical Simulation of Fluid-Structure Interaction for Refrigerator Compressors Suction and Exhaust System Performance Analysis

A Research on the Airflow Efficiency Analysis according to the Variation of the Geometry Tolerance of the Sirocco Fan Cut-off for Air Purifier

International Journal of Technical Research and Applications e-issn: , Volume 4, Issue 3 (May-June, 2016), PP.

Simulation of Flow Field Past Symmetrical Aerofoil Baffles Using Computational Fluid Dynamics Method

Development of Biomimicry Wind Louver Surface Design

Volume 2, Issue 5, May- 2015, Impact Factor: Structural Analysis of Formula One Racing Car

WAKE MODELING OF AN OFFSHORE WINDFARM USING OPENFOAM

Aerodynamic Performance of Trains with Different Longitudinal Section Lines under Crosswind

Numerical and Experimental Investigation of the Possibility of Forming the Wake Flow of Large Ships by Using the Vortex Generators

Computational Fluid Flow Analysis of Formula One Racing Car Triya Nanalal Vadgama 1 Mr. Arpit Patel 2 Dr. Dipali Thakkar 3 Mr.

Centre for Offshore Renewable Energy Engineering, School of Energy, Environment and Agrifood, Cranfield University, Cranfield, MK43 0AL, UK 2

Investigation on Divergent Exit Curvature Effect on Nozzle Pressure Ratio of Supersonic Convergent Divergent Nozzle

Influence of rounding corners on unsteady flow and heat transfer around a square cylinder

Characteristics of Decompression Tank Internally Pressurized With Water Using OpenFOAM Syamsuri 1, a

Fluid-Structure Interaction Analysis of a Flow Control Device

CYCLE ANALYSIS OF LINEAR COMPRESSORS USING THREE- DIMENSIONAL CFD

Transitional Steps Zone in Steeply Sloping Stepped Spillways

CFD SIMULATION STUDY OF AIR FLOW AROUND THE AIRFOIL USING THE MAGNUS EFFECT

3D NUMERICAL MODELLING OF THE CAPACITY FOR A PARTIALLY PRESSURIZED SPILLWAY

Wind Flow Modeling: Are computationally intensive models more accurate?

A new methodology to evaluate the flying shape of a sail

THE INFLUENCE OF PRESSURE GRADIENTS ON VENTILATION DESIGN SPECIAL FOCUS ON UPGRADING LONG TUNNELS

Improvement of the Volumetric and Isentropic Efficiency Due to Modifications of the Suction Chamber

CFD ANALYSIS OF FLOW AROUND AEROFOIL FOR DIFFERENT ANGLE OF ATTACKS

Free Surface Flow Simulation with ACUSIM in the Water Industry

Injector Dynamics Assumptions and their Impact on Predicting Cavitation and Performance

Experimental Investigation Of Flow Past A Rough Surfaced Cylinder

Effect of High-Lift Devices on Aircraft Wing

Investigation of Suction Process of Scroll Compressors

Surrounding buildings and wind pressure distribution on a high rise building

Steady State Comparisons HAWC2 v12.5 vs HAWCStab2 v2.14: Integrated and distributed aerodynamic performance

ASME International Mechanical Engineering Congress & Exhibition IMECE 2013 November 15-21, 2013, San Diego, California, USA

Are Advanced Wind Flow Models More Accurate? A Test of Four Models

OPTIMIZATION OF INERT GAS FLOW INSIDE LASER POWDER BED FUSION CHAMBER WITH COMPUTATIONAL FLUID DYNAMICS. Abstract. Introduction

Study of Cross Wind for Heavy Vehicles and Analysis over Ahmad body

THE TUNNELS IN GUADARRAMA FOR THE HIGH SPEED RAILWAY

External Tank- Drag Reduction Methods and Flow Analysis

Senior mechanical energy conversion trends

MODELING AND SIMULATION OF VALVE COEFFICIENTS AND CAVITATION CHARACTERISTICS IN A BALL VALVE

CFD Analysis and Experimental Study on Impeller of Centrifugal Pump Alpeshkumar R Patel 1 Neeraj Dubey 2

Computational Fluid Dynamics

APPLICATION OF COMPUTATIONAL FLUID DYNAMICS (CFD) IN WIND ANALYSIS OF TALL BUILDINGS. Damith Mohotti, Priyan Mendis, Tuan Ngo

EFFECTS OF SIDEWALL OPENINGS ON THE WIND LOADS ON PIPE-FRAMED GREENHOUSES

CFD Modeling of Thermal Manikin Heat Loss in a Comfort Evaluation Benchmark Test

Evaluation of four numerical wind flow models

Transcription:

OPTIMIZING THE LENGTH OF AIR SUPPLY DUCT IN CROSS CONNECTIONS OF GOTTHARD BASE TUNNEL Rehan Yousaf 1, Oliver Scherer 1 1 Pöyry Infra Ltd, Zürich, Switzerland ABSTRACT Gotthard Base Tunnel with its 57 km long twin tracks is going to be the world s longest train tunnel. The two tracks are connected to each other by means of 178 cross connections provided at regular intervals along the length of the tunnel. These cross connections are primarily used as technical rooms with operation relevant electronic devices installed in them. Additionally, these cross connections can be used as emergency exits from one to the other. All of these cross connection rooms are installed with mechanical ventilation systems in order to assure the air temperature limits for the optimal working of the installed electronic devices. The main focus of this paper is to show the application of Computational Fluid Dynamics (CFD) in reducing the total cost of the ventilation system by optimizing the length of air supply ducts provided in the cross connections. The results show that the length of the air supply ducts can be reduced from 28 m to 24 m in each of the cross connection without any noticeable operational compromise for the installed devices in terms of air temperature. The cost involved on the other hand reduced by almost 0.5 Million Swiss Francs. INTRODUCTION Gotthard base tunnel is a 57 km long twin Trans-Alpine railway tunnel, currently being built in Switzerland. The two s are connected to each other via cross connections located approximately 325 m from each other along the tunnel length. Two access tunnels provide additional access for logistic purposes. These access tunnels are considered aerodynamically disconnected during normal tunnel operation. Two multifunction stations (Sedrun and Faido) are built in order to provide an ease in tunnel maintenance and to assure safe evacuation in case of an emergency event. A graphical representation of the components described above is given in Figure 1. OBJECTIVES In the early design phases, the length of the supply duct (including the accessories such as dampers etc) was devised to be about 28 m with total length of the cross connection being 30 m. The aim was to bring the air as far as possible into the room using the length of the supply duct before it is exhausted via the shorter exhaust duct in order to maintain the cross connection room temperature as homogenous and as low as possible. An optimization in the form of reduction in supply duct length can play a vital role in reducing the material, transport and installation costs involved. In order to see the optimization potential, a 3- Dimensional Computational Fluid Dynamics (CFD) was employed to investigate the changes in temperature and flow field associated with a reduction in the supply duct length. VENTILATION PRINCIPLE Due to the thermal load induced by the rocks, the air temperature in the tunnel increases in the direction of flow i.e. from entrance portal to the exit portal. Depending upon the direction of travel and the length of the tunnel, the tunnel s are aerodynamically defined as warm and hot tunnel. The ventilation system of the cross connection is composed of two air ducts, one shorter and the other longer one as shown in Figure 2. Under normal operation, the fresh air enters the cross connection via the longer supply duct and leaves the room through the shorter duct. The shorter duct is installed with an exhaust fan planned to operate under normal operation thereby removing the thermal load generated due to technical equipments and the surrounding rocks. The exhausted air which is comparatively warmer is released directly to the colder tunnel as shown in Figure 2. SIMULATION METHODOLOGY The complete cross connection room was modelled using the program ANSYS ICEM CFD (ANSYS ICEM CFD Version 11.0, 2007, Ansys Inc.). A 3-D model of the cross connection room is shown in Figure 3. The complete model was then meshed using ANSYS ICEM CFD with approximately 2 million hexahedral cells. The mesh size was decided after carrying out a preliminary mesh independency test with different mesh resolutions. The geometrical model with mesh cells on a cut plane is shown in Figure 3. The simulations were carried out using ANSYS CFX Solver (ANSYS CFX, Version 11.0, 2007, Ansys Inc.) The temperature and flow fields - 436 -

were compared for reduced supply duct lengths of 24 m and 20 m with that of complete supply duct length of 28 m. Simulation Parameters and Boundary Conditions The meshed model was setup for the flow physics using the software ANSYS CFX (ANSYS CFX, Version 11.0, 2007, Ansys Inc.). The ideal gas law was used to capture the temperature dependent flows. Steady state simulations were carried out by solving Navier Stokes equations (Versteeg, Malalasekera, 1995). In order to resolve the turbulence induced effects, SST turbulence model (ANSYS CFX, Version 11.0, 2007, Ansys Inc.) was employed. The aero- and thermodynamic conditions were chosen for a cross connection room located centrally along the length of the Gotthard Base Tunnel. The surface temperature of the cross connection room (caved portion) was set to 35 C where as the surface temperature of the front and back walls adjacent to the warmer and colder tunnel were defined to have a surface temperature of 30 C. Technical equipments were modelled as internal load of 7 kw. Two technical equipment cupboards were modelled as flow resistances located near to each end of the cross connection room. The walls of the supply and exhaust ducts were modelled as adiabatic walls. The exhaust was modelled as an outlet with a constant volume flow of 2.2 m³/s. The air enters the supply duct via an opening with air temperature of 30 C. Computational Resources The simulations are carried out on a intel xeon cluster with 8, 2.66 GHz parallel processors. One simulation run took about 13 hours of wall clock time for carrying out 2000 iterations. RESULTS The simulation results were considered as valid converged results once the RMS residuals fell for momentum, mass and energy equation fell below 1e-5. The results are presented as a) iso-surface of 4 m/s velocity with overlay of temperature b) heat transfer coefficient at the technical equipment on the rear and front sides and c) temperature averaged cross sections located every 2 m along the length of the room (cross connection). Iso surfaces of velocity Figure 4 show the iso surface of 4 m/s velocity with an overlay of temperature for the three different variations. The value of 4 m/s is chosen arbitrarily for comparison purposes. In its basic variation (variation 0), the jet of air coming out of the supply duct impinges the wall directly with the temperature of 30.5 C. With a reduction of 4 m in supply duct length (variation 1), the incoming air (via supply duct) gets mixed with the room air and reaches the end of the cross connection with a temperature of 31 C. It is however seen that the impulse effect is still dominant and the temperature of the incoming air is influenced by +0.5 K. With a reduction of 8 m in the supply duct length (Variation 2), it is seen that the surrounding warmer air gets quickly mixed up with the air coming through the supply duct. The impulse effect is still to be seen but the temperature at the impingement point is about 31.6 C. Heat Transfer Coefficients Figure 5 show the perspective views of the cross connection room with heat transfer coefficients plotted on the surface of the technical equipment. It can be seen that a reduction of 8 m in the supply duct length increases the heat transfer (shown by higher heat transfer coefficients) on the Front Side but has little influence on the Rear Side of the technical equipments when compared with variations 0 and 1. Temperature Figure 6 is a graphical representation of temperatures averaged on a cross section plane at regular interval of 2 m along the length of cross connection room. The temperature curve is a result of linear interpolation of the averaged values. The temperature curves are shown as function of cross connection length for each of the three variations. It is seen that with a supply length of 28 m (variation 0), the air delivered is about 0.5 K colder near to the end of the cross connection room compared to air supplied using supply duct length of 24 m (variation 1) and supply duct length of 20 m (variation 2). The 0.5 K temperature change induced due to longer supply duct (variation 0) is however levelled out within the first meter and the longer supply duct brings no additional advantage in keeping the temperature of the cross connection room lower as compared to the variations 1 and 2. With shorter supply duct lengths (variation 1 and 2), the air takes away the heat from the technical equipments on its way towards the end of the cross connection room, returns back and removes again the heat from the technical equipment but with a lower heat transfer rate due to lower temperature difference. CONCLUSIONS On the basis of the results provided in earlier sections, it is seen that reducing the supply duct length has no negative effect instead the heat transfer from the surface of technical equipment increases with a decrease in the supply duct length. A supply duct reduction of 4 m proves to be more effective due to its linear temperature increase and lower overall temperature in the cross connection. A decrease of supply duct length by 8 m leads to satisfying results with the exception that the temperature near to the start of the cross section is higher. This is due to the fact that the air entering the cross connection starts to get warm on its way to the end of cross connection due to the shorter supply duct length and on its way - 437 -

back after impingement cumulate near the entrance (start) of the cross connection. A reduction in supply duct length is a cost effective measure as long as it does not influence the aero- and thermodynamic conditions such as air movement and temperatures in the cross connection room. A drastic increase in temperature can cause a threat to the functionality of the installed technical equipment. It is seen from the results that a reduction of 8 m in supply duct length indicates the tendency of increase in average temperature. Due to the uncertainties in the boundary conditions such as inlet air temperature, rock local temperature, variation in internal thermal loads etc, it was decided to reduce the length of supply duct by 4 m thereby saving the costs by approximately 0.5 million Swiss Francs in the final design. ACKNOWLEDGEMENT The results published in this paper are courtesy of the consortium "Alp-Transit Gotthard" (ATG, 2011). The authors would like to thank ATG for their allowance for publication. REFERENCES Alp Transit Gotthard; Website: www.alptransit.ch. ANSYS CFX, Version 11, Ansys Inc. (www.ansys.com) ANSYS ICEM CFD, Version 11, Ansys Inc. (www.ansys.com) H.K.Versteeg and W.Malalasekera, An introduction to Computational Fluid Dynamics, The Finite Volume Method, Prentice Hall, 1995. - 438 -

Vertical Multifunction shafts Multi-function station Faido Tunnel Portal Bodio Western Additional Access - Faido Multi-function station Sedrun Tunnel Portal Erstfeld Cross Connection Eastern Additional Access - Figure 1: Overview of Gotthard Base Tunnel Components Eastern Western Supply Duct Warmer Tunnel Cross Connection Exhaust Duct Colder Tunnel Technical Equipment Supply fan installed for redundancy and/or emergency case Exhaust fan installed for normal operation Figure 2: Ventilation Principal for Cross Connections under Normal Operation Conditions. - 439 -

Proceedings of Building Simulation 2011: Exhaust Duct Supply Duct Technical Equipment Cupboard 2 Technical Equipment Cupboard 1 thermal load Hexahedral cells at a cut plane Figure 3: 3-Dimensional model of the cross connection with mesh cut plane. Variation 0: Supply duct 28 m long Variation 1: Supply duct 24 m long Variation 2: Supply duct 20 m long Figure 4: Iso-Surface of 4 [m/s] velocity with an overlay of temperature. - 440 -

Proceedings of Building Simulation 2011: Figure 5: Heat transfer coefficients plotted on the technical equipment with thermal load of 7 kw. 34.5 34.0 33.5 Temperature [ C] 33.0 32.5 32.0 31.5 31.0 30.5 0 5 10 15 20 25 30 Length along the Cross Connection [m] Variation 2 End Variation 1 Start Variation 0 Figure 6: Average Temperature in the cross connection (excluding air temperature in supply and exhaust duct) plotted at 2 m interval along the length of the room (cross connection) - 441 -