Return. of the. Restored access leads to record runs up the Lamprey River. Michael Dionne

Similar documents
New Hampshire ASMFC River Herring Sustainable Fishing Plan New Hampshire Fish and Game Department March, Executive Summary

Executive Summary. New Hampshire ASMFC River Herring Sustainable Fishing Plan New Hampshire Fish and Game Department March, 2011.

The Life History and Management of Alewife (Alosa pseudoharengus)

Columbia Lake Dam Removal Project

Rahway River Fish Passage Feasibility Evaluation. Weston Solutions, Inc. February 5, 2009

Diadromous Fish Investigations, 2016: Anadromous Alosid Restoration and Evaluation

Columbia Lake Dam Removal Project

Blueback Herring. Appendix A: Fish. Alosa aestivalis. New Hampshire Wildlife Action Plan Appendix A Fish-10

Family Clupeidae. River Herring of the James

FINAL REPORT. State: New Hampshire Grant: F-61-R

COLUMBIA LAKE DAM REMOVAL PROJECT

2016 Diadromous Migration Season on the Presumpscot A R E P O RT F R OM THE GMR I FIS HE R IE S E C O L OGY LAB ON CB AS S

PROGRESS REPORT. State: NEW HAMPSHIRE Grant: F-61-R-21/F16AF00163

Alewife. Appendix A: Fish. Alosa pseudoharengus. New Hampshire Wildlife Action Plan Appendix A Fish-21

A BLUEPRINT FOR THE PENOBSCOT RIVER WATERSHED

Warm-up # 7 A day 5/17 - B day 5/18 UPDATE YOUR TABLE OF CONTENTS

Lamprey Rivers Advisory Committee (LRAC) Annual Report FY 2017 (Oct. 1, 2016 Sept. 30, 2017)

Merrimack River Watershed MERRIMACK RIVER WATERSHED

Herring Count Volunteer Monitoring Program Annual Results Report

Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River

Resources and Guidance for writing a River Herring Management Plan

The Waterline Watershed News from Northwood to Newmarket

Striped Bass and White Hybrid (x) Striped Bass Management and Fishing in Pennsylvania

Lamprey River. Junior Ranger Study Guide and Activity Book

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

Herring Count Volunteer Monitoring Program Annual Results Report

2017 Oyster Conservationist Report

2016 Milltown Fishway Research Trap Report St. Croix River, New Brunswick and Maine R. Goreham and H. Almeda Summary 1

Session B8- Monitoring changes in diadromous populations resulting from fish passage improvements on the Acushnet River, Massachusetts

BULL TROUT OPERATIONAL PLAN

Flowing from Mount Katahdin to the Gulf of

LIFE HISTORY DIVERSITY AND RESILIENCE

Okanagan Sockeye Reintroduction

WFC 50 California s Wild Vertebrates Jan. 11, Inland Waters (Lakes and Streams) Lisa Thompson

Diadromous Fish Assemblage Assessment in the Saco River Estuary, ME

GRANT F-48-R. Investigations and Management of New Jersey s Freshwater Fisheries Resources FINAL REPORT JOB I-5

Anadromous Forage Fisheries in Blue Hill Bay: Rainbow Smelt (Recreational) Alewife and Blueback Herring (Commercial and Recreational)

Refined Designated Uses for the Chesapeake Bay and Tidal Tributaries

Feasibility and Planning Study

Alewife Brook, Cape Elizabeth, River Herring Monitoring Summary 2015

Adaptations of Flora and Fauna in Rhode Island s s Estuaries

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

As a college student majoring in wildlife management,

FISH PROTECTION STRUCTURES AND FISH PASSAGE FACILITIES. Toshio Hirose The honorary member of the Japan Society of Civil Engineers, Japan UNESCO EOLSS

Delaware River Seine Survey: 2012 Sampling Summary

U. S. Fish and Wildlife Service Connecticut River Coordinator s Office. Ken Sprankle Connecticut River Coordinator

Salmon and Steelhead in the American River Tim Horner, PhD Geology Department California State University, Sacramento

Penobscot II: Penobscot Indian Nation: Land Management and Stream Connectivity

Restoring Migratory Fish to Rhode Island s Rivers and Streams. Outline

FISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP

CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES

Rainbow Smelt. Appendix A: Fish. Osmerus mordax. New Hampshire Wildlife Action Plan Appendix A Fish-125

Finding the Way Home

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

History and Ecology of Alewives in the St Croix Watershed

Geology. Key Factors. Overfishing. Great Lakes Fishes. Historical Fishing. About 10,000 years since last glacial retreat very young ecologically

Southern Oregon Coastal Cutthroat Trout

FISH PASSAGE ON THE BRONX RIVER: A VISION OF THE BRONX RIVER ECOLOGICAL AND RESTORATION MANAGEMENT PLAN

Endangered Species Act and FERC Hydroelectric Projects. Jeff Murphy & Julie Crocker NHA New England Meeting November 16, 2010

Hello, my name is Speck. I am a Spotted Sea Trout and live in estuaries and in waters along the coast of the Atlantic Ocean.

Sebec Lake Fisheries Management Plan 2012

Salmon resurgence in Butte County

Searsville Dam Removal

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council

Backgrounder and Frequently Asked Questions

California Steelhead: Management, Monitoring and Recovery Efforts

Quemahoning Reservoir

Beach. Coastal Fishing

Claytor Lake View of the Claytor Lake dam from Claytor Lake State Park s boat ramp.

California Steelhead: Management, Monitoring and Recovery Efforts

First Nations Fish Habitat Program Discussion Workbook

STEELHEAD SURVEYS IN OMAK CREEK

FISH PASSAGE ALTERNATIVES ANALYSIS ON PENNYPACK CREEK AT VERREE ROAD DAM AND ROOSEVELT BOULEVARD DAM PHILADELPHIA, PENNSYLVANIA

The. Plain Facts. What s happening on the Deschutes River

Chapter 1 INTRODUCTION

Coho. Oregon Native Fish Status Report 13

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California

Salmon Five Point Approach restoring salmon in England

Integrated Pest Management: Application in the Sea Lamprey Control Program

Oregon Coast Coastal Cutthroat Trout

SALMON FACTS. Chinook Salmon. Oncorhynchus tshawytscha

Agenda Item 7.1 For Information. Council CNL(10)24. Annual Report on Actions Taken Under Implementation Plans USA

Managing Development and Chesapeake Bay s Estuarine Fish

Upstream Passage Assessment of American Shad Using 3D Acoustic Telemetry

Newsletter Spring 2014

State of San Francisco Bay 2011 Appendix O Steelhead Trout Production as an Indicator of Watershed Health

SUMMARY OF CONOWINGO DAM WEST FISH LIFT OPERATIONS 2012

X.B WETLANDS ROGUE RIVER ESTUARY

Impacts of Aquatic Invasive Species on the Lake Superior Fishery. by Jeff Gunderson Minnesota Sea Grant Program

JOB 1, PART 2. SUMMARY OF CONOWINGO DAM WEST FISH LIFT OPERATIONS 2011

Managing Chesapeake Bay s Land Use, Fish Habitat, and Fisheries: Studies. Jim Uphoff & Margaret McGinty, Fisheries Service

THE IMPACT OF DAMS ON RIVER SYSTEMS

Guidance Note. Hydropower Guidance Note: HGN 8 Fish Passage. When do you need to install a fish pass?

Fish Conservation and Management

IN THE MATTER OF. Ed Friedman, under the penalty of perjury, states as follows:

2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA

Have the "Impediments" to Passage for Migratory Fish on Lower Hudson River Tributaries Changed Over a 15 Year Period?

A.23 RIVER LAMPREY (LAMPETRA

Executive Summary. Map 1. The Santa Clara River watershed with topography.

The Sand Beaches of New Hampshire and Maine

Transcription:

Return of the River Herring Restored access leads to record runs up the Lamprey River BY Michael Dionne ERIC ENGBRETSON Late one afternoon in mid-april, I decided to check on the newly constructed fish ladder at Wiswall Dam in Durham, to be sure it was ready to pass any river herring that made the journey upstream. The annual migration of river herring to New Hampshire s seacoast had started just the day before, with about 2,400 fish ascending the fish ladder at the headof-tide dam on the Lamprey River in Newmarket. As I approached the top of the fish ladder on that sunny afternoon, I saw two dark fish dart into the impoundment. Could it be? I thought to myself. Are river herring already here? As I quickly stepped up to the fence next to the dam and fish ladder, I was astonished at what I saw. River herring, lots of river herring! In the 10 short minutes I visited the fish ladder, I witnessed at least 60 river herring emerging from the fish ladder exit on their way to their historic spawning grounds. And to think these remarkable fish made the 3.6-mile journey from Newmarket in just one day! Even more astounding, these are the first fish to swim past this location since a dam was first built here in 1830. Alewives and Bluebacks River herring are actually comprised of two species of fish, the alewife (Alosa pseudoharengus) and the blueback herring (Alosa 8 July/August 2013

aestivalis). The appearance and life history of these two species are so similar that we group them together as river herring and manage them as one species. River herring serve as a significant bait source for many commercial and recreational fisheries, such as striped bass, bluefish, American lobster, Atlantic cod, haddock, and, while in freshwater, large and smallmouth bass and pickerel, to name a few! They are anadromous fish, meaning they spend most of their life in the ocean, but must migrate into freshwater to spawn. After spawning, which happens from early May to mid-june, the adults quickly move back downriver and into the estuary, while the juveniles spend the remainder of spring and a good portion of the summer in freshwater, feeding and growing. Emigration, or the seaward migration of juvenile river herring, is usually initiated by an increase in river flows following heavy rain sometime in late summer or early fall. The juvenile river herring school together in the ocean and feed primarily on plankton. They generally return back to New Hampshire s coastal rivers by the age of four or five to spawn. Typically, they return each year until they are six or seven years old, but we have seen some fish as old as nine returning to spawn. Alewives and blueback herring are both considered species July/August 2013 9 July/August 2013 9

Alewife Blueback herring American shad of concern by NOAA s (National Oceanic and Atmospheric Administration) National Marine Fisheries Service (NMFS) and by the State of New Hampshire. Both species range up and down the entire Atlantic coast, and numbers returning to rivers each spring are at all-time lows. Even here in New Hampshire, we have seen coastal returns of nearly 200,000 fish as recently as 2003 diminish to just about 35,000 fish making their way up the rivers in 2006. Fortunately, N.H. coastal rivers have slowly rebounded, with 117,000 adult river herring returning to spawn in 2012. Most of the recovery in recent years in N.H. can be attributed to the health and resilience of the river herring run in the Lamprey River. Monitoring the Migration Each spring, Fish and Game's Marine Fisheries Division monitors seven fish passage structures on six different coastal rivers. Typically, river herring first return to the Lamprey River during the second or third week of April. The barrier they first encounter is the Macallen Dam in Newmarket, built in 1887. A remnant population of river herring has survived, spawning in the lower salinity just below the falls. Around 1971, Fish and Game built a Denil fish ladder at Macallen MOVING UPSTREAM In mid to late April, river herring begin their trek up the Lamprey River. Once a barrier to herring migration, NORTHWOOD the Macallen Dam, is overcome BARRINGTON via a fish ladder built in 1971. From this point, the herring continue upstream 3.6 miles to the Wiswall Dam. Until recently, this was the end of their migration, but in 2012 a fish ladder was constructed, giving the fish access to another 7.8 miles upstream to Wadleigh Falls. Here, the herring seem unable to pass, as they are not able to "jump" the falls as salmon would. Beyond this point, 12.5 miles upstream, the Bunker Pond Dam was removed in 2011; eventually, this will allow passage to an additional 27 miles of the river. DEERFIELD NOTTINGHAM Wiswall Dam L A M P R E Y LEE DURHAM NEWINGTON R I V E R RAYMOND Wadleigh Falls EPPING L A M P R E Y R I V E R NEWMARKET NEWFIELDS GREAT BAY GREENLAND PORTSMOUTH RYE FREMONT BRENTWOOD EXETER Bunker Pond Dam (removed) Macallen Dam 10 July/August 2013 ATLANTIC OCEAN

MONITORING RIVER HERRING nhfg STAFF photos Clockwise from top left: River herring are collected by biologists with a seining net for sampling; after they are netted, the fish are quickly measured; marine biologist Renee Zobel takes a scale sample for data collection; a fish-eye view of a fish ladder. Dam, and over 1.3 million river herring have migrated through the ladder over the last 41 years! The fish ladder benefits not only river herring, but other anadromous fish such as sea lamprey and a small number of American shad. Also, some of the stronger-swimming resident species like trout, smallmouth bass and common white sucker use the fish ladder to gain access back to freshwater after inadvertently finding their way to the saltwater below the dam. In 2012, a record return of 86,862 river herring returned to the fish ladder at Macallen Dam. This exceeded the previous return record of 66,333 fish in 2004, and far exceeded the average annual return of about 32,000 river herring. In recent years, the Lamprey River has withstood extreme conditions, from flooding to drought, better than other coastal rivers, and continues to have some of our most consistent returns. These strong return numbers at the Lamprey allow Fish and Game to utilize river herring from the river to restore other depleted runs in New Hampshire. Each spring, a small portion of returning river herring are trapped at the fish ladder in Newmarket and trucked to other coastal rivers as needed; some are also transported to the Merrimack River to try to jump start depleted runs of fish. Moving Up River After passing the fish ladder at Macallen Dam in Newmarket, the river herring maneuver their way through the impounded backwater, up through Packer s Falls to Wiswall Dam, a distance of 3.6 miles, with many turns, coves and even an ancient oxbow to navigate. Until 2012, this is where their journey stopped; all returning river herring spawned here. However, the new fish ladder at Wiswall Dam now allows river herring to access nearly eight miles of historic spawning habitat above the dam for the first time since 1830. The new fish ladder at Wiswall Dam was a long time in the making. Fish and Game initiated the project back in 2000. The project July/August 2013 11

"The future for river herring in the Lamprey River watershed looks very bright." ethan gordon went through many iterations, from a nature-like dam bypass channel to complete dam removal, before fizzling out. Then in 2008, the dam owner, the Town of Durham, and the Natural Resource Conservation Service (NRCS) teamed up to build a fish ladder at the site. Many state and government agencies collaborated on the fish ladder project, which was finally completed in January of 2012. The fish ladder is owned and operated by the Town of Durham, with technical guidance provided by Fish and Game Marine Fisheries staff. A volunteer fish count coordinated by Fish and Game and the Town of Durham estimated that 31,888 river herring made their way through the new fish ladder at Wiswall Dam in 2012. That is an impressive number of fish passing through during its first year of operation! From Wiswall Dam, the river herring travel 7.8 miles to Wadleigh Falls in Lee. Wadleigh Falls is a historic mill site with a partially breached dam. The dam breach sits on a substantial ledge that can be very difficult for herring to ascend. Unlike salmon and trout, river herring cannot jump or leap over obstacles in a river 12 July/August 2013

during migration. River herring must continuously swim within the column of water to make their way up and over obstacles. This can make passage over some barriers very difficult from year to year as river flow varies; if flows are too low or too high or fast, the fish simply cannot make it. In 2012, Fish and Game staff observed thousands of river herring below Wadleigh Falls attempting to pass, but during limited observations, no passage was confirmed. More information should be forthcoming from a radio-tagging study of river herring in the Lamprey conducted by Marine Division staff this spring to determine the extent of upstream migration. The National Wild and Scenic Rivers System was created to preserve certain rivers with outstanding natural, cultural and recreational values in a free-flowing condition for the enjoyment of present and future generations. This designation safeguards the special character of the Lamprey River while recognizing the need for appropriate use and development an invaluable asset to the protection of one of the largest, most rural and healthy rivers that enters Great Bay. Free-flowing Habitat Beyond Wadleigh Falls, another 12.5 miles upstream is the former Bunker Pond Dam site in Epping. A dam had existed at this location on the Lamprey River since 1746, when an impoundment was created to power a grist mill, and later, around 1876, the Folsom sawmill and box factory. The Town of Epping sold the dam to the State of New Hampshire in 1959 for $1. In 1964, Fish and Game discussed the idea of installing a fish ladder at the dam, but instead a 15-foot high concrete spillway with a low-level gate was constructed in 1966-1967, without any fish passage structure. The Bunker Pond Dam was removed by N.H. Department of Environmental Services crews in 2011. The dam was a low-hazard structure, but the area impounded by the dam was very prone to flooding. With large flood events becoming more common in recent years, dam safety specifications have become tougher. The Bunker Pond Dam did not meet the current safety standards, and it was cheaper to remove it than build a new structure. In addition, federal grant money was available to help fund dam removal projects and restore aquatic habitats. Another goal of removing Bunker Pond Dam was to open up the Lamprey River to a free-flowing condition. Dams block the flow of sediments and nutrients in rivers. This can starve the downstream side of the dam of vital nutrients. Conversely, the impoundment behind the dam can become too nutrient-rich. This causes an overabundance of plant life and algae, which can significantly reduce dissolved oxygen levels, potentially affecting fish and other aquatic life. Also, the reduced river flow and increased surface area of an impoundment absorbs heat from the sun, elevating water temperatures. Warmer water contains less dissolved oxygen. Removal of the barrier (dam) allows for better nutrient exchange, which improves the water quality and allows for free movement of aquatic species. An additional 27 miles of the Lamprey River and its tributaries lie above the former Bunker Pond dam location. Wild and Scenic Resource The Lamprey River was designated as a Wild and Scenic River by the National Park Service in 1996. The designation begins at the confluence with the Piscassic River in Newmarket and ends at the former Bunker Pond Dam site. Now that the dam is gone, this protective status may eventually be extended to the upper reaches of the watershed. With the removal of Bunker Pond Dam, designation as a Wild and Scenic River, and the new fish ladder at Wiswall Dam opening Jerry MONKMAN Scenic Packer's Falls, Lamprey River, Durham up almost eight miles of spawning habitat, the future for river herring in the Lamprey River watershed looks bright. If river herring could get past Wadleigh Falls, a total of 70 miles of main stem and tributaries of the Lamprey River would be available to to them for spawning. The potential exists that New Hampshire's very own Lamprey River could be home to one of the strongest river herring runs on the entire Atlantic Coast. Michael Dionne is a Marine Biologist in N.H. Fish and Game's Marine Fisheries Division. July/August 2013 13