SECTION 2 HILLTOPPER MOUND AND HOMEPLATE CLAY BASEBALL APPLICATIONS. 1. Hilltopper Mound Clay for baseball pitching mound or homeplate areas

Similar documents
INSTALLATION & MAINTENANCE

Specifier Note: Retain or delete material(s) below to conform to project requirements.

BALLFIELD CLAYS. Our Ballfield Clay Products have been developed precisely for baseball fields. CONDITIONERS C L A Y - B A S E D S U R F A C E S SANDS

INNING Grass Baseball/Softball Field Renovation

SECTION [ ] [02730] STABILIZED DECOMPOSED GRANITE SURFACING

GOALS & OUTCOMES EXAMPLES OF EFFECTIVE GOALS

Irvington JV Baseball Field Care & Maintenance Manual

Section 2 Grass Field Maintenance (Soccer, Football, Lacrosse)

BEAM CLAY INFIELD CONDITIONER / TOP-DRESSING

INSTALLATION, OPERATION &MAINTENANCE MANUAL

PACKING INFIELD TURF SPORTS FIELD PRODUCTS CLAYS

Rule 1.01 to Objectives of the Game.

Field Maintenance Guidelines

TOP 10 TIPS FOR FIELD MAINTENANCE FEATURING MAJOR LEAGUE GROUNDSKEEPERS. Look inside for NEW. Pony Field Diagrams

Model B-1 Pipe Line Strainer 3, 4, 6 & 8 Inch (DN80, DN100, DN150 & DN200) 175 psi (12,1 bar) General Description. Technical Data

Claremont Little League Field Maintenance January 27, 2017

April This report was compiled by Soil & Dust Solutions Pty Limited Tel:

BEAM CLAY Soft Touch Bases A Series Premium Bases

Model C Pipe Line Strainer 6, 8 & 10 Inch (DN150, DN200 & DN250) 250 psi (17,2) General Description. Technical Data. Page of 6 MAY, 2006 TFP1644

Clayton Hubbs, Stabilizer Solutions, Inc. Barney Lopas, L.A. Angels of Anaheim Grant Trenbeath, Arizona Diamondbacks

Claremont Little League Field Maintenance. August 2016

Section GATE VALVES

Track Use and Maintenance Guidelines

Made in U.S.A. Narrow-U Bike Rack Heavy Duty Submittal Sheet. Materials: Finishes: Mount Options: Setbacks:

The installation of this kit must be performed by an authorized Honda riding mower dealer. These instructions are provided for dealer use.

EZ Set Ice Rink- 200 & 400 Owner s Manual

Moai Bike Rack Heavy Duty Submittal Sheet. Materials: 2.0 Schedule 40 Pipe (2.375 OD) Finishes: Capacity: Mount Options: Setbacks: 2 Bikes

FACILITY NAME: ASBA SINGLE FIELD FACILITY AWARDS APPLICATION. New Construction Upgrade of Existing Facility. Date of completed project:

Pipe Thread Connection 1/2 inch NPT. Friction Loss Refer to Figure 3

Dry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines.

Performance Standards for Non-Turf Cricket Pitches Intended for Outdoor Use [TS6] ecb.co.uk

Expert Advice on How to Keep Your Turf / Dirt Edge Trim & Level

HydroCourt Owner-Users Manual

ASBA MULTI-FIELD FACILITY AWARDS APPLICATION. Please complete the following or refer to site plan.

The World Leader In Artificial Turf TOP REASONS. Why FieldTurf is the Only Choice

Operator s Manual. with Maintenance Schedule. Fourth Edition Second Printing Part No

SECTION SHOWER AND BATH ENCLOSURES. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

OPERATOR'S & PARTS MANUAL

Limerock Bearing Ratio Technician Training Course

CONDITIONERS CONDITIONERS PACKING INFIELD TURF CLAYS. BUILDINGbetterBALLFIELDS

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

Step 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED

Installation of Nylon Putting NP50

Centerville Baseball Softball League. 6U T-Ball League Rules 2015

Application for Use, General Policies and Guidelines For Coca-Cola All Star Park

5 Gallon Pressure Pot with HVLP Spray Gun and Hose

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

All it takes is you. No gas, cords or batteries. StaySharp TM Max Reel Mower Model number:

1. Section Summary for loose climbing equipment provided by Owner. 2. Section "Cast in Place Concrete"

SECTION BUTTERFLY VALVES

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS MATERIAL AND PROPERTY STANDARD FOR

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT

BMX Track Guide. Developing the Sport of BMX Racing

"STEEL FRAMED" ALUMINUM PANEL SHIELDS

Sample Procurement Specifications for Aluminum Traffic Control Signs and Components

NEXT GENERATION FLEX FENCE

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual

Log Balance Beam. Product: (4 ), (6 )

Diamond Bar Pony Baseball Shetland Division Supplemental Rules For a copy of the Official PONY Rule Book, please visit

Watertown City Council

PLANNING TOOL FOR FUTURE LEAGUE NEEDS

Pectoral Machine. User manual E S S E N T I A L S T R E N G T H

PETERSEN 161-SERIES HIGH PRESSURE LIFTING AIR BAGS OPERATING INSTRUCTIONS WARNING!

LEAGUE PROFILE AND RULES 1.2

Item 404 Driving Piling

Parks Operations. Neighbourhood Outdoor Rink Program. Procedures

WHEATON YOUTH BASEBALL INSTRUCTIONAL LEAGUE SUPPLEMENTARY RULES

STYRIGGER PRODUCT MANUAL

FXT. FXT Cooling Tower RIGGING & ASSEMBLY INSTRUCTIONS

PLANNING TOOL FOR FUTURE LEAGUE NEEDS

SPEED SHORE MANUFACTURER S TABULATED DATA "MHS" MODELS. STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs

Parks Operations. Neighbourhood Outdoor Rink Program. Procedures

-- SGP (NOVA TEAM SQUARE)

FIELD EVENTS DIAGRAMS

TABLE OF CONTENTS. INTRODUCTION to the AirVAC... 2 SAFETY INFORMATION... 3 DIMENSIONS & SPECIFICATIONS... 5 UNIT OVERVIEW... 6

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

Monitoring excavation in the highway

City of Florence Athletic Field Use Policy

Geotechnical Engineering Laboratory CIVIL ENGINEERING VIRTUAL LABORATORY Experiment no 8 Standard Penetration Test

DHYS Rules & Regulations Colt League Supplemental to PONY Baseball, Inc, Rules and Regulations Table of Contents

OWNER S MANUAL AirTop Large and AirTop Small

Round pool 52 (1,32m)

MUELLER A A Non-Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

SNOWBOARD RESORT INFORMATION SHEET HALFPIPE

FACILITY NAME: ASBA TRACK AND FIELD FACILITY AWARDS APPLICATION TRACK PORTION

Density of Soils and/or Granular Material In-place by the Sand-Cone Method

NORTH SUBURBAN YOUTH BASEBALL ASSOCIATION (NSYBA) PONY LEAGUE LOCAL RULES 2017 FALL BALL.

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

SECTION DOMESTIC WATER PIPING

GREENS REPORT. January Prepared By: Justin Bradbury Course Superintendent

Athletic Field Use Regulations

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

RATCHET JACKS Reference # Rev. - A Date

NO FAULT SAFETY SURFACE DETAIL SHEET "A" CONCRETE BASE ADJACENT TO SOIL

FieldScience Opinions from the experts. 8 SportsTurf March 2012

LZBSA Major League Rules (5 th & 6th Grade)

Thanks for shopping with Improvements! 20 Reel Mower with Catcher Item #

13/14 Year Old League Rules September 2015

Owner s Manual & Safety Instructions

Transcription:

Stabilizer Solutions, Inc. 33 South 28 th St. Phoenix, AZ 85034 800-336-2468 (Fax) 602-225-5902 stabilizersolutions.com info@stabilizersolutions.com SECTION 2 HILLTOPPER MOUND AND HOMEPLATE CLAY BASEBALL APPLICATIONS PART 1 - GENERAL 1.1 SUMMARY A. The work of this Section consists of all surfacing work and related items as indicated on the drawings and or as specified herein and includes, but is not limited to, the following items: 1. Hilltopper Mound Clay for baseball pitching mound or homeplate areas B. Related Sections: 1. Section 02100 Site Preparation 2. Section 02200 Earthwork 3. Section 02230 Granular Materials C. General Provisions 1. All of the contract documents, including General and Supplementary Conditions and Division I General Requirements, apply to the work of this Section. 2. Examine all drawings and all other Sections of the Specifications for requirements therein affecting the work of this trade. 3. Coordinate work with that of all those affected by work of this Section. Cooperate with such trades to assure the steady progress of all work under the Contract. 1.2 PERFORMANCE REQUIREMENTS A. The following standards and definitions are applicable to the work of this Section to the extent referenced herein: 1. ASTM: American Society for Testing and Materials. 1.3 SUBMITTALS A. Products Data: Must be approved by Landscape Architect and owner. B. Shop Drawings: Show details of installation, including plans and sections. C. LEED Submittals: 1. Credit MR 5 Regional Materials: Attach product data for regional materials indicating location and distance from Project of material manufacturer and point of extraction, harvest, or recovery for each raw material. Include statement indicating cost for each regional material and the fraction by weight that is considered regional. 1

D. Maintenance Instructions: Submit copy(ies) of manufacturer s written maintenance instructions in accordance with 01 73 23 Operation and Maintenance Data. 1.4 PROJECT/SITE CONDITIONS A. Field Measurements: Each bidder is required to visit the site of the Work to verify the existing conditions. No adjustments will be made to the Contract Sum for variations in the existing conditions. 1. Where surfacing is indicated to fit with other construction, verify dimensions of other construction by field measurements before proceeding with the work. B. Environmental Limitations: Store in a moderate temperature. Hilltopper Mound Clay can form clods in cold weather. If clods form, set material outside in the sun until it becomes pliable. 1.5 QUALITY ASSURANCE A. Installer Qualifications: Installer to provide evidence to indicate successful experience building mounds, Hilltopper Mound Clay, or approval by manufacturer. 1.6 WARRANTY A. General Warranty: The special warranty specified in this Article shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by the Contractor under requirements of the Contract Documents. B. Special Warranty: Submit a written warranty executed by the installer agreeing to repair or replace components of Hilltopper Mound Clay surfacing that fail in materials or workmanship within the specified warranty period. Failures include, but are not limited to, the following: 1. Premature wear and tear, provide the material is maintained in accordance with manufacturer s written maintenance instructions. 2. Failure of system to meet performance requirements. C. Warranty Period: Contractor shall provide warranty that product was installed per specifications upon completion of install. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Hilltopper Mound Clay is provided by the following manufacturer: 1. Stabilizer Solutions, Inc. 33 South 28 th St., Phoenix, AZ 85034; phone (602) 225-5900, (800) 336-2468; fax (602) 225-5902; website stabilizersolutions.com; email info@stabilizersolutions.com 2.2 MATERIALS A. Hilltopper Mound Clay 1. Patented blend of natural clay and polymer shall not require water to activate. 2

B. Tools 2. Clay and polymer shall be blended by use of pugmill and metering controls. 3. Polymer shall coat all soil particles and remain moist and tacky and playable for 6 months after product installation without supplemental water. 4. Finished polymer coated clay shall remain firm through rain, snow, or drought. 1. Tamp, rake, hose; general field maintenance tools. 2.3 BLENDING A. Hilltopper Mound Clay is a solely owned and patented blending process. B. Blending procedures are performed only by a licensed Hilltopper Mound Clay blender and is only sold through licensed Hilltopper Mound Clay dealers. 2.4 EXCESS MATERIALS A. Provide owner s authorized rep. with the following excess materials for use in future mound or homeplate area repair: 50-lb bags of Hilltopper Mound Clay. PART 3 - EXECUTION 3.1 PREPARATION A. Proper base preparation is essential in the performance of Hilltopper Mound Clay. Hilltopper Mound Clay drains laterally off of surface. Base material should be leveled or laser graded to same grade as rest of field. B. Pre-soak base material prior to installing Hilltopper Mound Clay and allow time for drying until base can accept compaction without deformation. Compact base to 95% compaction. 3.2 BASEBALL MOUND - NEW BUILD A. Youth / Little League (9-12 yrs old) 1. Approximate quantity a. 1 to 2-tons Hilltopper Mound Clay a. Measures: 5 radius / 10 diameter b. Center of circle: 45 2 from back tip of home plate a. Height of mound: 6 above homeplate or infield grass. b. Distance of back tip of home plate to front of pitching rubber: 46 b. Generally platform measures 26 in length X 42 wide. c. The platform should extend 4 in front of the rubber and 17 in back of rubber. d. The platform should extend 12 on either side of the rubber. a. Start sloping area in front of platform downwards 4 in front of the pitching rubber. b. From platform mound extends 6 towards homeplate. 3

c. Front Slope: for each 1 distance, the grade should drop 1 d. Gradually slope the rear of mound from the back of pitching mound to the circle s edge. B. Pony / Middle School (13-14 yrs old) 1. Approximate material needed a. 3 ½ tons Hilltopper Mound Clay a. Measures: 7.5 radius / 15 diameter b. Center of circle: 52 8 from back tip of home plate a. Height of mound: 8 above homeplate or infield grass b. Distance from back tip of homeplate to front of pitching plate: 54 b. Generally platform measures 32 in length and 54 wide. c. The platform should extend in front of rubber and in back of rubber. d. The platform should extend on either side of the rubber. a. Start sloping area in front of platform downwards 6 in front of the pitching rubber. b. From platform the mound extends towards homeplate. c. Front Slope: for each 1 distance, the grade should drop 1 d. Gradually slope the rear of mound from the back of pitching mound to the circle s edge C. Regulation 1. Approximate material a. 4 to 7-tons Hilltopper Mound Clay a. Measures: 9 radius / 18 diameter b. Center of circle: 59 from back tip of homeplate a. Height of mound: 10 above homeplate or infield grass b. Distance from back tip of homeplate to front of pitching rubber: 60 6 b. Generally platform measures 36 in length and 60 in width. c. The platform should extend 6 in front of the rubber and 23 in back of rubber. d. The platform should extend 18 on either side of the rubber. a. Start sloping area in front of platform downwards 6 in front of the pitching rubber. b. From platform mound extends 10 towards homeplate. c. Front Slope: for each 1 distance, the grade should drop by 1. d. Gradually slope the rear of mound from the back of pitching mound to the circle s edge. 3.2 BASEBALL MOUND EXISTING MOUND A. Measurements and Installation are the same as 3.3 Baseball Mound New Build 3.3 BASEBALL HOMEPLATE AREA NEW BUILD A. Set homeplate and square it with the pitching rubber. 4

D. Homeplate area: (Including batter s and catcher s areas) Excavate an 8 X 13 area to a 3 to 4 depth (approximately: 45 / 50-lb bags). E. Batter s box installation: Excavate a 4 X 7 area to a 3 to 4 depth. F. Catcher s area: Excavate a 4 X 6 area to a 3 to 4 depth. G. Place Hilltopper Mound Clay in excavated areas in 1 ½ to 2 lifts. Tamp to compact. Repeat process with each layer. H. Cover area with infield mix. (Optional) 3.6 BASEBALL HOMEPLATE AREA EXISTING A. Measurements and Installation are the same as 3.3 Baseball Homeplate Area New Build. 3.7 INSPECTION A. Finished shall be uniform, solid under foot. Hilltopper Mound Clay shall be firm to full depth with no soft areas. 3.8 MAINTENANCE A. Weekly B. Yearly 3.9 REPAIRS 1. Do not contaminate Hilltopper Mound Clay with outside soils, it will compromise performance. 2. Field Lines- It is recommended to use field spray paint over marking chalk. 3. When using calcined clay or other amendments with Hilltopper Mound Clay. Always sweep off of surface and out of holes before applying new Hilltopper Mound Clay. 4. Remove debris, such as paper, grass clippings, leaves or other organic material by mechanically blowing, hand raking, or sweeping the surface as needed. 1. Add new Hilltopper Mound Clay as needed. A. To patch wear spots thoroughly sweep out the existing material, including all calcined clay. B. Use a shovel to chop the existing Hilltopper Mound Clay to score it so it will bond with the new material. C. Do not re-pack used Hilltopper Mound Clay into damaged areas, pack new Hilltopper into the hole. D. Tamp until firmly compacted. END OF SECTION 2 5