DRAFT EIS CONCEPTUAL DESIGN SR 99 ALTERNATIVE APRIL 2015 SHEET KEY

Similar documents
DRAFT EIS - CONCEPTUAL DESIGN I-5 ALTERNATIVE APRIL 2015 SHEET KEY

GENERAL LEGEND 12"CMP

Basic Road Design. If you don't know where you are going, any road will get you there. Lewis Carroll

Non-Motorized Overpass at SR 5/US1

CIVIL INDEX LANDSCAPE INDEX ELECTRICAL INDEX STRUCTURAL INDEX COVER SHEET G.101, 1 OF 55 LEGEND,ABBREVIATIONS, AND GENERAL NOTES G.

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Interim Transit Ridership Forecast Results Technical Memorandum

Design Criteria. Design Criteria

Introduction to Roadway Design

TENW Transportation Engineering NorthWest

CITY OF EPHRATA NAT WASHINGTON WAY OVERLAY TIB NO.: 3-E-164(003)-1 CITY OFFICIALS. Bruce Reim. Mayor. Tony Mora, Jr. City Council

C C C

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway.

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

METROPOLITAN COUNCIL METRO

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

CURB RAMP INSPECTION REPORT

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD

Staff Report Text Amendment Case #: TA

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

Doug s Corner. Contractor s Weekly Update. In this issue: NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP SSWJV SAFETY QUALITY COURTEOUS

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE. February 2nd, 2015 Volume 2, Issue 107.

Blair/Williamson Intersection Expressed Needs

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Giles Run Connector Road

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Field guide for Accessible Public Rights-of-Way Edition

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

Creating the Future Bruce B Downs Blvd

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

TABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 100 STREETS GENERAL 100.1

Inspector MUST Sign and Date Each Inspection

Transportation Technical Report

ADA Technical Frequently Asked Questions

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012

Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio

Engineering Design Criteria & Standard Drawings

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

City of Margate, Florida. Neighborhood Traffic Management Manual

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

CITY OF ROSEVILLE DESIGN STANDARDS

5. RUNNINGWAY GUIDELINES

200 Horizontal and Vertical Design. Table of Contents

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

KDOT Access Management Policy (AMP)

American Railway Engineering and Maintenance of Way Association Letter Ballot. Draft

APPENDIX C SANITARY SEWER PEAK DESIGN FACTOR

Basic Idea MEANS TO REDUCE OPERATING SPEEDS ON CURVES. Objectives. Review of Literature. CE 635 Highway Safety Spring 09

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

Driveway Design Criteria

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

Managed Lanes 2017: What They Are and How They Work. Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation

CE 535, Spring 2002 Preliminary Design Example 1 / 6

Ref. No February 19, Ms. Ashley Blissett, P. Eng., Senior Development Engineer City of Halifax PO Box 1749 HALIFAX NS B3J 3A5

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

Environmental Review Binder Documentation McGilchrist Street SE: 12th Street SE to 25th Street SE Project City of Salem, Marion County, Oregon

Vehicular turning and path of travel with a proposed curb bulb on the southwest corner of Mount Diablo Boulevard and Dewing Avenue.

DETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES:

6.1.1 All paving plans and construction shall be approved by City Webster for all streets within the jurisdictional limits of City of Webster.

Neighborhood Pedestrian Safety and Traffic Calming Study

CHAPTER 6H. TYPICAL APPLICATIONS

UNIVERSITY OF WASHINGTON TO SOUND TRANSIT U-LINK PEDESTRIAN CONNECTION PROJECT EIS ADDENDUM

FEASIBILITY STUDY DANBURY BRANCH ELECTRIFICATION PROJECT

CHAPTER 6 VERTICAL ALIGNMENT

Section 4 Basic Geometric Design Elements

Roadway Horizontal Alignment Design

Application of Value Engineering The Crosstown Project

SECTION 3 STREET DESIGN

TRAFFIC SIGNAL WARRANT STUDY

CHAPTER 7 STREET DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

section 4 Existing Conditions, Issues, and Options

APPENDIX L. Design Criteria

Vertical Alignment. Concepts of design & guidelines Computing elevations along vertical curves Designing vertical curves

MEMORANDUM. Date: September 22, Don Skillingstad, Spokane Transit Authority. Yongliang Zhu, Lochner

Transportation Impact Study for Abington Terrace

BEAR CREEK PARK AND RIDE

September 2008 REVISIONS (1) SYMMETRICAL VERTICAL CURVE EQUATIONS 12.5(12) VERTICAL CURVE COMPUTATIONS 12.5(14) TURNING LANE LENGTHS 15.

Friday, May 20, :46 PM Cambria N Armstrong Fw: Wolf Creek REV.pdf

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

Union Pacific Railroad

C Line Rapid Bus Preliminary Station Design

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

Meeting Notes. PIM Meeting #1 CTH D Reconstruction Nenno Road to Canadian National Railroad Town of Wayne Washington County

PEDESTRIAN SAFETY STUDY

MICHIGAN DESIGN MANUAL

Geometric designs for Safe Highways. Dr. Manoj M. Asst. Professor Department of Civil Engineering IIT Delhi

SFMTA SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

COMMUNITY MEETING August 23, 2018

Utilities Technical Report Oregon Department of Transportation. Appendix E. Figure Descriptions

POOL AND HOT TUB/SPA REGULATIONS A BUILDING PERMIT IS REQUIRED BEFORE THE INSTALLATION OF A POOL.

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1

City of Tacoma Right-of-Way Design Manual

APPENDIX E GRADE CROSSING LOCATIONS

RED BANK CORRIDOR. Community Partners Committee Meeting Madisonville Recreation Center. May 21,

Transcription:

DRAFT EIS CONCEPTUAL DESIGN SHEET KEY 99

Sheet No. Drawing No. Sheet Title KENT/DES MOINES HC CAMPUS STATION OPTION 50 SR99-F00-GX02 SHEET INDEX KEYMAP 1 SR99-A00-GX00 COVER SHEET 51 SR99-F1-PP03 TRACK PLAN AND PROFILE STA 20+00 TO STA 45+00 2 SR99-A00-GX01 SHEET INDEX 52 SR99-F2-PP04 TRACK PLAN AND PROFILE STA 45+00 TO STA 71+00 3 SR99-A00-GX02 SHEET INDEX KEYMAP 53 SR99-F3-PP05 TRACK PLAN AND PROFILE STA 71+00 TO STA 97+00 4 SR99-A1-PP01 TRACK PLAN AND PROFILE STA 7+25 TO STA 30+00 54 SR99-F4-PP06 TRACK PLAN AND PROFILE STA 97+00 TO STA 122+00 5 SR99-A2-PP02 TRACK PLAN AND PROFILE STA 30+00 TO STA 56+00 55 SR99-F5-PP07 TRACK PLAN AND PROFILE STA 122+00 TO STA 134+88.36 6 SR99-A3-PP03 TRACK PLAN AND PROFILE STA 56+00 TO STA 82+00 56 FWLE_S99_AP004 KENT/DES MOINES HC CAMPUS STATION OPTION - SITE PLAN 7 SR99-A4-PP04 TRACK PLAN AND PROFILE STA 82+00 TO STA 108+00 57 FWLE_S99_AX004 KENT/DES MOINES HC CAMPUS STATION OPTION - SECTIONS 8 SR99-A5-PP05 TRACK PLAN AND PROFILE STA 108+00 TO STA 134+00 9 SR99-A6-PP06 TRACK PLAN AND PROFILE STA 134+00 TO STA 160+00 KENT/DES MOINES HC CAMPUS STATION OPTION FROM S. 216TH WEST STATION OPTION 10 SR99-A7-PP07 TRACK PLAN AND PROFILE STA 160+00 TO STA 186+00 58 SR99-F00-GX02 SHEET INDEX KEY MAP 11 SR99-A8-PP08 TRACK PLAN AND PROFILE STA 186+00 TO STA 212+00 59 SR99-F6-PP01 TRACK PLAN AND PROFILE STA 15+00 TO STA 30+00 12 SR99-A9-PP09 TRACK PLAN AND PROFILE STA 212+00 TO STA 238+00 60 SR99-F7-PP02 TRACK PLAN AND PROFILE STA 30+00 TO STA 56+00 13 SR99-A10-PP10 TRACK PLAN AND PROFILE STA 238+00 TO STA 264+00 61 SR99-F8-PP03 TRACK PLAN AND PROFILE STA 56+00 TO STA 82+00 14 SR99-A11-PP11 TRACK PLAN AND PROFILE STA 264+00 TO STA 290+00 62 SR99-F9-PP04 TRACK PLAN AND PROFILE STA 82+00 TO STA 108+00 15 SR99-A12-PP12 TRACK PLAN AND PROFILE STA 290+00 TO STA 316+00 63 SR99-F10-PP05 TRACK PLAN AND PROFILE STA 108+00 TO STA 121+52.74 16 SR99-A13-PP13 TRACK PLAN AND PROFILE STA 316+00 TO STA 342+00 17 SR99-A14-PP14 TRACK PLAN AND PROFILE STA 342+00 TO STA 368+00 S 260TH WEST STATION OPTION (POTENTIAL ADDITIONAL STATION) 18 SR99-A15-PP15 TRACK PLAN AND PROFILE STA 368+00 TO STA 394+00 64 SR99-G00-GX02 SHEET INDEX KEYMAP 19 SR99-A16-PP16 TRACK PLAN AND PROFILE STA 394+00 TO STA 419+15.90 65 SR99-G1-PP05 TRACK PLAN AND PROFILE STA 20+00 TO STA 23+00 20 FWLE_SR99_AP009 KENT DES MOINES SR99 WEST STATION - SITE PLAN 66 SR99-G2-PP06 TRACK PLAN AND PROFILE STA 23+00 TO STA 49+00 21 FWLE_SR99_AX009 KENT DES MOINES SR99 WEST STATION - SECTIONS 67 SR99-G3-PP07 TRACK PLAN AND PROFILE STA 49+00 TO STA 75+00 22 FWLE_SR99_AP007 S 272ND REDONDO STATION - SITE PLAN 68 SR99-G4-PP08 TRACK PLAN AND PROFILE STA 75+00 TO STA 101+00 23 FWLE_SR99_AX007 S 272ND REDONDO STATION - SECTIONS 69 SR99-G5-PP09 TRACK PLAN AND PROFILE STA 101+00 TO STA 111+87.66 24 FWLE_SR99_AP003 FEDERAL WAY TRANSIT CENTER STATION - SITE PLAN 70 FWLE_S99_AP013 S 260TH WEST STATION OPTION - SITE PLAN 25 FWLE_SR99_AX003 FEDERAL WAY TRANSIT CENTER STATION - SECTIONS 71 FWLE_S99_AX013 S 260TH WEST STATION OPTION - SECTIONS S 216TH WEST STATION OPTION (POTENTIAL ADDITIONAL STATION) S 260TH EAST STATION OPTION (POTENTIAL ADDITIONAL STATION) 26 SR99-B00-GX02 SHEET INDEX KEYMAP 72 SR99-H00-GX02 SHEET INDEX KEYMAP 27 SR99-B1-PP01 TRACK PLAN AND PROFILE STA 15+00 TO STA 30+00 73 SR99-H1-PP07 TRACK PLAN AND PROFILE STA 20+00 TO STA 23+00 28 SR99-B2-PP02 TRACK PLAN AND PROFILE STA 30+00 TO STA 56+00 74 SR99-H2-PP08 TRACK PLAN AND PROFILE STA 23+00 TO STA 49+00 29 SR99-B3-PP03 TRACK PLAN AND PROFILE STA 56+00 TO STA 82+36.28 75 SR99-H3-PP09 TRACK PLAN AND PROFILE STA 49+00 TO STA 75+00 30 FWLE_SR99_AP010 S 216TH WEST STATION OPTION - SITE PLAN 76 SR99-H4-PP10 TRACK PLAN AND PROFILE STA 75+00 TO STA 80+98.42 31 FWLE_SR99_AX010 S 216TH WEST STATION OPTION - SECTIONS 77 FWLE_S99_AP012 S 260TH EAST STATION OPTION - SITE PLAN 78 FWLE_S99_AX012 S 260TH EAST STATION OPTION - SECTIONS S 216TH EAST STATION OPTION (POTENTIAL ADDITIONAL STATION) 32 SR99-C00-GX02 SHEET INDEX KEYMAP I - NOT USED 33 SR99-C1-PP02 TRACK PLAN AND PROFILE STA 20+00 TO STA 34+00 34 SR99-C2-PP03 TRACK PLAN AND PROFILE STA 34+00 TO STA 59+91.74 S 272ND REDONDO TRENCH STATION OPTION 35 FWLE_SR99_AP011 S 216TH EAST STATION OPTION - SITE PLAN 79 SR99-J00-GX02 SHEET INDEX KEYMAP 36 FWLE_SR99_AX011 S 216TH EAST STATION OPTION - SECTIONS 80 SR99-J1-PP08 TRACK PLAN AND PROFILE STA 20+00 TO STA 31+00 81 SR99-J2-PP09 TRACK PLAN AND PROFILE STA 31+00 TO STA 57+00 KENT/DES MOINES SR 99 MEDIAN STATION OPTION 82 SR99-J3-PP10 TRACK PLAN AND PROFILE STA 57+00 TO STA 83+00 37 SR99-D00-GX02 SHEET INDEX KEYMAP 83 SR99-J4-PP11 TRACK PLAN AND PROFILE STA 83+00 TO STA 109+00 38 SR99-D1-PP04 TRACK PLAN AND PROFILE STA 10+00 TO STA 26+00 84 SR99-J5-PP12 TRACK PLAN AND PROFILE STA 109+00 TO STA 136+00 39 SR99-D2-PP05 TRACK PLAN AND PROFILE STA 26+00 TO STA 52+00 85 SR99-J6-PP13 TRACK PLAN AND PROFILE STA 135+00 TO STA 161+00 40 SR99-D3-PP06 TRACK PLAN AND PROFILE STA 52+00 TO STA 63+99.96 86 SR99-J7-PP14 TRACK PLAN AND PROFILE STA 161+00 TO STA 174+00.00 41 FWLE_S99_AP005 KENT/DES MOINES SR 99 MEDIAN STATION OPTION - SITE PLAN 87 FWLE_S99_AP002 S 272ND REDONDO TRENCH STATION OPTION - SITE PLAN 42 FWLE_S99_AX005 KENT/DES MOINES SR 99 MEDIAN STATION OPTION - SECTIONS KENT/DES MOINES SR99 EAST STATION OPTION 88 FWLE_S99_AX002 S 272ND REDONDO TRENCH STATION OPTION - SECTIONS FEDERAL WAY SR 99 STATION OPTION 43 SR99-E00-GX01 SHEET INDEX KEYMAP 89 SR99-K00-GX02 SHEET INDEX KEYMAP 44 SR99-E01-PP04 TRACK PLAN AND PROFILE STA 17+45.77 TO STA 41+00 90 SR99-K1-PP15 TRACK PLAN AND PROFILE STA 20+00 TO STA 44+00 45 SR99-E02-PP05 TRACK PLAN AND PROFILE STA 41+00 TO STA 67+00 91 SR99-K2-PP16 TRACK PLAN AND PROFILE STA 44+00 TO STA 51+23.50 46 SR99-E03-PP06 TRACK PLAN AND PROFILE STA 67+00 TO STA 93+00 92 FWLE_S99_AP008 FEDERAL WAY SR 99 STATION OPTION - SITE PLAN 47 SR99-E04-PP07 TRACK PLAN AND PROFILE STA 93+00 TO STA 107+68.31 93 FWLE_S99_AX008 FEDERAL WAY SR 99 STATION OPTION - SECTIONS 48 FWLE_SR99_AP006 KENT/DES MOINES SR 99 EAST STATION OPTION - SITE PLAN 49 FWLE_SR99_AX006 KENT/DES MOINES SR 99 EAST STATION OPTION - SECTIONS B BP C CTR CL CS D DO DWG E E EL EP EX F FWLE FWTC G G H HC HORZ K KC KCM KDM Kv M MPH N N NB O OE P PC PL PS PT PVC PVI PVT R R RD ROW S S SB SC SF SR ST STA T TPSS TS TYP ABBREVIATIONS BEGIN POINT CENTER CENTERLINE CURVE TO SPIRAL DESIGN OPTION DRAWING EAST/ELECTRICAL ELEVATION END POINT EXISTING FEDERAL WAY LINK EXTENSION FEDERAL WAY TRANSIT CENTER GAS HIGHLINE COLLEGE HORIZONTAL KING COUNTY KING COUNTY METRO KENT/DES MOINES KILOVOLTS MILES PER HOUR NORTH NORTHBOUND OVERHEAD ELECTRICAL POINT OF CURVATURE PLACE POINT OF SWITCH POINT OF TANGENCY POINT OF VERTICAL CURVATURE POINT OF VERTICAL INTERSECTION POINT OF VERTICAL TANGENCY RADUIS ROAD RIGHT OF WAY SOUTH SOUTH BOUND SPIRAL TO CURVE SQUARE FEET STATE ROUTE STREET, SPIRAL TO TANGENT, or SOUND TRANSIT STATION TRACTION POWER SUBSTATION TANGENT TO SPIRAL TYPICAL EXISTING FEATURES RIGHT OF WAY LINE LOT LINE GAS OVERHEAD ELECTRICAL UNDERGROUND ELECTRICAL WETLAND STREAM TRACK CENTERLINE EXISTING GROUND (PROFILE) 250 CONTOUR LINE PROPOSED FEATURES PROPOSED WSDOT ROW CITY LIMITS CONSTRUCTION FOOTPRINT GUIDEWAY CENTERLINE CURB AND SIDEWALK BOTTOM OF STRUCTURE (PROFILE) TOP OF RAIL (PROFILE) STATION PLATFORM AT-GRADE /TRENCH (BALLASTED) TRACK ELEVATED GUIDEWAY COLUMNS / STRADDLE BENTS LONG SPAN COLUMNS HEAD WALL V V VELOCITY TPSS TPSS BUILDING NEW SIGNAL 2/25/2015 9:18:34 AM CFOX C:\PWWORKING\SEA\D1114117\SR99-A00-GX01.DWG SHEET INDEX SR99-A00-GX01 2

99 99 SR99 SHEET LAYOUT MATRIX 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 A - X X X X X X X X X X X X X X X X B - S 216TH WEST STATION OPTION (POTENTIAL ADDITIONAL STATION) X X X C - S 216TH EAST STATION OPTION (POTENTIAL ADDITIONAL STATION) X X D - KENT/DES MOINES SR 99 MEDIAN STATION OPTION X X X E - KENT/DES MOINES SR 99 EAST STATION OPTION X X X X F - KENT/DES MOINES HC CAMPUS STATION OPTION X X X X X F - KDM HC CAMPUS OPTION FROM S 216TH WEST STATION OPTION X X X X X G - S 260TH WEST STATION OPTION (POTENTIAL ADDITIONAL STATION) X X X X X H - S 260TH EAST STATION OPTION (POTENTIAL ADDITIONAL STATION) X X X X J - S 272ND REDONDO TRENCH STATION OPTION X X X X X X X K - FEDERAL WAY SR 99 STATION OPTION X X 2/25/2015 9:20:31 AM CFOX C:\PWWORKING\SEA\D1114117\SR99-A00-GX02.DWG I - NOT USED SR99 ALTERNATIVE SHEET INDEX KEYMAP SR99-A00-GX02 3

2/25/2015 2:19:35 PM CFOX STA 7+25 TO STA 30+00 SR99-A1-PP01 4

2/25/2015 2:20:14 PM CFOX STA 30+00 TO STA 56+00 SR99-A2-PP02 5

2/25/2015 2:20:36 PM CFOX STA 56+00 TO STA 82+00 SR99-A3-PP03 6

2/25/2015 2:21:00 PM CFOX STA 82+00 TO STA 108+00 SR99-A4-PP04 7

2/25/2015 2:21:22 PM CFOX SOUND TRANSIT FEDERAL WAY LINK EXTENSION STA 108+00 TO STA 134+00 SR99-A5-PP05 8

2/25/2015 2:21:45 PM CFOX STA 134+00 TO STA 160+00 SR99-A6-PP06 9

2/25/2015 2:22:09 PM CFOX STA 160+00 TO STA 186+00 SR99-A7-PP07 10

2/25/2015 2:22:33 PM CFOX STA 186+00 TO STA 212+00 SR99-A8-PP08 11

2/25/2015 2:22:57 PM CFOX STA 212+00 TO STA 238+00 SR99-A9-PP09 12