Serenity Houseboat. Standard Operating Procedures for:

Similar documents
On a calm day in open water check how the boat reacts at low speed. quick burst

Docking & Harbor Handling Guidelines

Docking & Harbor Handling Techniques

OASIS SAILING CLUB. A&E Review Form Sailing/CQM Rev 11/9/2015. Name: Level

05 Boat Handling. Captain

THE PHYSICS OF DOCKING

Roles: Presentation Questions:

04 Practical Seamanship. Captain

Rules Practice Exam 11

SAIL WELL, STAY WELL. Sydney Flying Squadron ACN Sydney Flying Squadron. SAILING A SKIFF a guide

2018 Osprey Yacht Club

Deckhand Crew. Deckhand Crew Responsibilities

National Maritime Center

Mooring, rafting, springing, locks etc, etc

End. Standing Part. An underhand loop is made by crossing the end under the standing part.

Houseboating Handbook

ARM 6.4 R/V ARMSTRONG SMALL BOAT OPERATIONS

Deckhand Duties Questions

National Maritime Center

CHAPTER 1 TROLLING BASICS

The Basics of Victory Sailing II

KNOTS. A very short guide to knotting terminology used on these pages.

Rules Practice Exam 14

ENABLING OBJECTIVE AND TEACHING POINTS. BUSHCRAFT: TIME Two 30 minute periods. 6. METHOD/APPROACH: a. demonstration; and. b. performance.

Berkeley Island Marine Pre-Rental Instructions. If you do not have a

Basic Cruising Standard

Seamanship 2. Contents. The technical skills covered by the practical seamanship module are essential for ensuring safety and efficiency at sea

Mooring Balls Explained A checklist for a secure mooring

Seamanship. A braided line comprises a core of braided or stranded threads covered with a sheath. The center or core of the line gives strength.

KNOTS. By Oliver Cameron with Ole Wik

National Maritime Center

Knots, Hitches and Bends

Basic Keelboat Sailing Standard (ASA 101)

Auxiliary Coxswain Performance Standards

Tying Farm Knots. Working with Heifers

ATL 6.6 R/V ATLANTIS SWIMMER QUALIFICATIONS

Rules Practice Exam 7

Level Two Green Rope. Clove Hitch

THE HAFENSKIPPER Dock & Maneuver in the Harbor

Rules Practice Exam 5

National Maritime Center

Work Standard CABLE PULLING OPERATIONS

MSC-132: Introduction, Plain Whipping, Loops, Turns & Hitches

Boating Essentials Getting started

OPERATIONAL CHECK LIST

Competency Framework for Advanced Deckhand-Fishing. Competency Framework for Advanced Deckhand-Fishing

Most sail with 5 or 6 in the boat. Here are the names I will use for the various positons (from the back forward):

MANAGEMENT SYSTEM MANUAL

RESULTS FROM PARACHUTE SEA ANCHOR DRAG TESTS FOR A SPACE CAPSULE, Jan. 10, 2013

Unit 18 LEAVING THE DOCK

Team Coordination Training 2009 Refresher Participant Reference. Learning Objectives. United States Coast Guard Auxiliary

Hansa 2.3 Rigging Guide

Stevpris installation

Scout Meeting Schedule: Week 2 Theme: Pioneering A Date:

Intermediate Cruising Standard (ASA 104)

Ontario Division Controlled Document Cover Page

Scout It Out would like to extend its gratitude to all the sites where the following information had been gathered.

Knot Masters Program

Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines)

Over Deck Control Lines V1

Raider 16/Sport - Spinnaker Rigging. Rigging Spinnaker

T 10 Tacking Ver

TUNE YOUR SAILS SPEED. Optimist Tuning Guide. Photo Wavelength

SECTION V. Terminology: Bight: Double Bight: Loop: Turn: Round Turn: Half Hitch: Girth Hitch: Running End: Standing End:

a. 27 inches or 0.69 m above the surface of the compressed seat;

Rules Practice Exam 9

Troop 226. Knot Master Program

Chelsea Yacht Club. Adult Sailing Program Course Description. Basic Keelboat

SEMI FINAL EXAMINATION

NavRule Practice Exam, 70 Series Practice April 18, Labeled C have been copied to collection

Roles and Responsibilities of a Coxswain

You must stop your. pass with caution on the port side of vessel "B" The vessel moving upstream against the current

ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL FOUR INSTRUCTIONAL GUIDE SECTION 3 EO M TIE KNOTS AND LASHINGS PREPARATION

Weta Basic Rigging Guide

NauticEd Practical Competency Training Syllabus Skipper Small Keelboat (to 26 ft)

Ropework. Stopper knots. Overhand Knot ROPEWORK. Figure of Eight 3.

Tonto Rim Search and Rescue (TRSAR) Rope Team Stand Operating Procedures Member Certification

Leg 1: First Narrows to Garrison Bay (Anchorage) Distance = 51.9nm (+ 10nm from Reed Point Marina) Roche Harbor Marina: Phone: (800) VHF 78

STUDENT STUDY GUIDE ASA 104 INTERMEDIATE COASTAL CRUISING & BAREBOAT CHARTERING

NAUTICAL TERMINOLOGY

CREW BOOKLET. The Sea School P/L. (Sea School Certificate Level 1) Contents:

Since rope is a vital part of a boat's equipment, a good sailor should be familiar with how to handle rope and how to tie a few basic knots.

CII Rigging suggestions

Rescue Technician Site Operations

Knots. Some points on ropes:

Name: USNSCC Phoenix Division / USNLCC T.S. Battleship Arizona Sailboat Training Personal Qualification Standard (PQS)

MOORING INFORMATION FOR BOAT OWNERS AT RGYC

RANDALL S ADVENTURE TRAINING BASIC SINGLE ROPE TECHNIQUES

requirement 9 Polyester Nylon

Seventeenth Coast Guard District Auxiliary Policy Directive 01-07

National Maritime Center

MARINE INCIDENT SUMMIT INCIDENT BRIEFS FROM THE 2ND & 3RD QUARTERS OF CY 2014

KITSAP MOUNTAINEERS BASIC CLIMBING COURSE

Personal Watercraft Safety Course for Boy Scouts

EPA Vessel Safety during Response Operations

Enclosure (5) to NVIC 03-16

Installation and service should be performed by a qualified service professional.

Army Mountain Warfare School Ethan Allen Firing Range Jericho, VT Military Mountaineer Course Knot Guide

INDEX

BASIC CRUISING STANDARD (Day Skipper Sail)

Transcription:

Serenity Houseboat Standard Operating Procedures for: Docking I. Safety a. Never get between the houseboat and the dock or other larger object. b. Always wear PFDs during docking. c. Always wear snug fitting, closed toe shoes during docking. d. Never step in the bight of a line, you can t be sure when it might come under tension suddenly and pull tight. e. When line handling, always keep at least 10-inches of line between your hand and line made off to a cleat. If a heavy load is placed on the line, it can be pulled through the cleat and your hand can go with it, resulting in serious injuries. f. Gloves can help prevent burns and injuries, but care must be taken to avoid getting them caught in the line. II. General Information a. Overview Maneuvering the houseboat up to a dock is one of the most difficult iterations you will face as an owner operator. A good understanding of the physics at work is helpful, but there is no substitution for experience. This SOP is designed to provide best practices in mooring the houseboat at the slip and alongside fuel and pump out docks. It is not intended as an exhaustive study in docking theory, but should provide a good basis for understanding how the mooring process should be accomplished. If you are not confident in your ability to bring the houseboat alongside safely, you are urged to arrange for pilotage services from Aramark Executive Services. b. Basic Terminology i. Mooring lines (not ropes) will generally have a loop spliced into the line at one, or both ends, to facilitate quickly making the line off to a cleat. On Serenity, these are ¾-in Double Braided Nylon lines with rated working loads of 18,800-lbs. ii. In order to make a line off to a cleat with a loop, pass the loop through the opening in the base of the cleat and then fold it back over the ears of the cleat. This ensures that it will not slip off if the line goes slack.

iii. Making a line off to a cleat. 1. First take a round turn on the base of the cleat. 2. Then take several (3 or more) figure-8 turns over the ears of the cleat. 3. Finally, you may use a locking hitch/half hitch to secure the line in place, but this is not necessary. Under no circumstances should you use a locking hitch prior to taking at least 3 figure-8 turns; if you do and the line comes under heavy tension it can seize such that you will need to cut it off the cleat. iv. The most useful knot you can learn is the Bowline. Any knot will be a weak point in the line, but a bowline comparatively reduces the strength far less than other knots (60% of breaking strength of the line). Additionally, a bowline is structured such that it should always be able to be broken and untied.

v. Mooring lines shall be referred to by number, starting at the bow and counting to the stern (1-4). The following lines comprise the normal mooring lines for the houseboat on each side. 1. Line 1 Bow Line 2. Line 2 Aft Leading Spring Line 3. Line 3 Forward Leading Spring Line 4. Line 4 Stern Line vi. Mooring in the Slip. Below is a mooring diagram for the minimum lines that should be used in tying the houseboat up in the slip. vii. Engine orders are given as Ahead, Stop, and Back. viii. Helm commands are given as Left, Midship, and Right. The term Hard, refers to taking the helm to its stops. ix. The vessel s motion is termed as Ahead or Astern and Port or Starboard.

III. IV. c. Good Practices i. Never maneuver up to a dock faster than you are willing to hit the dock. ii. The houseboat responds slowly to steering and engine input, there is a lot of momentum to stop; plan ahead. iii. Even light breezes effect how the houseboat will handle, approach the dock with wind effect in mind. iv. In general, it is desirable to moor starboard side to the dock, as this provides better visibility to the operator at the lower helm station. v. It is helpful to send a line handling party with a radio ahead of the houseboat in a small boat. This line handling party can identify where the houseboat will moor and catch mooring lines to tie off the houseboat when it comes in. vi. Line handlers should be instructed in how to make off a line on a cleat, how to take up slack in the line, and how to surge or pay out the line. vii. Good line handling makes good docking. When line handling, particularly in heavy winds, never try to pull the houseboat with a line. The houseboat weighs 22.5-tons and you will not be able to apply enough force to influence its motion. Use mechanical advantage by immediately making the line off to a cleat with at least one wrap. Take up slack by pulling the line through that wrap or surge the line (pay out line) by allowing it to feed out through the wrap. If you need to hold the line fast, you will have to take more wraps quickly, being careful not to get your hands caught in the line. viii. Never enter the marina while towing a small boat or PWC. ix. Keep the wind on the bow of the boat, if possible. The engines are more efficient pushing the boat ahead than they are astern and having this greater force to counteract the wind is optimal, even if it results in unconventional docking orientation. x. Always have an exit plan; if you have to abort the docking attempt, be ready with how you will maneuver the houseboat back out to open water. Prior to Entering Marina a. Prepare mooring lines for heaving; make off the mooring lines to the cleat on the boat and then coil the line for throwing. b. Hang fenders on the side of the boat you will be putting against the dock. If mooring at the slip, fenders should be rigged on both sides of the boat, but may be preset in the slip. c. Transfer control to the lower helm station; it is illegal to operate the houseboat from the flying bridge in the marina. When coming into or leaving the dock you must pilot the houseboat from the lower helm station to ensure visibility of other watercraft, fixed objects, and people. d. Identify who will be doing what during the docking evolution; usually it is best to have one person on the bow and one person on the stern to pass mooring lines and act as lookouts. Review which lines are to be passed and when. e. Open all doors in order to have communication and clear pathways for line handlers to move around the boat. Docking Operations. Docking is one of the most difficult iterations to perform with the houseboat and no two dockings will be exactly alike; each docking will be heavily dependent on prevailing conditions. Take wind conditions into account when planning your approach. Maneuvering the houseboat in close quarters is about balancing forces. As a general rule, if at all possible, approach the dock with the wind on the bow of the vessel so that you can power into the wind (the engines are much more efficient pushing forwards than in reverse). The below instructions are intended as examples of houseboat handling, but you will need to practice to develop these skills.

a. Calm or Light Wind, Docking Starboard Side To. In calm conditions, or even with moderate wind, the simplest method to dock the houseboat is to bring the bow into the dock, pass Line 1, and back the stern into the dock. i. Begin by approaching parallel to the dock about 10-ft off at clutch ahead or slower, by taking the engines in and out of gear to keep a bare steerageway. ii. Bring the engines to ALL STOP and then turn the wheel HARD RIGHT to swing the bow into the dock. You may bump the engines AHEAD if necessary to get the bow up to the dock, but your momentum should carry you into the dock. Remember approach the dock slowly. iii. The bow will swing into the dock and allow you to pass Line 1, the bow line. Line 1 will hold the bow into the dock and allow you to back against it to swing the stern in. You should leave the Helm HARD RIGHT.

iv. Once the bow is close to the pier, leaving the helm HARD RIGHT, come ALL BACK on the engines and apply enough throttle to check your forward motion (i.e. put on the brakes). The astern propulsion with the engines in the HARD RIGHT position will also pull the stern in towards the dock. v. You can bring the Starboard engine to STOP in order to prevent yourself from putting too much strain on Line 1. You should pass Line 2 as soon as you can. Line 2 allows you to spring off the dock, powering forward to pull the boat up to the dock and is helpful if you find yourself in a heavy wind situation. vi. Pass Line 4 as soon as the stern in close enough to the dock. The houseboat should come to rest against the dock and then can be made off with all mooring lines.

b. Heavy Wind, Docking Starboard Side To. With very heavy wind, it is likely that you will not be able to apply enough power by backing the engines to bring the stern into the dock, as outlined above. In this case, you will need to use the superior forward thrust to drive the stern into the dock by springing off of Line 2. i. Approach the dock at an angle as steep as is necessary to balance the force of the wind. Make a controlled and slow approach. ii. When close enough to do so, pass Line 2, the aft leading spring line. You may BACK on the Port Engine to slow your approach (put on the breaks) and help twist the stern towards the dock, but take care not to start moving astern as you can quickly be blown off the dock. iii. Once Line 2 is secured with several wraps on the cleat, spring forward on line 2 and pass Line 1, the bow line, to hold the bow into the dock. Once you have Line 1 passed and secured with several wraps on the cleat, you can take the helm HARD LEFT and come AHEAD on both engines to drive the stern into the pier. If you don t have Line 1 to hold the bow in, the bow will swing away from the pier and you will be blown off the dock.

iv. When close enough to do so, Pass Line 4, the stern line. The line handler on Line 4 should take one wrap on the cleat and then take up slack as the engines push the stern closer to the dock. Once the houseboat is alongside the dock, they can secure Line 4 with several wraps. v. Keep power on to hold the vessel in position until all lines are secured and made off to hold the houseboat in place.