Explain that this is how I did my tower, it does not necessarily represent the state of the art, nor even the right way to do any particular aspect

Similar documents
QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

Installation and Training Manual

How I Manage my Mast and Spiderbeam Antenna

REPLACING THE AFT RUDDER CABLES

Raising a Yagi Using A Tram Without the Need for Tag Lines

Troyer s Gourd Rack 8 unit F R H O P

PRO1030 Bi-Directional Assembly Replacement

E. Test, and if needed, adjust tips of antenna. 1. Mark will test antennas with meter at ground end of feedline bundle. Will take 10 minutes.

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

TOWER INSPECTION REPORT

Drive Belt Instructions

THOR 10 HAMMER CAGE INSTRUCTIONS

Assembly Instructions. -Cantilever Boat Lifts

ASSEMBLY MANUAL HOBIE CATSY

HEAVY DUTY H.S. DISCUS CAGE NET POLE NET POLE INSTALLATION

Shoreline Cantilever Lift 2500lb Capacity Models: (108" inside width) - Part # (120" inside width) - Part #

CamRT Sun Top Bimini Installation Instructions

TOWER INSTALLATION MANUAL For A.R.E. Guyed Pipe Towers Short Towers 43, 64 and 85 feet tall

Instructions. Follow All Instructions Before Assembling Or Using This Product

SEADUCER BOATS GAS SPORT HYDRO

SEADUCER BOATS GAS MONO COME VISIT US ON THE WEB AT

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

400/488 Rotating Davit Installation Instructions

Soma Wind Generators

THE GARRISON BINDER ...

Cable Replacement Instructions for R-Series Roust-A-Bout 100/150/250

DE8410 FIVB Official Beach Volleyball Net

Wing assemblyfinal Master 4/29/04 11:20 PM Page 1. Issued January 1, Sabre Aircraft. Assembly Manual. Sabre 16ss Wing

EUROBUNGY-TRAMPOLINE

ATOC Meteorological Tower (6 meter-4 level) Guide

TENSOREX C+ TENSOREX C+

A. TO PREPARE THE MACHINE FOR USE.

CHAPTER 5 REWIND STARTERS

WHISPER 42 FOOT (13 Meter) TOWER KIT for SKYSTREAM 3.7 AND WHISPER 500 WIND TURBINE

88 UP THE TOWER. RULE #1. The guy up on the tower is in charge.

VL 2K LIFT D-L WINCH INSTRUCTIONS (Applies to P/Ns , , , , , )

Nautique Triton Clamping Board Rack V2

A Foundation Of Trust. Hanging By A Thread

3 AND 6 SIDE ARMS, STRAIGHT/TAPERED TOWER SECTIONS

20', 15', AND 12' BALL STOPS ASSEMBLY INSTRUCTIONS

Lectric Cycles Mid-Drive Electric Motor Installation

Guyed 70 Foot Tower Kit for Skystream 3.7 Owner s Manual

icreasepro Creaser Operators Manual

Lock-N-Load. Bullet Feeder

J/22 Dave Perry. Based on sailing the POW in the Ft Worth Boat Club (TX) boats in 2006 We sailed with three in the boat

Zip-Line Kit Instructions

Sideshift SS230 Installation on a 2006 Bayliner 265SB

Model: 5100 OmniSteel Volleyball System

TECHNICAL DATA ZTR Model 312

UNITY 2. Uni-DAAMS Manual. Version 1.3 (Changes to Section 1.1) March 2010

Index 1. Trampoline 2. Main Foils 3. Spinnaker Pole 4. Mast Setup 5. Mast Rigging 6. Rig Tension 7. Trapeze Lines 8. Rudders 9. Boom 10. Main Sheet an

STATIONARY TRUCK INTERNAL HALYARD V-CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

OWNER'S MANUAL LOCK-N-LOAD BULLET FEEDER (PISTOL)

A Basic Guide to Europe Dinghy Rigging

MLV Mast Series Sectional Tripod Mast, 10-34m (32-110ft)

Operator s Manual. 2010, 2015, 2020, 2025 Material Lifts

BALL STOP INSTALLTION GUIDE

Charmborough Bells Risk Assessment and Method Statement

CO V E R S TA R AU TO MAT I C S A F E T Y CO V E R INSTALLATION GUIDE

SECTION 2 RING MOUNT

Operator s Manual. Series 2100 Contractor Lifts

Page 1 of 1 04/19/13 SBR

Falcon 3 145, 170, 195 and Tandem Owner / Service Manual

Booster Pump PB4-60 Replacement Kits

II-28 STOKES BASKET OPERATIONS

STATIONARY TRUCK INTERNAL HALYARD CAM CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL COMMERCIAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

Fiber Optic Lighted Bubbler Spillway Pot (DLP-45) Installation Manual

Premium PowerPoint Presentation. Rigging Review

COASTAL IN-BOOM FURLING SYSTEM. Installation Manual

PULLTARP INSTALLATION & OPERATORS MANUAL

Tripod Setup Guide (M-TPx)

VERSA BIKE RACK INSTRUCTIONS

I.H.S INSTALLATION INSTRUCTIONS

Important Note: Tighten lock nuts so the support tubes still swing freely see figure 2. There must be 1 2 threads of bolt past end of lock nuts.

SPOOLER INSTRUCTIONS. STEP 12 If you are going to paint your posts, that should be done at this time.

Operator s Manual Series 2400 Material Lift

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

Trike-Bike Assembly Manual

RAI-M series RUDDER ANGLE INDICATOR SYSTEM

SCUBAPRO. Balanced Power Inflator

NEXT GENERATION FLEX FENCE

HoldUp Plus2. Safety Kit included: See additional instructions for installation. REAR WHEEL TRAY. BASE (1x) lock WASHER (1x) KEY (2x) SAFETY CLIP (1x)

Channel Bracket Support Cable Bracket Bearer Locking Pin Foundation Bolt Iron Anchor Step Manhole Sump Grill PVC/Steel Ladder Ladder Support & Hook

Congratulations on your purchase of a JC Series Performer trike! The Performer JC Series is designed for everything from touring to commuting and

TECHNICAL DATA BROCHURE Model 304

INSTRUCTION MANUAL. January 23, 2003, Revision 0

RehabPro Speed Pulley (M100S & M100FS) User Manual

BEAMGUARD SAFETY POST TM INSTRUCTIONS

Special instruction of installation for SAINT FH-M800/RD-M800 and FH-M805/RD-M805

Trapping Protocols 2008 Emerald Ash Borer Survey

45-FOOT LAND TOWER KIT For AIR TM WIND MODULES

How to install AEA s 10 meter meteorological tower

Final Assembly Instructions Bikes with Threaded Headsets

RBI Solar One-Piece Ground Mount Solution GM-GS

Safety System Installation Guide for ARE Wind Poles

Experimental Procedure

CAISSON SHAFT SYSTEM

Specifications Testing & Adjusting Disassembly & Assembly

Fiber Cable Puller with Tuf-Lugger lite

Certified in 3 & 4 leg configurations to CEN/TS 16415:2013 for maximum 2 persons and EN 795:2012 for single person use. total edge management system

Transcription:

Explain that this is how I did my tower, it does not necessarily represent the state of the art, nor even the right way to do any particular aspect of the tower. I invite those more experience to make comments as we go along or at the end. Talk about why I wanted to put up a tower. Other than the radio itself your antenna is the most important part of your station. In order to put up antennas with gain you need to have a tower so you can rotate them AND the higher the better. My location is in a bit of a dip. 1

2

3

Turned out to be easy to work with. I didn t post bond. I explained to them about Federal law requiring accommodation and that tower has to be of adequate height to accomplish communications. 4

5

EXTREMELY IMPORTANT!! Wind load see ch 22 of ARRL antenna handbook. Needed to determine which rotator to buy. More than just ant sq ft and wind velocity. You also need to calculate the antenna K factor, or cumulative K factor for the antennas on your tower. It takes into effect the distance the weight is from the mast. Google antenna K factor for more info. Also see info on Yaesu rotators on their site. I ended up buying an inadequate rotator by just going by the square feet. Fortunately a friend bought it from me because it fit his needs. 6

Site restrictions include neighbor distance, power lines, height above local terrain / foliage. Remember higher is better! 7

8

Note that 45G requires hole 5 3 square w/ 4.1 cu yd concrete and #7rebar on 12 centers 9

10

11

Be sure to talk about how critical making base level is. Talk about conduit into elevator shaft next slide 12

13

Mast I bought a 20, 2 OD aluminum mast. I wanted to get.25 thick tubing, but it weighed too much and cost a LOT too much. So I settled for heavy wall tubing. So far it s stood up too everything Mother Nature could throw at it. Need 3 types of tape regular electrical, forming tape, and coax seal. AND BLACK WIRE TIES. Black wire ties are UV resistant BUT wrap with electrical tape to protect. Unfortunately I didn t. 14

15

Tower base, 5. Tower section, 10. Thrust bearing plate (tower top), Thrust bearing, Yeasu GS 50. Drift pin/ aligning punch = most important tool! 16

Gin pole. Tube was one we had lying around. Might have been better to buy a new, stronger one. Drift pin used on ground to align and swage holes, then mark for alignment. May nor be needed as much with newer ones. 17

Base is in and first 10 section. Now set up gin pole to add upper tower sections. 18

Pulley at bottom of tower just above NEMA box. Rope goes from piece being lifted up to pulley at top of gin pole down thru pole to this pulley then to my wheelchair for hoisting. 19

2 nd and third sections have been erected, now at 30. Gin pole set up to add final section. 20

Final section on ground. Note rope to gin pole, rotator base, top plate with thrust bearing, and mast. Can just see other end of rope attached to my chair. 21

Heave my maties HEAVE!! Each 10 section weighs about 70 lbs, plus other pieces brings total to 90 100 lbs 22

Almost there! 23

Tower section upright, note my grandson Dallin preparing to help me raise the section. Plenty of power in the chair, but not enough traction. 24

Section is up and at limit of gin pole. LOTS of tension on rope, you can pluck it like a guitar string. Now just a matter of lining up the tower sections. 25

Sections aligned and dropped in. Align bolt holes and put bolts in. 26

This is where the drift pin really earns its keep. 27

Tighten the bolts 28

View of top, thrust bearing plate. Note how short gin pole line is. 29

Close up of top part of gin pole and rope. Note fraying thank God this was the last lift! 30

Now the simple matter of adding the antennas to the mast, starting with the lowest and biggest quad band 3 element beam. Note lines hanging over elements to guide it on the way up. Also note that the coax was attached to the beams when we raised them. 31

Now thread the 5 element 6 meter beam past the big guy and mount it on the mast. 32

And finally the 7 element 2 meter beam. 33

Get that sucker up and don t bend any of the elements! 34

All of the beams have to be spaced out on the mast ant aligned with one another. AND keep the coax straight. 35

Pat feeds the mast up while John tightens and aligns each antenna with lots of shouting from the ground very hard for them to hear people on the ground. We marked the mast where we wanted each antenna while the mast was on the ground. Each step involves loosening the thrust bearing while Pat holds the entire weight, pushing the mast up to the next mark, tightening the thrust bearing, then aligning the antenna with the others and tightening it on the mast. Nylox nuts are wonderful!!! 36

Wow! Looks like we got them aligned pretty well. 37

Final steps are to attach coax to mast then push the mast up high enough to mount the rotator, mount it, lower mast into rotator, put bolts in holding rotator on mast, put bolts in attaching rotator to mast. NOTE: rotator does NOT carry weight of mast and antennas, thrust bearing does. 38

Note that the rotator is now installed. Wrap coax around top of tower plate so won t bind or chafe when antennas go round and round. We took about 2 ½ turns and tied off carefully at corner of tower. Haven t talked about mast itself. Wanted to use 2 OD with ¼ wall but was both too expensive. Mast is 8 in tower and 12 above the tower. Left pulley at top with 2X height of tower line. 39

Note how coax is connected and sealed to antenna, thrust bearing, and coax wrap. 40

Attaching the coax down the tower. 41

Note ground wires talk about bonding to tower. Lots of wire tie cleanup. Note cleanup is an on going PM item. So far so good though 3 years. Bird droppings! 42

Coax lightning arrestors and coax distribution. 43

Lightning arrestor panel. Note cable labels Note fish lines. 44

45

HF antenna switch box 46

Exit and run video 47