River Road - Proposed Road Safety Enhancement Measures

Similar documents
River Road - Proposed Implementation of Selected Road Safety Measures

Traffic Safety Advisory Committee - Proposed 2016 Initiatives

Traffic Safety Advisory Committee - Proposed 2015 Initiatives

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Chapter 3 DESIGN SPECIFICATIONS

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Tonight is for you. Learn everything you can. Share all your ideas.

ICBC invests $1.175 million to help make Surrey, Delta and White Rock s roads safer in 2013

Glebe Neighbourhood Cycling Plan

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Kelowna On the Move. Pedestrian and Bicycle Master Plan

Downey Road. Transportation Improvement Study

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

REPORT TO MAYOR AND COUNCIL

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Nanaimo Transportation Master Plan. Phase 1 Consultation Summary

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Public Information Centre

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE

WELCOME Public Information Centre

Speed Limits in the Hoddle Grid

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Classification Criteria

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

Bicycling Routes on Provincial Roads Policy

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Chapter 3: Multi-Modal Circulation and Streetscapes

Active Transportation Facility Glossary

CITY OF COCONUT CREEK IMPLEMENTATION GUIDELINES FOR TRAFFIC CALMING

ENGINEERING AND PUBLIC WORKS. Transportation Improvements: Santa s Village Road (MR15) Public Meeting

PROJECT FACT SHEET May 25, 2018

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

Minor Amendments to the Street and Traffic By-law 2849 and Skateboards in Protected Bike Lanes

NEIGHBORHOOD TRAFFIC CALMING PROGRAM. Policy and Procedure. Roswell Department of Transportation (770)

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

Dowling/Beaty Cycling Route

Traffic Calming Policy

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

Edenbrook Hill Drive Traffic Calming Study

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Complete Streets. Designing Streets for Everyone. Sarnia

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Richmond-Adelaide Cycle Tracks

Borough of Danville, PA Traffic Calming Program Guidelines

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

ICBC invests $738,000 to make Surrey, White Rock and Delta roads safer

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

WELCOME PETTIT AVENUE SPEED CONTROL REVIEW NIEGHBOURHOOD OPEN HOUSE. City of Niagara Falls Transportation Services

ORDINANCE NO

Living Streets Policy

Pennsylvania Avenue (CR 484) Design Alternatives Study

TORONTO VISION ZERO Improving Safety for Pedestrians and Cyclists Roger Browne, Manager Traffic Safety Unit October 11, 2018

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca

Appendix A Guiding Principles for Cycling Safety in Work Zones

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

Chapter V Transportation Concept Alternatives

2.0 LANE WIDTHS GUIDELINE

Design of Stanley Park S-Curve

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Appendix 3 Roadway and Bike/Ped Design Standards

Department of Transportation

To: Public Works and Transportation Committee Date: May 24, PROPOSED ROAD SECTIONS IN RICHMOND TO BE ADDED TO TRANSLlNK'S MAJOR ROAD NETWORK

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

POLICY: TRAFFIC CALMING

City of Waterloo Complete Streets Policy

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Committee of the Whole Report For the Meeting of October 6, 2016

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

Chapter 5 Future Transportation

Bicycle Friendly Streets

PROJECT FACT SHEET March 21, 2018

REPORT District of Maple Ridge

83 AVENUE PRE-CONSTRUCTION MEETING

Environmental Assessment Airport Road from King Street to Huntsmill Drive Community Working Group (CWG) Orientation November 30, 2017

Residential Traffic Calming Program Guide. Town of Ashland, Virginia

South Terrace Pedestrian Safety and Streetscape Improvement: Community Engagement Summary

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

CHAPTER 1 STANDARD PRACTICES

Hospital Link Project Project Update September 2017

Bicycle Facilities Planning

Highway 56 Traffic Study Rymal Road to Cemetery Road

Lynchburg District Update

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON APRIL 25, 2016

Draft North Industrial Area-Wide Traffic Plan

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION

INDOT Complete Streets Guideline & Policy

122 Avenue: 107 Street to Fort Road

Highway 1 Kamloops to Alberta Four-Laning Program

Transcription:

City of Richmond Report to Committee To: From: Re: Public Works and Transportation Committee Victor Wei, P. Eng. Director, Transportation Date: June 6, 2017 River Road - Proposed Road Safety Enhancement Measures File: 10-6450-09-01/2017- Vol 01 Staff Recommendation 1. That the proposed traffic enhancement measures on River Road between No. 6 Road and Westminster Highway, except for the installation of speed humps, as described in the staff report titled "River Road- Proposed Road Safety Enhancement Measures" dated June 6, 2017 from the Director, Transportation, be endorsed for implementation as part of the ongoing city-wide effort to improve safety for road users. 2. That staff be directed to consult with the area residents and businesses on River Road between No.6 Road and Westminster Highway on the proposed installation of speed humps and report back with the outcome. 3. That staff review the feasibility of widening River Road between No.6 Road and Westminster Highway with a view to further enhancing road safety as part of the long-term concept for the phased Dike Master Plan process. Victor Wei, P. Eng. Director, Transportation (604-276-4131) Art. 1 REPORT CONCURRENCE ROUTED TO: Parks Engineering RCMP Fire-Rescue Finance CONCURRENCE CONCURRENCE OF GENERAL MANAGER /v;?~ REVIEWED BY STAFF REPORT I AGENDA REVIEW SUBCOMMITTEE INITIALS:

June 6, 2017-2 - Origin Staff Report At the November 7, 2016 General Purposes Committee, staff were directed to "examine the circumstances and the area around the accident that occurred on River Road on November 6, 2016 and report back." This report responds to the referral and recommends the implementation of a package of measures as an immediate step to improve traffic safety in this location. This report supports Council's 2014-2018 Term Goal #1 A Safe Community: Maintain emphasis on community safety to ensure Richmond continues to be a safe community. This report supports Council's 2014-2018 Term Goal #3 A Well-Planned Community: Analysis 3. 3. Effective transportation and mobility networks. Richmond RCMP Investigations The Richmond RCMP investigation of the November 6, 2016 crash on River Road is substantially completed. The investigation concluded that roadway design did not play a factor in the crash and the likely cause is driver error. Subsequent to the November 6, 2016 crash, two separate single vehicle off-road crashes occurred on January 9, 2017 in the section of River Road between the CN Rail Bridge and Westminster Highway. Richmond RCMP indicate that icy road conditions were a factor in both crashes. Current Conditions on River Road River Road between No.6 Road and Westminster Highway is a collector road approximately 8.5 km in length used by local residents as well as large truck operators and employees accessing industrial properties on the south bank of the North Arm ofthe Fraser River. On weekdays, some commuters may use the route to avoid traffic congestion on Highway 91 and Westminster Highway while on weekends the roadway is a popular destination for cyclists, particularly cycling clubs with larger groups of cyclists. The typical pavement width is 6.5 m. Maximum speed limits are 50 km/h for cars and 30 km/h for trucks and a 9-tonne load limit is in effect between No.7 Road and Westminster Highway. During the five year period of2011 to 2015 (the most recent available crash data from ICBC), a total of 94 crashes (injury, fatality and property damage only) were recorded within this section of River Road with approximately 70 per cent of these crashes occurring between No.6 Road and No.7 Road (including 25 crashes at No.6 Road) and 30 percent between No.7 Road and Westminster Highway (including 16 crashes at Westminster Highway). Richmond RCMP further advise that from 2011 to present, there have been four driving-related fatalities on this same section of roadway with one occurring each year in 2013 to 2016

June 6, 2017-3 - inclusive. Of these fatalities, speed was a factor in two crashes (including impairment in one crash) and driver error was attributed to the other two crashes. Over the past 15 years, as part ofthe City's continual efforts to enhance traffic safety, a number of traffic and pedestrian safety measures have been implemented along this corridor including: Installation of additional road signs, hazard markers and delineator posts to advise drivers of potential traffic conditions and hazards. Oversized speed limit signs are used at the start of all speed limit zones to increase driver awareness. Servicing and re-lamping of existing streetlights leased from BC Hydro to improve street lighting levels. Removal of on-street parking from sections of River Road where the shoulder of the roadway is narrow and any parked vehicles would impede through traffic. Construction of an asphalt walkway (1.2 metres wide, 300 metres in length) on the south side of the 22,000-block of River Road that provides safer pedestrian access to the Queen Road right-of-way for area residents. Installation of six speed humps in the 18,000-block of River Road where a 30 km/h speed zone is in effect. Proposed Road Safety Measures This section of River Road is one of few rural-like roadways in the Lower Mainland that is regarded as a popular scenic route for weekend touring cyclists. Accordingly, in evaluating possible options of improvements, staff applied the primary principle of retaining the roadway as such while exploring cost-effective measures that could be implemented immediately to enhance its safety for both cyclists and motorists. Given that the crash investigation report from Richmond RCMP did not identify roadway design as a factor and the potential challenges of widening River Road (discussed further below), staff reviewed the existing signage, road markings and other safety measures along the section of River Road between No.6 Road and Westminster Highway and have identified the following combination of cost-effective road safety measures that are proposed for implementation as part of the City's on-going effort to enhance road safety: (1) Replacement of existing "Share the Road" signage with new "Single File" signage at more frequent intervals (e.g., every 400 m) along with complementary "sharrow" pavement markings (Attachment 1). The new signage would advise motorists that the travel lanes are too narrow for side-by-side operation and that they should change lanes safely to pass cyclists. (2) Conversion of the existing solid double yellow centreline to a dashed single yellow centreline at select locations where it is safe for motorists to change lanes safely to pass. (3) Installation of new "Caution" signs at suitable intervals (e.g., every 1 km) to advise motorists to expect large volumes of cyclists on the roadway during weekends (Attachment 1). ( 4) Removal of remaining raised pavement markers (cat' s eyes) that are located adjacent to the white edge line along the north side of the roadway as contact with the raised surface when riding can potentially cause cyclists, especially with touring bikes with narrow tires, to lose their balance. As the markers were installed to help highlight the edge of the roadway

June 6, 2017-4- during foggy conditions, they would be replaced with reflective delineator posts mounted in the gravel shoulder with adequate shy distance away from the travelled paved portion. Staff discussed these proposed immediate measures with the Richmond Active Transportation Committee (advisory committee to Council) as well as representatives of other cycling organizations and clubs (including HUB Cycling, BC Cycling Coalition, Velo Vets). The proposed signage incorporates refinements suggested by the groups, who are supportive of the implementation of the proposed measures. Recommendation: Staff recommend that the proposed measures in this section ofriver Road be endorsed for implementation as part of the City's on-going effort to improve road safety. Should they be endorsed, the effectiveness of the "Single File" and "Caution" signage would be monitored, including seeking feedback from cyclists, and if judged effective, would be deployed on other two-lane rural roads in Richmond that are known to be frequented by cycling groups on weekends (e.g., Sidaway Road, Dyke Road, Finn Road). Potential Future Road Safety Improvements Staff also reviewed the feasibility of the following additional potential road safety improvements for this section of River Road. Speed Humps Feedback from cyclists and area residents has consistently identified vehicle speeds as a primary concern. Speed humps are a proven albeit permanent measure to help ensure that motorists respect the 50 km/h speed limit. A spacing of300 m for the speed humps is recommended based on feedback from Richmond Fire-Rescue, as a closer spacing (e.g., every 150m) would dramatically affect response times. Based on this spacing, the number of speed humps required would be 12 with an estimated total cost of$42,000. Recommendation: Staff recommend that residents and businesses in the affected roadway section be consulted and given an opportunity to provide their feedback. Staff would report back on the results with recommendations prior to any further action. Widened and Paved Road Shoulders Based on a high-level review of the feasibility of adding paved shoulders to River Road in this section, staff identified the following road geometric challenges: The physical constraints of the North Arm of the Fraser River to the north and the large canal to the south may limit the extent to which any road widening can be achieved. The open canal on the south side is used by adjacent cranberry farmers during harvesting. The roadway is located on top of the City's perimeter dike system such that any widening would be significantly more complex and costly. The foreshore along the entire length is a designated Environmentally Sensitive Area and the roadway is within a designated Riparian Management Area. High potential for private property impacts including the need to reconstruct driveways on the south side.

June 6, 2017-5 - Potential for a significant loss of trees, particularly on the north side. Recommendation: The majority of River Road between No.6 Road and Westminster Highway sits on top of the dike. This section of dike will be reviewed in Phase 4 of the Dike Master Plan process, which is scheduled to begin in 2018 following the completion of Phases 2 and 3. The review process will develop options for the complete reconstruction of River Road to further improve road safety and facilitate dike raising over the 30-year time frame. Financial Impact As shown in Table 2, the proposed road safety measures for implementation have a total estimated cost of$67,000 and would be funded from the following existing approved budgets. Table 2: Cost Estimates and FundinQ Sources Item Cost Estimate Fundina Source Sign age $25,000 Pavement Markings ("Sharrows") $12,000 2015 Active Transportation Improvement Program Removal of Pavement Markers & New Roadside Delineator Posts $30,000 2016 Traffic Calming Program Total $67,000 Conclusion The proposed signage and pavement markings would raise the awareness for both motorists and cyclists that River Road between No.6 Road and Westminster Highway is a popular cycling route, particularly on weekends, and remind both road users to proceed safely when sharing the road. The removal of the raised pavement markers would further enhance cycling safety. Staff will report back on the future potential installation of additional speed humps on River Road as a further road safety improvement, along with the associated costs. Joan Caravan Transportation Planner (604-276-4035) Supervisor, Traffic Operations ( 604-24 7-4697) Att. 1: Illustration of Proposed Road Safety Signage and Pavement Markings

Attachment 1 Proposed Signage and Pavement Markings for River Road: No.6 Road-Westminster Highway SHARE THE ROAD Existing "Share the Road" Signage I SINGLE FILE CHANGE LANES TO PASS WHEN SAFE New 11 Single File" Signage - - -- - - CAUTION ~ Hlfitl CYCLING ACTIVITY ON WEEKENDS Caution Signage 11 Sharrow" Pavement Marking