DRAFT INVESTMENT CORRIDORS

Similar documents
Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

Section 1 - North Lamar: Tech Ridge to US 183

Enhancements Short-term improvements to keep Austin moving. Mobility Hubs

Short Term 12 Expanded Freeway TxDOT IH-35 Slaughter Creek Overpass Reconstruct bridge and add lane to frontage road.

Capital Metro Downtown Multimodal Station

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

Light Rail Proposal. June 13, 2016 Presentation for the Joint Sustainability Committee by the Central Austin Community Development Corporation

2016 MOBILITY BOND PROGRAM

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

Bus Rapid Transit Plans

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

Traffic Guide. Please refer to the How to Use This Guide section below to learn how to navigate around event day closures.

KEARNY MESA COMMUNITY PLAN UPDATE

AVAILABLE AVAILABILITY OVERVIEW

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

City of Moorhead Committee of the Whole Meeting

ABOUT THE PROJECT. DOWNTOWN WEST Transportation Planning Study. Pennsylvania Ave. NW: H Street NW: Farragut. K St. NW. North. I St.

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

Aurora Corridor to E Line

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Seattle Transit Master Plan

a 20 year period. separate phases of development with staggered years)

Joseph Iacobucci. James Czarnecky, AICP

LOOP 360 IMPROVEMENT STUDY

Regional Transportation Needs Within Southeastern Wisconsin

Proposed Action, Purpose and Need Technical Memorandum

State Street Transit and Traffic Operational Plan June Æa «44 «55. Installation of Bus Bays. Land Use Activities

AVAILABLE AVAILABILITY OVERVIEW

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

CHAPTER 1 INTRODUCTION

Geary Corridor Bus Rapid Transit

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

San Jose Transportation Policy

Capital Metro Rail-with-Trail Feasibility Study. Downtown Austin to Leander, Texas. June 12, 2007

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Capital Metro Rail-with-Trail Feasibility Study. Downtown Austin to Leander, Texas. June 12, 2007

Afeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown

Crystal City Citizen Review Council Meeting. July 10, 2013

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

2012 PRIORITY TRANSPORTATION PROJECTS

North Coast Corridor:

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

95 th Street Corridor Transportation Plan. Steering Committee Meeting

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

C C C

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities.

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

Hennepin County Bicycle and Pedestrian Planning

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

Clackamas County Comprehensive Plan

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Central Corridor. Light Rail Transit. Improving mobility Easing congestion Strengthening our communities. Committee of the Whole January 30, 2008

Washington DC Section of ITE Project Briefing

PRESS RELEASE San Joaquin Council of Governments

Transit-Driven Complete Streets

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

WELCOME BUS RAPID TRANSIT PUBLIC MEETING. MEETING TIME: 5 p.m. - 8 p.m.

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

SANTA MONICA BOULEVARD CORRIDOR

WALKABLE + BIKEABLE REGIONS TxAPA Conference Alex Carroll Andrew Pompei, AICP Kelly Porter, AICP

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

I-35 Corridor Segment Committee NW Loop 410 San Antonio, Texas. February 11, :00 AM to Noon

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

102 Avenue Corridor Review

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

TRANSPORTATION TRAINING TOPICS. April 6, 2010

West Village Mobility & Integration

VIRGINIA RAILWAY EXPRESS

Van Ness Avenue Bus Rapid Transit (BRT) San Francisco Environment Commission Policy Committee

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

THIRD&GRAND. Public Workshop #1. Transportation Hub Area Plan. June 12, 2013

T1-A - Service Reduction (Re-sizing)

City of Charlottesville Bicycle and Pedestrian Master Plan Update

MAYFIELD ROAD CORRIDOR MULTIMODAL TRANSPORTATION PLAN. Public Workshop

High-Level Considerations for the Wire One Austin Urban Gondola Proposal

Welcome to the Sellwood Bridge Project Open House!

Transcription:

DRAFT INVESTMENT CORRIDORS Mode Studied ID CORRIDOR / ROADWAY FROM TO EXISTING CMTA ROUTES CORRIDOR TYPE PRIORITY STREET COMMUTER ELECTRIC EXPRESS LIGHT METRO RAPID RIGHT-OF-WAY PRESERVATION SHUTTLE STREETCAR STUDY ID E 2th Trinity St Springdale Rd 6, 8 9 2 S. st 3 th / Lake Austin Cesar Chavez St Red Bud Trail US 83 SH 0, 0 20 4, 8, 2/22, 22, 663 4, 9, 3, 6, 9 4 5th N Lamar Blvd IH 35 8 3 5 35th / 38th MoPac Guadalupe St 3, 9, 2/22, 66, 803 6 5st N Lamar Blvd Manor Rd 3, 20, 320 6,9 Airport Blvd N Lamar Blvd US 83 0, 3, 35, 350 9, 2, 6, 9 8 Bergstrom Spur Near S st St & St. Elmo Austin Bergstrom Int l Airport 9 Cesar Chavez MoPac Shady Lane,,, 90, 4, 9, 6, 9 9, 6, 9, 2 4, 9, 9 0 Congress th St SH, 00, 80 3, 30, 03, 338, S. Lamar Riverside Dr US 290/SH 803 N. Lamar /, 3, 5, 9, 300, 2 US 83 Riverside Dr Guadalupe 350, 80, 803 3 MLK Jr. Guadalupe St US 83 8 9, 3, 6, 9 4 Oltorf S Lamar Blvd 5 6 Pleasant Valley Highland / Red River / Trinity Manor / Dean Keeton S Pleasant Valley Rd 300, 33 6, 9 Airport Blvd E Oltorf St 2, 300, 320 6, 9, 2 Highland Mall Guadalupe St US 83 E Riverside Dr, 0, 20, 3, 00, 350, 20, 00, 60, 6, 62, 80, 935, 985, 98, 4, 5, 9, 6, 9, 22, 4, 9, 6, 9, 2 5, 9, 6, 9, 2 9, 8, 3, 4,, 6, 9, 23 See Table : Source Community Planning Efforts - Draft Investment Corridors November, 206

DRAFT INVESTMENT CORRIDORS ID CORRIDOR / ROADWAY FROM 8 Riverside S st St SH TO EXISTING CMTA ROUTES,, 20, 00, 60, 6, 62, 80, 935, 985, 98 CORRIDOR TYPE PRIORITY STREET COMMUTER ELECTRIC Mode Studied EXPRESS LIGHT METRO RAPID RIGHT-OF-WAY PRESERVATION SHUTTLE STREETCAR STUDY ID, 4, 9,, 4, 6,, 9, 2 9 45th/Burnet Guadalupe St US 83 3, 5, 803, 6, 9 20 2 S. Congress Red River to Lamar 22 Red River E MLK Blvd 23 Airport Line 24 MoKan Line th St to 3rd St 2, 6, 9, 3, 2, 00 2nd St Leland St, 00, 80 4 Station Station E Cesar Chavez St Austin Bergstrom Intl. Airport Georgetown or Round Rock 25 IH 35 SH 45 N SH 45 SE 26 Green Line Station 2 MoPac (N) US 83 28 MoPac (S) 29 Union Pacific RR Cesar Chavez / Lake Austin Blvd Taylor / Round Rock 4, 0,, 20, 3, 00, 22 2, 35, 42, 935, 985, 4, 8, 3, 5, 6 4, 3, 9, 8, 0, 9 Elgin Cesar Chavez / Lake Austin Blvd 90, 982, 983, 98 4, 8,6, 9, 24, 2,, 8, 6, 9 4, 8, 9, 25 Slaughter Ln, 22, 4, 8, 9, 26 San Marcos 30 US 290 W ACC Pinnacle S Lamar Blvd 5, 30, 4, 8, 9 3 US 290 E SH 30 IH 35 990 6, 6, 9, 8, 6, 9, 2 32 US 83 (N) SH 45 MoPac 982, 985, 98 4, 28 33 Red Line (double track) Leander Red Line See Table : Source Community Planning Efforts - Draft Investment Corridors November, 206

DRAFT PROJECTS ID ROADWAY FROM TO MetroRapid SERVICE TECHNOLOGY S. Lamar Blvd Barton Springs Rd Manchaca Rd 2 S. Congress Ave W. Riverside Dr. Ben White Blvd INFRASTRUCTURE Transit priority lane (Peak-Hour Only) Queue jumps at Barton Springs, Oltorf, Bluebonnet, Manchaca, and Barton Skyway. Improved stop/station amenities New (infill) station/stop locations Transit priority treatment (TBD) Improved stop/station amenities New (infill) station/stop locations, 2 3 Barton Springs Rd S. Lamar Blvd. S. st St Transit priority lane (Peak-Hour Only) 4 W. Riverside Dr S. st St S. Congress Ave Transit priority lane (Peak-Hour Only) 5 S. st St Barton Springs Rd Riverside Dr Traffic signal timing Transit priority lanes/dedicated ROW Intersection enhancements to facilitate MetroRapid routing from S. Congress and S. Lamar to S. st St. Queue jump (where feasible) 6 Guadalupe St (SB) / Lavaca St (NB) W. Cesar Chavez W. 3rd St Transit priority lanes Guadalupe St ( The Drag ) W. MLK Jr. Blvd 29th St Transit priority lanes Improved stop/station amenities New (infill) station/stop locations, 0 8 W. MLK Jr. Blvd Guadalupe St Lavaca St Traffic signal timing Intersection improvement to facilitate NB MetroRapid, MetroExpress routing from Lavaca to Guadalupe 9 Guadalupe St (SB) / Lavaca St (NB) W. Cesar Chavez St W. MLK Jr. Blvd Transit Signal Priority (TSP) activation at signalized intersections Improved stop/station amenities 9 0 N. Lamar Blvd Justin Ln St. Johns Ave Traffic signal timing Intersection improvement at MetroRail Red Line at-grade crossing Bicycle/pedestrian connectivity enhancements 5 See Table 2: Source Community Planning Efforts - Draft Enhancement Projects November, 206

DRAFT PROJECTS NW MetroExpress ID ROADWAY LOCATION SERVICE N. MoPac Express Lanes W. 5th St (SB access point) Cesar Chavez St (NB egress point) Operational routing enhancements to utilize N. MoPac Express Lane access / egress points: MetroExpress 980 (New Howard Express) MetroExpress 98 (New Oak Knoll Express) MetroExpress 985 (N 83 Express) TECHNOLOGY INFRASTRUCTURE, 2 2 N. MoPac Express Lanes Far West Blvd (SB / NB access and egress point) Operational routing enhancements to utilize N. MoPac Express Lane access / egress points: MetroExpress 982 (Pavilion Express) MetroExpress 98 (Leander/NW Express), 2 MetroRail Red Line ID ROADWAY / CORRIDOR FROM TO SERVICE TECHNOLOGY INFRASTRUCTURE Station platform expansions and improved amenities to accommodate two-car trains 3 2 MetroRail Red Line Leander Station Station Increased service frequency (< 5 minutes) 3 Kramer Station (existing) 4 Highland Station (existing) Rail passing sidings (queue jump) at the following locations: o Plaza Saltillo o Between MLK and Highland Station o Between Crestview and North Operations o Between Kramer and Howard o Between Howard and Lakeline o South of Leander Station Kramer Station relocation (to Broadmoor) and improved amenities Highland Station relocation (to ACC Highland) and improved amenities 3 8 8 5 Braker Ln New Braker (infill) station and improved amenities 6 4st St New Hancock Center (Infill) station and improved amenities 4 N. Lamar Justin Ln St. Johns Ave Rail signal crossing and gate control Multiple intersection to improve pedestrian, bicycle and transit safety / access to Crestview Station 5 8 I-35 Frontage Road 4st St Ardenwood Rd Rail signal crossing and gate control Multiple intersection to improve pedestrian, bicycle and transit safety / access to potential New Hancock Center station 4 See Table 2: Source Community Planning Efforts - Draft Enhancement Projects November, 206

DRAFT PROJECTS ID ROADWAY FROM TO Transit Entryway SERVICE TECHNOLOGY W. 5th St MoPac Guadalupe St 2 W. Cesar Chavez St MoPac Guadalupe St 3 S st St Barton Springs Rd Cesar Chavez St INFRASTRUCTURE Eastbound Transit Priority Lane (AM Peak) for MetroExpress access to downtown from N. MoPac Express Lanes Queue jump (where feasible) Westbound Transit Priority Lane (PM Peak) for downtown MetroExpress egress to N. MoPac Express Lanes Modified traffic operations (road diets, -way or 2-way conversion) Queue jump (where feasible) Transit Priority Lanes for MetroRapid and MetroExpress routing, 3, 3, 3 4 35th St MoPac Guadalupe St Transit Priority Lanes for MetroExpress routing Mobility Hub ID ROADWAY / LOCATION FROM TO SERVICE TECHNOLOGY INFRASTRUCTURE W. 4th St (DT MetroRail Station) Sabine St Trinity St modifications to serve hub Eastside Multi-Modal Hub Reconstruction of MetroRail Station and conversion of 4th St (from Trinity to Nueces) into a pedestrian plaza Bicycle and pedestrian safety / access, 4, 6 2 W. 4th St (Republic Square) San Antonio St Guadalupe St modifications to serve hub Westside Multi-Modal Hub Stop/station amenities Bicycle and pedestrian safety / access 3 W. 4th Street San Antonio St Trinity St modifications to utilize transit priority treatments Transit mall Two-way transit only lanes Modified traffic operations 4 N. Lamar Airport Blvd St. Johns Ave modifications to serve hub Crestview Mobility Hub Stop/station amenities Bicycle and pedestrian safety / access, 5 5 OTHER MOBILITY HUBS (TBD w/cmta input) Highland, Congress / Riverside, UT Austin, Leander, Lakeline, Howard, Domain, Braker, Anderson, Rundberg, N. Lamar T.C., Triangle, Hancock / 45th, South Congress T.C., others... modifications to serve hubs Potential (TBD) Stop/station amenities Bicycle and pedestrian safety / access Modified traffic operations See Table 2: Source Community Planning Efforts - Draft Enhancement Projects November, 206

TABLE : COMMUNITY PLANNING EFFORTS - DRAFT INVESTMENT CORRIDORS TABLE 2: COMMUNITY PLANNING EFFORTS - DRAFT PROJECTS CAPITAL METRO OTHER AGENCY PLANNING EFFORTS CAPITAL METRO OTHER AGENCY PLANNING EFFORTS. All Systems Go (2004) 9. CAMPO 2040. CMTA Connections 2025 (206) 2. CMTA-CTRMA P&R Initiative (206) 2. Austin-Manor-Elgin Transit Corridor: A Preliminary Review (2009) 24. TxDOT I-35 Mobility Program (SH 45 N to SH 45 SE) 5. CMTA Crestview Station Transit Access Study (2008) 3. COA/CMTA Transit Priority Working Group 3. Central Austin Transit Study (200) 25. CTRMA North MoPac Managed Lanes Project (Under Construction) 6. CMTA Project Connect MetroRail Multimodal Station - Final Design (206) 4. Connections 2025 (206) 26. CTRMA MoPac South (Environmental Study). CMTA Service Plan 2020 5. FTA Project Development Application (2000) 6. Hutto & Pflugerville Transit Development Plans (206) 2. Lone Star Rail District independent studies (various) 28. CTRMA US 83 North Mobility Project (206) 8. CMTA TIGER Grant (206) 9. CMTA Very Small Starts Application to FTA (2008) 3. MetroRail Long Range Feasibility Study (206). Metrorail Long-Range Feasibility Study (206) 8. Project Connect: Central Texas HCT System Plan (Adopted 202, Revised 204) 4. Project Connect Central Corridor HCT Study (204) CITY OF AUSTIN OTHER COMMUNITY PLANNING EFFORTS 9. Project Connect: Central Corridor HCT Study (204) 0. Project Connect: North Corridor LPA (Aug. 204). Service Plan 2020 (200) CITY OF AUSTIN OTHER COMMUNITY PLANNING EFFORTS 4. Smart City Proposal (206) 0. Guadalupe Corridor Study (206). Private-Public Partnership (P3) Proposal (206) 2. South Lamar Blvd Transportation Corridor Study (April 206) 2. Airport Blvd Corridor Plan (204) 20. The Wire Argodesign (CTRMA Board 206) Frog Design (CAMPO Board 203) 3. Austin Plan (20) 2. CACDC Light Rail Proposal (205) 4. E Riverside Corridor Plan (203) 22. Austin Alliance Congress Avenue Vision (200) 5. Great Streets Master Plan (2002) 6. Imagine Austin (June 202). Smart City Challenge Proposal (206) 8. Strategic Mobility Plan Brochure (204) 23. Robert Mueller Municipal Airport Redevelopment & Reuse Plan (2000) CoA Mueller Design Book (2004) Recommendations from the Draft Connections 2025 plan were used to complete the Phase inventory of corridors for HCT investment, as the CMTA board had not yet adopted the final version of Connections 2025. November, 206