The Van Ness Campus. Weekly Construction Bulletin #238

Similar documents
MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

Polk Streetscape Project

Central Subway UMS Utility Relocation

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

Geary Corridor Bus Rapid Transit: Staff-Recommended Alternative

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

3.9 Recreational Trails and Natural Areas

Public Comment Meeting Geary BRT Project Draft Environmental Impact Statement/Report

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

TEMPORARY OCCUPANCY PERMITS. Street Space, Additional Street Space and Temporary Occupancy Permits PUBLIC WORKS CODE : ARTICLE 15, SEC.

See Figure 38, Existing Nonmotorized Connections.

Purple Line Extension Community Meeting

Geary Community Advisory Committee Tuesday, March 20, :00 pm One South Van Ness, 7 th floor, Union Square Conference Room

Multiple Road Closures / Limited Access Crystal City 5K Fridays April 6, 13, 20, and 27 6:15 PM to 7:45 PM

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

IL Route 71 Construction Update

SFMTA SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

ORDER NUMBER SPECIAL EVENTS REMEMBER: SERVICE IS OUR ONLY BUSINESS

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

CITY OF LANCASTER PROPOSED NEW PROJECTS

Proposal for Improving Muni Line 29-Sunset Service (updated August 13, 2007)

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Mission Bay Loop (MBL) Public Meeting

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Red Light Camera Annual Report 2014

ROADWORK AND INFRASTRUCTURE OVERSIGHT

Freeway ramp intersection study

Van Ness Avenue Bus Rapid Transit (BRT) San Francisco Environment Commission Policy Committee

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Implementing the Three Es of School Zone Traffic Calming

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

2017 Temporary traffic control guidelines for pedestrians. v.2

Frequently Asked Questions

Meadow Woods Elementary School

Construction Staging Area Vaughan Road

History Recent Problems Alternative Routes

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

CIRCULATION, PARKING AND ALTERNATIVE TRANSPORTATION PLANS

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

Cincinnati Dayton Rd Widening

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Bicycle Strategy Capital Projects Polk Street Northbound Separated Bikeway 481, ,

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

Norfolk Tide LRT System Weaving Transit in Downtown Norfolk

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

APPENDIX E GRADE CROSSING LOCATIONS

May 20, 2016 PUBLIC HEARING RESULTS

Temporary Traffic Control for Highway Work Zones

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Welcome! Fore River Bridge Reconstruction Project Quincy & Weymouth Project File No Public Information Meeting May 18, 2017

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

San Francisco Planning Department IPIC Report 2016

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5068 FOR PUBLIC HEARING

Vision Zero Priority Projects (March 2017)

Hospital Link Project Project Update September 2017

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee

Central Freeway and Octavia Circulation Study

Existing Transportation System

San Bernardino County Non-Motorized Transportation Plan - Chapter 5

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

Street Design Workshop. Existing cross section Traffic volumes Examine adjacent land uses You design future improvements

Traffic Impact Memorandum. May 22, 2018

Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library

GEARY BRT SIMULATION VISSIM Calibration and Existing Conditions Results

42nd Ave N Reconstruction

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Welcome 78 Ave S.E. Underpass and Road Widening Project Update

WEST CAMPUS COGENERATION FACILITY CONSTRUCTION TRAFFIC PLAN. Madison, Wisconsin 53726

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

WELCOME PETTIT AVENUE SPEED CONTROL REVIEW NIEGHBOURHOOD OPEN HOUSE. City of Niagara Falls Transportation Services

Certificate of Determination Suite 400 Exemption from Environmental Review

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

City and County of San Francisco. Regulations for Working in San Francisco Streets

Decision on North Waterloo Routing

STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 De MINIMIS WRITE-UP FOR PM For parks, recreation areas, wildlife or waterfowl refuges Page 1 of 3

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Doug s Corner. Contractor s Weekly Update. In this issue: NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP SSWJV SAFETY QUALITY COURTEOUS

Traffic Circulation & Pedestrian Safety Study

Traffic Control & Road Closures for Special Events

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form

Celebrate Mardi Gras! Galveston February 22 nd through March 5 th. Please Note City Street Closures, Guidelines, and Safety Information

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Vehicular and Pedestrian Access to Herndon Metrorail Station. Robert B. Boxer, Director John Stuart, Clark Nexen October 28, 2015

Coachman Ridge Neighborhood Plan. Neighborhood Strengths and Weaknesses

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL

Accommodating Pedestrians in the Work Zone

SAFE ROUTES TO SCHOOL

Hospital Link Project Project Update November 2017

Implementation challenge 2: Is there room for Complete Streets? Does street classification enable Complete Streets?

I-10 Bypass Project Banning to Cabazon

Transcription:

The Van Ness Campus Weekly Construction Bulletin #238 Construction Update Week of April 23, 2018 The Van Ness Campus Weekly Bulletins are intended to help inform members of the community about upcoming construction activities. 1. 2. 3. 4. 5. 6. Reference Weekly Construction Activities Log (attached) Reference Six Week Construction Activities Log (attached) Submit written questions or comments at http://cpmc2020.org/contact-us For additional project information visit our project website at http://cpmc2020.org General Information (415) 762-7447 Emergency Phone Numbers a. For police, fire or ambulance emergencies dial 911 b. Van Ness Campus Construction Hotline (415) 762-7477. Please note this is for urgent construction related concerns at the Van Ness Campus only. For nonemergency communication associated with the Van Ness Campus Construction please contact us via our project website or the General Information phone line. 1200 Van Ness Avenue San Francisco, CA 94109 General Information (415) 762-7447

Weekly Construction Activities Sutter Health CPMC Van Ness Campus Hospital - Week Starting Monday, April 23, 2018 The purpose of the Weekly Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass Daily No New Activities X X 1 Delivery of Construction Material Deliveries move to Franklin street to accommodate sitework on Post street. X 5 Post Street Sitework Demolition of sidewalk, utility work, and pavement on Post street. X 3 Pedestrian Walkway Change The pedestrian walkway on Van Ness Avenue (between Post Street and Geary street) will be shifting out. X X 1 Fire Alarm Testing BRT Van Ness Improvement construction will be taking place during pedestrian walkway change. Fire alarm testing will occur at various location of the building. Emergency lights will flash and alarm will produce sound. For concerns, please call the information hotline at (415) 762-7477. X 1 Permanent Bus Stop Change West bound 38 bus line will be to its permanent location to 4/23/18 None 5/4/18 4/23/18 7a-11p None 7/27/18

Six Week Construction Activities Sutter Health CPMC Van Ness Campus Hospital - Week Starting Monday, April 23, 2018 The purpose of the Six Week Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass Daily No New Activities X X 1 Delivery of Construction Material Deliveries move to Franklin street to accommodate sitework on Post street. X 5 Post Street Sitework Demolition of sidewalk, utility work, and pavement on Post street. X 3 Pedestrian Walkway Change The pedestrian walkway on Van Ness Avenue (between Post Street and Geary street) will be shifting out. X X 1 Fire Alarm Testing BRT Van Ness Improvement construction will be taking place during pedestrian walkway change. Fire alarm testing will occur at various location of the building. Emergency lights will flash and alarm will produce sound. For concerns, please call the information hotline at (415) 762-7477. X 1 Permanent Bus Stop Change West bound 38 bus line will be to its permanent location to 4/23/18 None 5/4/18 4/23/18 7a-11p None 7/27/18

Weekly Construction Activities Sutter Health CPMC Van Ness Campus MOB - Week Starting Monday, April 23, 2018 The purpose of the Six Week Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass Daily New Activities X X 2 Delivery of Construction Materials Cedar Ave delivery lane. X X X X X 4 Geary Street Barricade Modify Geary Street barricade for sitework. X X X X 4 Geary Street Sitework X X 4 Sidewalk Closure Demolition and pavement of sidewalk adjacent to the medical office. Lane changes on Geary Street between Polk Street and Geary Street to accommodate right lane closure. Northern pedestrian sidewalk on Geary Street will be closed and rerouted to southern sidewalk for utility work. X 4 Permanent Bus Stop Change West bound 38 bus line will be to its permanent location to 4/23/18 7a-5p, M-F None 6/15/18 4/23/18 7a-5p, M-F 8p-6a 4/24/18 4/23/18 7a-5p, M-F None 4/27/18 4/23/18 7a-5p None 6/15/18

Six Week Construction Activities Sutter Health CPMC Van Ness Campus MOB - Week Starting Monday, April 23 2018 The purpose of the Six Week Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass Daily New Activities X X X X X 4 Geary Street Barricade Modify Geary Street barricade for sitework. X X 2 Delivery of Construction Materials X X X X 4 Geary Street Sitework X X 4 Sidewalk Closure Cedar Ave delivery lane. Demolition and pavement of sidewalk adjacent to the medical office. Lane changes on Geary Street between Polk Street and Geary Street to accommodate right lane closure. Northern pedestrian sidewalk on Geary Street will be closed and rerouted to southern sidewalk for utility work. X 4 Permanent Bus Stop Change West bound 38 bus line will be to its permanent location to 4/23/18 7a-5p, M-F 8p-6a 4/24/18 4/23/18 7a-5p, M-F None 6/15/18 4/23/18 7a-5p, M-F None 4/27/18 4/23/18 7a-5p None 6/15/18

HEMLOCK ST. POST STREET Y Loading dock for abatement activities Court Yard Hotel Tower Office Tower Entrance Staging area for interior/soft demolition GEARY BOULEVARD FRANKLIN STREET VAN NESS AVENUE Directions of Demolition CEDAR STREET POLK STREET Loading dock for abatement activities GEARY STREET N LEGEND MOB Area Boundary Fence Construction Access Gate MUNI Electric Lines MYRTLE ST. Hospital Truck Routes MOB Truck Routes SCALE CAMPUS BUILDING VERSION Not to Scale VNC Hospital, MOB 2.4 DATE Sept 08, 2010 NUMBER D1 O'FARREL ST.