The Van Ness Campus Weekly Construction Bulletin #238 Construction Update Week of April 23, 2018 The Van Ness Campus Weekly Bulletins are intended to help inform members of the community about upcoming construction activities. 1. 2. 3. 4. 5. 6. Reference Weekly Construction Activities Log (attached) Reference Six Week Construction Activities Log (attached) Submit written questions or comments at http://cpmc2020.org/contact-us For additional project information visit our project website at http://cpmc2020.org General Information (415) 762-7447 Emergency Phone Numbers a. For police, fire or ambulance emergencies dial 911 b. Van Ness Campus Construction Hotline (415) 762-7477. Please note this is for urgent construction related concerns at the Van Ness Campus only. For nonemergency communication associated with the Van Ness Campus Construction please contact us via our project website or the General Information phone line. 1200 Van Ness Avenue San Francisco, CA 94109 General Information (415) 762-7447
Weekly Construction Activities Sutter Health CPMC Van Ness Campus Hospital - Week Starting Monday, April 23, 2018 The purpose of the Weekly Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass Daily No New Activities X X 1 Delivery of Construction Material Deliveries move to Franklin street to accommodate sitework on Post street. X 5 Post Street Sitework Demolition of sidewalk, utility work, and pavement on Post street. X 3 Pedestrian Walkway Change The pedestrian walkway on Van Ness Avenue (between Post Street and Geary street) will be shifting out. X X 1 Fire Alarm Testing BRT Van Ness Improvement construction will be taking place during pedestrian walkway change. Fire alarm testing will occur at various location of the building. Emergency lights will flash and alarm will produce sound. For concerns, please call the information hotline at (415) 762-7477. X 1 Permanent Bus Stop Change West bound 38 bus line will be to its permanent location to 4/23/18 None 5/4/18 4/23/18 7a-11p None 7/27/18
Six Week Construction Activities Sutter Health CPMC Van Ness Campus Hospital - Week Starting Monday, April 23, 2018 The purpose of the Six Week Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass Daily No New Activities X X 1 Delivery of Construction Material Deliveries move to Franklin street to accommodate sitework on Post street. X 5 Post Street Sitework Demolition of sidewalk, utility work, and pavement on Post street. X 3 Pedestrian Walkway Change The pedestrian walkway on Van Ness Avenue (between Post Street and Geary street) will be shifting out. X X 1 Fire Alarm Testing BRT Van Ness Improvement construction will be taking place during pedestrian walkway change. Fire alarm testing will occur at various location of the building. Emergency lights will flash and alarm will produce sound. For concerns, please call the information hotline at (415) 762-7477. X 1 Permanent Bus Stop Change West bound 38 bus line will be to its permanent location to 4/23/18 None 5/4/18 4/23/18 7a-11p None 7/27/18
Weekly Construction Activities Sutter Health CPMC Van Ness Campus MOB - Week Starting Monday, April 23, 2018 The purpose of the Six Week Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass Daily New Activities X X 2 Delivery of Construction Materials Cedar Ave delivery lane. X X X X X 4 Geary Street Barricade Modify Geary Street barricade for sitework. X X X X 4 Geary Street Sitework X X 4 Sidewalk Closure Demolition and pavement of sidewalk adjacent to the medical office. Lane changes on Geary Street between Polk Street and Geary Street to accommodate right lane closure. Northern pedestrian sidewalk on Geary Street will be closed and rerouted to southern sidewalk for utility work. X 4 Permanent Bus Stop Change West bound 38 bus line will be to its permanent location to 4/23/18 7a-5p, M-F None 6/15/18 4/23/18 7a-5p, M-F 8p-6a 4/24/18 4/23/18 7a-5p, M-F None 4/27/18 4/23/18 7a-5p None 6/15/18
Six Week Construction Activities Sutter Health CPMC Van Ness Campus MOB - Week Starting Monday, April 23 2018 The purpose of the Six Week Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass Daily New Activities X X X X X 4 Geary Street Barricade Modify Geary Street barricade for sitework. X X 2 Delivery of Construction Materials X X X X 4 Geary Street Sitework X X 4 Sidewalk Closure Cedar Ave delivery lane. Demolition and pavement of sidewalk adjacent to the medical office. Lane changes on Geary Street between Polk Street and Geary Street to accommodate right lane closure. Northern pedestrian sidewalk on Geary Street will be closed and rerouted to southern sidewalk for utility work. X 4 Permanent Bus Stop Change West bound 38 bus line will be to its permanent location to 4/23/18 7a-5p, M-F 8p-6a 4/24/18 4/23/18 7a-5p, M-F None 6/15/18 4/23/18 7a-5p, M-F None 4/27/18 4/23/18 7a-5p None 6/15/18
HEMLOCK ST. POST STREET Y Loading dock for abatement activities Court Yard Hotel Tower Office Tower Entrance Staging area for interior/soft demolition GEARY BOULEVARD FRANKLIN STREET VAN NESS AVENUE Directions of Demolition CEDAR STREET POLK STREET Loading dock for abatement activities GEARY STREET N LEGEND MOB Area Boundary Fence Construction Access Gate MUNI Electric Lines MYRTLE ST. Hospital Truck Routes MOB Truck Routes SCALE CAMPUS BUILDING VERSION Not to Scale VNC Hospital, MOB 2.4 DATE Sept 08, 2010 NUMBER D1 O'FARREL ST.