Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI Should really follow HEC 18, but this summary will get you the main points.

Similar documents
Annex E Bridge Pier Protection Plan

Experimental Investigation of Clear-Water Local Scour at Pile Groups

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL

PENNDRAIN.rep. HEC-RAS Version May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX C ESTIMATING SCOUR IN BOTTOMLESS ARCH CULVERTS

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY

ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

Exercise (3): Open Channel Flow Rapidly Varied Flow

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO B WABASHA STREET SOUTH BOUND (MASA 235 SB)

Components of a Barrage

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

The Challenge of Wave Scouring Design for the Confederation Bridge

2D Modelling Series. Modelling Structures in Floodplains

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY

HYDRAULIC JUMP AND WEIR FLOW

Technical Report Culvert A Hydraulic Analysis

FORMAT FOR SENDING COMMENTS. Title: CRITERIA FOR DESIGN OF CANAL HEAD REGULATORS (Second revision of IS 6531)

General Information for Culvert Design

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

Scale Factor Study for 1:30 Local Scour Model

PROPOSING A NEW PORTABLE DEVICE FOR BRIDGE SCOUR INSPECTION

Rock Ramp Design Guidelines. David Mooney MS Chris Holmquist-Johnson MS Drew Baird Ph.D. P.E. Kent Collins P.E.

CE 535, Spring 2002 Preliminary Design Example 1 / 6

FISH PASSAGE ALTERNATIVES ANALYSIS ON PENNYPACK CREEK AT VERREE ROAD DAM AND ROOSEVELT BOULEVARD DAM PHILADELPHIA, PENNSYLVANIA

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 13 CULVERTS APRIL 2011

HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10

Plan B Dam Breach Assessment

Exercise (4): Open Channel Flow - Gradually Varied Flow

Engineer Research and Development

OPEN CHANNEL FLOW WORKSHEET 3 WATER SURFACE PROFILES

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design

COASTAL HAZARDS. What are Coastal Hazards?

SCOUR REDUCTION BY USING A COLLAR AROUND A PIER GROUP

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012


Presented by Fred Halterman, URS Jennie Agerton, URS

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

CFD Modelling of Scour around Offshore Wind Turbines Situated in Areas with Strong Currents Solberg, Tron; Hjertager, Bjørn Helge; Bove, Stefano

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 5, No 2, 2014

Experiment (13): Flow channel

Hydraulic Modeling of Stream Enhancement Methods

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

TOP:001.3 U.S. Fish and Wildlife Service TECHNICAL OPERATING PROCEDURE

Illinois State Water Survey

Water surface slope extending up to 20 channel widths up and downstream of crossing.

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

FLUID FORCE ACTING ON A CYLINDRICAL PIER STANDING IN A SCOUR

19.1 Problem: Maximum Discharge

Dam Breach Inundation Analysis

Defra / Environment Agency FCERM Joint Science Programme. SC030218/PR Afflux Estimation System. August 2007

Great Lakes Stream Crossing Inventory Instructions

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

Sussex County, DE Preliminary Study Overview

SCOUR PROTECTION BY A SLOT THROUGH A MODEL BRIDGE PIER

Culvert Design Basics

3. GRADUALLY-VARIED FLOW (GVF) AUTUMN 2018

Simulating Streams Through Culverts in Mat-Su, Alaska

Section 5: Pond Outlets

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

DEAD-ENDCHANNELFLUSHINGINHARBORS

Testing of hull drag for a sailboat

Request Number IR1-12: Flow Passage. Information Request

Cross-Vane Plan View FIN-UP Habitat Consultants, Inc. 220 Illinois Avenue Manitou Springs, CO (719) P.

The Basics of Culvert and Inlet Design

Concepts & Phenomena

Kennedy Bridge - Summary of Pier 6 Movement Records

Evaluating Surge Potential in CSO Tunnels

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

Mouth of the Columbia River Jetties Three-Phase Construction Plan

Using sea bed roughness as a wave energy dissipater

Loads on Structures. Dead Load / Fixed Load Live Load / Imposed Load Earthquake Load Wind Load Snow Load

Simple Flow Measurement Devices for Open Channels

Fish Passage Assessment of Private Stream Crossings on Lower Stonybrook Creek

Added Introduction: Comparing highway design and stream design

CROSS-SHORE SEDIMENT PROCESSES

Quantifying Performance of Stream Simulation Culverts in the Chehalis Basin, WA

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

2016 UNDERWATER BRIDGE INSPECTION REPORT. 81(ENCHANTED LANE) over CHANNEL. Date of Inspection: Equipment Used: 09/07/2016

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

NATURAL RESOURCES WALES / RESCUE 3 EUROPE WEIR ASSESSMENT SYSTEM

OECS Regional Engineering Workshop September 29 October 3, 2014

Transcription:

Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI 01-001 Should really follow HEC 18, but this summary will get you the main points.

1: Determine scour analysis variables 2: Analyze long-term bed elevation change 3: Evaluate scour analysis method 4: Compute contraction scour magnitude 5: Compute local pier scour magnitude 6: Compute local abutment scour magnitude 7: Plot and evaluate total scour

Find design Q (worst-case scenario) 500-yr Q or special angle, etc. Any future changes to river? Calculate water surface profiles (step method, HEC-2, WSPRO, etc.) Get geology, sediment size, cross-sections, planform, watershed data, similar bridge scour, energy gradeline slope, flooding history,location wrt other bridges or tributaries, meander history, erosion history, sand mining,etc.)

Photo courtesy of Art Parola

Find trend of aggradation/degradation using either past data, Site evidence, worst-case, or software.

Get fixed-bed hydraulic data Assess profile and planform changes Adjust fixed-bed hydraulics for profile and planform changes Compute contraction (discussed later) Compute local scour (discussed later) Get total scour by adding long-term degradation+contraction scour+local scour

Determine if clear water or live bed by incipient motion equation: V c =6.19 y 1/6 D 50 1/3 V c =min. vel. for size D 50 sediment movement y=flow depth (m) D 50 =sed. size of which 50% are smaller (m)

y y Q Q W W 2 2 1 ; 1 1 6/ 7 2 k 1 y s y 2 y o y 2 = contracted section flow depth (m) y 1 =upstream main channel depth (m) y o = contracted section flow depth (m) before scour y s =scour depth (m) Q 1 =flow in upstream channel transporting sediment (m 3 /s) Q 2 =contracted channel flow (m 3 /s) W 1 =upstream main channel bottom width (m) W 2 =main channel contracted section bottom width without pier widths (m) k 1 =exponent determined below

V * / k 1 Bed Transport Mode <0.5 0.59 bed contact 0.5-2 0.64 some suspended load >2 0.69 suspended load V*=upstream shear velocity (m/s) =(gy 1 S 1 ) 1/2 =D 50 fall velocity (following figure) S 1 =main channel energy grade line slope g=acceleration of gravity (9.81 m/s 2 )

y 2 K (S s s n 2 2 Q 1)D m W 2 3/ 7 y 2 =contracted section depth after contraction scour (m) Q=discharge through bridge (m 3 /s) D m =1.25D 50 (m)=min. non-movable part. W=bottom width in contracted section wo pier widths

y a s 2K K 1 2 K K 3 4 y a 1 0.35 Fr 0.43 1 ;Fr 1 V / 1 gy 1 1/ 2 y s =scour depth (m) y 1 =flow depth directly upstream of pier(m) K 1 =pier nose shape correction K 2 =angle of attack correction K 3 =bed condition correction K 4 =armoring correction a=pier width(m) V 1 =velocity upstream of pier(m/s)

Pier Nose Shape K 1 Square nose 1.1 Round nose 1.0 Circular cylinder 1.0 Group of cylinders 1.0 Sharp nose 0.9

Angle L/a=4 L/a=8 L/a=12 0 1.0 1.0 1.0 15 1.5 2.0 2.5 30 2.0 2.75 3.5 45 2.3 3.3 4.3 90 2.5 3.9 5.0 L=pier length (m), a=pier width (m)

Bed Condition Dune Height (m) K 3 Clear-Water Scour N/A 1.1 Plane Bed and Antidune N/A 1.1 Small Dunes 0.6<H<0.6 1.1 Medium Dunes 3<H<9 1.2 Large Dunes 9<H 1.3

K 4 =[1-0.89(1-V R ) 2 ] 0.5 V R =(V 1 -V i )/(V c90 -V i ) V i =0.645(D 50 /a) 0.053 V c50 V c =6.19y 1/6 D c 1/3 Where V 1 =approach velocity (m/s) V c90 =critical velocity to move D 90 D c =critical part. size (m) for critical vel.,v c a=pier width (m)

Factor Min. Bed Material Size K 4 min. V R >1.0 K 4 D 50 >0.06 m 0.7 1.0

Very wide piers Exposed footings and/or piles Pile caps in flow Multiple columns skewed to flow Pressure flow scour deck over-topping Debris

Many kinds exist: Different setbacks (in main channel, back on floodplain) Shape (spill-through, vertical face, wingwall) Angle to flow

y y s a 2.27K K 1 2 L' y a 0.43 F 0.61 r 1;F r V e gy a ;V e Q A e e K 1,K 2 =correction coefficients L =abutment length normal to flow (m) y a =floodplain average depth (m) y s =scour depth (m) Q e =flow obstructed by abut. and embank. (m 3 /s) A e =cross-sect. flow obstr. by abut. and emb. (m 2 )

Description K 1 Vertical-wall 1.00 Vertical-wall/wing wall 0.82 Spill-through 0.55

K 2 =( /90) 0.13 <90 o if embankment points downstream >90 o if embankment points upstream Q

y K s 4F 0.33 1 r y 0.55 1 y s =scour depth (m) y 1 =flow depth at abutment (m) Fr=Froude Number at abutment K 1 =abutment shape correction

Plot bed degradation elevation Subtract contraction scour and local scour (include local scour width as well=2depth) Is scour depth reasonable? Avoid overlapping scour holes Consider scour protection rather than a foundation deeper than the scour (can you count on it?) Evaluate cost, safety, environmental effects, ice, and debris.

Waterway width OK? (Leave as is?) Are scour holes overlapping? Relief bridges on floodplain needed? Abutments properly aligned? Can crossing location be changed? Can you train the flow at bridge? Is 2-D numerical model or physical model study needed?

Code 5: Bridge foundations determined to be stable for calculated scour conditions; scour within limits of footing or piles. Must complete scour calculations to know this. If a large section of piling is exposed, you may also need to do a structural / geotechnical analysis to see if the piles are stable.

Pier Bed level Spread footing Piles

Code 7: Countermeasures have been installed to correct a previously existing problem with scour. Bridge is no longer scour critical. Instructions in a plan of action have been implemented. Depending on what your plan of action is, you must calculate the scour first to know what event would trigger monitoring, or at least have done a HEC-RAS to get your parameters for designing countermeasures.

Any questions or discussion?