Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Similar documents
CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway. Open House - February 2017

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Arterial Transitway Corridors Study. Ave

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Arterial Transitway Corridors Study

122 Avenue: 107 Street to Fort Road

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

42nd Ave N Reconstruction

Welcome. If you have any questions or comments on the project, please contact:

Station Plan: Penn & 43rd Avenue

Public Works and Infrastructure Committee. General Manager, Transportation Services

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Terwillegar Drive Expressway Draft Concept Plan

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

Community Task Force November 15, 2017

Building Great Neighbourhoods QUEEN ALEXANDRA

Construction Staging Area Vaughan Road

City of Seattle Edward B. Murray, Mayor

WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre. City of Hamilton

ACTION TRANSMITTAL No

Building Great Neighbourhoods BONNIE DOON

Omaha s Complete Streets Policy

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Fleur Drive Reconstruction

Bellevue Downtown Association Downtown Bike Series

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road

TRASBURG RANSPORTATION

Thank you for attending

Geneva-Harney Bus Rapid Transit Feasibility Study

Welcome to the Quebec Alternatives Analysis Public Meeting

Building Great Neighbourhoods LANSDOWNE

Creating the Future Bruce B Downs Blvd

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Technical Working Group November 15, 2017

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

Capital Metro Downtown Multimodal Station

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Hennepin County Bicycle and Pedestrian Planning

Why invest in the 1 Street S.W. Corridor?

Santa Ana Creating Community Together

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

CITY OF VANCOUVER ADMINISTRATIVE REPORT

Complete Streets Training. Georgia Municipal Association June 27, 2016

What Is a Complete Street?

PROJECT FACT SHEET May 25, 2018

1. Provide a dedicated westbound approach bus lane at the intersection;

City of Wausau Wausau Center Urban Design and Transportation Master Plan. Design Workshop // October 18, 2018

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010

North Shore Transportation Improvement Strategy

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

Major Bike Routes 102 Avenue Workshop April 21, 2015

CSAH 101 Preliminary Design

Snelling Bus Rapid Transit June 17, 2013 Technical Advisory Committee Meeting #2 & VISSIM Traffic / TSP Evaluation Wrap-Up

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m.

Polk Streetscape Project

Foothill Expressway Improvements Between El Monte and San Antonio

Blair/Williamson Intersection Expressed Needs

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Lynchburg District Update

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

RZC Appendix 8A Marymoor Subarea Street Requirements

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

WELCOME Public Information Centre


A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Lincoln Neighborhood Corridor Plan The LiNC

CITY OF SPOKANE VALLEY Request for Council Action

Maywood Town Hall Meeting. May 4, 2016

Engineering - Bicycle and Pedestrian

C Line Rapid Bus Preliminary Station Design

Having held a public hearing, that Council approve:

Public Meeting #6. Buffalo Niagara Medical Campus Phase III Allen Street Extension Project D Youville College Center February 21, 2018

Third Street Bridge & Corridor Project

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Bicycling & Walking in the Twin Cities TPP Bike/Ped Chapter Overview. Land Use Advisory Committee September 21, 2017

ACTION TRANSMITTAL No

Request for Proposals Contra Costa County Contra Costa Centre I 680/Treat Boulevard Bicycle & Pedestrian Plan

Dowling/Beaty Cycling Route

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

COMMUNITY MEETING AGENDA

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

Wood and Cortland Neighborhood Greenways

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Bike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master.

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Transcription:

CITY OF MINNEAPOLIS Hennepin Avenue Reconstruction Washington Avenue to 12 th Street April 2016 1

Upcoming Opportunities Public Meeting #2 April 25, 2016 Minneapolis Central Library Doty Board Room Repeat presentation at 4pm & 5pm Project Contact: Simon Blenski, Minneapolis Public Works 612-673-5012 Simon.Blenski@minneapolismn.gov Website: www.minneapolismn.gov/cip/future/wcmsp-172270 2

Project Overview 3

Project Schedule Timing Task Winter/Spring 2016 Early June 2016 July 2016 Technical evaluation and initial public engagement Seek City Council approval for preferred street concept Submit application for federal transportation grant 2017-2019 Detailed design/engineering and additional public engagement 2019 Advanced utility work Current task Near-term deadline 2020 Construction 4

Project Funding Anticipated Funding Sources Total (millions) Federal grant $7.0 Municipal State Aid $5.0 Net Debt Bonds $2.3 Special Assessments $1.075 Sewer Enterprise Funding $0.25 Total $15.625 Initial estimate from Public Works Capital Budget Request Planning work and preferred concept will inform a refined cost estimate 5

Existing Design 10 th St to 12 th St 87-88 right of way 4/5 lanes 15 sidewalks Shared bike lane Washington Ave to 10 th St 98-100 right of way 4/5 lanes 20 sidewalks Shared bike lane 6

Project Components Sidewalk area Able to support pedestrian activities with space for planting and furnishing zones Transit facilities Space for enhanced shelters, real-time departure signs, and long-term arterial bus rapid transit (abrt) Bikeway design Protected bikeway separated from motor vehicle traffic Roadway design Maintain an acceptable level of service for transit and motor vehicles and foster a safe environment for all users 7

Concepts Evaluated Various Travel Lane Configurations Alternating 3/4 lanes 4 lanes 4 lanes with select left turn lanes Alternating 4/5 lanes Bikeway Design 1-way protected bike lane 2-way protected bike lane Other combinations of bikeway, travel lane, and transit design 8

Proposed Concept Washington Ave & 3 rd St 4 lanes + NB left turn lanes 14-18 sidewalks 7 protected bike lane 10 th St to 12 th St 4 lanes Ped & bike area design in process 4 th St to 10 th St 4 lanes 18 sidewalks 7 protected bike lane 9

Proposed Concept Pedestrian and bicycle design Segment Pedestrian Zone Street Width Base Proposed Base Proposed Washington Ave to 4 th St 20 14-18 59 48-58 4 th St to 10 th St 20 18 59 48 10 th St to 12 th St 15 In process 59 48 Segment Washington Ave to 10 th St Base Shared lane Bikeway Zone Proposed 7 protected bike lane at sidewalk level 10 th St to 12 th St Shared lane Protected bike lane design in process 10

Proposed Concept Motor vehicle and transit travel times Northbound (min) Southbound (min) Base Proposed Base Proposed AM Peak 6.9 7.6 6.6 7.2 Mid-Day 4.3 4.5 5.3 5.4 PM Peak 10.3 9.4 7.8 8.4 Northbound (min) Southbound (min) Base Proposed Base Proposed AM Peak 12.2 13.1 13.6 14.1 Mid-Day 10.9 10.9 11.7 11.6 PM Peak 15.9 15.1 15.8 16.7 2040 travel time from Mississippi River to 16 th St Assume 0.25% annual growth in motor vehicle traffic 11

Proposed Concept 4 th St to 10 th St Block with no transit stop 18 pedestrian zone 7 protected bike lane at sidewalk level 48 roadway with 4 lanes Example protected bike lane at sidewalk level 12

Proposed Concept 4 th St to 10 th St Block with transit stop 18 pedestrian zone 7 protected bike lane at sidewalk level 48 roadway with 4 lanes Transit shelter and waiting area (narrower pedestrian and bike zone) 13

Proposed Concept Washington Ave to 4 th St NB left turn lane 14-20 pedestrian zone 7 protected bike lane at sidewalk level 48-58 roadway with 4-5 lanes Transit shelter and waiting area (narrower pedestrian and bike zone) 14

Proposed Concept 10 th St to 12 th St narrower right of way Draft - Pedestrian and bikeway design in process 15

Next steps April - Seeking feedback on proposed concept April 25 - Public meeting #2 Early June - Seek Council approval for preferred concept 2017-2019 - Additional engagement and detailed design Project Contact: Simon Blenski, Minneapolis Public Works 612-673-5012 Simon.Blenski@minneapolismn.gov Website: www.minneapolismn.gov/cip/future/wcmsp-172270 16