R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects

Similar documents
This report was financed, in part, by the U.S. Department of Transportation and the Florida Department of Transportation.

2017 LIST OF PRIORITY PROJECTS

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

DRAFT Transportation Congestion Management/Performance Measures Report

Planning & Development Services Division

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

NOTE: PLEASE SILENCE ALL BEEPERS AND CELL PHONES DURING THE MEETING!! AGENDA I. CALL TO ORDER / ROLL CALL / DETERMINATION OF QUORUM

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE

FDOT Northern US 19 - Pinellas County Strategic Intermodal System (SIS) Projects Updates

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

Regional Trails Corridor Assessment

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

2016 TELL THE TPO SURVEY

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012

Cost Feasible Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN

2012 PRIORITY TRANSPORTATION PROJECTS

Needs Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN

ATTACHMENT "A" ULTIMATE IMPLEMENTATION DESCRIPTION

Needs Plan and Cost Feasible Plan Amendment Report FLORIDA-ALABAMA 2040 LONG RANGE TRANSPORTATION PLAN

Prepared For: DIRECTION 2035 SHAPING OUR FUTURE SUMMARY REPORT JULY Prepared By: Staff to Bay County TPO

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

LIST OF PRIORITY PROJECTS

BICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION. Tel: (941) AGENDA

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

SUNRAIL FEEDER ROUTES BEGINS MAY 1 ST 2014

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

BOARD ACTION AGENDA ITEM #VI PROJECT PRIORITIES

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

CHARLOTTE COUNTY PUNTA GORDA MPO

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

FY FY 2023 Bay County TPO Project Priorities

LIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

Appendix B. Transportation Analysis. B.1 Summary. East Nassau Employment Center DSAP

Route 29 Solutions Projects

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP

UNFUNDED PRIORITY PROJECTS

FM #: ETDM #: 11241

7.0 Preferred Alternative with Service Road Concept

Malabar Road (SR 514) PD&E. Town of Malabar Briefing (July 17, 2017)

DeSoto County. Fiscal Years FDOT Draft Tentative Five Year Work Program Project Highlights

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

State Road (S.R.) 61 (U.S. 319) FPID s and

Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2024

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

State of the System Report. Agenda. Trends Summary. Corridor Analysis. Safety Analysis

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) FY 2018 TRANSPORTATION PROJECT PRIORITIES FY FY 2023 (ADOPTED JULY 13, 2017) A(1)

Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2023

ATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018

LIST OF PRIORITY PROJECTS 2020/ /35

Hillsborough MPO List of Priority Projects 2016/2017 Transportation Improvement Program Table 1: EXISTING PRIORITIES FUNDED FOR CONSTRUCTION

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

Design Traffic Technical Memorandum

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

A: PLANNED P ROJECTS PROJECTS

APPENDIX L: COST ESTIMATING TOOLS

2017 (FY 21,22,23) Ohio CMAQ Prioritization

Waterford Lakes Small Area Study

INTERSECTION CONTROL NOVEMBER 2018

PART FIVE. Systems Management, Operations and Maintenance

Project Description Form 8EE

County of Fairfax, Virginia. Department of Transportation

Project Budget and Schedule Status

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

CHAPTER 5 TRANSPORTATION GOAL

Culpeper District. Albemarle County Monthly Report September, 2011

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Gandy Connector: Travel Demand. Policy Committee August 2013

Bluffdale/ UDOT South High-T Intersection Project Type Operations

2017 (FY 21,22,23) Ohio CMAQ Project Selection

Diamond Springs Parkway Project

INTRODUCTION. Specifically, the objectives are to:

Emerald Coast Home Show. Public Outreach Event to Solicit Citizen Input on the FY14-18 Project Priorities

Casablanca Boulevard & GO Station Access

Orange County s Transportation Planning and Multimodal Corridor Plan

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

Transportation Committee Project Priority List

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Financial Project ID No(s).: and ETDM No(s).: and 14181

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015

Chapter 5. Financial Analysis

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

2040 Long Range Plan Projects Draft October 2011

AGENDA I. CALL TO ORDER/ROLL CALL/DETERMINATION OF QUORUM/PLEDGE OF ALLEGIANCE

Application of a Complete Street

FY 2018-FY 2022 Florida-Alabama TPO Project Priorities

Transcription:

Printed 6/9/15 Project I-4 - widen to 1 lanes (Managed Use Lanes) Part of the I-4 Beyond the Ultimate project SR 47 - widen from 4 to 6 lanes (including ramps) Saxon Blvd - ramp and roadway improvements Rhode Island extension SR 15 (US 17) - widen to 4 lanes SR 4 - widen to 6 lanes SR 4 - widen to 4 lanes SR 4 - widen to 4 lanes SR 15 (US 17) Preliminary Design and Engineering (PD&E) SR 1 - widen to 6 lanes I-95 Interchange/Maytown Rd (Farmton Interchange) RCTPO 4 LRTP Draft Project List as Approved by the TPO Board (June 4, 15) Strategic Intermodal System (SIS) Projects Limits (from - to) Est. Cost (PDC) * (in millions) Seminole County to SR 47 $51. Add managed-use lanes - public private partnership Graves Ave to Kentucky/MLK Blvd $6. Road/Intersection (I-4 Beyond the Ultimate) I-4 to Normandy Blvd $33.5 Saxon Blvd widening to 3 lanes from EB ramps terminal to Normandy Blvd (I-4 Beyond the Ultimate) Veterans Memorial to Normandy Blvd $15.5 Extend Lane with & overpass (I-4 Beyond the Ultimate) Ponce DeLeon Blvd to SR 4 r e $39.4 Construction only & includes 1 foot multi-use trail Williamson Blvd. to Breakaway Trails $3.4 (Note: Funded in Other Arterial Category) not in FDOT's SIS Cost Feasible. Includes 1 foot multi-use trails Cone Road to SR 11 $43.8 Includes 1 foot multi-use trail SR 11 to SR 15 (US 17) $37.9 Includes 1 foot multi-use trail SR 4 to Putnam Co. line $. Safety study Old Kings Road to Belle Terre Parkway $34.87 (Note: Funded in Other Arterial Category) not in FDOT's SIS Cost Feasible I-95 & Maytown Road $1.9 New interchange ($1.9 Developer funded) Notes I-95 Interchange /US 1 interchange modifications I-95 Interchange/LPGA interchange modifications I-95 Interchange/SR 44 interchange modifications I-95 Interchange/Pioneer Trail new interchange at I-95 & SR 5 (US 1) SIS Needs $8. Interchange improvements/safety & Capacity Williamson Blvd to Tymber Creek Ext $. Interchange improvements/safety & Capacity at I-95 & SR 44 $15. Interchange improvements/safety & Capacity at Pioneer Trail $. Interchange Justification Report (IJR) underway by FDOT * Present Day Costs Page 1

Printed 6/9/15 SR 4 - widen to 6 lanes SR 1 - widen to 6 lanes Project RCTPO 4 LRTP Draft Project List as Approved by the TPO Board (June 4, 15) Other Arterial Projects List Limits (from - to) On System (State Roadways) Projects Williamson Blvd. to Breakaway Trails $34. Total Funding Available Est. Cost (PDC) * (in millions) $43. Estimated Funding Available (Present Day Value); 8.1% of funding $3.4 SIS project not currently funded in FDOT's Cost Feasible Plan (Includes 1 foot multi-use trail) Old Kings Road to Belle Terre Parkway $34.87 SIS project not currently funded in FDOT's Cost Feasible Plan Notes SR 483 (Clyde Morris Blvd) - widen to 6 lanes SR 44 - Misc. upgrades to improve access to DeLand Sunrail US 9 - widen from 4 to 6 lanes SR 6/SR 15 (US 17/9) - emerging SIS SR 44 extend roadway (Edgewater to Deltona) Local Corridor Initiatives Old Kings Rd - widen from to 4 lanes Old Kings Rd - extension roadway (Phase II) Commerce Pkwy Connector Road - new lane roadway Matanzas Woods Pkwy (west) widen to 4 lanes LPGA - widen to 3 lanes Howland Blvd. - widen to 4 lanes North Entrance DeLand Airport (Industrial Park) SR 4 (Beville Road) to US 9 $3.6 Construction only SR 15A to the DeLand SunRail Station $19.1 SR 44 Study completed I-4 EB Ramps to CR 415 (Tomoka Farms Rd) $5.8 ROW/Construction only - design completed SR 47 to SR 15A (Taylor Road) $35. Intersection/corridor improvements SR 44 to SR 415 - alignment not set $1. PD&E/PE Total Estimated Costs (PDC) On System $185.7 Off System Projects Balance $58.14 Palm Coast Parkway to Forest Grove Dr. $14.85 Add thru lanes Available for On System projects; including complete streets, roundabouts, major ITS projects to improve capacity and safety $6.8 Estimated Funding Available (Present Day Value); 19.99% of funding Matanzas Woods Pkwy to Old Kings Rd $5. New 4-lane roadway/row programmed $6, SR 1 to SR 5 (US 1) $4.7 Construction only finding/row donated/6% plans completed SR 5 (US 1) to Southbound I-95 ramps $16.3 PE completed/design funded FY 17/18 Nova Road to US 1 $9.9 Providence Blvd to Elkcam Blvd. $13. Add lanes Industrial Drive to SR 11 $1.7 New lane access road Total Estimated Costs (PDC) - Off System $63.9 Improve segment to three lane section with turn lanes, improved bike and pedestrian facilities Balance -$3.1 Available revenue TBD based on further cost estimates Page