Form 21 Mechanical Integrity Test

Similar documents
COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES

Colorado Oil and Gas Conservation Commission

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions

Disposal/Injection Well Pressure Test Report (H-5)

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production?

OIL/GAS WELL COMPLETION REPORT. Well Name and Number Surveyed elevation (feet): KB GL

WELL SUSPENSION AND ABANDONMENT GUIDELINES AND INTERPRETATION NOTES OFFICE OF THE REGULATOR OF OIL AND GAS OPERATIONS

Reclassification and Recompletion

Practice Exam IADC WellSharp Driller and Supervisor

Mechanical Integrity Assessment Training

Casing Design. Casing Design. By Dr. Khaled El-shreef

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

FREQUENTLY ASKED QUESTIONS

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

MIA Training Example (Catalano 2H)

BIMBAR INFLATABLE PACKERS AND ACCESSORIES

TECHNICAL DATA. than the water inlet pressure to the concentrate

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

APPS Halliburton. All Rights Reserved. AUTHORS: Mandeep Kuldeep Singh and Josh Lavery, Halliburton

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

Standard Operating Procedure Measuring & Testing Equipment

Perforations Cleanup with Surge Chambers to Increase Well Productivity SLAP Jorge Patino, Halliburton. Oct 18 th, 19 th & 20 th, 2016

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Acoustic Liquid-Level Determination of Liquid Loading in Gas Wells

CHDT Cased Hole Dynamics Tester. Pressure testing and sampling in cased wells

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Oil Well Potential Test, Completion or Recompletion Report, and Log

Hydro-Mech Bridge Plug

OCEAN DRILLING PROGRAM

Kerry A. Pollard Texstar Midstream Utility, LP Gallon E. Gray Phillip Zamzow EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

RUPTURE HAZARD OF PRESSURE VESSELS

Directive 059: Well Drilling and Completion Data Filing Requirements

Fisher DVI Desuperheater Venturi Inline

E NGINEERED C EMENTING S OLUTIONS

Representing EXAMINERS REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

PETROLEUM: Well operations and well examination schemes

Dynamic IPR and Gas Flow Rate Determined for Conventional Plunger Lift Well

Acoustic Liquid Level Testing of Gas Wells

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Oil Well Potential Test, Completion or Recompletion Report, and Log

LARGE DRY CHEMICAL, TWIN-AGENT, AFFF, HALON 1211, AND AQUASONIC (NITROGEN-OPERATED SYSTEMS) Pressure Regulator Test Manual

DB Bridge Plug. Features. Benefits. Applications

Pasquale Imbò e Marco Pelucchi ENI S.pA;

Texas Administrative Code

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

SLAP-41 - SPE Perforating Gunshock Loads Prediction and Mitigation

Oil Well Potential Test, Completion or Recompletion Report, and Log

WELLHEADS, FLOWLINES & GAS LIFT INJECTION SYSTEMS

VortexFlow DX (Downhole) Tool Installation Instructions

MIA Training Example (Beattie No. 99)

Innovating Gas-Lift for Life of Well Artificial Lift Solution. The Unconventional Solution!

Piped Air SCBA Refilling System Standard

EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

TECHNICAL DATA PILOT PRESSURE REGULATED DELUGE SYSTEM CONTROLLED BY PNEUMATIC RELEASE. 1. DESCRIPTION (Refer to Figures 1, 2 or 3.

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve.

16. Studio ScaleChem Calculations

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

TECHNICAL DATA PILOT PRESSURE REGULATED DELUGE SYSTEM CONTROLLED BY ELECTRIC RELEASE 1. DESCRIPTION 2. LISTINGS AND APPROVALS 3.

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Well Testing Plan. New York Marginal Well Study. Introduction. I. Tests to be Conducted. II. Testing Procedures

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick

Trainer User Guide Submitting a Monthly Gallops Return

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

FAULT CODE TROUBLESHOOTING INDEX

CONTROL VALVE TESTING

31 st Gas-Lift Workshop

APPENDIX A1 - Drilling and completion work programme

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

PRODUCTION I (PP 414) ANALYSIS OF MAXIMUM STABLE RATE AND CHOKES RESOLVE OF OIL WELLS JOSE RODRIGUEZ CRUZADO JOHAN CHAVEZ BERNAL

TAM Single SeT inflatable

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

Yoke Block Instruction Manual

Enbridge G & P (East Texas) LP EXAMINER S REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

Vertical and Horizontal Bladder Tanks

INSTRUCTIONS FOR NAVIGATING TOPDOG

AWG Fittings LLC. Pressure Relief Valve Up to 250 PSI. Product Number Read this instruction manual before use.

MAXIMISE YOUR PRODUCTION FAST & EFFICIENT

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

Simplified Start-Up Checklist For Fully-Pressurized Seasonal Systems

KEM Scientific, Inc. Instruments for Science from Scientists

GAS SAFETY Information Bulletin

Retrievable Bridge Plugs

Gas Well De-Liquification Workshop. Denver, Colorado February 27 - March 1, Multi-Staging Wells. Chandler Frost Production Control Services

TECHNICAL DATA. Dry 132a. October 1, 2008

Gas Measurement Fundamentals Certification. Curriculum

STIPumpCard. User Manual

Pressure Reducing Control Valve w/ Hydraulic Check Feature

Presents the following instructional slide show:

Testing Services Overview

CLEANING, INSPECTION, AND TESTING OF SEWERS

Inventory User Guide

Technical

Pressure is our Business

Dynamic Underbalance (DUB)

PHE KE30-A8 WORKOVER PROGRAM

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH PNEUMATIC RELEASE

Barrier Philosophy for Wells on Gas lift and Ways of Reducing HSE Risks. Alan Brodie Feb 2011 For more info visit

Warning: NEVER ALTER TEST EQUIPMENT

Transcription:

Form 21 Mechanical Integrity Test Instructions for completing the Form 21, Mechanical Integrity Test for submission in eform. Required for eform submission Completed test form from field (please see Practices and Procedures - Mechanical Integrity Tests for detailed instructions for requirements) Document number from Field Operations Notice, Form 42 Mechanical Integrity Test(MIT) Pressure test (chart) for all non-witnessed mechanical integrity tests Document number for Field Inspection Report for witnessed tests The Wizard will require the operator number, well API number, test date and the submission date. eform will auto-populate the operator and well information based on these entries. eform will auto-populate the last approved MIT date from the COGCC database. The Operator Comments box are available the Submit tab. eforms divides each form into TABS Well/Location Tab (1 of 6) Mailing Info and well information: auto-populated by eforms from Operator Number in Form 21 Wizard (grayed out) Contact Name & Info: will need to be entered, should be the best person to answer questions about this form, being a Designated Agent is optional for this person can be the same person as listed on the Submit tab.

MIT Tab (2 of 6) Well type: this is either an idle production well or an injection well Test type: for a production well it is either VERIFICATION OF REPAIRS or SI/TA MAINTENANCE STATUS For an injection well there are four options - 5 YEAR UIC TEST, RESET PACKER, VERIFICATION OF REPAIRS, or ANNUAL UIC TEST

Injection/Producing Zone(s): this should be the shallowest open formation (there is a dropdown). Perforated Interval: this should be the perforations that correspond to the listed zone. This can be entered as a range, e.g. 7120 7177 For a cased hole without any perforations enter NP in this box Open Hole Interval: If the well completion is open hole instead of perforated, enter the open hole interval. This can be entered as a range, e.g. 7120 7177 Casing Test use when perforations or open hole is isolated by a bridge plug or a cement plug Bridge Plug or Cement Plug Depth: this depth should be the top of the bridge plug or cement plug (If cased-hole only (no perforations or open hole interval), this depth should be the plugback depth) Tubing Casing/Annulus Test - use when well has tubing and a packer (usual configuration for injection wells) If this test is performed, all of these entries are required tubing size, tubing depth and the top of the packer depth The Form 21 is looking for either the top of the packer depth or the bridge plug depth it will generate an error if both are filled-in. The correct depth is where the downhole segment is isolated.

Test Data Test Date date the mechanical integrity test was performed Well Status During Test dropdown to choose whether well shut-in or injecting during MIT Casing Pressure Before (psi) the MIT* this is the static pressure prior to pressurizing the casing for *For vacuum situations enter a -1 Initial Tubing Pressure (psi) this is the tubing pressure prior to pressurizing the casing for the MIT* Final Tubing Pressure (psi) this is the tubing pressure at the end of the MIT* Casing Pressure Start Test (psi) this is the pressure that the casing is pressured to to begin the MIT Casing Pressure 5 min (psi) casing pressure at 10 minutes into test Casing Pressure Final (psi) - casing pressure at the conclusion of the test (15 min) Pressure Loss or Gain During Test this is a calculated value. A passing test must show less than a 10% loss or gain. Test Witnessed by State Representative dropdown to choose if test witnessed by state representative. A state witnessed test will require the Field Inspection Report Document number to be included as a Related Form. OGCC Field Representative - dropdown with field inspectors and engineering represented. If the well is an injection well under EPA jurisdiction, please enter EPA as the inspector.

Submit Tab (3 of 6) OPERATOR COMMENTS AND SUBMITTAL please provide any comments that may be pertinent to the MIT Submitter s Information checkbox if same as Contact will auto populate with the same information as provided for Contact. All three boxes are required to be filled-in. Related Forms Tab (4 of 6) Related Forms - the Form 42, Field Operations Notice for MIT is a required Related Form for submission of the Form 21. If the MIT was witnessed by a state representative, the Field Inspection Report Document number is also a required Related Form. Attachments Tab (5 of 6)

eform will auto populate the FORM 21 ORIGINAL once the form is submitted. A Pressure Chart should be included for those wells that were not witnessed by a state representative and should be included if one was run as part of the MIT. Temperature or tracer surveys can also be attached. Review Tab (6 of 6) Internal review tab for the form approval.