PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT FLUSHING REPORT

Similar documents
SECTION PRESSURE TESTING OF PIPING

CLEANING, INSPECTION, AND TESTING OF SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS

Pumping Systems for Landscaping Pumps, Controls and Accessories. Mark Snyder, PE

DW Module 8: Distribution Answer Key

SECTION 25 TESTING AND DISINFECTING WATER MAINS General

Simplified Start-Up Checklist For Fully-Pressurized Seasonal Systems

SECTION DOMESTIC WATER PIPING

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc.

22. Specialty Valves.

1020 Industrial Drive, Orlinda, TN fax

ETL listed for installations within 5 ft. (1.5M) of outer edge of water

SECTION ACCEPTANCE TESTING FOR SANITARY SEWERS

1 Exam Prep NSF/ANSI Tabs and Highlights

Swimming Pool Plans and Specification Report

RESIDENTIAL IRRIGATION WORKSHOP IRRIGATION 101 AND BEYOND FOR WEST BENCH RESIDENTS

TECHNICAL DATA. Q= Cv S

ASSE International Product (Seal) Listing Program

Watermain Replacement and Connection Procedure

HYDRANT/WATER POINT INSPECTION AND MAINTENANCE

HYDROSTATIC LEAK TEST PROCEDURE

Watermain Replacement and Connection Procedure

Office Use Only Fee Paid

TECHNICAL DATA. Q = C v P S

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

Watermain Replacement and Connection Procedure

Warning: NEVER ALTER TEST EQUIPMENT

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

SELECTION & APPLICATION

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S

STATIONARY SPRINKLER IRRIGATION SYSTEM

2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A

III. Identify the initial installation requirements for standpipe systems

Public Swimming and Bathing Facilities Operators Guide 2018

Combination Air Valve

VB-7323 Series. Application. Features. Applicable Literature. 1/2 to 2 Screwed NPT Three-Way Diverting Valves General Instructions

APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN

Chapter 9 System Design Procedures

SITE WATER UTILITY DISTRIBUTION PIPING

Joint Expo 2012 February 7-8, 2012 BASIC HYDRAULICS

S & M Water Consultants

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

Dual Solenoid Gas Valve Installation

TECHNICAL DATA. Q = C v P S

PHYSICAL FACILITIES Consultant s Handbook Division 33 Utilities 1300 Disinfecting Underground Potable Water Piping.

Private Swimming Pool Permit Application

FIRE FIGHTER II SKILL PERFORMANCE CHECK SHEETS NFPA FIRE FIGHTER II SKILL STATION MENU

TECHNICAL DATA. Q = C v P S

DRS4-RM Manual. Set Up Instructions for DRS4 Series Single Tank

Dean Pump Self-Priming Chemical Process Pumps

Installation of Your SprayMaster System

VACUUM TESTING PRECAST CONCRETE MANHOLES

BUTTERFLY VALVES Series 800

S300 Series. Valve Link. Features. Fisher Controls

List of Forms. Form Description Page No. Form Commercial Swimming Pool Discharge Application Form 31-4

TECHNICAL DATA. Q = C v P S

Standard Operating and Maintenance Instructions for Pumping System Model PS-90

SECTION BUTTERFLY VALVES

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

Water Distribution Study Guide Class II (Made available by: Kansas Rural Water Association)

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE

Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION

WORCESTER COUNTY HEALTH DEPARTMENT PRE-OPENING GUIDE SEMI PUBLIC POOLS 1. POOL WALLS AND BOTTOM SMOOTH, LIGHT COLORED AND EASILY CLEANABLE. (.

Leak testing of Valves. Standards for acceptable Rates of Valve Leakage

WORCESTER COUNTY HEALTH DEPARTMENT PRE-OPENING GUIDE RECREATIONAL POOLS 2. DECK AND COPING MUST BE IN GOOD REPAIR AND PROPERLY DRAINED. (.

Deep Well Submersible Pump Model MSU/MSUS

ESCONDIDO FIRE DEPT TRAINING MANUAL Section DRIVER OPERATOR Page 1 of 14 Hydraulics Revised

Inert Air (N2) Systems Manual

Aquavar SOLO 2 Frequently Asked Questions

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

Backflow What is it? City Water. Boiler. Make-Up Water Line

Item 404 Driving Piling

Combination Air Valve Model

Irrigation System Winterization and Pressurization Procedures

UBEC 1AT. AUTO TANK Fill System Installation, Operation, & Setup Instructions

APPLYING VARIABLE SPEED PRESSURE LIMITING CONTROL DRIVER FIRE PUMPS. SEC Project No

Asheville s Fairview Water System Improvements: from Modeling to Contract Documents. April 19, 2016 Meg Roberts, PE

Nikuni KTM Series Pumps

TECHNICAL DATA. than the water inlet pressure to the concentrate

A centrifugal pump consists of an impeller attached to and rotating with the shaft and a casing that encloses the impeller.

CORROSION AT THE AIR-WATER INTERFACE REMOVE THE GAS

Water Management Plan For The Blue Ocean Golf Club

icon i150 / i350 Installation / Operation Manual

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

CITY OF ROSEVILLE DESIGN STANDARDS

FIRE LOGISTICS AND MATH EDUCATION A Rumpke Public Outreach Program

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

AIR-OPERATED DOUBLE DIAPHRAGM PUMP USER S MANUAL

Nikuni KTM Series Pumps

Nikuni KTM Series Pumps

Nikuni KTM Series Pumps

Idaho Fire Service Technology Pumping Apparatus Driver/Operator Skill Sheet: 1

Pool Inspection. Your Street San Diego, California Prepared for: Your Name Prepared by: Priority Inspection Service

Master Control Systems, Inc. Variable Speed Fire Pump Controllers

Des Plaines Fire Dept. Engineer Program

4 IN. BALL LAUNCHER Engine Mounted / PTO Driven

Transcription:

FLUSHING REPORT Project Name: : of Record: Date of Inspection: Date Gallons Minutes Gallons Location of Test Per Minute Flushed Flushed Number of pigs used:. Total Gallons Flushed Number of pigs retreived:. Water Sewer Residue in bucket: Yes No Reclaimed Signature Date Effective Date 10/01/2010 PSLUSD Doc No. 48

Project Name: : of Record: : Test Date: PORT ST. LUCIE UTILITY SYSTEM DEPARTMENT PRESSURE TEST REPORT Allowable Leakage Formula: (AWWA C600 / C605) L= S x D x P 148000 S = Length D = Pipe P = Test P Allowable Allowable Pipe Diameter Pressure (square root of P) Leakage Leakage Feet Inches psi 1 hour 2 hours Total Allowable Leakage Actual Leakage Location / Limits of Test: Water Wastewater Re-claimed Failed Passed Start Time: End Time: Signature Date Effective Date 10/01/2010 PSLUSD Doc No. 70

CHLORINATION TEST REPORT Project Name of Record Test Date: Description of disinfectant: Disinfectant meets AWWA criteria: Yes No All sample point locations have been verified to match the approved plans prior to chlorination: Yes No Sample points meet spacing requirements: Yes No Limits of test: All services, fire hydrants, blow-offs, and sample points chlorinated per specifications: Yes No Chlorination completed for entire project: Yes No : Signature Date Effective Date: 10/01/2010 PSLUSD Doc No. 71

DISINFECTION TEST RESULTS REPORT Project Name of Record Test Locations (sample points) Description of sample point Initial residual after injection of chlorine in ppm (minimum of 25 ppm) 24 hour chlorine residual (minimum of 10 ppm) Chlorine residual after flushing in (ppm) Pass/Fail Comments Chlorine injection Start Time Chlorine injection End Time Date: Chlorine flush Start Time Chlorine flush End Time Date: : Signature Date Effective Date 10/01/2010 PSLUSD Doc No. 72

FIRE HYDRANT FLOW TEST PSL Project No.: Project Name: : Contractor: Project Hydrant #: PSL Hyd. #: Date Tested: Coefficient Number (CN) * 0.88 * CN = 0.88 unless PSLUSD approves otherwise Diameter (D) in inches 2.5 Diameter of Hydrant Discharge (Typically 2.5") Static Pressure (SP) in psi Enter pressure prior to flushing Hydrant (psi) Residual Pressure (RP) in psi Enter pressure during flushing of Hydrant (psi) Pitot Pressure (PP) in psi Enter pressure reading on Pitot Guage (psi) Residual Flow (RF) in gpm at Residual Pressure Calculate RF=29.83 X CN X D 2 X (PP) 0.5 Fire Flow in gpm at 20 psi Calculate FF=RF X [(SP-20) (SP-RP)] 0.54 CN = Coefficient Number *Coefficient number is based on sharp square edge inlet types D = Diameter PP = Pitot Pressure SP = Static Pressure RF = Residual Flow RP = Residual Pressure FF = Fire Flow Comments: (Include location of residual pressure and pitot pressure. Attach map if necessary) Hydrant Repair Kit Received? YES NO TEST FAILS UNTIL KIT RECEIVED Pass Fail : Signature Date Effective Date: 10/01/2010 PSLUSD Doc No. 73

Project Name of Record Date Tested: PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT WIRE CONTINUITY & ELECTRONIC MARKER VERIFICATION TEST REPORT Length/size of WM tested: Length/size of FM tested: Length/size of Re-Claimed tested: All trace wire tested: Yes No Pass Fail All electronic markers verified: Yes No Pass Fail If not completed, list limits of test: Problem(s) found: Signature Date: Effective 10/01/2010 PSLUSD Doc No. 93

TELESPECTION TEST REPORT page of Project Name Date Tested: of Record Telespection Company: Verified running water downstream for each test Yes No Beginning End SVC SVC SVC SVC SVC SVC SVC SVC SVC Other MH # MH # L/R FT L/R FT L/R FT L/R FT L/R FT L/R FT L/R FT L/R FT L/R FT DIP Footage Problem Pass Fail Other Problem(s): A Excessive Sand/Silt B Leaking Service Signature Date C Damaged Pipe D Bad Joint Effective 10/01/2010 PSLUSD Doc No. 105

DEFLECTION TEST REPORT Equipment Used Mandrel Calibrated Laser Camera Date Calibrated: Project Name of Record Date Tested Main Main From To Pass or Diameter Length Structure Structure Fail 30 Days after backfill? Start Time: End Time: Signature Date Effective 10/01/2010 PSLUSD Doc No. 107

Project Name of Record Date Tested PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT GRAVITY SEWER / INTERCEPTOR / WET WELL INFIL / EXFIL TEST REPORT Allowable Leakage Formula: Gravity Sewer - 50 Gallons / per day (24 hours) / per inch diameter / per mile (5280 feet) Wet Well & Interceptor - 0 loss Structures Structure Structure Allowable Test Tested Diameter Depth Per Hour Allowable Main Main Main Allowable Test Tested Diameter Length Per Hour Allowable Services Service Service Allowable Test Tested Diameter Length Per Hour Allowable Infil Exfil Start Time: Total Test Allowable Actual Leakage End Time: Passed Failed Signature Date Effective Date 10/01/2010 PSLUSD Doc No. 109

Project Name of Record Date Tested: Diameter Depth Voltage Phasing Full Load Amps Pump HP FPL Meter Design GPM Design TDH Actual GPM Actual TDH Pump Manf/Model PUMP # 1 PUMP # 2 Generator on site YES NO Repair Kit turned over YES NO Start Up Fails until Kit turned over Plant able to communicate YES NO Plant can read guages YES NO Attendees: PORT ST. LUCIE UTILITY SYSTEM DEPARTMENT PUMP STATION START UP TEST REPORT Deficiencies: Passed Failed : Signature Date Effective 10/01/2010 Page 1 of 2 PSLUSD Doc No. 110

PUMP STATION START-UP WORKSHEET A = The measurement from the top of the water to the rim of the station after ending the pump draw down test. B = The measurement from the top of the water to the rim of the station before starting the pump draw down test. C = The measurement from the rim of the station to the center of the pressure gauge. D = The diameter of the station. PSI = Reading of pressure gauge. Formula: 1. (A ft B ft) x (D ft x D ft) x 7.481 x 0.7854 = Volume Displaced in gallons 2. A ft C ft = Total Static Lift (TSL) 3. PSI x 2.31 = Dynamic Head Pressure (DHP) 4. TSL + DHP = Total Dynamic Head Pressure (TDHP) Pump #1 Pump #2 A = inches feet A = inches feet B = inches feet B = inches feet C = inches feet C = inches feet D = inches feet D = inches feet PSI = PSI = PUMP #1 1.((A ft) (B ft) ) x (D ft) x (D ft) ) x 7.481 x 0.7854 = Volume Displaced (A-B ft) x (DxD ft) x 7.481 x 0.7854 = Volume Displaced 2. (A ft) /+ (C ft) = Total Static Lift (A-C if pressure gauge is below rim, A+C if pressure gauge is above rim.) 3. (PSI) x 2.31 = Dynamic Head Pressure 4. (TSL) + (DHP) = Total Dynamic Head Pressure 5. (PSI) x 2.31 = + Static Lift = Shutoff Head (Not for low pressure) (after start up, close valves in valve pit and pump against them for PSI) PUMP #2 1.((A ft) (B ft) ) x (D ft) x (D ft) ) x 7.481 x 0.7854 = Volume Displaced (A-B ft) x (DxD ft) x 7.481 x 0.7854 = Volume Displaced 2. (A ft) /+ (C ft) = Total Static Lift (A-C if pressure gauge is below rim, A+C if pressure gauge is is above rim.) 3. (PSI) x 2.31 = Dynamic Head Pressure 4. (TSL) + (DHP) = Total Dynamic Head Pressure 5. (PSI) x 2.31 = + Static Lift = Shutoff Head (Not for low pressure) (after start up, close valves in valve pit and pump against them for PSI) Effective 10/01/2010 Page 2 of 2 PSLUSD Doc No. 110

FINAL INSPECTION REPORT Project Name: Project #: Initial Inspection Date: : Utility Contractor: Reinspection Date: All grading complete Valve pads are level Discs are correct Valve lids painted correct color Valves turn freely Electronic Marker System balls in place Sample points removed and plugged Fire Service has hi/lo flow setup Fire service has chains and locks Mains have cover in swale areas Reflective PavementMarker's in place All necessary valves opened or closed Pumpstation fence has no damage Fence Gates open/close smoothly All pad locks in place Interceptors at grade Interceptors have correct lids Interceptor lids are labeled correctly PSLUSD Paperwork Package Accepted provide documentation - i.e. an email Y N N/A Y N N/A RPZ plumb and stable Meters set Meters locked All meters have separate curb stop Meters over 3" have hi/lo flow setup Blow off assemblies correct Fire hydrants paint not scufffed Fire hydrant meets clearances Hydrant chains intact Air Release Valve (ARV) ARV lid painted correct color ARV lid doesn't hit valve Landscape/Tree issues Concrete work has no damage Manholes at correct elevation Manholes are clean Manholes have correct lids Clean outs in place with covers Final Inspection Pass Final Re-Inspection Pass Comments Attendees Signature Date Effective Date 10/01/2010 04/03/15 PSLUSD Doc No. 111