Dundas. Plan Propose. ed North Northea Town

Similar documents
Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

Sixth Line Development - Transit Facilities Plan

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

4. ALTERNATIVE DESIGN

North Oakville. Terms of Reference for Transportation Impact Studies and Transportation Functional Design Studies

Chapter 3 BUS IMPROVEMENT CONCEPTS

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 5. February 2013

Town of Oakville Growth Areas Transportation Report

Dundas Street (Regional Road 5) Corridor Improvements Class EA. Welcome to Public Information Centre #3. Thursday, September 13, 2012

Dundas Street (Regional Road 5) Corridor Improvements Class EA Neyagawa Boulevard to Oak Park Boulevard. Welcome Public Information Centre

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

Decision on North Waterloo Routing

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

5 Transit & Traffic. Overview

Classification Criteria

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

Welcome. If you have any questions or comments on the project, please contact:

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

CPC Parking Lot Riverside Drive. Transportation Rationale

CITY OF SASKATOON COUNCIL POLICY

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

5 CIRCULATION AND STREET DESIGN

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

STONY PLAIN ROAD STREETSCAPE

Public Works and Infrastructure Committee. General Manager, Transportation Services

7 June 2018 OUR REF:

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

NEWMARKET CENTRE Mobility Hub Profile

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

Roadways. Roadways III.

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

2.0 LANE WIDTHS GUIDELINE

Corporation of the Town of Oakville. December 16, 2013

DON MILLS-EGLINTON Mobility Hub Profile

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton

Cycling Network Plan Implementation in Thorncliffe Park and Flemingdon Park

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

Multimodal Through Corridors and Placemaking Corridors

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Noise Assessment Technical Memorandum. City of Mississauga Rathburn Road Transit Priority Measures Transit Project Assessment Process

PALERMO TRANSIT TERMINAL LOCATION STUDY

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

SECTION 1 - TRAFFIC PLANNING

Roadway Classification Review

DUNDAS WEST-BLOOR Mobility Hub Profile

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

T A B L E OF C O N T E N T S

Welcome to the Open House

Traffic Control Signals - Cosburn Avenue and Cedarvale Avenue

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

S T A T I O N A R E A P L A N

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation. Overview of Issues

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

City of Tamarac, Florida Traffic Calming Policy

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.

Highway 111 Corridor Study

Donahue Drive Corridor Traffic Operational Evaluation

MASTER BICYCLE AND PEDESTRIAN PLAN

CITY OF VANCOUVER ADMINISTRATIVE REPORT

PEDESTRIAN ACTION PLAN

Frequently Asked Questions (FAQ)

Access Management Guidelines February 2013 THE CITY OF

Transportation Corridor Studies: Summary of Recommendations

DUNBOW ROAD FUNCTIONAL PLANNING

83 AVENUE PRE-CONSTRUCTION MEETING

Appendix B Transportation Report

CONNECTING PEOPLE TO PLACES

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

This chapter describes the proposed circulation system and transportation alternatives associated with

Station Plan: Penn & 43rd Avenue

Tonight is for you. Learn everything you can. Share all your ideas.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

Markham Sports, Entertainment and Cultural Centre Transportation Overview

Long Island Rail Road Expansion Project Floral Park to Hicksville

TECHNICAL MEMORANDUM. Introduction

Appendix G. Mavis Road / Sombrero Way Multi-Use Trail Design Alternatives

10.0 CURB EXTENSIONS GUIDELINE

122 Avenue: 107 Street to Fort Road

WELCOME TO OPEN HOUSE # 1 June 14, 2017

3.0 PROJECT DESCRIPTION

EL CAMINO REAL BUS RAPID TRANSIT PROJECT

Town of Milton. Derry Green Corporate Business Park Secondary Plan. Transportation Strategy Report Final. December 2010

ALLEY 24 TRAFFIC STUDY

Transcription:

Dundas Trafalgar Inc. Transit Facilities Plan Propose ed North Oakville Residential Subdivision Northea ast Corner of Dundas Street and Trafalgar Road Town of Oakville 12237 December 2012

Table of Contents 1 Introduction 1 2 Proposed Development 3 2.1 Land Use 3 2.2 Road System 3 3 Transit Streets 5 3.1 North Oakville East Transit Plan 5 3.2 Existing Transit Routes 5 3.3 Dundas Street Bus Rapid Transit 6 4 Transit stops 7 5 Conclusions 10 Figure Figure 1 Site Location 2 Figure 2 Preliminary Draft Plan 4 Figure 3 Functional Servicing Plan 9 Appendix Appendix A North Oakville Plans Appendix B Cross Sections Appendix C Transit Stops GHD Dundas Trafalgar Inc. Transit Facilities Plan December i

1 Introduction Dundas Trafalgar Inc. is filing a draft plan of subdivision application for Phase 1, 2 and 3 of the Dundas Trafalgar Inc. North Oakville Development located in the northeast quadrant of Dundas Street East and Trafalgar Road in the Town of Oakville, see Figure 1. These land form part of the North Oakville Secondary Plan. GHD was retained by Dundas Trafalgar Inc. to prepare a Transit Facilities Plan for Phases 1, 2 and 3 to confirm that the proposed subdivision development is consistent with the Town s transit plan for North Oakville. GHD Dundas Trafalgar Inc. Transit Facilities Plan December 2012 1

BURNHAMTHORPE ROAD EAST DUNDAS STREET EAST HIGHWAY 407 BURNHAMTHORPE ROAD EAST SITE DUNDAS STREET EAST SITE LOCATION NOT TO SCALE FIGURE 1

2 Proposed Development 2.1 Land Use Figure 2 shows the preliminary draft plan of subdivision provided by Bousfields Inc., dated December 10 2012. The subject lands are currently primarily agricultural and occupied by two small businesses. The surrounding lands are also primarily agricultural farmland to the north, east and west. The land to the south has been recently built-out with a mix of residential and commercial uses. The proposal is to develop approximately 2,000 townhouse/apartment units and a 0.859 ha commercial block. The Dundas Trafalgar Inc. lands are designated within the Town of Oakville s Official Plan (February 2008) as an urban residential area and are proposed to be developed and marketed as part of the Trafalgar Urban Core Area. 2.2 Road System The internal road system currently shows a modified layout from that contained in the North Oakville East Secondary Plan resulting in a discontinuous north-south avenue/transit corridor through the development. A proposed realignment within Phase 2 has converted Street A into two roads north (Street D ) and south (Street A ) of Street C. Street C intersects Street D and Street A approximately 90 metres and 315 metres east of Trafalgar respectively. The subdivision has one connection to Dundas Street through the subdivision to the south, identified as Street A. Street A is a north-south Avenue/Transit Corridor, opposite Postridge Drive, that extends from Dundas Street to Street C. The subdivision has two connections to Trafalgar Road through the subdivision to the west, identified as Street B and Street C. Streets B and C are both east-west roads that extend from Trafalgar Road to the subdivision s east boundary, they are classified as an Avenue/Transit Corridor and a Connector/Transit Corridor respectively. In the future, both transit corridors will extend through the entire North Oakville Secondary Plan. The subdivision has one connection through the subdivision to the north, identified as Street D. Street D is a north-south Avenue/Transit Corridor that extends from Street C to the subdivision s north boundary. In the future, this transit corridor will extend through future development to the north and intersect with Burnhamthorpe Road and the New North Oakville Transportation Corridor. Access to the Dundas Street and Trafalgar Road Urban Core blocks will be provided by internal local roads. GHD Dundas Trafalgar Inc. Transit Facilities Plan December 2012 3

NOT TO SCALE PRELIMINARY DRAFT PLAN FIGURE 2

3 Transit Streets 3.1 North Oakville East Transit Plan The North Oakville East Transportation Plan has identified the transit routes that are intended to serve the new development north of Dundas Street. Within the Dundas Trafalgar Inc. lands the transit routes include the Postridge Drive extension (Street A ) and Street D in the north-south direction and Streets B and C in the east-west direction. Street A intersects Street B and Street C approximately 315 metres and 620 metres north of Dundas Street respectively. Street C intersects Street D approximately 90 metres east of Trafalgar Road. The North Oakville East Transportation Plan is appended. Streets A and D are classified as Avenue / Transit Corridors and proposed to provide community (local) service. The right-of-way width is 22 metres with a pavement width of 12.5 metres. This leaves 4.75 metres for boulevard on each side. Transit stop facilities will be located in the boulevards. Street C is classified as a Connector / Transit Corridor and is also proposed to provide community (local) service. The right-of-way width is 19 metres with a pavement width of 9.5 metres. This leaves 4.75 metres for boulevard on each side. Transit stop facilities will be located in the boulevards. Local services provide the highest degree of local access at the neighbourhood level. Some routes will be very similar to many of the existing local routes, operating at similar levels of service. These routes provide direct access to lower demand and existing areas, and operate on the network of arterial, avenue and connector roads. Transit riders will use these routes to access local destinations, such as schools or shopping, and as connections to the corridor routes for longer trips. Street B is classified as an Avenue / Transit Corridor and proposed to provide secondary transit corridor service. The right-of-way width is 22 metres with a pavement width of 12.5 metres. This leaves 4.75 metres for boulevard on each side. Transit stop facilities will be located in the boulevards. Secondary transit corridors provide high level of service, operate on the grid network of streets and provide cross-boundary connections. Trafalgar Road and Dundas Street are classified as Major Arterial / Transit Corridors and proposed to provide bus-way corridor service. The mid-block right-of-way width is 50 metres with a pavement width of 28.4 metres; two travel lanes, one bus only lane and a parking lane in each direction. The boulevard width on each side varies. Transit stop facilities will be located in the boulevards. All units in the subdivision are located less than 150 metres from one of the Transit Corridors which define the planned transit service routes. Samples of the North Oakville roadway cross-sections are appended. 3.2 Existing Transit Routes Oakville Transit Oakville Transit operates one transit route in close proximity to the site with a bus stop located 45 metres north of English Rose Lane on Postridge Drive. Route #20 (Northridge) provides north-south through Oakville s Trafalgar neighbourhood with 30-minute frequency during the weekday peak hours, and 60-minute frequency during the weekend peak hours. The route provides service to/from the Oakville GO Station to the Uptown Core Bus Terminal. GHD Dundas Trafalgar Inc. Transit Facilities Plan December 2012 5

GO Transit GO Transit operates two routes along Trafalgar Road with a stop at the Dundas Street intersection, within 400 metres of the planned Street A intersection at Dundas Street. Route #20 (Milton/Oakville) provides north-south service along Trafalgar Road with one-way 60-minute frequency during the weekday a.m. peak hours from the Milton GO Station to the Oakville GO Station. During the weekday p.m. peak hours, one-way 60-minute frequency is provided from the Oakville GO Station to the Milton GO Station. There is no scheduled weekend bus service for this route. Route #46 (407 West) provides east-west via Trafalgar Road with 30-minute frequency during the weekday peak hours. The route provides service to/from the Oakville GO Station to York University. There is no scheduled weekend bus service for this route. 3.3 Dundas Street Bus Rapid Transit Halton Region with the City of Burlington and the Town of Oakville is carrying out a study to consider Bus Rapid Transit (BRT) within the Burlington and Oakville along Dundas Street and Trafalgar Road. The study provides an opportunity to develop improvements along both major arterials and other transit supportive corridors so that people living or working in Halton Region have a better alternative to automotive travel. The proposed infrastructure improvements will provide exclusive transit lanes on Dundas Street from Brant Street to Trafalgar Road, and on Trafalgar Road from the Oakville GO Station to the Oakville Highway 407 carpool lot. Curb BRT is preferred over Median BRT as it would provide slightly better BRT travel time and better integration with local transit services. The Trafalgar BRT Corridor study identifies potential far-side curb BRT stations at Street B on each side of Trafalgar Road. The Dundas BRT Corridor study identifies the closest potential BRT station at the Uptown Core Bus Terminal. GHD Dundas Trafalgar Inc. Transit Facilities Plan December 2012 6

4 Transit stops Bus stop type Based on the warrants for bus stop levels of amenities such as; boarding volumes, transfer locations, land use activity type, type of road and wait time. Stop types A-Sheltered Info, C-Comfort and D-Basic transit stops are warranted for this area. A Type D-Basic bus stop should provide the following standard amenities: Sign and post Route designation Route schedules Route map(s) Shelter pads A Type C-Comfort bus stop should provide the same as a Type D-Basic plus a bench. A Type A-Sheltered Info bus stop should provide the same as a Type C-Comfort plus a shelter, lighting and power pedestal. The physical space requirement for Types D, C and A are 3.25, 4.00 and 4.75 metres, respectively, from the front of curb, including the sidewalk, which can be accommodated within the 4.75 metre boulevard that is available on the roads. No additional property is required to provide the described bus stops. Recommended bus stop type exhibits are appended. Streets A & D The street distance between Dundas Street and the north limit of the subdivision is approximately 1200 metres. This transit corridor would provide community service with connections to primary and secondary transit corridors with 15-30 minute service frequency. North-south transit stops along Street A would be located at Dundas Street, Street B, Street C and mid-block approximately 150 metres north of Dundas Street. North-south transit stops along Street D would be located at Street C and approximately 80 metres south of the subdivision s north property limit at a local road T -intersection. Street C The street distance between Trafalgar Road and the east limit of the subdivision is approximately 390 metres. This transit corridor would provide community service with connections to primary and secondary transit corridors with 15-30 minute service frequency. East-west transit stops along Street C would be located at Trafalgar Road, Street C and Street D. GHD Dundas Trafalgar Inc. Transit Facilities Plan December 2012 7

Street B The street distance between Trafalgar Road and the east limit of the subdivision is approximately 390 metres. This transit corridor would provide secondary transit corridor service with connection to primary transit corridors and community (local) service with 10-15 minute service frequency. East-west transit stops along Street C would be located at Trafalgar Road, Street A and approximately 170 metres east of Trafalgar Road at a local road T -intersection. Figure 3 shows the Functional Servicing Plan - Transit Stop Locations when full transit service is provided along the transit corridor roads. Spacing of transit stops ranges from 110 metres to 250 metres. GHD Dundas Trafalgar Inc. Transit Facilities Plan December 2012 8

Ensure Connection Stop D Stop D Mid-Block Ensure Connection Stop C Stop D Stop D Far Side Stop D Stop D Stop D Ensure Connection Ensure Connection Stop A Stop D Mid-Block Stop D Stop C Stop C Stop C Stop C Ensure Connection Stop D Mid-Block Stop D Mid-Block Stop C Ensure Connection TRANSIT STOP COMMUNITY SERVICE SECONDARY TRANSIT CORRIDOR SERVICE BUSWAY CORRIDOR GO TRANSIT SERVICE FUNCTIONAL SERVICING PLAN TRANSIT STOP LOCATIONS FIGURE 3

5 Conclusions The transit facilities plan has evaluated conditions for the Dundas Trafalgar Inc. lands. The long term transit plan utilizes two Avenue/Transit Corridors in the north-south and east-west directions and a Connector/Transit Corridor in the east-west direction. These roads will form part of the continuous routes between Neyagawa Boulevard and White Oaks Golf Club (east-west), and between Dundas Street and the New North Oakville Transportation Corridor (north-south). The Dundas Trafalgar Inc. development is located adjacent to Dundas Street to the south, Trafalgar Road to the west and the Shield Bay subdivision to the east. This is consistent with the phasing objective of avoiding creation of lengthy transit routes with limited market. The number of residential units is 1,990, made up of a variety of dwelling types. All units are located less than 400 metres from one of the Transit Corridors which define the planned transit service routes. The proposed bus stops will be implemented at the maximum spacing of 250 metres along the transit routes. Based on the warrants for bus stop levels of amenities, Type A-Sheltered Info. Type C-Comfort and Type D-Basic stops are warranted for the area. Spacing of transit stops in ranges from 110 metres to 250 metres. Postridge Drive extension (Street A ) and Street B will be constructed prior to any occupancy in the subdivision. This will allow introductory transit service to be started whenever deemed appropriate. The actual route of initial transit service will be governed by the overall system services in operation at the time and practical integration of the new route. GHD Dundas Trafalgar Inc. Transit Facilities Plan December 2012 10

Appendix A North Oakville Plans

Exhibit 5A ~ North Oakville East Transportation Plan Town of Oakville 2009-08-14 Page 9

Appendix B Cross Sections

Appendix C Transit Stops

Exhibit 15 ~ Stop A, Sheltered Info Stop Page 22 2009-08-14 Town of Oakville

Exhibit 17 ~ Stop C, Comfort Page 24 2009-08-14 Town of Oakville

Exhibit 18 ~ Stop D, Basic Town of Oakville 2009-08-14 Page 25

GHD 6705 Millcreek Drive Unit 1 Mississauga Ontario L5N 5M4 Canada T: 416-213-7121 F: 905-890-8499 E: michael.dowdall@ ghd.com GHD 2012 This document is and shall remain the property of GHD. The document may only be used for the purpose for which it was commissioned and in accordance with the Terms of Engagement for the commission. Unauthorised use of this document in any form whatsoeverr is prohibited. \\mississauga2\sernastranstech\projects\2012\12237 MINTO TRAFALGAR DEVELOPMENTS\Reports\12237 Dundas Trafalgar Inc. Transit Facilities Plan Dec 20-12.docx Document Status Rev No. 0 Author Michael Dowdall Reviewer Name William Maria Signature Approved for Issue Name Signature William Maria Date Dec 20 2012

www.ghd.com