OTC and

Similar documents
SPE The paper gives a brief description and the experience gained with WRIPS applied to water injection wells. The main

OTC Copyright 2001, Offshore Technology Conference

An approach to account ESP head degradation in gassy well for ESP frequency optimization

Measurement & Analytics Wet gas monitoring

New power in production logging

Drilling Efficiency Utilizing Coriolis Flow Technology

Gas Injection for Hydrodynamic Slug Control

SPE Copyright 2012, Society of Petroleum Engineers

PRODUCTION I (PP 414) ANALYSIS OF MAXIMUM STABLE RATE AND CHOKES RESOLVE OF OIL WELLS JOSE RODRIGUEZ CRUZADO JOHAN CHAVEZ BERNAL

SPE Copyright 2001, Society of Petroleum Engineers Inc.

STUDY OF SLUG CONTROL TECHNIQUES IN PIPELINE SYSTEMS

Fail Operational Controls for an Independent Metering Valve

44 (0) E:

Novel empirical correlations for estimation of bubble point pressure, saturated viscosity and gas solubility of crude oils

29th Monitoring Research Review: Ground-Based Nuclear Explosion Monitoring Technologies

TWO PHASE FLOW METER UTILIZING A SLOTTED PLATE. Acadiana Flow Measurement Society

2600T Series Pressure Transmitters Plugged Impulse Line Detection Diagnostic. Pressure Measurement Engineered solutions for all applications

GAS LIFT IN NEW FIELDS

An innovative technology for Coriolis metering under entrained gas conditions

SPE Fuel gas supply (at the flowstations and gathering centers) and artificial lift gas supply for the lift gas compressors at GC1 are

Gas Gathering System Modeling The Pipeline Pressure Loss Match

Application Note AN-107

Impact of imperfect sealing on the flow measurement of natural gas by orifice plates

Paper 2.2. Operation of Ultrasonic Flow Meters at Conditions Different Than Their Calibration

Flow transients in multiphase pipelines

2007 Gas-Lift Workshop

RESIDENTIAL WATER DISTRIBUTION

Computer Simulation Helps Improve Vertical Column Induced Gas Flotation (IGF) System

The Future of Hydraulic Control in Water-Systems

The ERCB Directive 017 Overview

CoriolisMaster mass flowmeter Diagnostics, verification and proof test

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015

FLOWSIC100 Flare Challenges in Ultrasonic Flare meter field installations. History of Evolution

Prudhoe Bay Oil Production Optimization: Using Virtual Intelligence Techniques, Stage One: Neural Model Building

Injector Dynamics Assumptions and their Impact on Predicting Cavitation and Performance

International Journal of Technical Research and Applications e-issn: , Volume 4, Issue 3 (May-June, 2016), PP.

IBP2739_10 FIELD TEST OF A FLEXIBLE PIPE INTEGRITY MONITORING SYSTEM Jean-Philippe Roques 1, Benoit Balagué 1, Dominique Dion 2, Gregoire Audouin 2

Improve Process Reliability

Micro Motion Pressure Drop Testing

Intermittent Gas Lift and Gas Assist Plunger Lift

This portion of the piping tutorial covers control valve sizing, control valves, and the use of nodes.

Ron Gibson, Senior Engineer Gary McCargar, Senior Engineer ONEOK Partners

OLGA. The Dynamic Three Phase Flow Simulator. Input. Output. Mass transfer Momentum transfer Energy transfer. 9 Conservation equations

Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well

Fail operational controls for an independent metering valve

HOW TO MANAGE VAPORIZATION IN AN ANALYTICAL SYSTEM By Dean Slejko and Tony Waters

The M-Series Eletta Flow Meter High accuracy DP Flow Meter with multiple functions

Multiphase MixMeter. MixMeter specification. System Specification. Introduction

UNIVERSITY OF WATERLOO

ACCURATE PRESSURE MEASUREMENT FOR STEAM TURBINE PERFORMANCE TESTING

AC : MEASUREMENT OF HYDROGEN IN HELIUM FLOW

MEMORANDUM. Investigation of Variability of Bourdon Gauge Sets in the Chemical Engineering Transport Laboratory

Lab 3 Introduction to Quantitative Analysis: Pumps and Measurements of Flow

Fit for Purpose Compositional Input for Allocation Using Equations of State Thomas Hurstell, Letton Hall Group

Research and optimization of intake restrictor for Formula SAE car engine

Results and Discussion for Steady Measurements

TP Validating a dynamic grid model with tracer gas injection and analysis

36 th Gas-Lift Workshop. Reverse Flow Check Valve Reliability and Performance Testing of Gas Lift Barrier Check Valves

Pigging as a Flow Assurance Solution Avoiding Slug Catcher Overflow

GRUNDFOS industry GRUNDFOS CR MONITOR. Intelligent warning

Laboratory Hardware. Custom Gas Chromatography Solutions WASSON - ECE INSTRUMENTATION. Custom solutions for your analytical needs.

Transient Analyses In Relief Systems

DP Ice Model Test of Arctic Drillship

CHARACTERISTICS OF LEAK DETECTION BASED ON DIFERENTIAL PRESSURE MEASUREMENT

Gas-Well De-Watering Method Field Study

Retention Time Locking: Concepts and Applications. Application

Chapter 20. Planning Accelerated Life Tests. William Q. Meeker and Luis A. Escobar Iowa State University and Louisiana State University

Free Surface Flow Simulation with ACUSIM in the Water Industry

COMPRESSED AIR DISTRIBUTION SYSTEMS

Performance Monitoring Examples Monitor, Analyze, Optimize

Author s Name Name of the Paper Session. Positioning Committee. Marine Technology Society. DYNAMIC POSITIONING CONFERENCE September 18-19, 2001

RICK FAUSEL, BUSINESS DEVELOPMENT ENGINEER TURBOMACHINERY CONTROL SYSTEM DESIGN OBJECTIVES

FIRE PROTECTION. In fact, hydraulic modeling allows for infinite what if scenarios including:

ISOLATION OF NON-HYDROSTATIC REGIONS WITHIN A BASIN

Upgrading Vestas V47-660kW

Laboratory Hardware. Custom Gas Chromatography Solutions WASSON - ECE INSTRUMENTATION. Engineered Solutions, Guaranteed Results.

Advanced Test Equipment Rentals ATEC (2832) OMS 600

Validation of Measurements from a ZephIR Lidar

CALCULATING THE SPEED OF SOUND IN NATURAL GAS USING AGA REPORT NO Walnut Lake Rd th Street Houston TX Garner, IA 50438

Wind Regimes 1. 1 Wind Regimes

A Game Theoretic Study of Attack and Defense in Cyber-Physical Systems

WellTracer. East Texas Gas Producers Association. Carthage, Texas September 21 st, 2010

1 PIPESYS Application

Measurement of Water in a Wet Gas

The benefits of the extended diagnostics feature. Compact, well-proven, and flexible

Ingersoll Rand. X-Series System Automation

Gas lift optimization to improve well performance

Modelling Gas Well Liquid (Un)Loading

2. Determine how the mass transfer rate is affected by gas flow rate and liquid flow rate.

Improving distillation tower operation

Leakage Current Testing Is it right for your application?

WIND DATA REPORT. Paxton, MA

TG GUIDELINES CONCERNING CALIBRATION INTERVALS AND RECALIBRATION

Flare Gas Measurement in B.C., Alberta, and Saskatchewan Using GE Ultrasonic Metering Technology

Comparative temperature measurements in an experimental borehole heat exchanger. Vincent Badoux 1, Rita Kobler 2

Design Tapered Electric Submersible Pumps For Gassy Wells Desheng Zhou, SPE, Rajesh Sachdeva, SPE, IHS INC.

Validation Study of Gas Solubility Correlations at bubble point pressure for Some Libyan Crude Oils Using Three chosen Correlations

WATER OIL RELATIVE PERMEABILITY COMPARATIVE STUDY: STEADY VERSUS UNSTEADY STATE

Evaluation of Three Different Bubble Point Pressure Correlations on Some Libyan Crude Oils

The HumiSys. RH Generator. Operation. Applications. Designed, built, and supported by InstruQuest Inc.

Transcription:

OTC 15363 Software That Enables Flow Metering of Well Rates With Long Tiebacks and With Limited or Inaccurate Instrumentation Hallgeir Melbø 1), Svein Arne Morud 1), SPE; Bjørn Bringedal 2), SPE; Robert van der Geest 1), SPE; and Kjetil Stenersen 2). 1) ABB AS, Corporate Research Center in Norway, 2) ABB AS, Division Automation Technology; Contact addresses: Hallgeir.Melbo@no.abb.com and Bjorn.Bringedal@no.abb.com. Copyright 23, Offshore Technology Conference This paper was prepared for presentation at the 23 Offshore Technology Conference held in Houston, Texas, U.S.A., 5 8 May 23. This paper was selected for presentation by an OTC Program Committee following review of information contained in an abstract submitted by the author(s). Contents of the paper, as presented, have not been reviewed by the Offshore Technology Conference and are subject to correction by the author(s). The material, as presented, does not necessarily reflect any position of the Offshore Technology Conference or officers. Electronic reproduction, distribution, or storage of any part of this paper for commercial purposes without the written consent of the Offshore Technology Conference is prohibited. Permission to reproduce in print is restricted to an abstract of not more than 3 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of where and by whom the paper was presented. Abstract Accurate metering of flow rates and prediction of water breakthrough are important issues in offshore oil production. The multiphase flow rates can be found for instance from frequent well testing, from multiphase flow meters, or from software simulations. Multiphase flow meters are very expensive and so are single-well tests, especially in cases with long tiebacks. On the contrary, software simulations are cheap, they can be made accurate, and simulations can usually be based on existing sensors. Also, software is easy to install, operate, and maintain compared to hardware multiphase meters. In this article we describe the main components needed in a flexible software system for flow metering that can handle sparsely instrumented production facilities. Several sources of implicit information are pointed out, and a tuning strategy that avoids single-well tests is described. We also present examples that show the power of advanced simulations in situations that are not well handled by multiphase flow meters and standard software because of very low flow rates. What makes the situation in the examples even harder is that: There is no available information about the choke, the bottom hole sensors fail, and the temperature measurements are influenced by the seawater temperature. Despite this, good results are obtained. Introduction The offshore oil industry is facing a market where the number of brown fields is growing, and where more and more of the green fields are marginal fields. In addition, many of the new findings are on deep water. These facts all point in the direction of more production networks with long tiebacks, a stronger need for limiting the number of expensive well tests, and a push towards minimizing OPEX in general. The need for reliable monitoring of the production from each well in a production network is therefore continuously increasing. Furthermore, reservoirs may have more than one owner, whereas the various owners may share the same infrastructure and production facilities. In such cases reliable production monitoring is of course highly demanded. A software system for flow rate estimation may satisfy the above needs. Software is relatively cheap, and both installation and usage can be made very easy. Furthermore, software is easily maintained and supervised from remote, whereas hardware, such as a multiphase flow meter, usually needs to be maintained on the site. This is an important issue since many larger green fields are far away from where many of the oil companies expertise traditionally is situated. Remote access can easily be obtained using standard web browsers and internet technology. However, if the instrumentation is sparse or inaccurate most software systems will not give reliable rate estimates. In this article we will look at how to deal with such problems. We will present the main building blocks for a flexible software system that can handle almost any production network configuration. We also show how inaccurate measurements and what may look like useless information may contribute to good rate estimates. In addition it will be described how the software can be tuned without performing single-well tests. This is indeed valuable since it means that no well needs to be shut down to re-tune the production rate estimator. In cases with long tiebacks single-well testing may even be impossible. Finally we present examples from two wells on the British sector in the North Sea. The wells are sparsely instrumented, and additional major challenges arise due to low flow rates. For sufficiently low rates the pressure drop along the tubing does not give unique information about the actual flow. This causes difficulties for standard software, but the examples show that even this situation can be handled. The software used in the examples is ABB s Well Monitoring System, WMS. This software system has also been discussed in [3] and [4], and a similar software system is described in [2].

2 OTC 15363 Software and models A flexible software system for rate estimation should, as in most other applications, be made modular and reusable. The system needs to be configurable such that it can fit all relevant production facilities and such that it can adapt to changes in both production conditions and facilities. It needs to be easy to tune and use, both on the site and from remote, and it must provide secure handling of all data. On the modeling side the estimates should make efficient use of all available measurements that carry information about the actual flow in the production network, and this is what we will focus on in the following. The main components needed by state-of-the-art rate estimators for production networks are: Fluid and flow models for simulating the physical behavior inside each piece of equipment, measurements of physical properties of the actual flow, and an optimization algorithm for determining rates that give the best possible fit of the simulated values to the measured properties. The most central part in the simulation system is the fluid model. The system used in the examples applies a compositional model, which means the flow is subdivided into its separate hydrocarbon components. Each component has known physical properties, and the fluid model uses those to determine physical properties of the total flow at any given combination of pressure and temperature. This makes the model capable of handling almost any type of fluid in a unified way based on well-founded physical principles. The fluid model can be tuned using lab reports. In the examples the equation-of-state by Peng and Robinson was applied, see [6] and [5]. Once the fluid model is in place, a set of flow models needs to be selected. The purpose of these models is to estimate the change in physical properties when a given flow with given inlet conditions runs through a piece of equipment, e.g. a pipe, a choke, a venturi, or the near-well domain; see [1] for the state-of-the-art pipe models used in the examples. The current guess of rates, determined by the optimization algorithm, is let into the models through sources, for instance the reservoir providing produced oil, gas, and water, or the gaslift system providing lift gas. Finally, the simulated properties are compared to the actual physical measurements, which typically are pressures, temperatures, flow rates, etc. The mismatch between simulated and measured values provides the necessary information for the optimization algorithm to improve its temporary solution. However, the comparison of mismatches in different physical properties, e.g. pressure and temperature, is not a straightforward matter. To keep the number of different properties down one may choose to use raw measurements, such as the pressure drop across a venturi, instead of secondary values such as flow rate. Furthermore, the mismatches need to be weighted depending on the accuracy of the measurements and the models. Measurements Primary Measurements. Allocation of rates to each individual well in a network requires a set of physical measurements at corresponding points in time. Typical measurements used by the software system applied in the examples are pressures and temperatures. Also other types of measurements may be considered, such as capacitance, conductivity, and gamma ray absorbance. The obvious solution is then to interpret all mismatches in terms of statistical quantities such that all comparison is done in a unified framework. Classical tuning of models requires additional measurements such as measured single-well rates together with corresponding measurements used for allocation. In addition, detailed and accurate lab reports of the involved fluids are essential for tuning advanced compositional fluid models. Implicit information. Often measurements may seem less informative than one could wish for, but if the software is flexible such measurements may still be used. A typical example would be a gas lifted well with no working down-hole sensor. Rate estimation is a lot easier if there are working down-hole sensors available, but in this case the sensor may be replaced by measurements on the gaslift system. As long as the lift gas velocity is sub-sonic, the pressure at the point of gas injection can be computed provided the gaslift system has a venturi or other relevant equipment. This computed pressure may act as a down-hole pressure sensor, and the well can then be modeled with that point as the lowest point. To make use of all available information, one will in practice use both the measurements on the gaslift system and the down-hole sensor if all sensors are working. Another typical example is temperature measurements that are influenced by the seawater temperature. This often happens if the temperature probe is placed in the piping steel and the insulation outside the pipe is poor. Such measurements may seem almost useless. However, they can be made useful by constructing a heat transfer model for determining the fluid temperature as a function of measured temperature. Such models can easily be tuned from well tests, and as will be seen in the examples, this may be the only adjustment needed to provide a reliable piece of information based only on the existing equipment. At nodes in the production network a temperature measurement may provide especially useful information. We define a node to be the point where two or more flows meet. This can for instance be a manifold or a point where methanol or other fluids are injected. If at a point of methanol injection the rate and the temperature of the methanol are known, one can determine the production rate from the blending temperature. This eliminates all uncertainty in the heat transfer coefficient for the pipe, which is present in most other temperature calculations. Alternatively one could measure the concentration of the injected fluid after the blending, which would also determine the rate. A more obvious example is that the down-hole temperature at a given depth is often close to constant in time and space. Therefore, if a down-hole temperature sensor fails, the temperature can often still be regarded as known. Likewise, if no down-hole temperature sensor has ever been present in a well, it may still be found from a computed temperature gradient in the soil based on measurements from nearby wells. Yet another possibility is to use soft sensoring to tune the

OTC 15363 3 unknown reservoir temperature early in the production phase when all measurements are likely to be very accurate. This means that the reservoir temperature is treated as an unknown in the simulations, and thereafter it is assumed to be constant. The assumption about properties being constant in space may also be applied to the reservoir pressure if the connectivity in the reservoir is good. Then the reservoir pressure can be found during shutdown of one well, and the measured value may be used as reservoir pressure for all other wells that have a good connection to the one being shut down. A final and illuminating example is related to the pressure at nodes in a production network. It is obvious that the pressure at the outlet of the incoming flows must be the same, but it is easily overseen that this provides a new piece of information, a new equation that is, for each new flow which is connected to the node. A node with n inlet flows will therefore provide n-1 equations although there is no sensor at the node. Tuning models without single-well tests Single-well tests are generally very expensive, and they are especially costly in cases with long tiebacks. In such cases single-well testing may even be impossible due to flow assurance issues such as scaling or instabilities caused by low flow rates and low temperatures. The cost of such tests is one of the main reasons for installing software for estimating flow rates. As long as the software models are well tuned there is hardly any need for well testing. However, software models need tuning once in a while, and if this could be done without single-well tests it would be a great economical advantage. This is indeed possible, and the solution is to perform multirate tests, which is the focus of this section. Allocation can be viewed as an optimization problem where the deviation between simulated and measured data is to be minimized by adjusting the rates used in the models. On the other hand, classical tuning is also an optimization problem, where the rates are known from single-well tests and the deviation between simulated and measured data is minimized by adjusting the tuning parameters, e.g. roughness, heat transfer coefficients, etc. Multi-rate tuning is a mixture between allocation and classical tuning: The main idea is to avoid shutting down any well, and instead only change the flow rates from the individual wells to obtain a set of independent flow cases. For each of these cases the total flow rates and all other available flow measurements in the production network, typically pressures and temperatures, are recorded. All these test cases are now considered simultaneously and viewed as one large optimization problem where the free variables are the oil, gas, and water rate from each well for each test, and the tuning variables, which are the same for all tests. The solution that gives the best overall fit to the measured data provides the optimal tuning variables. The necessary changes in flow rates may be obtained by e.g. changing the choke positions, changing the lift gas rates, or by other means changing conditions affecting the individual flow rates. Let w be the number of wells, let f be the number of flowlines, let t be the number of tuning variables for well or i flowline number i, and let c be the number of independent test cases. We then get the following expression for the number of unknowns, N, in the multi-rate tuning problem: w f wc + N = 3 + t i. i= 1 The factor 3 represents the oil, gas, and water rate from each well. What is important to note is that the number of unknowns has a very limited growth with respect to the number of test cases, c. The number of equations for determining these unknowns depends on the instrumentation. Each measured rate and each measured pressure or temperature drop gives one equation. The number of equations therefore obviously grows with the number of test cases, and to obtain robust estimates it should be larger than the number of unknowns. This requirement can be stated more precisely as follows: It must be possible to assign at least one equation to each free variable such that the equation is sensitive to changes in the free variable and such that once an equation has been assigned to a free variable it cannot be assigned to any other free variable. In other words, one needs a sufficiently large number of independent equations, but the system does not need to be solvable as only a best-fit solution is sought. If the instrumentation is limited it is possible to reduce the number of unknowns by assuming the gas-oil ratio and/or the water-oil ratio to be constant for some of the wells in some of the test cases. If all wells are treated equally this reduces the factor 3 in the above equation to 2 or 1. Similar perturbation techniques are addressed in [7]. Examples In this section two examples will be considered, and the example wells will be referred to as Well A and Well B. Both examples are taken from a field on the British sector in the North Sea, and the wells have very limited instrumentation as can be seen from Figure 1. One thing to notice about the examples is that the measured flow rates are so low that the pressure information does not point towards one unique solution. However, utilizing temperature information the correct solution may still be identified, but most standard software is not capable of handling this. In one example there is a working down-hole pressure sensor, whereas in the other example there is no such sensor. We also show what happens if the working bottom hole sensor fails. The pressure and temperature measurements are logged with an accuracy of only 1 bar and 1 Kelvin, respectively, which are rather coarse scales. Tuning. In each of the examples the flow models are tuned using only a few of the measured data points which were made available from single-well tests. A general tuning was performed, and the optimal value of the overall heat transfer coefficient was also estimated. In addition, a model for the fluid temperature was made based on temperature measurements that, according to simulations, seemed to be affected by the seawater temperature. This model was tuned using 3 data points. The temperature model was only used for Well B.

4 OTC 15363 Well A. This well has a working down-hole pressure sensor, but the down-hole temperature is estimated from neighboring wells. In addition, there is a pressure and temperature sensor upstream of the choke. This information was used to predict the oil and water rate assuming the gas-oil ratio to be constant. The result is seen in Figure 2. There it is clear that the allocated oil rates are close to the measured ones, and the time of the water breakthrough is estimated correctly. Figure 3 shows the estimated and measured tubing head temperature and pressure drop as a function of oil rate. The figure clearly shows the non-uniqueness of the rate for a given pressure drop, both for the measured rates and for their estimated counterparts. However, the temperature drop ensures a unique solution. In Figure 4 is shown the results when the information from the down-hole sensor is left out. The tuning is the same as when the down-hole sensor was included. The pressure at the inlet is now left as a free variable, a soft sensor. In this case there is one equation less and we are forced to assume the water-oil ratio (WOR) to be known. In the example we have assumed WOR=, which is close to correct for most of the test cases. Well B. This well has no working down-hole sensor, and the down-hole temperature is estimated from neighboring wells. As for Well A the down-hole pressure is left as a free variable, since there is no information about its value. There is a working pressure and temperature sensor upstream of the choke, but what makes this case hard is that the seawater temperature influences the temperature measurement. As already mentioned a simple heat transfer model was made relating the measured temperature to the actual fluid temperature. This system provides only one equation and therefore only one unknown can be determined. An easy way of seeing this is to look at the tubing in the following way: The flow model for the tubing is simply a set of two ordinary differential equations, one for pressure and one for temperature, and there are three measurements available. Two of these are needed to provide a sufficient number of initial conditions, or rather control points, and the third measurement provides an equation for determining one unknown. We have chosen to assume the gas-oil ratio to be known and that WOR=. These assumptions are close to being satisfied in all the test cases in this example. The results are shown in Figure 5. The estimated oil rate is very close to the measured one although the instrumentation is extremely sparse and inaccurate. The relation between the measured and calculated oil rate and the tubing head temperature is shown in Figure 6. This figure also shows the relation between measured and calculated oil rate and the tubing head pressure. Note that hardly any information about the oil rate can be extracted from the measured tubing head pressure. advantages of such a software system are: It reduces the need for well testing, it is accurate and cheap, it may be based on existing sensors, and it can be monitored and maintained from remote. Furthermore, it has been shown how low quality measurements can be used for rate estimation, and how the software can be tuned without performing single-well tests. We have shown through two examples that it is possible to obtain good results also in cases where the pressure information does not identify a unique solution, even with both oil and water rates as free variables. Good results were obtained with limited instrumentation and with temperature measurements containing significant (systematic) errors. Usually more measurements are available, which gives a more accurate and robust solution and less dependence on the accuracy of each individual sensor. Nomenclature Abbreviations BHP Bottom hole pressure (= down-hole pressure) BHT Bottom hole temperature (= down-hole temperature) OPEX Operational Expenditure THP Tubing head pressure THT Tubing head temperature WOR Water-oil ratio Units d m day meter References [1] Barnea, D., A unified model for predicting flow pattern transitions for the whole range of pipe inclinations, Int. J. Multiphase Flow (1987), vol 1, pp.1-12. [2] Berg, K., Davalath, J., Field applications of Idun production measurement system, OTC 147 (22). [3] Van der Geest, R., Broman Jr., W.H., Johnson T., Fleming, R.H., and Allen, J.O., Reliability through data reconciliation, OTC 13 (21). [4] Van der Geest, R., Morud S., and Zaostrovski, A., Oil well allocation: the ultimate interpolation problem, in Preprints ADCHEM 2 International Symposium on Advanced Control of Chemical Processes, IFAC International Federation of Automatic Control (2), pp. 443-448. [5] Lobato-Barradas, G., Dutta-Roy, K., Moreno-Rosas, A., Ozgen, C., Firincioglu, T., Integrated compositional surface-subsurface modeling for rate allocation calculations, SPE 74328 (22). [6] Whitson, C., SPE Phase behavior monograph, Society of Petroleum Engineers (1999). [7] Zakarian, E., Constant, A., Thomas, L., Gainville, M., Duchet- Suchaux, P., Grenier, P., Deep offshore well metering and permutation testing, OTC 149 (22). Conclusion In this article we have presented a concept for building a software system for estimating flow rates from individual wells in oil production networks. The concept is suitable also for sparsely instrumented production facilities. The main

OTC 15363 5 Appendix A: Figures Well A Well B P,T P,T * P,T * T * Figure 1. Instrumentation in Well A and Well B. P indicates a pressure measurement and T indicates a temperature measurement. An asterisk indicates that the measurement is in some way modeled. The bottom hole temperatures are modeled from temperatures in nearby wells, whereas the tubing head temperature in Well B is measured, but the measurement is influenced by the seawater temperature.

6 OTC 15363 Rate [m 3 /d] 2 15 1 5 Oil rate Oil rate calc Water rate Water rate calc 28.aug.99 6.des.99 15.mar. 23.jun. 1.okt. 9.jan.1 19.apr.1 Figure 2. Well A, working down-hole pressure sensor, no down-hole temperature sensor. The top two lines show the measured and calculated oil rate. The two lines at the bottom show the measured and calculated water rate. The bottom hole temperature is estimated from surrounding wells. THT [ o C] 9 85 8 75 7 65 6 55 5 Oil rate, THT Oil rate calc, THT calc 5 1 15 2 BHP-THP [bar] 17 16 15 14 13 12 11 1 Oil rate, BHP-THP Oil rate calc, BHP - THP calc 5 1 15 2 Figure 3. Well A, working down-hole pressure sensor. Left: Measured tubing head temperature plotted against measured oil rate, and calculated tubing head temperature plotted against the calculated oil rate. Right: The pressure drop in the well (bottom hole pressure tubing head pressure) plotted against oil rate. The plot shows measured pressure drop versus measured oil rate and calculated pressure drop versus calculated oil rate. In both cases the bottom hole pressure is measured. 2 Oil rate 15 Oil rate calc Rate [m 3 /d] 1 5 28.aug.99 6.des.99 15.mar. 23.jun. 1.okt. 9.jan.1 19.apr.1 Figure 4. Well A, down-hole sensor fails. Measured and calculated oil rates are plotted. The calculation does not make use of the down-hole pressure sensor values. Water rate is assumed to be zero. No re-tuning of the model.

OTC 15363 7 25 2 Rate [m 3 /d] 15 1 5 Oil rate Oil rate calc 9-feb-99 2-mai-99 28-aug-99 6-des-99 15-mar- 23-jun- 1-okt- 9-jan-1 19-apr-1 Figure 5. Well B, estimation of oil rate. No down-hole pressure sensor, no down-hole temperature sensor, tubing head temperature sensor is influenced by the seawater temperature, tubing head pressure sensor is working. The bottom hole temperature is estimated from surrounding wells, and the influence of seawater temperature on the tubing head pressure sensor is modeled. THT [ o C] 8 78 76 74 72 7 68 66 64 62 Oil rate, THT modeled Oil rate calc, THT calc 6 5 1 15 2 25 THP [bar] 35 3 25 2 15 1 5 Oil rate, THP Oil rate calc, THP calc 5 1 15 2 25 Figure 6. Well B. Left: The modeled tubing head temperature is plotted against the measured oil rate, and the calculated tubing head temperature is plotted against the calculated oil rate. On average the measured temperature deviates from the modeled temperature by about 15 Kelvin. Right: The measured tubing head pressure is plotted against the measured oil rate, and the calculated tubing head pressure is plotted against the calculated oil rate.